Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation...

40
Forward pixels – on tracking at higher η in CMS Frank Meier University of Nebraska-Lincoln Januar 23, 2015 1 / 40

Transcript of Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation...

Page 1: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Forward pixels – on tracking at higher η in CMS

Frank MeierUniversity of Nebraska-Lincoln

Januar 23, 2015

1 / 40

Page 2: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Introduction

2 / 40

Page 3: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Introduction

3 / 40

Page 4: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Overview

Introduction

Phase-I forward pixelsPhase-I: Motivation

Phase-II forward pixels

Very forward pixelsSimulationsSensor R&D:HardwareConclusions

Conclusions

4 / 40

Page 5: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

5 / 40

Page 6: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

The upgrade is foressen to be installed at YETS2016

I Baseline: L = 2 · 1034 cm−2s−1 @ 25 ns → 50 PU withnegligible efficiency loss

I Tolerate: L = 2 · 1034 cm−2s−1 @ 50 ns → 100 PU withreduced performance

I Survive integrated luminosity of 500 fb−1

I Evolutionary upgradeI Robustify tracking: 4 instead of 3 hits; from 2 to 3 disks

(can compensate point losses in strips)6 / 40

Page 7: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I: Motivation

Requirements (TDR)I Running at 50 or more pile-up, same or better than current

detector in low pile-up (PU)I Maintain or improve the high efficiencies and low fake ratesI Maintain or improve the track impact resolutions and vertex

resolutions

I Maximize 4-pixel-hit coverage over an η range of ±2.5

I No increase of material in the tracking volume; Minimizedegradation due to radiation damage

I Reuse patch panel and off-detector cables and fibers

I Have one FPix module type, simplifying production andmaintenance

I Be compatible with the new smaller diameter beam pipe

I Switch to 2-phase CO2 cooling, target −25◦C

I Install during a slightly extended year-end technical stop

7 / 40

Page 8: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

Plots show expected fluence in innermost disk:

Comparison based on x-rays.

8 / 40

Page 9: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

Comparing old and new for efficiency:

9 / 40

Page 10: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

Improvements in impact parameter resolution:

10 / 40

Page 11: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

New design reduced mass

Biggest impact: optimized cabling, end-flange of barrel, cooling

11 / 40

Page 12: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

B-tagging efficiency

12 / 40

Page 13: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

One physics example: H → ZZ → 4`Analysis does:

1. trigger on di-lepton

2. kinematic reconstruction of 2 Zs from isolated di-leptons

3. reconstruct invariant mass of H

Plot on next slide shows a cut flow-chart to emphasize on cutsthat make the biggest improvement

13 / 40

Page 14: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

14 / 40

Page 15: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

Where are we?

I FPix passed CD reviews (critical decision), production canstart

I Final pre-production of modules end of February

I Module production seems to work

I Mechanics starts now as well

Want to emphasize on some module manufacturing issues

15 / 40

Page 16: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

102Delivery of BBM

101Deliveryof HDI

103Glueing of

HDI to BBM

104Wirebonding

105Encapsulation

106Final inspectionand shipping

107Reworking

206Electrical

acceptancetest module

204Electrical

acceptancetest HDI

203IV test

202Visual

inspection201

Visualinspection

205Visual

inspection module

208Electrical

acceptancetest BBM

207Pull testing

of wirebonds

This is the workflow at UNL.The second production center,Purdue, differs slightly

We use a semi-automatedmanufacturing process using arobotic gantry, a Delvotecwirebonder and some testequipment

Bare modules (sensor + ROC)are made at a commercialvendor (RTI), as well as theHDI (Compunetics)

16 / 40

Page 17: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I: Motivation

17 / 40

Page 18: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

https://www.youtube.com/watch?v=ofdntTIwKY4

Beware: it is not an action movie. . .18 / 40

Page 19: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-I forward pixels

19 / 40

Page 20: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Phase-II forward pixels

I Phase-II is beyond about 2023

I 10× more instantaneous luminosity, even more PU

I Major challenge

I Simply said: what layer 1 of the barrel is in Phase-I wouldbecome the outer layers and new technology will be neededfor innermost layer(s)

I will focus on some very forward studies and will briefly come backto this at the end

20 / 40

Page 21: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Very forward pixelsI VFPix effort studies optins in high pseudorapidity tracking

using optimised pixels (2.5 < |η| < 4.0)I Worked on three areas:

I Simulation: Explore physics potential and resolution impactby studying different strawmans and pixel cell geometries

I Sensor R&D: Explore potential of other pixel sizes thancurrently in use

I Hardware: Finish up the construction of a precision telescope(from a PIRE project)

I Will flash status on all three areas.I Baseline layout from TP:

z [mm]0 500 1000 1500 2000 2500

r [m

m]

0

200

400

600

800

1000

1200

0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6

1.8

2.0

2.2

2.5η

this proposal

21 / 40

Page 22: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Very forward pixels

Latest proposal (strawman 5):

Observe: Extended inner layer, two types of modules. Has insertionalready in mind.

22 / 40

Page 23: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Simulations

Results from TkLayout studies:

Strawman 0: TP; Strawman 5: Previous slide.Pixel size is 75 × 100µm2. Estimated resolutions were (assumingdigitized analog pulse-height and charge sharing based onmounting angle/B-field):

FPix/VFPix: 6.8 × 28µm2

BPix: 6.8 × 14.8µm2

Details: https://twiki.cern.ch/twiki/bin/view/CMS/VFPix

23 / 40

Page 24: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Simulations

This already allows to justify the importance of a well-chosenenvelope.

I Conical geometry performs better than cylindrical

I Keep in mind: there is a strip tracker around this volume

I For a good pT measurement, three points need to bemeasured to good precision:

I Why do we need good pT ? Think of calorimetry and particleflow

24 / 40

Page 25: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Simulations

Results from TkLayout studies:

Strawman 4, similar to 5Observe: To establish charge of a track, a good pT resolutionmatters, even one is tempted to optimize on z resolution

NB: pT resolution comes from lever arm and hit resolution, zresolution dominated by distance to first hit

25 / 40

Page 26: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

SimulationsHow to recover z resolution?

layer closer to BS

layer further away

Overlap helps. Some we get in the disks “for free”, somedownstream.

The resolution studies already have some assumptions on zresolution beyond just the local pixel resolution.

26 / 40

Page 27: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

SimulationsHot off the press: Resolution studies using PixelAV (courtesyMorris Swartz)

27 / 40

Page 28: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Simulations

Next steps here:

I Use this information in TkLayout simulation

I Have to deal with clusters of size 30. . . – but we already havesome ideas how to handle this

I ROC: psi46 architecture can be translated into more advancedtechnologies. I.e. 110 nm offers reduction of pixel cell by factor5, good for pixels of size 60× 90µm2. Would allow forevolutionary design.

28 / 40

Page 29: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Simulations

Results from Delphes using resolution data from TkLayout:

Details: See TWiki, table of presentations.

29 / 40

Page 30: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Simulations

Results from Delphes using resolution data from TkLayout:

Details: See TWiki, table of presentations.

30 / 40

Page 31: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Sensor R&D:

30

0 µ

m

50 µm

60

0 µ

m

25 µm

I All our pixel geometriesused same area

I Want to study resolutionusing some clever metallayer routing

I Made a sensor designgood for current Psi46pixel, available spring2015Disadvantage: increasedcapacitance, of course

I Will have 300 × 50µm2

and 600 × 25µm2

geometries

31 / 40

Page 32: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Hardware

I We work on external triggering and soft TBM for the DTB

I Build a telescope based on PIRE project

I Uses thinned-down strip sensors with 25µm pitch

I APC128 chip with analog readout

I Telescope had some issues with signal quality. Improving thatto get decent S/N

I Should be ready in spring 2015

I Target resolution: ≈ 1µm

32 / 40

Page 33: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Conclusions

I Established simulation chain

I Resolution studies show very nice results

I One physics case studies with clear benefit from VFPix

I More physics channels in the come

I Hardware studies will soon start as well

I Telescope should be available for beam tests

I Will keep you updated

33 / 40

Page 34: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

Conclusions

I Phase-I forward pixel ongoing and on track

I For Phase-II, I’ve shown some studies we did for very forwardtracking

I Efforts ongoing

34 / 40

Page 35: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

35 / 40

Page 36: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

36 / 40

Page 37: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

37 / 40

Page 38: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

38 / 40

Page 39: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

39 / 40

Page 40: Forward pixels on tracking at higher in CMS - Instrumentation …€¦ · Phase-I: Motivation Requirements (TDR) I Running at 50 or more pile-up, same or better than current detector

40 / 40