THE BABCOCK & WILCOX CO.

2
94 A INDUSTRIAL AND ENGINEERING CHEMISTRY Vol. 39, No. 12 Solving new problems AN OLD Stress Problem Solved Installing 753 tube* and 4'/i in. tube sheet in hug· converter for operation over wide range of temperature·, it typical of difficult stres· problems solved by Β AW. Field Construction Simplified Short-cuts in fabricating 100 ft. χ 20 ft. catalyst reactor in B&W shops saved erection time on location. World's Largest Pipe Fabricated Supplying 45,000 tons of welded steel-plate pipe — ΛΥΐ to 30 ft. in diameter —for Hoover Dam pre- sented many new problems of fabrication, trans- portation, handling and installation solved by B&W. The Weld That Held Butt welding 6Vi in. A .70 firebox plate into unfired! pressure vessel of unusual design was successfully accomplished by B&W Fusion Welding Process. Strength of welds greatly exceeded code require- ments. Sample of butt-welded plate after face bend test is shown below.

Transcript of THE BABCOCK & WILCOX CO.

Page 1: THE BABCOCK & WILCOX CO.

94 A I N D U S T R I A L A N D E N G I N E E R I N G C H E M I S T R Y Vol. 39, No. 12

Solving new problems A N OLD

Stress Problem Solved Installing 753 tube* and 4 ' / i in. tube sheet in hug· converter for operation over wide range of temperature·, it typical of difficult stres· problems solved by Β AW.

Field Construction Simplified Short-cuts in fabricating 100 ft. χ 20 ft. catalyst reactor in B&W shops saved erection time on location.

World's Largest Pipe Fabricated Supplying 45,000 tons of welded steel-plate pipe — ΛΥΐ to 30 ft. in diameter —for Hoover Dam pre­sented many new problems of fabrication, trans­portation, handling and installation solved by B&W.

The W e l d That Held Butt welding 6Vi in. A .70 firebox plate into unfired! pressure vessel of unusual design was successfully accomplished by B&W Fusion Welding Process. Strength of welds greatly exceeded code require­ments. Sample of butt-welded plate after face bend test is shown below.

Page 2: THE BABCOCK & WILCOX CO.

December 1947 I N D U S T R I A L A N D E N G I N E E R I N G C H E M I S T R Y 95 A

in pressure vessels... STORY AT

N Air Hot Enough to Mel t Bricks Pebble Heal Exchanger developed by B&W heats gases to over 2000F and far above the temperature limits of metallic heat exchang­ers— hot enough to melt bricks.

S-74T

Fusion-Welded Boiler D r u m s - a B & W First The first welded boiler drums used in both marine and stationary boilers were built by B&W in 1930.

Designing and fabricating pressure vessels, drums,

tanks, towers, tubes, piping and related products is a

major activity at B&W — and has been for many years.

Here, practical solutions for new problems encountered in

the application of high pressure, high temperature

equipment are constantly being developed. In fact, B & W

pioneered many pressure vessel fabrication techniques

such as fusion welding, x-ray inspection, stress relieving,,

welded drums and streamlined openings.

Shown on these pages are a few examples of how

B&W pressure vessels and fabricating techniques have

solved new and difficult problems.

PROCESS EQUIPMENT — Al loy, Clad, a n d Bonded Pressure Vessels . . . Heat a n d Abrasive-resistant Alloy Castings . . .

Special Process Equipment. • • •

OTHER B & W PRODUCTS — Stat ionary a n d M a r i n e Boilers . . . Boiler Components . . .Chemica l Recovery Uni ts . . .Pulver izers . . . Fuel Burning Equipment . . . Refractories . . . Seamless & We lded Tubes for Al l Pressure a n d Mechanical Applications.

B&W

BABCOCK & WILCOX

THE BABCOCK & WILCOX CO. GENERAL OFFICE: 85 LIBERTY ST., NEW YORK 6, N.Y. WORKS: ALLIANCE AND BARBERTON, O.; AUGUSTA, GA.