ΕΛΛΗΝΙΚΗ ΔΗΜΟΚΡΑΤΙΑ ........................ ........................ ........................ .................. ΕΡΓΟ: ............................. ................... Ταχ. Δ/νση: .................. ........ ΧΡΗΜΑΤΟΔΟΤΗΣΗ: ΕΣΠΑ 2007-2013/ΕΠΠΕΡΑΑ (ΤΑΜΕΙΟ ΣΥΝΟΧΗΣ-ΕΘΝΙΚΟΙ ΠΟΡΟΙ) 1 Τ.Κ. .................. ........ Τηλ. .................. ........ Fax. .................. ........ ΠΡΟΥΠΟΛΟΓΙΣΜΟΣ: .......................... €, πλέον ΦΠΑ Τεύχη Δημοπράτησης Τεύχος 5.1. Τεχνικές Προδιαγραφές Έργων Πολιτικού Μηχανικού 1 Εάν υπάρχουν και ίδιοι πόροι τότε η χρηματοδότηση προσαρμόζεται ανάλογα

description

ΝΟΜΟΙ

Transcript of ΤΕΥΧΟΣ_5.1-ΠΡΟΔΙΑΓΡΑΦΕΣ_ΕΡΓΩΝ_ΠΜ_RT

..........................................................................................

:

................................................

. /:..........................: 2007-2013/

( - )

............................

...........................

Fax...........................:.......................... ,

5.1. ()

()

1.

2. ()

21.

221.--1:

221.1 -

221.2

221.2.1 HDPE 3 10atm

231.2.2

231.2.3

241.2.4 HDPE

241.2.5 SPIRAL uPVC HDPE

251.2.6

251.2.7

251.3

251.3.1

251.3.2

261.3.3

271.3.4

291.3.5

322.--2:

322.1 -

322.2

332.3

332.3.1

342.3.2

342.3.3

352.3.4

363.--3: EPA

363.1 -

363.2

363.3

363.3.1

363.3.2

363.3.3

373.3.4

384.--4:

384.1

384.2

384.3

394.4

404.5

414.5.1

414.5.2

424.5.3

424.5.4

424.6 -

424.6.1

434.6.2

434.6.3

444.7

444.7.1

454.7.2

454.7.3

464.8

464.8.1

464.8.2

464.8.3

474.9

474.9.1

474.9.2

514.9.3

524.9.4

534.10/

555.--5:

555.1

555.2

566.--6:

566.1

566.2

566.3

.

, .

. (), . (www.ggde.gr). .. ()

//273 ( 2221//30-07-2012) ( ) 26/04-10-2012 .

, .

(), 26/04-10-2012.

/ . " 1501-" +

01

01-01 -

101-01-01-00 Concrete production andtransportation

201-01-02-00 Concrete casting

301-01-03-00 Concrete curing

401-01-04-00 Work site concrete batchingplants

501-01-05-00 Concrete compaction by vibration

601-01-06-00 Self compacting concrete

701-01-07-00 Mass concrete

01-02

801-02-01-00 Steel reinforcement for concrete

901-02-02-00 Concrete post- & pre-tensioning

01-03 -

1001-03-00-00Scaffolding (falsework)

1101-04-00-00 ()Concrete formwork

1201-05-00-00 () Formation of final surfaces in cast concrete without use of mortars

02

02-01

1302-01-01-00, Works zone grubbing and clearing

1402-01-02-00 Removal of the top layer of thesoil

02-02

1502-02-01-00 General excavations for Road and Hydraulic works

1602-03-00-00 General excavations for Buildings

1702-04-00-00 Excavations for foundation works

1802-05-00-00 Management of excavation materials and exploitation of dumping sites

1902-06-00-00 - Quarry sites and borrow areas development and exploitation

02-07 /

2002-07-01-00 Construction of embankments with suitable excavation or borrow materials

2102-07-02-00 Refill of excavations for foundation works

2202-07-03-00 transition embankments

2302-07-04-00 Reinforced embankments

2402-07-05-00 - lining of road embarkment slopes and filling of road islands with horticultural soil

2502-07-06-00 Rip-rap for road slope protection

02-08

2602-08-00-00 Dealing with public networks during excavation works

02-09 /

2702-09-01-00 , , Soil improvement and stabilization using lime, pozzolans, cement and calcareous fly ash

03

03-02

2803-02-01-00 Natural stone masonry

2903-02-02-00 Clay bricks masonry

03-03

3003-03-01-00 Coatings using in-situ mortars

03-04

3103-04-05-00 Sealing of building joints

03-05 -

3203-05-01-00 Roof coverings with clay roofing tiles

3303-05-02-01 Roof coverings with self supporting metal sheet products

3403-05-02-03 Roof coverings with steel sheets with upwards trapezoidal corrugations without insulation

having downwards trapezoidal

corrugations, thermal insulation

and waterproofing layers

03-06

3603-06-01-01 Waterproofing of roofs and terraces with asphaltic membranes

3703-06-01-02 PVCWaterproofing of roofs and terraces with PVC membranes

3803-06-02-01 Thermal insulation of terraces

3903-06-02-02 Thermal insulation of external walls

4003-06-02-03 Thermal insulation of clay roofing tiles

4103-06-02-04 External wall insulation systems with expanded polystyrene (EPS) boards and fibre mesh reinforced synthetic coatings

03-07 - -

4203-07-01-01 Nail and staple hardwood flooring

4303-07-01-02 Glue down hardwood flooring

4403-07-02-00 , Ceramic tiles covering of indoor and outdoor surfaces

4503-07-03-00 Natural stone paving

4603-07-04-00 , Cladding with marble, granite and natural stones

4703-07-06-01 Textile floor coverings

4803-07-06-02 Vinyl tile flooring

4903-07-08-00 Raised access flooring

5003-07-10-01 Gypsum boards for suspended ceilings

5103-07-10-02 Sound absorbing suspended ceilings

5203-07-10-03 Fibre cement boards suspended ceilings

03-08 -

5303-08-01-00 Wooden windows and doors

5403-08-02-00 Steel windows and doors

5503-08-03-00 Aluminium windows and doors

5603-08-04-00 Synthetic windows and doors

5703-08-07-01 Single layer and laminated glass glazing

5803-08-07-02 Insulated (double) glazing

5903-08-07-03 - Fire resistant glazing - Fire resistant wall partitions with glass tiles

6003-08-09-00 Glass doors made of security glass

03-09

6103-09-01-00 Built-in furniture

03-10

6203-10-01-00 Concrete painting

6303-10-02-00 Render and plaster painting

6403-10-03-00 Corrosion protection and painting of steel

6503-10-05-00 Wood painting

04/

04-01

6604-01-01-00 Building piping systems under pressure with black welded steel tubes

6704-01-02-00 Building piping systems under pressure with seamless steel tubes

6804-01-03-00 Building piping systems under pressure with copper tubes

6904-01-04-01 Building piping systems under pressure with polyethylene tubes

7004-01-04-02 Building piping systems under pressure with flexible, reinforced plastic tubes

7104-01-05-00 Building piping systems under pressure with welded, galvanized steel tubes

7204-01-06-00 Building piping systems under pressure with seamless, galvanized steel tubes

7304-01-07-00 Building piping systems under pressure with stainless steel tubes

04-02

7404-02-01-01 Building piping systems with linear plastic tubes using free flow

04-04

7504-04-01-01 General requirements for domestic sewerage systems

7604-04-01-02 General requirements for nondomestic sewerage systems

7704-04-03-01 Sanitary ware, common

7804-04-03-02 ()Sanitary ware for disabled persons

7904-04-03-03 Bath and WC ancillary equipment

8004-04-04-01 Floor gullies, odour-trap

8104-04-04-02 Floor gullies, not odour-trap

8204-04-05-01 ( )Outdoor manholes of building sewerage systems

8304-04-05-02 - , Inspection-cleaning outlets of buildings sewerage piping, inside or without manholes

05

05-01

10005-01-02-01 Prefabricated, post tensioned beams

10105-01-02-02 Bridge construction with the balanced cantilever method

10205-01-02-03

10305-01-05-01 Elastomeric bearings

10405-01-06-00 - Bridge deck joints

10505-01-07-01 Bridge deck waterproofing with synthetic membranes

10605-01-08-00 Bridge drainage systems

10705-01-09-02 Fixing of guard rails and lighting poles on bridge decks and walls

05-02

10805-02-01-00, Kerbs, gutters and roadside concrete lined drainage ditches

10905-02-02-00- Paving slabs and cobblestones for pedestrian areas

11005-02-03-00Antigraffiticoatings

11105-02-04-00Road sound barriers

11205-02-05-00Road anti-glare systems

11305-02-06-00 -Stepped slope gutters and their inflow-outflow shafts

11405-02-07-00 Rockfall protection barriers

05-03

11505-03-01-00 Road pavementsubgradelayer with unbound soil

11605-03-02-01 Road pavementsubgradelayers and embankment bedding layers with lime stabilized soil

11705-03-02-02 Road pavementsubgradelayers with cement stabilized soil and cement bounded granular materials

11805-03-03-00 Road pavement layers with unbound aggregates

11905-03-05-01 ()Road pavement layers with cement bounded aggregates

12005-03-07-00 Roller compacted concrete pavement

12105-03-08-00 Road shoulders with horticultural soil and aggregates mixture

12205-03-11-01Asphalt pre-coating

12305-03-11-04 Hot mixed dense graded asphalt concrete layers

12405-03-12-01 Skid resistant asphalt concrete wearing course

12505-03-12-04 Skid resistant asphaltslurry wearing course

12605-03-14-00() Milling of asphalt concrete pavements

12705-03-16-00 (CIR)Full depth road pavement reclamation with cold in-situ recycling and addition of foamed asphalt

12805-03-17-00 Road pavement layers with cement bound recycled materials resulting from asphalt concrete and underlying layers milling

12905-03-18-01 Asphalt emulsion coating for the protection of stabilized pavement layers

05-04

13005-04-01-00 Removal of pavement markings

13105-04-03-00Retroflecting road studs

13205-04-04-00Road delineators

13305-04-05-00 ,/ Removal and/or repositioning of traffic signs and webs

13405-04-07-00 Traffic signs mounting and support systems

13505-04-08-00()Changeable message signs

05-05

13605-05-05-00 Expropriation zone markers

13705-05-06-00Permanent road fences

08

08-01

17208-01-01-00Ditch and channel excavations

17308-01-02-00 , Clearing, snagging and dredging of rivers, streams and drainage ditches

17408-01-03-01 Trench excavations for utility networks

17508-01-03-02 Underground utilities trench backfilling

17608-01-04-01 Trenchless utilities installation with soil displacement methods

17708-01-04-02 Trenchless utilities installation with soil removal methods

08-02

17808-02-01-00, (Serasanetti)Wire-mesh gabions for slope, river bed and embankment protection

17908-02-02-00 Rip-rap on geotextile for slope and river bed protection

08-03

18008-03-02-00 Underdrain filters with graded aggregates

18108-03-03-00Geotextiles for underdrains

18208-03-04-00 Drain relief valves (vents) in concrete lined channels

18308-03-06-00 Surface drainage with geosynthetics

08-04

18408-04-01-00 Channels and reservoirs concrete lining. Porous concrete substrate

18508-04-02-00 Concrete casting using slipform pavers

18608-04-03-00 Concrete structures with special waterproofing, abrasion and chemical attack resistance requirements

08-05

18708-05-01-02 Waterproofing of concrete structures using asphaltic membranes

18808-05-01-04 Protective coatings of hydraulic concrete structures using in-situ or ready-mixed cement mortars

18908-05-02-01 Saw cutting joints in concrete slabs

19008-05-02-02 (Waterstops)Waterstops for concrete joints

19108-05-02-03 Concrete structures joint gap filling

19208-05-02-04 Concrete structures jointsealing using asphaltic mastics

19308-05-02-05 Concrete structures joint sealing using elastomeric materials

19408-05-03-01 Clay barrier liners for ponds and landfills

19508-05-03-02 Pond and landfill membrane lining cushion layer of fine graded granular materials

19608-05-03-03/ Pond and landfill membrane lining protection/filter layer of graded granular materials

19708-05-03-04 (HDPE)Pond and landfill lining with HDPE membranes

19808-05-03-05- Pont and landfill lining membrane ballast cylinders

19908-05-03-06 Pond and landfill lining membrane vents

08-06-

20008-06-02-01 u-PVCpressurized u-PVC pipe networks

20108-06-02-02 u-PVCpressurized u-PVC pipe networks for sewage

20208-06-06-01 (FW-GRP)Glass-reinforced polyester produced by filament winding (FW-GRP) pipe networks

20308-06-06-02 Fibre cement pipe networks fro drainage and sewage

20408-06-07-02Cast iron gate valves

20508-06-07-03 Cast iron butterfly valves

20608-06-07-05Pipeline components dismantling joints

20708-06-07-06Pressure relief valves

20808-06-07-07- Double orifice air relief valves

20908-06-07-10Irrigation hydrants

21008-06-08-01Warning tape above buried utilities

21108-06-08-03 Retrofitting of concrete paving slabs along constructed underground utility

21208-06-08-04 Retrofitting of kerbs and gutters along constructed underground utility

21308-06-08-06 Prefabricated concrete manholes

21408-06-08-07 Prefabricated manholes made of polymer-reinforced concrete (PRC)

08-07

21508-07-01-01 Grey cast iron gully tops

21608-07-01-02 Hand welded gully tops

21708-07-01-03 Press welded gully tops

21808-07-01-04 Ductile iron gully tops

21908-07-01-05Manhole steps

22008-07-01-06 Factory produced floor drainage channels

22108-07-02-01 Rust protection of steel structures used in hydraulic works

22208-07-02-03 Installation of open channel flow level control gates

22308-07-03-01 Corrugated galvanized steel conduits

09

09-02

23609-02-01-00 Sea-bed dredging

23709-02-02-00 Sea-bed rock excavations using explosives

09-03

23809-03-01-00 Sea-bed improvement with sand and gravel

23909-03-02-00 Underwater vertical wick drains

24009-03-03-00 Underwater laying of geotextiles

24109-03-04-00 Underwater laying of geogrids

24209-03-05-00 Construction of underwater stone columns

09-04

24309-04-01-00 Underwater embankments with granular borrow pit or quarry materials

24409-04-02-00 Underwater embankments with suitable sea bed excavation materials

24509-04-03-00 Coast reclamation with selected sand and gravel materials

09-05

24609-05-01-00 Rockfill prism and levelling layer for the foundation of marine structures

24709-05-02-00 Rockfill core of marine gravity structures

24809-05-03-00 Backfill of marine structures with rock materials

24909-05-04-01 Rockfills in concrete block cells of marine structures

25009-05-04-02 Rockfills in floating caisson cells of marine structures

09-06

25109-06-01-00 Rip-rap armouring ofbreakwaters and shore protection structures

09-07

25209-07-01-00 Compact concrete blocks for marine structures

25309-07-02-00 Cellular and special shape concrete blocks for marine structures

25409-07-03-00 Concrete blocks for slope protection of marine structures

25509-07-04-00 Precast concrete elements for marine structures

09-08(caissons)

25609-08-00-00 Concrete caissons for marine structures

09-09

25709-09-01-00 Marine structures with unreinforced or lightly reinforced concrete

25809-09-02-00 Marine structures with reinforced concrete

25909-09-03-00 Marine structures' expansion joints

09-10

26009-10-01-00 Gravity marine structures with underwater concrete casting

26109-10-02-00 / Filling of the blocks cells and the gaps among the blocks and/or marine structures with underwater concrete casting

26209-10-03-00 Gap filling or retrofitting of gravity marine structures using underwater concrete casting

09-11- -

26309-11-02-00 Driven steel piles in marine works

09-13

26409-13-01-00 /Cast and ductile iron quay side bollards

26509-13-02-00, Quay fittings made of steel, cast iron or stainless steel

09-14

26609-14-01-00 Harbour deckings made of concrete, reinforced or not

26709-14-02-00 Harbour deckings made of fibre reinforced concrete

26809-14-03-00 Harbour deckings made of concrete cobblestones

26909-14-04-00 Joints of concrete harbour deckings

27009-15-01-00/Floating docks and wave breakers

09-17

27109-17-01-00Underwater pipeline systems with steel pipes

27209-17-02-00 Underwater pipeline systems with reinforced concrete pipes

27309-17-03-00 (HDPE)Underwater pipeline systems with high density polyethylene (HDPE) pipes

27409-17-04-00 (GRP)Underwater pipeline systems with glass reinforced polymers (GRP) pipes

09-19

27509-19-01-00- Health-Safety and Environmental Protection requirements for marine works

10

10-02

27610-02-02-01Park benches

27710-02-02-02Litter receptacles

27810-02-02-03Open playgroundsequipment

10-05

27910-05-01-00-Planting of trees and shrubs

28010-05-02-01Lawn turf sowing

28110-05-02-02Laying ready made lawn turf

28210-05-02-03 Installation of lawn turf on athletic fields

28310-05-03-00 ()Planting of Mesembryanthemum

28410-05-04-00Lawn planting on slopes

28510-05-05-00----Temporary erosion control structures utilizing locally available timber (contour log terraces etc)

28610-05-06-00Planting of indoorplants

28710-05-07-00, Planting of bulbs, or annual and perennial plants

28810-05-08-00 -Transplanting of existing trees and shrubs

28910-05-09-00Trees staking

10-06

29010-06-01-00 Reshaping of plant irrigation basins

29110-06-02-01Irrigation of plants

29210-06-02-02- -Irrigation of lawn, ground cover plants and slope cover plants

29310-06-03-00Application of fertilizers

29410-06-04-01Lopping and pruning of trees

29510-06-04-02Pruning of shrubs

29610-06-04-03Lawn mowing

29710-06-05-00Plant protection

29810-06-06-00Weed control methods

29910-06-07-00Grassed areas clearing

30010-06-08-00lawnimprovement

30110-06-10-00Indoor plants tending

10-07

30210-07-01-00-Cutting of trees and shrubs and stump removal

10-08

30310-08-01-00Construction of plant irrigation networks

10-09

30410-09-01-00 Supply and handling of planting material

11

11-01

30511-01-01-00'()Bored, in-situ cast concrete piles

30611-01-02-00'()Driven piles

30711-01-03-00Micro-piles

11-02

30811-02-02-00 Retaining structures with steel-sheet piles

30911-02-03-00Diaphragm walls

31011-02-04-00Prestressed anchors

31111-02-05-00Retaining structures with reinforced earth

11-03

31211-03-01-00Dynamic soil compaction

31311-03-02-00Vibratory soil compaction

31411-03-03-00 ()Vibratory soil replacement (stone column construction)

31511-03-04-00 (jetgrouting)Soil piles using jet grouting

31611-03-05-00Soil grouting

31711-03-06-00Vertical wick drains

12

12-01

31812-01-01-00Tunnel worksite ventilation

31912-01-02-00 Tunnel worksite lighting

12-02

32012-02-01-01 Tunnel excavation with conventional means

32112-02-01-02 Tunnel excavation with full-facers or roadheaders

32212-02-02-00 Infiltration and mud control during tunnel construction

12-03

32312-03-01-01 Steel frames for initial tunnel support

32412-03-01-02 Lattice girder frames for initial tunnel support

32512-03-01-03() Adjustable (sliding) steel frames for tunnel support

32612-03-02-00 Sprayed concrete for underground works and tunnels

32712-03-03-00 General requirements for tunnel support anchoring

32812-03-03-01 ( )Tunnel support with partially grouted mechanically anchored rockbolts (EB bolts)

32912-03-03-02 (RB)Tunnel support with resin anchored rock bolts (RB bolts)

33012-03-03-03 Perfo(SNPerfo)Tunnel support with Perfo type hollow tube dowels (SN perfo dowels)

33112-03-03-04 (SN)Tunnel support with simple fully grouted bolts (SN dowels)

33212-03-03-05 swellex(SWX)'Tunnel support with Swellex dowels (SWX dowels)

33312-03-03-06 (SDBr)Tunnel support with self drilling anchors (SDBr dowels)

33412-03-03-07 (SPL)Tunnel supportwith set type rock anchors (SPL dowels)

33512-03-04-00 (PSA)Tunnel support with prestressed soil anchors (PSAanchors)

33612-03-05-00 Heavy forepoling

33712-03-06-00 Light forepoling and spiling

33812-03-07-00Micro-piles in tunnels

33912-03-08-00 Reinforcement meshes for sprayed concrete in tunnels

12-04

34012-04-01-00 Tunnel lining with cast in-situ concrete

34112-04-03-00 Tunnel lining with prefabricated concrete segments

12-05

34212-05-01-00 Tunnel lining waterproofingwith synthetic membranes

34312-05-02-00 Geotextiles for the protection or drainage of tunnel lining waterproofing membranes

12-07-

34412-07-01-00 , ,Drilling in tunnels for grouting, anchoring, instrumentation etc

34512-07-02-00Cement grouting in tunnels

34612-07-03-01 Tunnel grout holes' fittings

34712-07-03-02 Tunnel drainage holes' fittings

12-08

34812-08-01-00 Convergence monitoring of tunnel excavation surfaces and linings

34912-08-02-00 Strain gauges

14

14-01

39114-01-01-01 Removal of loose or adhered material from concrete surfaces

39214-01-01-02 -Preparation of concrete surfaces for retrofitting or strengthening works

39314-01-02-01 Partial demolition of concrete elements with preservation of reinforcement

39414-01-02-02 Partial demolition of concrete elements without preservation of reinforcement

39514-01-03-01 Drilling in concrete elements without cut-offof existing reinforcement

39614-01-03-02 Drilling in concrete elements with cut-off of encountered reinforcement

39714-01-04-00 Local retrofitting of concrete element damage caused by reinforcement corrosion

39814-01-05-00 , Local retrofitting of concrete elementdamage, not extending to the reinforcement

39914-01-06-00 Cross section retrofitting of structural elements with local disintegration

40014-01-07-01 Filling of narrow concrete cracks

40114-01-07-02 Filling of wide concrete cracks

40214-01-08-01- (FRP)Strengthening-retrofitting of reinforced concrete structures by gluing of fibre reinforced polymeric fabrics (FRP fabrics)

40314-01-08-02- (FRP)Strengthening-retrofitting of reinforced concrete structures by gluing of fibre reinforced polymeric strips (FRP strips)

40414-01-09-01 Surface cleaning of exposed steel reinforcement bars

40514-01-09-04 Repair of exposed open reinforcement stirrups

40614-01-10-01 Strengthening of concrete members with weldable reinforcement steel, by welding additional bars on the existing ones.

40714-01-10-02 Strengthening of concrete members with weldable, under preconditions, reinforcement steel, by welding additional bars on the existing ones.

40814-01-11-00 Anchoring of new steel reinforcement bars in existing concrete elements

40914-01-12-01 Placing of dowels in concrete elements

41014-01-12-02 Placing of simple fully grouted bolts in concrete elements

41114-01-13-01- Strengthening or retrofitting of concrete structures with epoxy bonded steel sheets

41214-01-13-02- Strengthening or retrofitting of concrete structures with encased steel frames

41314-01-13-03- Strengthening of concrete elements by confinement with structural steel jackets

41414-01-14-00- Strengthening or retrofitting of concrete structures with sprayed concrete jackets

14-02

41514-02-01-01Removal of plaster coatings from masonry

41614-02-01-02Clearing of masonry surface

41714-02-01-03Widening of masonry joints

41814-02-02-01 Partial masonry wall demolition with mechanical tools

41914-02-02-02 Partial wall demolition with hand tools

42014-02-02-03 Partial wall demolition with thermic methods

42114-02-04-00 Masonry retrofitting with grouting

42214-02-05-01 ()Repair of wide masonry cracks with sparse replacement of masonry units across the cracks

42314-02-05-02 Repair of wide masonry cracks with wall-stitching

42414-02-07-00 /Existing masonry strengthening with a new, highstrength and/or reinforced render or plaster

42514-02-08-00 Strengthening masonry walls by placing an adjacent masonry wall

42614-02-09-01 Masonry strengthening with unilateral layer of reinforced concrete

42714-02-09-02 Masonry strengthening with bilateral layer of reinforced concrete

14-03

42814-03-01-00 Removing infill walls from the concrete structure

42914-03-02-00 Retrofitting of infill wall cracks

15--

15-01

43015-01-01-00 Structures demolition with explosives

43115-01-02-00 Structures demolition with the falling weight method

43215-01-03-00 Structures demolition with mechanical means

15-02

43315-02-01-01 Demolition of members of concrete structures by mechanical means

43415-02-01-02 Thermic demolition of members of concrete structures

43515-02-01-03 Hydrodemolition of members of concrete structures

43615-02-02-02 Thermic demolition of steel structures

15-03

43715-03-01-00 Demolition of post-tensioned concrete structures

43815-03-02-00 Piles and pile-sheets pullout

43915-03-03-00 Demolition of slabs on the ground

15-04- -

44015-04-01-00- -Health-Safety and Environmental Protection requirements for demolition works

.

, , .

/ " 1501-" +

1--1 08-06-**-**

2--2 08-07-01-01 08-07-01-0408-07-01-05

3--3EPA 05-02-01-0005-02-02-0005-03-01-0005-03-03-0005-03-08-0005-03-11-0105-03-11-04

4--4 03-**-**-**04-**-**-**

5--5 05-05-06-00

6--6 08-06-06-02

1. --1:

1.1 -

, , , , , , ( , .) ( ). --3: .

:

uPVC 6atm

HDPE 3 10atm

( )

:

uPVC 41

HDPE

SPIRAL uPVC-HDPE

.

1.2

1.2.1 HDPE 3 10atm

HDPE, 10atm., 12201. :

(1) -

M (butt fusion), 110. 110 , :

(Electrofusion Welding). (), .

. . DN32, .

(2) - PVC

. O . ( - ). .

1.2.2

545, 9 . EN545 .

1.2.3

, , DIN1626. , :

[mm] [mm]

802,9

1003,2

1253,6

1504,0

2004,5

2505,0

3005,6

3505,6

4006,3

5006,3

6006,3

7007,1

8008,0

90010,0

100010,0

120012,5

140014,2

, 1514. (, , ) ( 10253, 3). , 10253.

, () 30( 35(. , , .

:

i. , .

ii. BS4232, 2 , SIS 055900, Sa 2,5-3

iii. :

(75m),

(200m)

iv. :

(50m)

(100m)

, DIN30670, :

1 : (primer) 60

2 : (adhesive coat) 250

3 : (extruded) . 3mm.

3 3,2mm. DIN30672, 0,75mm 0,80mm 100mm, 50mm.

, .

1.2.4 HDPE

13476, . , 13476, . . .

1.2.5 SPIRAL uPVC HDPE

( 600) (SPIRAL) uPVC HDPE DIN16961, 1169.

SPIRAL uPVC () uPVC . . () . .

SPIRAL HDPE, (), .

1.2.6

. 2/02/44/.1.1 253//84 . , , .

SLW60 DIN1072

1.2.7

. , . 1.3

1.3.1

, . .

, ( ) . , .

, . , .

PVC HDPE ' . 0C .

PVC HDPE . , , .. , , 50mm 2m . 1,50m.

PVC HDPE. O , .

, . uPVC HDPE.

1.3.2

.

0,30m . , .

.

( ), . H .

. , , .

. . , . .

.

0,40m .

D 1,00m, , t=D/8 C12/15, tmin=0,15m.

.

.

.

uPVC HDPE, . () ( ) . . .

, , .

1.3.3

.

' . , .

, . , .

. . .

. ( ) .

(). . (, , ) .

' , , . (). , , .

PVC , 3. .

HDPE 30D, D .

, .

, . , , .

1.3.4

1.3.4.1

, C20/25 II V (Sulfate Resisting), . C20/25, , . , .

, .

.

GRP, . , GRP, .

.

(1)

( , , ), , . .

, 650kg 1,0m3 900kg 0,8m3 .

. . .

, , . 2cm.

. . ().

(2)

, , .

, . , , .

, , . , .

(3)

, , , 2mm 2,20 kg/m2 2,50kg/m2. 2cm 650kg/m3 , . 9.23.2 110.

1.3.4.2

, , 13598.

(), , D 1000mm, 3 :

,

.

, , . , .

, .

, .

H . . .

, 40cm, ( 30cm) ( 10cm). PVC, , .

1.3.5

, , . , , .

. ' . .

(4)

. , .

, , , , , , . , .

. , (1%. , .

.

v.

, , . ( 24 ), . .

vi.

, , . .

100m , (2) .

0,1 mm 24 .

, . , .

, , .

(5)

vii.

. . .

. , . . . .

0,4atm (4m ) . 30' .

.

' , , , , .

. .

, , .

viii.

, 300-500m , .

.

, 24. 3% .

ix.

/ , , .

2. --2: 2.1 -

:

( ).

2.2

:

, :

, 1563

, 1561

(AISI 304)

, 50 m (350 kg/m2), 5 mm 65 m (450 kg/m2) 5mm.

(UV). , .

:

1561

, BS 3412 BS 5139. 10301.

:

(medium size) , DN40, DIN2440. . 10mm , 10 .

o, . . 13706.

( ) :

(AISI 304)

, 50m (350kg/m2), 5mm 65m (450kg/m2) 5mm.

(GRP) (UV). , .

:

: - ( )

:

, , ( 50m)

:

, :

, ( 300m).

:

( 100m)

:

( 100m)

( 50m).

2.3

, , , , , , , , , .

2.3.1

600mm, 800mm, EN124.

. , , .

124:

124

D400

C250

A15

GRP GRP EPDM. sandwich UV inhibitor, (, .).

GRP . 40x40mm 25mm, 70%.2.3.2

0,50m . . 1.100mm 1.200mm.

1.000N/m, 12255-10, .

12255-10, 0,10m, 0,50m. , 0,30m.

GRP 50mm , . , 6mm 1,0m, ( ) 4mm. 2,0 m , 800mm, .2.3.3

, 50cm . , , .

. 500 650.

(6) .

300 450 5k/m2 600mm. 10mm.

12255-10, 1.100mm.

1.000mm . .

, (.. ), , .

(7)

650 750, 500mm 600mm. 650mm, 200mm . 10mm (-) 3.500mm.

12255-10, 1.100mm.

200mm . .

, , , .

(8)

750, 400mm 500mm. 3.000mm . (-) 6.000mm.

12255-10, 650mm 150mm. 1.000mm, .

, 20mm.

2.3.4

3,5kN/m2 10mm L/200 ( L ), 12255-1.

, (). ( ).

.

, DIN24537 , .

. .

GRP . 40x40mm 25mm, 70%.

GRP GRP EPDM. sandwich UV inhibitor, (, .). 3. --3: EPA 3.1 -

. . 3.2

, .

50cmx 50cm 1501-05-02-02-00:2009 5cm, 1cm .3.3

3.3.1

3.3.2

.

H , . , , .

, , . , .

, , , , .

1501-05-03-03-00:2009. , . :

0,05m ...-265.

... -12 -201.

0,05m ... -260.

... -11 -201.

3.3.3

. . 5m .

. 3mm .

3.3.4

, , . ( ), .

-0150, , , 58cm. 90% PROCTOR.

2,5 3,0cm, 180kg/m3 . 650 kg m3 .

4. --4:

4.1

. , . panels.

4.2

.

. , . , . .

4.3

, .

, , , , , , (DI 17100, DIN 1000).

:

:

x. Sa 21/2xi. 120 mxii. primer () 100 m

xiii. 160 mxiv. 40 m

, , . , 4cm, , . , 0,5mm, 275 (275 gr/m2), 10147, 10m 25m.

, , 5cm

.

4.4

. 998. 350 kg - 450 kg m3 0,08 m3 .

., 15 mm (0/7). 8 mm - 15 mm (0/3). 8 mm (0/1).

. / , .

, , , . . , . .

2,20m , () 0,15m 412 8/15. .

1,50m.

.

, , / . 1:3 . 400kg 24h .

. , . , 300 kg , . , .

. . .

. 10mm. . . 15cm , ( ) .

4.5

. , . 450kg 1:3, 1:2 150kg ().

, , , . : () (). .

:

.

.

.

.

, (.. , .).

, , , . , , , . . , :

3,5h 5h 2,5h.

. , . :

[kg/m3] (..) (..)

1:2-0,420,84

1:2,5-0,360,90

1:3-0,320,96

1:21500,420,84

1:2,53000,360,90

1:34500,320,96

3503500,101,12

4004500,101,06

6006000,101,00

350kg - 400kg m3 . 450kg m3 .

. , , . . , 7-10 3 .

:

, . , , , .

(, .), .

( ) .

6mm - 15mm, 5mm-6mm. .

, (). , , . 0,8cm, 2cm. 12mm.

7-10 5mm - 7mm. . . , , .

4.5.1

, , , 1,5 :1. .

450kg (), . () 450kg , , , () .

. 25mm x 16mm 8 m2. 6mm . . .

4.5.2

, , . () 150 kg m3 , 1 2 . . 6 mm. .

() . , . .

, , () , . , ( ). . ( ) , . , .

4.5.3

, .

() 450 kg , 1,05 m3 0,07 m3 . 15 mm. , .

1 2,5 - 3 . .

4.5.4

. , . . . , . , .

, 2 12mm 15mm . , 5mm 6mm.

4.6 -

4.6.1

, , . , , , , .

450kg . , .

, . . ( 450 kg) 2cm 3cm . ( 2mm). 600kg .

4.6.2

, 176, - (