3.9 MW-30JD Mooring Winch
MW-30JD Mooring Winch is single roller, it’s mooring positioned by drawing steel wire rope. As a important corollary equipment of Jack-up platform, it can be used of Jack-up platform positioning.
Technical Parameter
Load:150/300/300kN (first-layer )Rated Speed: 18/9/4.5m/min(first-layer )Rope Diameter:φ38mmcope capacity: 900mBrake holding:600kNHydraulic System Pressure:10MPaMotor Type:YZ280S-4/8/16-HPower:56/56/27kWRotate Speed:1415/694/345r/min Supply Voltage:380V/50HzWorking Time:10/30/5minDegree of Protection:IP56
496
3.9 MW-30JD Mooring Winch
MW-30JD Mooring Winch is single roller, it’s mooring positioned by drawing steel wire rope. As a important corollary equipment of Jack-up platform, it can be used of Jack-up platform positioning.
Technical Parameter
Load:150/300/300kN (first-layer )Rated Speed: 18/9/4.5m/min(first-layer )Rope Diameter:φ38mmcope capacity: 900mBrake holding:600kNHydraulic System Pressure:10MPaMotor Type:YZ280S-4/8/16-HPower:56/56/27kWRotate Speed:1415/694/345r/min Supply Voltage:380V/50HzWorking Time:10/30/5minDegree of Protection:IP56
497
Offshore Equipment
4. Offshore Project List
4.1 Modular drilling rig
Project Name HZ19-3/2 Project (2 sets)
Client ACT-OG Operation Group
Project Start 2002.9
Project Complete 2004.10
Rig Type Fixed /Jacket platform
Operation Area South sea of PR.China
Responsibility☆ ZJ70D drilling rig system☆ Commissioning
Project Name Chunxiao gas field development
Client CNOOC Shanghai Branch
Project start 2002.9
Project complete 2004.7
Rig Type Fixed /Jacket platform
Operation Area East sea of PR.China
Responsibility☆ ZJ70D drilling rig system☆ Commissioning
Project Name NANBAO No.35-2 Project
Client China Oilfield Services Limited
Project start 2004
Project Complete 2005
Rig Type Fixed /Jacket platform
Operation Area Bohai Bay of PR.China
Responsibility☆ ZJ50D drilling rig system☆ Commissioning
498
Project Name PANYU No.30-1 Project
Client CNOOC Shenzhen Branch
Project Start 2005.6
Project Complete 2006.6
Rig Type Fixed /Jacket platform
Operation Area South sea of PR.China
Responsibility☆ ZJ70D drilling rig system☆ Commissioning
Project NameCOSL Mexico PEMEX Project(4sets)
Client China Oilfield Services Limited
Project Start 2006
Project Complete 2007.3/4/5/7
Rig Type Mexico Bay of PR.China
Operation Area Fixed /Jacket drilling platform
Responsibility☆ ZJ70D drilling rig system☆ Commissioning
Project Name BZ28-2S Drilling rig module
Client China Oilfield Services Limited
Project Start 2008
Project Complete 2009.1
Rig Type Fixed drilling platform
Operation Area Bohai Bay of China
Responsibility☆ ZJ50DB drilling rig system☆ Commissioning
498
Project Name PANYU No.30-1 Project
Client CNOOC Shenzhen Branch
Project Start 2005.6
Project Complete 2006.6
Rig Type Fixed /Jacket platform
Operation Area South sea of PR.China
Responsibility☆ ZJ70D drilling rig system☆ Commissioning
Project NameCOSL Mexico PEMEX Project(4sets)
Client China Oilfield Services Limited
Project Start 2006
Project Complete 2007.3/4/5/7
Rig Type Mexico Bay of PR.China
Operation Area Fixed /Jacket drilling platform
Responsibility☆ ZJ70D drilling rig system☆ Commissioning
Project Name BZ28-2S Drilling rig module
Client China Oilfield Services Limited
Project Start 2008
Project Complete 2009.1
Rig Type Fixed drilling platform
Operation Area Bohai Bay of China
Responsibility☆ ZJ50DB drilling rig system☆ Commissioning
499
Offshore Equipment
Project Name BZ19-4 Drilling rig module
ClientChina Oilfield Services Limited
Project Start 2008
Project Complete 2008.11
Rig Type Fixed drilling platform
Operation Area Bohai Bay of PR.China
Responsibility☆ ZJ50DB drilling rig system☆ Commissioning
Project Name JZ25-1S Drilling rig module
Client China Oilfield Services Limited
Project Start 2008
Project Complete 2009.2
Rig Type Fixed drilling platform
Operation Area Bohai Bay of PR.China
Responsibility☆ ZJ70DB drilling rig system☆ Commissioning
4.2 Jack-up drilling platform
Project Name CPOE No.1
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 1997
Project Complete 1997
Rig Type Jack-up drilling platform
Responsibility☆ ZJ50D drilling rig system☆ Commissioning
500
Project NameCPOE No.5 Jack-upDrilling Platform
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2006
Project Complete 2007.9
Rig Type Jack-up drilling platform
Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning
Project Name CPOE No.6 Jack-up Drilling Platform
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2006
Project Complete 2007.11
Rig Type Jack-up drilling platform
Responsibility☆ ZJ70DB drilling rig system☆ Commissioning
Project NameCPOE No.7 Jack-up Drilling Platform
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2007
Project Complete 2008.12
Rig Type Jack-up drilling platform
Responsibility☆ ZJ70DB drilling rig system☆ Commissioning
500
Project NameCPOE No.5 Jack-upDrilling Platform
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2006
Project Complete 2007.9
Rig Type Jack-up drilling platform
Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning
Project Name CPOE No.6 Jack-up Drilling Platform
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2006
Project Complete 2007.11
Rig Type Jack-up drilling platform
Responsibility☆ ZJ70DB drilling rig system☆ Commissioning
Project NameCPOE No.7 Jack-up Drilling Platform
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2007
Project Complete 2008.12
Rig Type Jack-up drilling platform
Responsibility☆ ZJ70DB drilling rig system☆ Commissioning
501
Offshore Equipment
Project Name CPOE No.8 Jack-up Drilling Platform
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2007
Project Complete 2009.1
Rig Type Jack-up drilling platform
Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning
Project Name CPOE No.9 Jack-up Drilling Platform
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2006
Project Complete 2008.12
Rig Type Jack-up drilling platform
Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning
Project NameCPOE No.10 Jack-up Drilling Platform
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2006
Project Complete 2009。4
Rig Type Jack-up drilling platform
Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning
502
Project Name COSL931 Jack-up Drilling Platform
Client China Oilfield Services Limited
Project Start 2007
Project Complete 2008.1
Rig Type Jack-up drilling platform
Responsibility☆ZJ70DB Derrick,hoisting system,F-2200HL Mud Pump☆ Commissioning
Project Name COSL200FT Jack-up Rig(4sets)
ClientChina Oilfield Services Limited
Project Start 2008.12
Project Complete2009.4(2 sets)2009.6(2sets)
Rig Type 200FEETJack-up drilling platform
Responsibility☆ ZJ70 Drilling system(Drill Floor Design included)☆ Commissioning
4.3 Submersible Drilling platform
Project NameCPOE No.3 Submersible Drilling Platform
ClientChina National Petroleum Offshore Engineering Co.,ltd
Project Start 2006
Project Complete 2007.5
Rig Type Submersible Drilling Platform
Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning
502
Project Name COSL931 Jack-up Drilling Platform
Client China Oilfield Services Limited
Project Start 2007
Project Complete 2008.1
Rig Type Jack-up drilling platform
Responsibility☆ZJ70DB Derrick,hoisting system,F-2200HL Mud Pump☆ Commissioning
Project Name COSL200FT Jack-up Rig(4sets)
ClientChina Oilfield Services Limited
Project Start 2008.12
Project Complete2009.4(2 sets)2009.6(2sets)
Rig Type 200FEETJack-up drilling platform
Responsibility☆ ZJ70 Drilling system(Drill Floor Design included)☆ Commissioning
4.3 Submersible Drilling platform
Project NameCPOE No.3 Submersible Drilling Platform
ClientChina National Petroleum Offshore Engineering Co.,ltd
Project Start 2006
Project Complete 2007.5
Rig Type Submersible Drilling Platform
Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning
503
Offshore Equipment
Project Name CPOE No.33 Submersible Drilling Platform
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2008
Project Complete 2009.4
Rig Type Submersible Drilling Platform
Responsibility☆ ZJ70DB drilling rig system(Drill floor design included)☆ Commissioning
4.4 Multi- functional drilling & workover platform
Project Name CPOE No.61 Workover Jack-up
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2003
Project Complete 2003
Rig Type Jack-up drilling platform
Responsibility☆ ZJ30DB Workover rig ☆ Commissioning
Project Name CPOE No.62 Workover Platform
ClientChina National PetroleumOffshore Engineering Co.,ltd
Project Start 2008
Project Complete 2009.2
Rig Type Jack-up drilling platform
Responsibility☆ ZJ30DB Workover rig ☆ Commissioning
504
Project Name CPOE No.63 Drilling/Workover
ClientChina National PetroleumOffshore Engineering Co., ltd
Project Start 2005
Project Complete 2006
Rig Type Jack-up drilling/workover platform
Responsibility☆ ZJ30DB Workover rig☆ Commissioning
Project Name COSL LIFTBOAT PROJECT
Client China Oilfield Services Limited
Project Start 2006
Project Complete 2008.1
Rig Type Multi-functional Jack-up platform
Responsibility☆ ZJ30DB Workover rig☆ Commissioning
4.5 Other type platform
Project NameJidong Artificial IslandSkidding Modular Rig(10 sets totally)
ClientChina National Petroleum Corporation
Project Start 2007.4
Project Complete4 sets finsihed in 2008.1,other6 sets are ready for delivery.
Rig Type Artificial Island drilling platform
Responsibility☆ ZJ70DB Modular Rig(EPC)☆ Commissioning
504
Project Name CPOE No.63 Drilling/Workover
ClientChina National PetroleumOffshore Engineering Co., ltd
Project Start 2005
Project Complete 2006
Rig Type Jack-up drilling/workover platform
Responsibility☆ ZJ30DB Workover rig☆ Commissioning
Project Name COSL LIFTBOAT PROJECT
Client China Oilfield Services Limited
Project Start 2006
Project Complete 2008.1
Rig Type Multi-functional Jack-up platform
Responsibility☆ ZJ30DB Workover rig☆ Commissioning
4.5 Other type platform
Project NameJidong Artificial IslandSkidding Modular Rig(10 sets totally)
ClientChina National Petroleum Corporation
Project Start 2007.4
Project Complete4 sets finsihed in 2008.1,other6 sets are ready for delivery.
Rig Type Artificial Island drilling platform
Responsibility☆ ZJ70DB Modular Rig(EPC)☆ Commissioning
505
Offshore Equipment
Project Name KANTAN No.3
Client Sinopec Shanghai Offshore Oil Bureau
Project Start 2008
Project Complete 2009.2
Rig TypeSemi-submersibledrilling platform
Responsibility☆ 7000 meters dynamic mast☆ Commissioning
Project Name COSL Deep water investigation ship
Client China Oilfield Services Limited
Project Start 2009.1
Project Complete in progress
Rig TypeDeep water investigation ship
Responsibility
☆ZJ50DB Drilling and Sampling System☆ Commissioning
Project Name Dubai EPC offshore jack-up project
Client Dubai
Project Start 2009.7
Project Complete in progress
Rig Type 300FT jack-up drilling platform
Responsibility EPC contract