1
STEP 1 STEP = 2 Uult = 10000 kN Uult = 12000 kN Blows = 76.5 blows/m Blows = 101.4 blows/m σc = 142 Mpa (Stress at element 23) σc = 145.7 Mpa (Stress at element 23) σt = -45.9 Mpa (Stress at element 23) σt = -77.4 Mpa (Stress at element 23) Penet = 35 m Penet = 42 m Total No of Blows = 2677.5 blows Total No of Blows 709.8 blows P3 P2 P1 MUDLINE Location where Fatigue to be checked.(P2+P3) Say Element Li=23 TARGET PENETRATION

Transcript of Pile driveabilitym ethodology

STEP 1 STEP = 2Uult = 10000 kN Uult = 12000 kNBlows = 76.5 blows/m Blows = 101.4 blows/mσc = 142 Mpa (Stress at element 23) σc = 145.7 Mpa (Stress at element 23)σt = -45.9 Mpa (Stress at element 23) σt = -77.4 Mpa (Stress at element 23)Penet = 35 m Penet = 42 m

Total No of Blows = 2677.5 blows Total No of Blows 709.8 blows

P3

P2

P1

MUDLINE

Location where Fatigue to be checked.(P2+P3)

Say Element Li=23

TARGET PENETRATION