Corporate Presentation - Eunice Energy...
Transcript of Corporate Presentation - Eunice Energy...
www.eunice-group.com
Corporate Presentation
Agenda
EUNICE ENERGY GROUP (EEG)
EEG at a glance01WIND PARKS
Brief presentation02PHOTOVOLTAIC PARKS
Brief presentation03AIGAIO PROJECT
Brief presentation04S4S in operation
Brief presentation05EW16 θέτις
Brief presentation06
07 Key Partners
2
Corporate presentation EEG | www.eunice-group.com
EUNICE ENERGY GROUP
3
Corporate presentation EEG | www.eunice-group.com
By name…
EUNICE is a feminine given name,
from the Greek Εὐνίκη, Euníkē, from
"eu", which means good, and "níkē",
which means victory.
Eunice is one of the Nereids in the
Greek Mythology.
Introduction
EUNICE ENERGY GROUP (EEG) is the first Greek Group to develop and invest
in Renewable Energy Sources (RES) projects, generating and allocating
electricity from Renewable Energy Sources (RES).
Thanks to the overall know-how and full activity in the field of electricity from
RES, EEG is a "partner of choice" for international organizations, companies
and funds that are interested in projects in Greece, and Europe in general.
The Group implements novelties and delivers smart energy solutions. Soon,
every individual or facility will be able to become a NetProsumer - a
producer as well as a part in the energy exchange grid.
By developing and applying innovations, EEG is appointed and established as
the Greek power to implement energy from Renewable Energy Sources (RES)
in everyday life.
4
Corporate presentation EEG | www.eunice-group.com
Energy production
& continuous
development
EUNICE ENERGY GROUP (EEG) at
a glance
• Operates Wind Parks with a total capacity of 80.6MW
• Manages photovoltaic parks with a total capacity of 1.2MW
• Projects with a total output of about 200MW are in the licensing phase
• AIGAIO Project with a total wind energy capacity of 582MW develops and prospers
on remote and uninhabited islets of the Cyclades and Dodecanese complex of the
Aegean Sea
• Evolves and implements the S4S Total Energy Management System that converts the
consumer into a producer and manager of its consumption and ensures energy
autonomy in remote areas
• Ownership and operation of the hybrid system in Tilos island• Operates the EUNICE WIND factory producing small wind turbine EW16 θέτις 50KW,
fully integrated with battery storage, in Mandra, Attica
• Active in trading and supplying electricity exclusively from Renewable energy
Sources (RES) through WE ENERGY
• The Group recently announced the signing of a contract with Blink Charging Co.,
USA for the creation of the Blink Europe consortium and its entry into the European
electric vehicle charging market, starting with Greece
• Employs 55 people with high skills in all areas of development of Renewable Energy
Sources (RES)
5
Corporate presentation EEG | www.eunice-group.com
EUNICE ENERGY GROUP (EEG) in one
picture
Aiolika Parka
Arkadias
Wind Park
Arkadika
Meltemia
Wind Park
Aioliko Parko
Voiotia, Kedros
Wind Park
Energy
Communities
Wind turbine
manufacturing
EW16 θέτις
wind turbine
Development
of the S4S
System
S4S TILOSAΙGAIO
PROJECT
Valkanika PVs
6
Corporate presentation EEG | www.eunice-group.com
Wind
& Solar
Parks
7
AIOLIKO PARKO VOIOTIAS
KEDROS
ARKADIKA MELTEMIA
AIOLIKA PARKA ARKADIAS KYKLADIKA MELTEMIA
TILOS Project
PHOTOVOLTAIC PARK
Corporate presentation EEG | www.eunice-group.com
WIND PARKS
8
ARKADIKA MELTEMIA
AIOLIKA PARKA
ARKADIAS
General information of installed
Wind Parks, Arkadia, Greece
AIOLIKA PARKA ARKADIAS: • 16.2MW total capacity
• PPA 2027
ARKADIKA MELTEMIA:• 43.7MW total capacity
• PPA 2027
10
AIOLIKO PARKO
VOIOTIAS
KEDROS
General information of installed
Wind Park, Voiotia, Kedros
AIOLIKO PARKO KEDROS:• 20.7MW total capacity
• PPA 2031
12
Corporate presentation EEG | www.eunice-group.com
SOLAR PARKS
13
VALKANIKA PVs
1,2MW total installed capacity
Year of installation: 2013
Corporate presentation EEG | www.eunice-group.com
AIGAIO Project
15
AIGAIO Project
• 23 remote and uninhabited islets of the
Aegean Sea, Cyclades and Dodecanese
complex
• Production licenses totaling 582MW wind
power capacity
• 138 wind turbines
• Mean Annual wind speed of 9.7m/s
• Project’s total implementation cost
amounts to €1.712 millions
16
AIGAIO Project:
Interconnection Map
17
2008… 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Aegean Project Map
Granting of Environmental Terms
Installation License
Securing od Suppliers
Financial Closing & Beginning of Installation
Project Completion
Operation License
Granting of Production License of 582MW
Production
License
342MW
AIGAIO Project: Timeline
18
AIGAIO Project: Basic Illustratory depictions
19
AIGAIO Project: International
dimension
Aegean Project Map
• The interconnection of the AIGAIO Project has been included in the Ten-
Year Network Development Plan of ENTSO-E under the title “Project 293 –
Southern Aegean Interconnector (SAI)”. ENTSO-E is the European Network
of Transmission System Operators, representing 42 electricity transmission
system operators (TSOs) from 35 countries across Europe. ENTSO-E was
established by European TSOs with a mandate by the EU’s Third
Legislative Package for the Internal Energy Market in 2009, which aims at
further liberalizing the gas and electricity markets in the EU.
• In addition, the interconnection of the AIGAIO Project has been included
in “The Ten-Year Network Development Plan, with the distinctive title
“Southern Aegean Interconnector (SAI)” TYNDP” of 2014 and successfully
remained in the plan’s recent update of 2016 (TYNDP 2016) and 2018
(TYNDP 2018).20
AIGAIO Project: International Dimension of Interconnectivity
Aegean Project Map
21
Corporate presentation EEG | www.eunice-group.com
S4S IN OPERATION
22
S4S in operation at Tilos Island
• The Hybrid Tilos Station is in operation and has
measurable results
• It includes an 800kW wind turbine, an 160kW
photovoltaic solar panel park and storage in a total
two battery capacity of 400kWh (x2)
• The design and development of the project storage
system has been integrated into the HORIZON2020
program (European Commission Convention No.
646529-TILOS-H2020-LCE-2014-2015 / H2020-LCE-
2014-3)
23
Corporate presentation EEG | www.eunice-group.comAegean Project Map
TILOS Project: International awards
TILOS Project was part of the pioneering European research program
HORIZON2020. EUNICE ENERGY GROUP (EEG), as the leading private
partner in the consortium, designed, funded and created the hybrid
station, which is considered the prototype of the S4S application.
In 2017, TILOS Project won the "Energy Islands" award, which was judged
by a panel of experts and was announced as the winner in ENERGY
ISLANDS sector by European Commission and also received the CITIZEN’S
AWARD.
Today, EEG owns and operates the Hybrid Station, with the S4S in Tilos
operating fully to meet the island's total power consumption requirements.
This event established Tilos as the first energy autonomous island of the
Mediterranean.
S4S in Hybrid Power System, Tilos island, GreeceENERGY PRODUCTION REAL DATA
http://s4s.eunice.gr/
24
Corporate presentation EEG | www.eunice-group.com
THE FIRST MADE IN GREECE WIND TURBINE:
EW16 θέτις
25
Corporate presentation EEG | www.eunice-group.com
The innovative small wind turbine EW16 θέτις
EW16 θέτις is manufactured by
EUNICE WIND with a total power of
50kW.
The first MADE IN GREECE
wind turbine
The first Greek wind turbine EW16 θέτις, manufactured in Mandra, Attica, by
EUNICE WIND, member of the Group EUNICE ENERGY GROUP (EEG), is the
crown of modern technology in the field of wind power and is suitable for
medium-scale wind systems.
Ideal for mid-scale wind parks, for interconnected or self-contained systems
that have very low noise levels and require minimal maintenance. The EW16 θέτις stands out for its high reliability, performance and efficient
design.
The fully integrated manufacturing process ensures that EW16 θέτις is an
innovative product while, at the same time satisfies the most stricter
international regulations for interconnection of energy networks.
EW16 θέτις is designed in accordance with IEC 61400-2 standards while the
EUNICE WIND factory is certified according to ISO 9001:2015 for all its
activities.
26
27
EW16 θέτις
EW16 θέτις – Advantages:
• Direct drive (without gearbox)
• Variable Speed Operation
• Active yaw alignment
• Smooth and silent operation
• Low-maintenance proven technology
• Designed according to Standards IEC 61400-2
27
Corporate presentation EEG | www.eunice-group.comAegean Project Map
Key Partners
The Group, as healthy, independent and pioneering company, has a constant orientation on the production and application of
renewable energy. It already has important collaborations worldwide with global giants and enjoys international recognition.
EUNICE ENERGY GROUP (EEG) is a
member of the Leading European
Association for Energy storage (EASE).
EUNICE ENERGY GROUP (EEG) recently announced
the signing of a contract with Blink Charging Co.,
USA for the creation of the consortium Blink
Europe, and its entry into the European electric
vehicle charging market, starting from Greece.
EUNICE ENERGY GROUP (EEG) is the chosen partner for
the Climate KIC in Greece.
28
THANK YOU
EUNICE ENERGY GROUP (EEG) Central offices:
29, Vas. Sofias Ave. 106 74 Athens, Greece
Eunice Wind - Factory:
Thesi Patima, 196 00 Mandra Attikis, Greece
T: +30 210 3242020
www.eunice-group.com
Cyprus offices:
1, Bouboulinas str., 1060 Nicosia
T: (+357) 22760765
Germany offices:
3C Nymphenburger Str., D-80335 Munich
T: (+49) 8951 661979