Kurdistan Operator Activity Map[1]
-
Upload
anto-nirmal -
Category
Documents
-
view
762 -
download
62
description
Transcript of Kurdistan Operator Activity Map[1]
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
¾
¾
¾
¾
¾
¾
¾
¾
¾
Μ
Μ
=
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂̂_
_̂
Q
_̂
_̂
_̂
_̂
=
=
=
B
B
BBBBBBB
B
B
B
B
B
BB
B
BBB
BB
B
B
BBBB
B
B
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*#*
#*#*
#*
#* #*
_̂
Q Q
Q
Q
Q
Q
Q
QQQ
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
QQ Q
Q
Q
Q
Q
Q Q
Q
QQQ
Q
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
Q
_̂
_̂
B
=
#* #*
)=
)=
)=
)=
)=)=
È
)=
)=
)=)=
)=
)=)=
)È
È
ÈÈÈÈÈÈ
)=)=
)=)=
)=
)=)=
)=)=
)=
)=
)=
)=
)=
)=
)=
)=
)=)=
)=)=)=
)=)=)=)=)=)=
)= )=)=)=)=)=)=
)=
)È)È
)= )=
)È)È
)=
ÈÈ
)ÈÈ)=
)=
)È
)=
)=)=
)=
)=
)=
)=)È )=
)=
)=
)=)=
)=
)=
)=
)=)=)=
È
)È
)È
)=
)=
)=
)È)È)È
)È
)È
)=
)=
)=
)= )=)=)=
)=
)=)=
)=È
È
)=
È)=
)=
)È)=
)=
)= )=)=
)=
)=
)=)=
)=)=)=
)=
)=)=)=
)=
)=
)=
)=
)=
)=
)=
È
)=
)È
)=
)=
)=
)=)=
)=
)=
)=
)=
)È
)=
È
)=
)=
)=
)=
)È
)È
)=
)=
)=
)=
)=
)È)È)È
)È)È )È)È)È)È)È )È)È)È
)=
)È
)È
Tawke Field (DNO)Discovered 2006Reservoirs: Tertiary, Cretaceous and U JurassicResources: 771 mmbbls (2P)Production Capacity: 100,000 bopd (Target 150,000 bopd CPF end of 2014)Tawke Deep TD 4775m (Triassic). Tested 1500 bopd 26-28 API from U JurassicTawke-20 1st Cretaceous horizontal tested 25,000 bopd.Tawke-23 reached TD and Tawke-21 expected to spud mid Sept 2013
TaqTaq -> Khurmala oil pipeline Completed in early 2013 (150,000 bopd) .
Chemchemal FieldDiscovered: 1930Reservoir: Pila Spi (43 API) CondensateResources: 2.07 TCF recoverable
Kirkuk Field - Baba and Avanah domes (North Oil Co)Discovered: 1927Reservoirs: Oligocene,Jaddala, Shiranish/Kometan and QamchuqaResources: 10,800 mmbbls + 2.7 TCF recoverable remaining Production: 180,000 bopd. BP in talks over service contract to enhance production to 600,000 bopd by 2017
Bai Hassan Field (North Oil Co)Discovered: 1953Reservoirs: Oligocene, Shiranish/Kometan and QamchuqaResources: 1700 mmbbls + 8.9 TCF recoverable remainingProduction: 198,000 bopd, projected 240,000 bopd by 2014
Chia Surkh Field (Genel Energy) Discovered 1903Reservoirs: Fars, Jeribe, OligoceneResources: 306 mmboe prospectiveChia Surkh-10 spud October 2012 (TD 1696m). Mio-Oligocene tested up to 11,950 bopd (41 API) + 15 mmscfd. Miocene tested up to 3200 bopd (38 API) + 8.4 mmscfdChia Surkh-11 spud April 2013. PTD 3000mGross H/C column 170m. Currently testing 3D seismic to commence Q3 2013
Qamar Field (North Oil Co)Discovery well: Qamar 1 (1979)Reservoir: Jeribe Resources: 200 mmbbls 250 BCF recoverableTested: 2200 bopd (42 API); GOR 4000Not Producing
Hamrin Field (North Oil Co) Discovered :1961Reservoirs: Jeribe, Euphrates/Serikagni and OilgoceneResources: 1,800 mmbbls + 750 BCF recoverable remainingProduction: Projected 60,000 bopd and 60 mmcfd by 2014
Khabbaz Field (North Oil Co)Discovered: 1976Reservoirs: Jeribe, Oligocene, Kometan and Qamchuqa Resources: 2000 mmbbls + 3 TCF recoverable remainingProduction: 29,000 bopd
Topkhana-1 TD 3140m Jaddala (2011)Tested up to 7.45 mmscfd + 350 bcpd from OligoceneTopkhana-2 projected spud Q4 2013. Target: OligoceneTalisman to farm out working interest in Topkhana/Kurdamir.
Rovi North-1 spud July 2013.Rovi South-1 (2010) TD 4027m. Oil shows during drilling
Atrush Discovery (TAQA)Discovery well: Atrush-1 (2011)Reservoirs: Cretaceous,Jurassic,Triassic Resources: 647 mmbbls (contingent) + 70 mmbbls (prospective)Production: EWT 5000 bopd. 30,000 bopd EPF by late 2014 with phase development to 120,000 bopd by 2016. FDP submitted May 2013Atrush-2 2012. 3 tests over U Jurassic aggregate 42,000 bopd (27 API). Heavy oil in Butmah (1450 bopd) and Adiayah (650 bopd)Atrush-3 spud March 2013. TD 1806m.Tested up to 1500 bopd (10-17 API). Atrush-4 planned spud Nov 2013. Deviated to target structural crest.
Sheikh Adi Discovery (Gulf Keystone) Discovery well: Sheikh Adi-2 (2012)Reservoirs: Jurassic (15-18 API)SA-2 tested aggregate flow rate of 4235 bopd from 4 Jurassic zones (15-18 API) SA-3 appraisal planned spud Q4 2013. PTD 3500m
Dohuk Discovery (DNO)Discovery well: Summail-1 (2011)Reservoirs: Cretaceous (gas), Jurassic (heavy oil)Resources: 300 bcf recoverableSM1 tested 11.6 mmcfd in CretaceousSummail-1 completion and drilling 2 additional appraisal wellsAgreement to supply gas to Dohuk Power Plant starting Q1 2014
Bastora Discovery (DNO)Discovery well: Bastora-1/1A (2011)Reservoir: Cretaceous (Bekhme and Qamchuqa)Resources: 100 mmbbls oil recoverable (P50) 18-19 APIProduction: 10,000 bopd EWT facility installed. Bastora-2 spud Dec 2012. Oil encountered in Bekhme andQamchuqa targets. Preparing to test multiple Qamchuqa zones. B-2H to follow: horizontal sidetrack into Bekhme
Shaikan Field (Gulf Keystone)Discovery well: Shaikan-1 (2009)Reservoirs: Jurassic/Triassic (~17 API)Resources: 2,660 mmbbls recoverable*Production Capacity : 40,000 bopd by mid 2013. Constructing 2 EPFs.Shaikan-7 spud June 2013.Target Permian.Shaikan-10 1st development well spud July 2013.
Jambur Field (North Oil Co)Discovered: 1929Reservoirs: Jeribe, Euphrates, Eocene, Shiranish and QamchuqaResources: 3000 mmbbls + 9.0 TCF recoverable remainingProduction: 50,000 bopd + 120 mmcfd, projected 80,000 bopd by 2014
Sangaw North-1 TD 4190m Kurra Chine (2011)Jurassic/Triassic tested uncommercial rates of gas + water. (high H2S)
Iran
Iraq
Peshkabir-1 TD 4092m (Triassic)Spud Sept 2011. Susp July 2012Jurassic tested oil/water cut (27-29 API)Water in Triassic/ Cretaceous.Sidetrack planned for Q2 2014.FDP to be submitted Oct 2013
Khalakan PSC (Gas Plus)Turkish Entity expected to be awarded the open 40% 3rd party interestShewashan-1 projected spud Nov 2013Khalakan-1 TD 3520m Triassic (2012) dry hole
Sangaw South-1 TD 3820m Sarki fm (2011)KNOC Completed 2D Kurdamir flank seismic program
Mil Qasim Discovery (WesternZagros) Discovery well: Mil Qasim-1 (2011)Reservior: Upper FarsMQ1 tested an aggregate of ~850 bopd (43-44 API)Non-commercial oil and gas discovery in the Upper Bakhtiari fm
Kor Mor Field (Dana/Crescent)Discovery well: Kor Mor-1 (1928) Reservoirs: Jeribe, Euphrates, Oligocene (Gas); Shiranish (Oil)Resources: 1.8 TCF recoverableProduction: 340 mmcfd + 15,000 bpd condensate LPG Plant rebuild completed July 2013. Capacity 900 tonnes per day.Dispute between Dana/Crescent and the KRG over payments.
Pulkhana FieldDiscovery well: Pulkhana-5 (1956)Reservoirs: Euphrates, Jaddala, Shiranish and BalamboResources: 38-328 mmbbls, P50 113 mmbbls recoverablePulkana-9 (2011) tested limited oil (30-33 API) from Shiranish/BalamboPulkana-8 (2010) tested 2,650 bopd (31.6 API) Shiranish.Turkish Entity awarded block by KRG June 2013
Bazian-2 spud June 2013. Drilling 12 1/4" hole.Bazian-1 TD 4091m Chia Gara (2010). Tested 500 bopd L Qamchuqa
Taza Discovery (Oilsearch)Discovery well: Taza-1 (2013)Reservoirs: Jeribe/Dhiban + EuphratesResources: 250-500 mmbbls recoverableTaza-1 200-250 bpd oil/water in Jeribe/Dhiban.Tested up to 1100 bopd + 2900 bwpd in Euphrates.Taza-2 planned spud Q4 2013 to appraise upperintervals and explore deeper Tertiary + Cretaceous
Barda Rash Field (Afren)Discovery well: Barda Rash-1 (2009)Reservoir: Cretaceous and Jurassic (Mus/Adaiyah)Resources: 190 mmbbls (2P) + 1243 mmbbls contingentProduction: ~5000 bopdBR-4 spud Mar 2013. Drilling at 3109mBR-5 spud May 2013. Drilling at 2195m
Sarqala Field (WesternZagros)Discovery well: Sarqala-1RE (2011)Reservoir: JeribeResources: 24 mmbbls (contingent), 198 mmbbls (prospective) Production Capacity: 5-6000 bopd S-1RE tested 9444 bopd (40 API) from Jeribe fmHasira-1spud June 2013. Target: OligoceneDrilling ahead in Upper Fars at 3133m3D Seismic processing and interpretation ongoing
Miran Field (Genel Energy)Discovery well: Miran West-1 (2009)Reservoirs: U Cret (15-18 API), L Cret/Jurassic (wet gas)Resources: 3.5 TCF and 95 mmbbls liquids (recoverable)Oil Production: EPF on stream Aug 2013. Currently 2000bopd. Target 30,000 by end 2014.Declaration of Commerciality Sept 2013Gas Production: targeting 400mmscfd by 2017.Miran-4 TD 4850m (Jurassic) No hydrocarbons in Cretaceous and unable to test Jurassic due to operational difficulties. Reentry and sidetrack in 2014.Miran-5 TD 1905m (U Cretaceous) tested 1350 bopd (16-18 API) from horizontal section.Miran-6 spud July 2013. Drilling 17 1/2" hole.Miran-Deep projected spud Q1 2014
Benenan Discovery (DNO)Discovery well: Hawler -1 (2008)Reservoir: Bekhme/Najmah (16 API)Resources: 60-70 mmbbls recoverable (P50). BN-3 spud Aug 2012. Encountered additional 210m oil column in Najmah reservoir. Preparing to initiate production from Bekhme reservoirBN-4 spud Aug 2013.
Bina Bawi Discovery (OMV) Discovery well: Bina Bawi-1Reservoirs: Mus, Upper Butmah (Jurassic)Resources: 4.4 tcf (mean) recoverableProduction: BB-3 EWT commenced Mar 2013 (1000-3000 bopdfrom Jurassic). FDP to be submitted 2H 2013.BB-3 2 Jurassic tests aggregate flow 4000bopd + 15mmcfdBB-4 spud June 2012. TD 4800m (Permian).BB-5 spud Oct 2012. TD 3600m (Triassic).Wells tested 20 mmscfd + 10 mmscfd in 2 Triassic reservoirs,confirming 1500m H/C column.3D seismic acquisition ongoing
Kurdamir Field (Talisman)Discovery well: Kurdamir-1 (2010)Reservoirs: Oligocene and Eocene Resources: 643 mmbbls contingent + 1465 mmbbls prospectiveKurdamir-2 TD 4000m (Cretaceous) Spud Oct 2011. RR Jan 2013Oligocene test 3450 bopd. Completed as an Oligocene producerKurdamir-3 TD 2895m (Oligocene). Spud Feb 2013. Tested oil and formation water from base Oligocene. Additional Oligocene testing ongoing. Kurdamir-Topkhana 3D completed Aug 2013
Shakal Discovery (GazProm Neft)Discovery well: Shakal-1 (2009)Reservoir: Jaddala, Aaliji Resources: 45 mmbbls3 Test Aggregate max of 2,450 bopd (35 API)350sqkm 3D seismic program ongoingTo commence drilling program 2014.
Ber Behr Discovery (Genel)Discovery well: Ber Bahr-1 ST (2013)Reservoirs: Jurassic Sargelu (15 API)Resources: 50-100 mmbbls recoverableBer Bahr-2 appraisal to spud Q1 20143D Seismic commencing Q3 2013
Khurmala Field (Kar Oil and Gas)Reservoirs: Eocene, Shiranish/Kometanand Qamchuqa (34 API)Production Capacity: 150,000 bopd + 100 mmcfd.Under going W/O of 19 wells.
Ajeel Field (North Oil Co) Discovered :1961Reservoirs: Jeribe and EuphratesResources: 500 mmbbls + 496 BCF recoverable remainingProduction: 23,500 bopd, projected 35,000 bopd by 2014
Bijeel Field (Kalegran)Discovery well: Bijeel-1 (2010)Reservoirs: Jurassic (13 API)Resources: 2.4 billion barrels (STOIIP)Production: 10,000 bopd EPF completed Q2 2013Bijeel-7spud Dec 2012. Drilling 2nd sidetrack.Bijeel-2 spud Mar 2013. Drilling sidetrack.2 additional appraisal wells expected to spud 2013.Linnava-1
Spud Apr 2012 Abandoned Dec 2012.No commercial flow obtained
Qara Dagh-1 TD 3908m Kometan (2011)Tests in Shiranish and Tanjero produced oil (43-46 API) at non-commercial rates.
Qaiyarah and Najmah Fields (Sonangol)Reservoirs: Jeribe, Euphrates, Hartha (15.5 API)Reserves: 424 mmbbls and 200 mmbbls oil recoverable Production: projected 230,000 bopd by 2017.
Demir Dagh Discovery (Oryx)Discovery well: Demir Dagh-1 (1960)Reservoir: Cretaceous/JurassicResources: 252 mmbbls (2P) + 307 mmbbls (2C)Production: 7-9,000 bopd by Q2 2014Demir Dagh-2 spud July 2012. Tested 39-42 API 2780 bopd (Adaiyah) and 2210 bopd (Mus). Cretaceous tested 6700bopd (23 API) Awaiting KRG approval for 3 well appraisal program3D seismic to commence early 2014
Safeen-1 spud April 2013. Reached TD 3155m. Testing
Shakrok-1 spud Aug 2013. PTD 3000m. Target Jurassic/Triassic
Taq Taq Field (TTOPCO)Discovered: 1961Reservoirs: Pilaspi (26 API) , Shiranish/Kometan/U Qamchuqa (46 API)Resources: 647 mmboe (2P)Production Capacity: 120,000 bopd. Projected 200,000 bopd by 2014.Trucking 30-40,000 bopd to Turkey.TT-22 (deep) spud Mar 2013. PTD 5400m (Triassic).TT-18 completed and test flowed at 13,000 bopdTT-20 completed2 additional 2013 development wells, including 1st horizontal.
Simrit Discovery (Hunt)Discovery well: Simrit-1 (2011)Reservoir: Cretaceous/Jurassic/TriassicResources: 42 MMBOE contingent + 227 MMBOE prospective (June 2011)Production: Simrit-2 EWT (Jurassic) underway. Trucking to local marketsSimrit-2 Cret/Jurassic/Triassic aggregate flow rate19,641 bopd. Simrit-3 spud Sept 2012. TD 3750m. Testing ongoing
Baram-1 spud Aug 2013. Target: Oligocene. Current depth 830m (Lower Bakhtiari)3D Seismic acquisition completed early Sept 2013
North Salah ad Din (Sonoro Energy) Resources: 140 mmbbls recoverableTarget: Jeribe asphalt Drilling program to has been deferredSonoro seeking to farm out assets
Swara Tika Discovery (HKN)Discovery well: Swara Tika-1 (2011)Reservoirs: Jurassic,Triassic (457m gross oil column)Production: 10,000 bopd EPF completed March 2013Swara Tika-2 TD ~3700m. (Triassic). Spud Nov 2011. Tested 15,000 bopd (35 API) and associated gasEast Swara Tika-1 spud July 2013
Al Qush-1 estimated spud Nov 2013
Khurmala --> Fish Khabur oil pipeline Due to be completed by end of 2013 (initial capacity 300,000 bopd)
Sarta-2 spud July 2013. Running 16" casingSarta Central-A1 (2010) TD 2702m Jurassic tested 1,000 bopd. Underwent EWT in 2011.
Maqlub-1 spud May 2013. Cretaceous/Jurassic/Triassic targets
Choman / Hindren PSCs Turkish entity awarded operatorshipof blocks by the KRG June 2013
Arbat PSC Turkish Entity awarded block by KRG June 2013
Jabel Kand PSCTurkish Entity awarded 40% interest by KRG June 2013
S.E KORMOR
QUSHTAPPA
SHORISH
BLOCK II
BLOCK V
PENJWIN
SANGAWNORTH
BLOCK I
MALAOMAR
SINDIAMEDIWEST
MOSEL
IRBIL
KIRKUK
MARAGHEN
BONAB
MIANDOAB
MAHABAD
SULAYMANIYAH
TIKRIT
Samarra
KHANAQIN
DOHUK
AQ1
AM1
AT4AT5
BN1
BS3
BT1
BJ4
BJ5
BJ6
DD3
GD1
JS1
ML2
MR7
PM1
SA3
SW1
SH1
SG1
TW7TW21 TW22
TZ2TP2
SM2SM3
AS1
AT3
BA1
BR4
BR5
BN4
BJ2BJ7
CS11
EST1
MN1
ML1
MR6
MR1
RN1
SF1
SC2
SH7
TT20
TZ1
BZ2
HS1
SK1
TW23
SH8 BJ3
BB2
HR1
KC1z
KH1
KH1
MO1
SN1SN1ST1 SN1ST2
SN1ST3
MQUB1
ZG1
BR1
BR3AP
BS1A
BN3
SQ1SQ1RE
SH1SH3
SM2
ST1
ST2
TT4TT5
TT6
TT7
TT8TT12
TT13
TT14TT15
TT16TT18
TW2
TW3TW4
TW5TW9
TW11TW13TW14
TW15TW16
TW18
TW19
KU1KU2
AT1
AT2
BZ1
BE1
BN1
BN2
BB1
BJ1
BB1
CS10
GL1
KC2
LN1
MT1
MQ1
MR2
MR3
PS1
PU8PU9
QT1
RS1
SS1
SCA1
SH4 SH5SH6
SK1
SA1
SA2
SR1
SI1
SM_E1SM1
ST1A
TT11
TP1
KU3
BM1
BS2
BB4
BB5
DD2
GA1
MR1
MR4MR5
SM3
TW17
MQUB2
TAWKEDNO 55%
Genel Energy 25%KRG 20 %
DOHUKDNO 40%
Genel Energy 40%KRG 20 %
MIRANGenel Energy 75%
KRG 25%
SARSANGHKN 56.25%
Marathon 18.75%KRG 25%
AIN SIFNIHunt 60%Afren 20%KRG 20 %
QARA HANJEERExxonMobil 80%
KRG 20 %
TAZAOilsearch 60%
Total 20%KRG 20 %
BAZIANKNOC Bazian* 80%
KRG 20%
AKRE-BIJEELMOL (Kalegran) 51.2%Gulf Keystone 12.8%UNASSIGNED 16%
KRG 20 %
HAWLEROryx 65%
KNOC 15%KRG 20 %
SINDI AMEDI EASTPerenco 30.94%
Oryx Petroleum 25.31%UNASSIGNED 18.75%
KRG 25%
ATRUSHTAQA 39.9%
Shamaran 20.1%Marathon 15%
KRG 25%
SHAKALGazprom Neft 80%
KRG 20 %
TAQ TAQTTOPCO* 80%
KRG 20 %
QARA DAGHChevron 80%
KRG 20 %
DINARTAHess Middle East 64%
Petroceltic 16%KRG 20 %
PIRMAMExxonMobil 80%
KRG 20 %
HARIRMarathon 45%
Total 35%KRG 20 %
SAFEENMarathon 45%
Total 35%KRG 20 %
SHAKROKHess Middle East 64%
Petroceltic 16%KRG 20 %
BETWATAExxonMobil 80%
KRG 20 %
CHOMANTurkish entity 80%
KRG 20 %
QALA DZERepsol 80%KRG 20 %
PIRAMAGRUNRepsol 80%KRG 20 %
BARANANTotal 60%
Murphy 20%KRG 20 %
ARBATTurkish entity 80%
KRG 20 %
HALABJAGazprom Neft 80%
KRG 20 %SANGAW SOUTHKNOC 30%
UNASSIGNED 50%KRG 20 %
PULKHANATurkish entity 40%UNASSIGNED 40%
KRG 20 %
BARDA RASHAfren 60%Komet 20%KRG 20 %
SARTAChevron 60%
OMV 15%KRG 25%
ERBILDNO 40%
New Age 40%KRG 20 %
TOPKHANATalisman 60%
UNASSIGNED 20%KRG 20 %
GARMIANWesternZagros 40%Gazprom Neft 40%
KRG 20 %
CHIA SURKHGenel Energy 60%
Petoil 20%KRG 20 %
KHALAKANGas Plus Khalakan* 40%
Turkish entity 40%KRG 20 %
SHEIKH ADIGulf Keystone 80%
KRG 20 %
SULEVANIPetroquest 80%
KRG 20 %
BINA BAWIOMV 36%
Genel Energy 44%KRG 20 %
AL QUSHExxonMobil 80%
KRG 20 %
SHAIKANGulf Keystone 51%
MOL (Kalegran) 13.6%Texas Keystone 3.4%
UNASSIGNED 12%KRG 20 %
BER BEHRGenel Energy 40%Gulf Keystone 40%
KRG 20 %
CENTRAL DOHUKMurphy 50%
Petroquest 30%KRG 20 %
BASHIQAExxonMobil 80%
KRG 20 %
KURDAMIRTalisman 40%
WesternZagros 40%KRG 20 %
ARBAT EASTExxonMobil 80%
KRG 20 %
HINDRENTurkish entity 80%
KRG 20 %
JABAL KANDTurkish entity 40%UNASSIGNED 40%
KRG 20 %
ROVIChevron 60%
OMV 15%KRG 25%
KEWA CHIRMILAGenel Enerji 44%
Addax Petroleum 36%KRG 20 %
CHEMCHEMALPearl Petroleum* 100%
Crescent Petroleum 40%Dana Gas 40%
MOL (Kalegran) 10%OMV 10%
KOR MORPearl Petroleum* 100%
Crescent Petroleum 40%Dana Gas 40%
MOL (Kalegran) 10%OMV 10%
KHURMALA DOMEKAR Group 100%
KRG %
Mosul750 MW
Dibis ICE640 MW
Dohuk CGT500 MW
Baiji North170000 BOPD
Baiji Salahedden140000 BOPD
Bazian34000 BOPD
Kalak100000 BOPD
Kirkuk27000 BOPD
Qayarah16000 BOPD
Tawke5000 BOPD
K-2 (Siniyah)20000 BOPD
Dohuk29MW
Erbil29MW
Rizgari29MW
Chemchemal DF1000MW
Pirdawd DF1312MW
Darbandikhan HPP249MW
Dohuk DF500MW
Dokan HPP400MW
Samarra HPP75MW
Tasluja ICE51MW
Mullah Abdullah CGT402MW
Taza CGT330MW
Haditha HPP660MW
Mosul Dam1052MW
KHURMALA
FISH KHABUR
KHASHMAL AHMAR
CHEMCHEMAL
JARIAPIKA
MANSURIYAH
GILABAT
KHURMALADOME
AVANAHDOME
BABADOME
JAWAN
NAJMAH
AJEEL
NAUDOMAN
INJANA
PULKHANA
CHIASURKH
JAMBUR
TAQ TAQ
KIRKUK
KHABBAZ
BAIHASSAN
ISMAIL
QARACHAUQ
QAIYARAH
QASAB
QALIAN
ADAIYAH
ATSHAN
ALAN
BUTMAH
RAFAN JEBELKAND
GUSAIR
SASAN
NAOUR
MUSHORAH
SUFAYA
HAMZAH
KARATCHOK
KARATCHOKWEST
LELACYOLACAN
RUMAILAN
TELGHARAB
ULAYYAN
JUDAIDA
KHANUQAH
MAKHUL
HAMRIN
TIKRIT
KOR MOR
TAWKE
BENENAN
SARQALA
SHAKAL
MIRANWEST
ATRUSH
SWARATIKA
SARTACENTRAL
BASTORA
JEBELSIMRIT
ROVISOUTH
BAZIAN
QARADAGH
SHAIKAN
SHEIKHADI
BIJEEL
BARDARASH
KURDAMIR
TOPKHANA
BAKRMAN
DEMIR DAGHBINABAWI
QAMAR
BERBEHR
TAZA
SUMMAIL
MILQASIM
46°0'0"E
46°0'0"E
45°0'0"E
45°0'0"E
44°0'0"E
44°0'0"E
43°0'0"E
43°0'0"E
42°0'0"E
42°0'0"E37
°0'0"
N
37°0
'0"N
36°0
'0"N
36°0
'0"N
35°0
'0"N
35°0
'0"N
250000
250000
300000
300000
350000
350000
400000
400000
450000
450000
500000
500000
550000
550000
600000
600000
3800
000
3800
000
3850
000
3850
000
3900
000
3900
000
3950
000
3950
000
4000
000
4000
000
4050
000
4050
000
4100
000
4100
000
q
Well Status#* Planned
_̂ Drilling/Testing
Q Suspended
B Plugged and Abandoned
= Location
Hydrocarbons)= Oil
)È Oil and Gas
È Gas/Condensate
FieldsOil Field/Discovery
Gas/Condensate Field/Discovery
PipelinesGas, Active
Gas, Proposed
Oil, Active
Oil, Construction
Oil, Proposed
Product, Active
Facility - ActiveΜ Metering Station
C Power Station
¾ Refinery
Facility - ConstructingC Power Station
¾ Refinery
Kurdistan BlocksAwarded
Open
Study
Newly awarded PSCs
Kurdamir PSC
Garmian PSC
Mountain Front
KRG Boundary1991 NE extent of Saddam regime
Current SW extent KRG military control
Country Boundaries
Urban Areas
09 September, 2013
Projection: WGS 84 UTM38N
I:\appdata\ArcGIS\Maps\Activity Maps\130904_operator_activity_for_pdf.mxd09 September, 2013
Date printed:Date last saved:File location:
Kurdistan & Northern IraqOperator Activity Map
September 20130 10 20 30 40 505
KilometersNo Copying or Distribution without
permission of WesternZagrosData shown is to the best knowledge of WesternZagros at time of printing, however we cannot be
held responsible for outdated or incorrect information. To inform us of any discrepancies, please contact:[email protected]
mmbbls Million barrels (oil)TCF Trillion cubic feet (gas)BCF Billion cubic feet (gas)bopd Barrels of oil per daymmcfd Million cubic feet gas per dayEWT Extended well testEPF Early production facility (temporary)CPF Central production facility (permenant)FDP Field Development PlanOIP Oil in placePSC Production Sharing ContractMW Mega wattsHPP Hydro Power PlantICE Internal Combustion (Heavy Fuel Oil)CGT Single Cycle Gas TurbineCCGT Combined Cycle Gas TurbineDF Dual fuel (Gas + Fuel Oil)
Abbreviations
Red text indicates recently updated informationText box information
Perenco relinquished Sindi Amedi West to KRG 2013
Sarsang PSC explorationMangesh-1 spud Sept 2012. Currently testingGara-1 spud Nov 4 2012. Awaiting testing results
Sindi Amedi East PSC exploration145km 2D seismic completed. Amedi-1and Sindi Gara-1 due to spud 2014
Shireen-1 planned spud Nov 2013.509km 2D seismic completed over Dinarta PSC Aug 2013
Bakrman-1 spud May 2012. TD 3930m. Triassic tested 2616 bopd + 5.86 mmcfd.Reentry and sidetrack planned Sept 2013
Harir-1 TD 3800m (Triassic). Abandoned 2012. . Mirawa-1 spud March 2013. Reached TD 3900m. Testing2D Seismic completed
Pirmam-1 target spud Oct 2013.
Gazprom to commence 2D seismic acquisition 2014
Zay Gawra-1spud April 2013. TD 4407m. Testing
Ain al Safra-1 spud June2013. Currently drilling at 2565m