PLANILLA DE ACEROS ZAPATA B-5
1 2 3 4 5 6 7 8 9 10 11 12 13
TRAMO ESQUEMA a (m) b (m) c (m) d (m) e (m) Nro. Lu Lt Φ (mm) P(kg)
Øx 0 1.76 0 0 0 7 1.76 12.32 16 1.58 19.4656
Øy 0 1.76 0 0 0 7 1.76 12.32 16 1.58 19.4656
ax = 1.8 h = 0.35 m PESO TOTAL= 38.9312
by= 1.8 Volumen= 1.134 m^3 CUANTIA= 34.3308642 kg/m^3
PLANILLA DE ACEROS ZAPATA C-5
1 2 3 4 5 6 7 8 9 10 11 12 13
TRAMO ESQUEMA a (m) b (m) c (m) d (m) e (m) Nro. Lu Lt Φ (mm) P(kg)
Øx 0 1.81 0 0 0 8 1.81 14.48 16 1.58 22.8784
Øy 0 1.81 0 0 0 8 1.81 14.48 16 1.58 22.8784
ax = 1.8 h = 0.35 m PESO TOTAL= 45.7568
by= 1.8 Volumen= 1.134 m^3 CUANTIA= 40.34991182 kg/m^3
PLANILLA DE ACEROS ZAPATA D-5
1 2 3 4 5 6 7 8 9 10 11 12 13
TRAMO ESQUEMA a (m) b (m) c (m) d (m) e (m) Nro. Lu Lt Φ (mm) P(kg)
Øx 0 1.76 0 0 0 7 1.76 12.32 16 1.58 19.4656
Øy 0 1.76 0 0 0 7 1.76 12.32 16 1.58 19.4656
ax = 1.75 h = 0.3 m PESO TOTAL= 38.9312
by= 1.75 Volumen= 0.919 m^3 CUANTIA= 42.37409524 kg/m^3
PLANILLA DE ACEROS ZAPATA E-5
1 2 3 4 5 6 7 8 9 10 11 12 13
TRAMO ESQUEMA a (m) b (m) c (m) d (m) e (m) Nro. Lu Lt Φ (mm) P(kg)
Øx 0 1.26 0 0 0 8 1.26 10.08 12 0.89 8.9712
Øy 0 1.26 0 0 0 9 1.26 11.34 12 0.89 10.0926
ax = 1.3 h = 0.3 m PESO TOTAL= 19.0638
by= 1.3 Volumen= 0.507 m^3 CUANTIA= 37.60118343 kg/m^3
Pu (Kg/m)
Pu (Kg/m)
Pu (Kg/m)
Pu (Kg/m)
PLANILLA DE ACEROS ZAPATA E-4
1 2 3 4 5 6 7 8 9 10 11 12 13
TRAMO ESQUEMA a (m) b (m) c (m) d (m) e (m) Nro. Lu Lt Φ (mm) P(kg)
Øx 0 1.66 0 0 0 7 1.66 11.62 16 1.58 18.3596
Øy 0 1.66 0 0 0 8 1.66 13.28 16 1.58 20.9824
ax = 1.7 h = 0.3 m PESO TOTAL= 39.342
by= 1.7 Volumen= 0.867 m^3 CUANTIA= 45.37716263 kg/m^3
PLANILLA DE ACEROS ZAPATA E-3
1 2 3 4 5 6 7 8 9 10 11 12 13
TRAMO ESQUEMA a (m) b (m) c (m) d (m) e (m) Nro. Lu Lt Φ (mm) P(kg)
Øx 0 1.71 0 0 0 8 1.71 13.68 16 1.58 21.6144
Øy 0 1.71 0 0 0 8 1.71 13.68 16 1.58 21.6144
ax = 1.75 h = 0.3 m PESO TOTAL= 43.2288
by= 1.75 Volumen= 0.919 m^3 CUANTIA= 47.0517551 kg/m^3
PLANILLA DE ACEROS ZAPATA E-2
1 2 3 4 5 6 7 8 9 10 11 12 13
TRAMO ESQUEMA a (m) b (m) c (m) d (m) e (m) Nro. Lu Lt Φ (mm) P(kg)
Øx 0 1.31 0 0 0 10 1.31 13.1 12 0.89 11.659
Øy 0 1.31 0 0 0 11 1.31 14.41 12 0.89 12.8249
ax = 1.35 h = 0.3 m PESO TOTAL= 24.4839
by= 1.35 Volumen= 0.547 m^3 CUANTIA= 44.78079561 kg/m^3
Pu (Kg/m)
Pu (Kg/m)
Pu (Kg/m)
PLANILLA DE ACEROS COL. B-5 35/35 (PLANTA BAJA)
ALT. = 0.4 Long, Col. total= 5 m PESO TOTAL= 71.67
BASE= 0.4 Volumen= 0.8 m^3 CUANTIA= 89.5875
PLANILLA DE ACEROS COL. B-5 35/35 (1ra. PLANTA)
ALT. = 0.4 Long, Col. total= 3.5 m PESO TOTAL= 39.002
PLANILLA DE ACEROS COL. B-5 35/35 (2da. PLANTA)
ALT. = 0.35 Long, Col. total= 3 m PESO TOTAL= 35.536
BASE= 0.35 Volumen= 0.3675 m^3 CUANTIA= 96.69659864
PLANILLA DE ACEROS COL. B-5 35/35 (3ra. PLANTA)
ALT. = 0.35 Long, Col. total= 3 m PESO TOTAL= 34.062
BASE= 0.35 Volumen= 0.3675 m^3 CUANTIA= 92.68571429
PLANILLA DE ACEROS COL. B-5 35/35 (4ta. PLANTA)
ALT. = 0.35 Long, Col. total= 3 m PESO TOTAL= 33.4724
PLANILLA DE ACEROS COL. B-5 35/35 (5ta. PLANTA)
ALT. = 0.35 Long, Col. total= 3 m PESO TOTAL= 34.656
BASE= 0.35 Volumen= 0.3675 m^3 CUANTIA= 94.30204082
PLANILLA DE ACEROS COL. B-5 CUANTIA TOTAL
PESO TOTAL= 248.3984 kg/m^3
VOL. TOTAL = 2.83 kg/m^3
PLANILLA DE ACEROS COL. B-5 35/35 (PLANTA BAJA)
kg.
kg/m^3
PLANILLA DE ACEROS COL. B-5 35/35 (1ra. PLANTA)
kg.
PLANILLA DE ACEROS COL. B-5 35/35 (2da. PLANTA)
kg.
kg/m^3
PLANILLA DE ACEROS COL. B-5 35/35 (3ra. PLANTA)
kg.
kg/m^3
PLANILLA DE ACEROS COL. B-5 35/35 (4ta. PLANTA)
kg.
PLANILLA DE ACEROS COL. B-5 35/35 (5ta. PLANTA)
kg.
kg/m^3
PLANILLA DE ACEROS COL. B-5 CUANTIA TOTAL
ESQUEMA DE COLUMNAS B - 5
5 m 3.5 m
40/ 40 40/ 40Planta Baja 1ra. Planta
3 m 3 m
35/ 35 35/ 352da. Planta 3ra. Planta
3 m 3 m Esquema de las columnas en la estructura
35/ 35 35/ 354ta. Planta 5ta. Planta