SVD2 - Kyoto U

11
Status of BELLE upgrade Yoshikazu YAMADA (KEK-IPNS) at 44th KEKB Suishin Iinkai on June 11, 2001 Upgrade Points of Inner Tracker New Beam Pipe for IP SVD2 Small Cell Chamber

Transcript of SVD2 - Kyoto U

Status of BELLE upgradeYoshikazu YAMADA (KEK-IPNS)at 44th KEKB Suishin Iinkai on June 11, 2001

• Upgrade Points of Inner Tracker• New Beam Pipe for IP• SVD2• Small Cell Chamber

1. Upgrade Points of Inner Tracker•Better impact parameter resolution

Rbp : 2.0 cm→→→→ 1.5 cm ���� σσσσ∆∆∆∆z : 100 µµµµm →→→→ 75 µµµµm•Larger acceptance for SVD

Ladder length : 22 cm →→→→ 46 cm ���� 23º < θθθθ < 139º →→→→ 17º < θθθθ < 150º•Better tracking efficiency

RSVD-outermost : 6.0 cm→→→→ 8.8 cm ���� eff. of slow π :π :π :π :54 % →→→→ 77 %•More radiation hardness for SVD

VA1−−−−0.8 µµµµm →→→→ VA1−−−−0.35 µµµµm ���� 1 MRad →→→→ >5 MRad•Better trigger capability

•VA1 →→→→ VA1TA (VA1 with trigger)•Introduction of Level−−−−1.5 trigger in SVD FADC system•Introduction of Small cell chamber•Faster SVD / CDCsmallcell electronics���� trigger rate @ design current : 1400 Hz →→→→ 500? Hz

•Installation in Summer 2002

Design modificationBeam pipe : Rin = 2.0 cmSVD1 : R = 3.0, 4.5, 6.0 cmCDC : 3 layers of Cathode part

Beam pipe : Rin = 1.5 cmSVD2 : R = 2.0, 4.35, 7.0, 8.8 cmCDC : 2 layers of small cell chamber

Acceptance

17 º < θθθθ < 150 º

23 º < θθθθ < 139 º

2. New beam pipe for IP

~3.6~1.5~3≡≡≡≡1CDC 1st layer Occup.~660~80~130~40SVD 1st layer dose(krad/yr=107s)

~ 8~ 0.9~3≡≡≡≡1SVD 1st layer Occup.~75

4/2.0cm

SVD2Rbp=1.5cm

@design current

SVD2Rbp=1.0cm

@design current

SVD1.4Rbp=2.0cm

@design current

SVD1.4Rbp=2.0cm@ 0.6/0.8A

~50××××1.3?~100××××1.2?~100σσσσ∆∆∆∆Z (µµµµm)

5/1.5cm3/3.0cm3/3.0cm# of layers/R1st

•BELLE Executive Board discussed background issue and concluded Rbp=1.5 cm for SVD2 (Rbp=1.0 cm is too risky)

•Better cooling capability (He ���� PF200)•Under final design and will be fabricated by Apr. 2002

•Simulation study on beam background

~20cmHybrid

DSSD

ABC

DSSD

~2mREBO

MAMBO

REBO

REBOREBO

RAMBO

TTM

FADC/DSP(digitizing system)

Timing controland monitorreadout system

~30m

detector biaselectronicspower supply

total:~80k stripsTrigger rate Max 500Hz

128 input channels Control signalAnalog signal

640strip(one hybrid)/ADC-ch

Repeater system

BELLE electronics hut

In the BELLE complex

3. SVD2

DSSDFLEX

Hybrid

Ladder

Support structure

Electronics

•DSSD (Tokyo) : •delivered for 1st, 2nd and 3rd layers•designed for 4th layer and will be delivered from Sep. 2001

•FLEX (Taiwan) : •prototype delivered andtested with DSSD/VA1

•VA1TA/Hybrid (Princeton) :•prototype will be delivered and tested end of June

•Ladder assembly (KEK/Melbourne) :•under prototyping and final design•Ladders will be assembled by Apr. 2002

•Support structure (KEK) :•under prototyping and final design

79.6

28.4

Front-end Electronics

Level- sensitive

Discriminator

Semigaussian fast shaper

Monostable (fixed width)

Semigaussian slow shaper

Charge Integrator (preamp.)

S/H H 1 (s) H 2 (s)

vss

vdd

TriggerOut

TAVA1

Multiplexer

analog out

0

20

40

0 1000 2000 3000 4000 5000radiation dose (krad)

0pF 20pF 50pF

VA-0.35t=500ns

Gain vs. rad. dose

•VA1TA•Fast shaper and discriminator•Radiation hardness up to 10 MRad confirmed•2 or 4 analog output from a hybrid•will be delivered and tested end of June

0

500

1000

1500

0 2 4 6 8 10

EN

C (

elec

tron

s)

Radiation dose (MRad)

ENC(VA)

ENC(leak)

ENC(total)

Total noise vs. Radiation dose (3 DSSD)Expected noise for 3 DSSD ladder

•VA1-0.35 : tested with DSSD+FLEX to 5 Mrad

Backend Electronics

FADCOnline data

sparsification

Triggerlogicboard

Analogsignal

FPGA

Level-1.5 trigger

Flash-ADC module

8 hybrids/module(4098ch/module)

30 systems for 60 ladders.

Data rate after sparsification<0.3kB/s@1kHz trigger rate.

Backend electronics schematic diagram

•Repeater system (Krakow) : under final design•DC level shift for 2 or 4 analog signals from a hybrid •4 trigger signals from a hybrid

•FADC (Vienna) and Trigger (Princeton) : under final design

•PC farm for SVD DAQ (Taiwan/Frankfurt) : under test

4. CDC : small cell chamber•Prototype is being tested.•Final one will be fabricated by Dec. 2001.