3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498...

10
3.9 MW-30JD Mooring Winch MW-30JD Mooring Winch is single roller, its mooring positioned by drawing steel wire rope. As a important corollary equipment of Jack-up platform, it can be used of Jack-up platform positioning. Technical Parameter Load150/300/300kN (rst-layer ) Rated Speed18/9/4.5m/min(rst-layer ) Rope Diameter:φ38mm cope capacity: 900m Brake holding600kN Hydraulic System Pressure10MPa Motor TypeYZ280S-4/8/16-H Power56/56/27kW Rotate Speed1415/694/345r/min Supply Voltage380V/50Hz Working Time10/30/5min Degree of ProtectionIP56

Transcript of 3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498...

Page 1: 3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498 Project Name PANYU No.30-1 Project Client CNOOC Shenzhen Branch Project Start 2005.6

496

3.9 MW-30JD Mooring Winch

MW-30JD Mooring Winch is single roller, it’s mooring positioned by drawing steel wire rope. As a important corollary equipment of Jack-up platform, it can be used of Jack-up platform positioning.

Technical Parameter

Load:150/300/300kN (first-layer )Rated Speed: 18/9/4.5m/min(first-layer )Rope Diameter:φ38mmcope capacity: 900mBrake holding:600kNHydraulic System Pressure:10MPaMotor Type:YZ280S-4/8/16-HPower:56/56/27kWRotate Speed:1415/694/345r/min Supply Voltage:380V/50HzWorking Time:10/30/5minDegree of Protection:IP56

Page 2: 3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498 Project Name PANYU No.30-1 Project Client CNOOC Shenzhen Branch Project Start 2005.6

496

3.9 MW-30JD Mooring Winch

MW-30JD Mooring Winch is single roller, it’s mooring positioned by drawing steel wire rope. As a important corollary equipment of Jack-up platform, it can be used of Jack-up platform positioning.

Technical Parameter

Load:150/300/300kN (first-layer )Rated Speed: 18/9/4.5m/min(first-layer )Rope Diameter:φ38mmcope capacity: 900mBrake holding:600kNHydraulic System Pressure:10MPaMotor Type:YZ280S-4/8/16-HPower:56/56/27kWRotate Speed:1415/694/345r/min Supply Voltage:380V/50HzWorking Time:10/30/5minDegree of Protection:IP56

497

Offshore Equipment

4. Offshore Project List

4.1 Modular drilling rig

Project Name HZ19-3/2 Project (2 sets)

Client ACT-OG Operation Group

Project Start 2002.9

Project Complete 2004.10

Rig Type Fixed /Jacket platform

Operation Area South sea of PR.China

Responsibility☆ ZJ70D drilling rig system☆ Commissioning

Project Name Chunxiao gas field development

Client CNOOC Shanghai Branch

Project start 2002.9

Project complete 2004.7

Rig Type Fixed /Jacket platform

Operation Area East sea of PR.China

Responsibility☆ ZJ70D drilling rig system☆ Commissioning

Project Name NANBAO No.35-2 Project

Client China Oilfield Services Limited

Project start 2004

Project Complete 2005

Rig Type Fixed /Jacket platform

Operation Area Bohai Bay of PR.China

Responsibility☆ ZJ50D drilling rig system☆ Commissioning

Page 3: 3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498 Project Name PANYU No.30-1 Project Client CNOOC Shenzhen Branch Project Start 2005.6

498

Project Name PANYU No.30-1 Project

Client CNOOC Shenzhen Branch

Project Start 2005.6

Project Complete 2006.6

Rig Type Fixed /Jacket platform

Operation Area South sea of PR.China

Responsibility☆ ZJ70D drilling rig system☆ Commissioning

Project NameCOSL Mexico PEMEX Project(4sets)

Client China Oilfield Services Limited

Project Start 2006

Project Complete 2007.3/4/5/7

Rig Type Mexico Bay of PR.China

Operation Area Fixed /Jacket drilling platform

Responsibility☆ ZJ70D drilling rig system☆ Commissioning

Project Name BZ28-2S Drilling rig module

Client China Oilfield Services Limited

Project Start 2008

Project Complete 2009.1

Rig Type Fixed drilling platform

Operation Area Bohai Bay of China

Responsibility☆ ZJ50DB drilling rig system☆ Commissioning

Page 4: 3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498 Project Name PANYU No.30-1 Project Client CNOOC Shenzhen Branch Project Start 2005.6

498

Project Name PANYU No.30-1 Project

Client CNOOC Shenzhen Branch

Project Start 2005.6

Project Complete 2006.6

Rig Type Fixed /Jacket platform

Operation Area South sea of PR.China

Responsibility☆ ZJ70D drilling rig system☆ Commissioning

Project NameCOSL Mexico PEMEX Project(4sets)

Client China Oilfield Services Limited

Project Start 2006

Project Complete 2007.3/4/5/7

Rig Type Mexico Bay of PR.China

Operation Area Fixed /Jacket drilling platform

Responsibility☆ ZJ70D drilling rig system☆ Commissioning

Project Name BZ28-2S Drilling rig module

Client China Oilfield Services Limited

Project Start 2008

Project Complete 2009.1

Rig Type Fixed drilling platform

Operation Area Bohai Bay of China

Responsibility☆ ZJ50DB drilling rig system☆ Commissioning

499

Offshore Equipment

Project Name BZ19-4 Drilling rig module

ClientChina Oilfield Services Limited

Project Start 2008

Project Complete 2008.11

Rig Type Fixed drilling platform

Operation Area Bohai Bay of PR.China

Responsibility☆ ZJ50DB drilling rig system☆ Commissioning

Project Name JZ25-1S Drilling rig module

Client China Oilfield Services Limited

Project Start 2008

Project Complete 2009.2

Rig Type Fixed drilling platform

Operation Area Bohai Bay of PR.China

Responsibility☆ ZJ70DB drilling rig system☆ Commissioning

4.2 Jack-up drilling platform

Project Name CPOE No.1

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 1997

Project Complete 1997

Rig Type Jack-up drilling platform

Responsibility☆ ZJ50D drilling rig system☆ Commissioning

Page 5: 3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498 Project Name PANYU No.30-1 Project Client CNOOC Shenzhen Branch Project Start 2005.6

500

Project NameCPOE No.5 Jack-upDrilling Platform 

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2006

Project Complete 2007.9

Rig Type Jack-up drilling platform

Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning

Project Name CPOE No.6 Jack-up Drilling Platform

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2006

Project Complete 2007.11

Rig Type Jack-up drilling platform

Responsibility☆ ZJ70DB drilling rig system☆ Commissioning

Project NameCPOE No.7 Jack-up Drilling Platform 

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2007

Project Complete 2008.12

Rig Type Jack-up drilling platform

Responsibility☆ ZJ70DB drilling rig system☆ Commissioning

Page 6: 3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498 Project Name PANYU No.30-1 Project Client CNOOC Shenzhen Branch Project Start 2005.6

500

Project NameCPOE No.5 Jack-upDrilling Platform 

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2006

Project Complete 2007.9

Rig Type Jack-up drilling platform

Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning

Project Name CPOE No.6 Jack-up Drilling Platform

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2006

Project Complete 2007.11

Rig Type Jack-up drilling platform

Responsibility☆ ZJ70DB drilling rig system☆ Commissioning

Project NameCPOE No.7 Jack-up Drilling Platform 

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2007

Project Complete 2008.12

Rig Type Jack-up drilling platform

Responsibility☆ ZJ70DB drilling rig system☆ Commissioning

501

Offshore Equipment

Project Name CPOE No.8 Jack-up Drilling Platform

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2007

Project Complete 2009.1

Rig Type Jack-up drilling platform

Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning

Project Name CPOE No.9 Jack-up Drilling Platform

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2006

Project Complete 2008.12

Rig Type Jack-up drilling platform

Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning

Project NameCPOE No.10 Jack-up Drilling Platform 

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2006

Project Complete 2009。4

Rig Type Jack-up drilling platform

Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning

Page 7: 3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498 Project Name PANYU No.30-1 Project Client CNOOC Shenzhen Branch Project Start 2005.6

502

Project Name COSL931 Jack-up Drilling Platform

Client China Oilfield Services Limited

Project Start 2007

Project Complete 2008.1

Rig Type Jack-up drilling platform

Responsibility☆ZJ70DB Derrick,hoisting system,F-2200HL Mud Pump☆ Commissioning

Project Name COSL200FT Jack-up Rig(4sets)

ClientChina Oilfield Services Limited

Project Start 2008.12

Project Complete2009.4(2 sets)2009.6(2sets)

Rig Type 200FEETJack-up drilling platform

Responsibility☆ ZJ70 Drilling system(Drill Floor Design included)☆ Commissioning

4.3 Submersible Drilling platform

Project NameCPOE No.3 Submersible Drilling Platform 

ClientChina National Petroleum Offshore Engineering Co.,ltd

Project Start 2006

Project Complete 2007.5

Rig Type Submersible Drilling Platform

Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning

Page 8: 3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498 Project Name PANYU No.30-1 Project Client CNOOC Shenzhen Branch Project Start 2005.6

502

Project Name COSL931 Jack-up Drilling Platform

Client China Oilfield Services Limited

Project Start 2007

Project Complete 2008.1

Rig Type Jack-up drilling platform

Responsibility☆ZJ70DB Derrick,hoisting system,F-2200HL Mud Pump☆ Commissioning

Project Name COSL200FT Jack-up Rig(4sets)

ClientChina Oilfield Services Limited

Project Start 2008.12

Project Complete2009.4(2 sets)2009.6(2sets)

Rig Type 200FEETJack-up drilling platform

Responsibility☆ ZJ70 Drilling system(Drill Floor Design included)☆ Commissioning

4.3 Submersible Drilling platform

Project NameCPOE No.3 Submersible Drilling Platform 

ClientChina National Petroleum Offshore Engineering Co.,ltd

Project Start 2006

Project Complete 2007.5

Rig Type Submersible Drilling Platform

Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning

503

Offshore Equipment

Project Name CPOE No.33 Submersible Drilling Platform

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2008

Project Complete 2009.4

Rig Type Submersible Drilling Platform

Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning

4.4 Multi- functional drilling & workover platform

Project Name CPOE No.61 Workover Jack-up

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2003

Project Complete 2003

Rig Type Jack-up drilling platform

Responsibility☆ ZJ30DB Workover rig ☆ Commissioning

Project Name CPOE No.62 Workover Platform

ClientChina National PetroleumOffshore Engineering Co.,ltd

Project Start 2008

Project Complete 2009.2

Rig Type Jack-up drilling platform

Responsibility☆ ZJ30DB Workover rig ☆ Commissioning

Page 9: 3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498 Project Name PANYU No.30-1 Project Client CNOOC Shenzhen Branch Project Start 2005.6

504

Project Name CPOE No.63 Drilling/Workover

ClientChina National PetroleumOffshore Engineering Co., ltd

Project Start 2005

Project Complete 2006

Rig Type Jack-up drilling/workover platform

Responsibility☆ ZJ30DB Workover rig☆ Commissioning

Project Name COSL LIFTBOAT PROJECT

Client China Oilfield Services Limited

Project Start 2006

Project Complete 2008.1

Rig Type Multi-functional Jack-up platform

Responsibility☆ ZJ30DB Workover rig☆ Commissioning

4.5 Other type platform

Project NameJidong Artificial IslandSkidding Modular Rig(10 sets totally)

ClientChina National Petroleum Corporation

Project Start 2007.4

Project Complete4 sets finsihed in 2008.1,other6 sets are ready for delivery.

Rig Type Artificial Island drilling platform

Responsibility☆ ZJ70DB Modular Rig(EPC)☆ Commissioning

Page 10: 3.9 MW-30JD Mooring Winch - Bomcobras · ☆ ZJ50D drilling rig system ☆ Commissioning . 498 Project Name PANYU No.30-1 Project Client CNOOC Shenzhen Branch Project Start 2005.6

504

Project Name CPOE No.63 Drilling/Workover

ClientChina National PetroleumOffshore Engineering Co., ltd

Project Start 2005

Project Complete 2006

Rig Type Jack-up drilling/workover platform

Responsibility☆ ZJ30DB Workover rig☆ Commissioning

Project Name COSL LIFTBOAT PROJECT

Client China Oilfield Services Limited

Project Start 2006

Project Complete 2008.1

Rig Type Multi-functional Jack-up platform

Responsibility☆ ZJ30DB Workover rig☆ Commissioning

4.5 Other type platform

Project NameJidong Artificial IslandSkidding Modular Rig(10 sets totally)

ClientChina National Petroleum Corporation

Project Start 2007.4

Project Complete4 sets finsihed in 2008.1,other6 sets are ready for delivery.

Rig Type Artificial Island drilling platform

Responsibility☆ ZJ70DB Modular Rig(EPC)☆ Commissioning

505

Offshore Equipment

Project Name KANTAN No.3

Client Sinopec Shanghai Offshore Oil Bureau

Project Start 2008

Project Complete 2009.2

Rig TypeSemi-submersibledrilling platform

Responsibility☆ 7000 meters dynamic mast☆ Commissioning

Project Name COSL Deep water investigation ship

Client China Oilfield Services Limited

Project Start 2009.1

Project Complete in progress

Rig TypeDeep water investigation ship

Responsibility

☆ZJ50DB Drilling and Sampling System☆ Commissioning

Project Name Dubai EPC offshore jack-up project

Client Dubai

Project Start 2009.7

Project Complete in progress

Rig Type 300FT jack-up drilling platform

Responsibility EPC contract