THERMOGRAPHY REPORTReport No. :- 01
MAIN LOCATION:- SWITCH YARD (400 KV), BAY-02
Location Equipment Date Cursor-1 Cursor-2 Diff. Temp.ISOLATOR(402-89-AL) CT SIDE 06.04.10 55.6 38.2 17.4
Objective:- R Φ
Basic Observation:- . R Φ is over heated.
Analysis & Recommendation:- R Φ temp. is in semi critical range so close monitoringis needed. Should be attended in the next priority.
Client Analysis by:- Client Representative:-
THERMOGRAPHY REPORTReport No. :- 02
MAIN LOCATION: - SWITCH YARD (400 KV), BAY-05
Location Equipment Date Cursor 1 Cursor 2 Diff.Temp.
Avg.Temp.
ISOLATOR(405-89-TB) CT SIDE 21.02.2011 53.2 35.2 35.3 44.2
Objective:- B Φ
Basic Observation:- . B Φ is over heated.
Analysis & Recommendation:- B Φ temp is in semi critical range and may createproblem in near future so it should be attended in next priority .
Client Analysis by:- Client Representative:-
THERMOGRAPHY REPORTReport No. :- 03
MAIN LOCATION:- SWITCH YARD (400 KV), BAY-02
Location Equipment Date Cursor-1 Cursor-2 Diff. Temp.ISOLATOR(402-89-AA) CENTRE 06.04.10 69.2 43.4 25.8
Objective:- B Φ
Basic Observation:- . B Φ is over heated.
Analysis & Recommendation:- B Φ temp. is in semi critical range and may createproblem in near future so close monitoring is needed.
Client Analysis by:- Client Representative:-
THERMOGRAPHY REPORTReport No. :- 04
MAIN LOCATION:- SWITCH YARD (400 KV), BAY-03
Location Equipment Date Cursor-1 Cursor-2 Diff. Temp.ISOLATOR(403-89-AT) 1B BUS 2 SIDE 06.04.10 67.3 35.6 31.7
Objective:- R Φ
Basic Observation:- . R Φ is over heated.
Analysis & Recommendation:- :- R Φ temp. is in semi critical range so it should beunder regular monitoring .Check the loose connection .
Client Analysis by:- Client Representative:-
THERMOGRAPHY REPORTReport No. :- 05
MAIN LOCATION: - SWITCH YARD (400 KV), BAY-07
Location Equipment Date Cursor 1 Cursor 2 Diff.Temp.
Avg.Temp.
ISOLATOR(407-89-AA)
BREAKERSIDE
22.02.2011 53.3 34.8 18.5 44.05
Objective:- Y Φ
Basic Observation:- . Y Φ is over heated.
Analysis & Recommendation: - Y Φ temp is in semi critical range and may createproblem in near future so it should be attended in next priority.
Client Analysis by:- Client Representative:-
THERMOGRAPHY REPORTReport No. :- 06
MAIN LOCATION: - COOLING TOWER
Location Equipment Date Max.Temp.
Min.Temp.
Diff.Temp.
Avg.Temp.
CT #3 SWITCHGEAR ROOM FAN G 02.05.2011 103.2 52.8 50.4 64.3
Objective:- R Φ
Basic Observation:- . R Φ is over heated.
Analysis & Recommendation:- R Φ temp is in semi critical range and may createproblem in near future so it should be attended in next priority .
Client Analysis by:- Client Representative:-
THERMOGRAPHY REPORTReport No. :-07
MAIN LOCATION :- COOLING TOWER
Location Equipment Date Cursor 1 Cursor 2 Diff.Temp.
CT #2 SWITCHGEAR ROOM FAN - K 22.12.2010 126.8 80.3 46.5
Objective:- R Φ,Y Φ
Basic Observation:- . R Φ,Y Φ is over heated.
Analysis & Recommendation:- R Φ,Y Φ temp. is in critical range so it should beattended as soon as possible.
Client Analysis by:- Client Representative:-
THERMOGRAPHY REPORTReport No. :- 08
MAIN LOCATION:- TRANSFORMERS
Location Equipment Date Cursor-1 Cursor-2 Diff.Temp.
GTG 1A GSU TRANSFORMERBUSHING
30.01.10 55.5 42.9 12.6
Basic Observation:- R Φ is heated.
Analysis & Recommendation:- R Φ transformer bushing Temp is high so it should beattended with next priority .
Client Analysis by:- Client Representative:-