Item PROJECT DESCRIPTION LENGTH CUSTOMER AREA CONTRACTUAL PRICE (EURO) CONTRACTUAL DATES PROJECT COMPLETION PROJECT START 3 Overhead & Underground Transmission Networks 150kV & 400kV 3.1 Overhead Transmission Line 150 KV between the distribution center of N. Smyrni and the S/S of Argyroupolis 4.800 Μ Public Power Corporation S.A. / ATTICA Region Attica 2.054.112,00 1996-1998 1998 1996 3.2 Installation of underground cables 150 KV - Sections: Cholargos - Pagrati, ATTICA region 6.600 Μ Public Power Corporation S.A. / ATTICA Region Attica 1.030.042,00 2002 - 2003 2003 10-2002 3.3 Installation of underground cables 150 KV - Sections: Amarousio - Vrilisia, ATTICA region 4.800 Μ Public Power Corporation S.A. / ATTICA Region Attica 726.674,42 2002-2003 2003 10-2002 3.4 Installation of underground cables 150 KV - Sections: Vrilissia - Palini, ATTICA region 9.600 Μ Public Power Corporation S.A. / ATTICA Region Attica 1.412.384,72 2002-2003 2003 10-2002 3.5 Construction of Overhead Transmission Lines 20KV/150KV for the interconnection of the Panahaikos Wind Park to the PPC substation. 6.300 M AREVA HELLAS ACHAIA 800.000,00 2005 - 2006 2006 06-2005 3.6 Procurement, management, construction & commissioning on turnkey basis of the 400kV Overhead Transmission Line (OHTL) for Thisvi CCPP 20.000 Μ THISVI POWER GENERATION PLANT S.A. VIOTIA 13.000.000,00 2009 - 2010 2010 2009 3.7 Installation of 400 KV high voltage cables for the interconnection of the 390 MW Power Plant to the PPC grid 4.500 M ELPEDISON S.A. THES/NIKI 1.487.000,00 2004 - 2005 2005 2004 3.8 Construction of the Overhead Transmission Line (OHTL) 400 KV Tithorea -Chaironia - Thiva 2.000 Μ Public Power Corporation S.A. FTHIOTIDA - VIOTIA 270.000,00 2010 - 2011 2011 2010 3.9 Construction of the Overhead Transmission Line (OHTL) 150 KV s/s Aisimi - N. Santa 7.300 Μ Thrace Wind S.A. EVROS 394.000,00 2011 2011 2011 3.10 Construction of the Overhead Transmission Line (OHTL) 150 KV s/s Marathia 1.000 Μ EDF / IEN FOKIDA 50.000,00 2010 - 2011 2011 2010 3.11 Interconnection of the s/s of the wind park Agionori to the National grid WPKo/IWPKo KORINTHIA 240.000,00 2011 2011 2011 PROJECTS' REFERENCE LIST

Transcript of PROJECTS' REFERENCE LIST - atermon.com.gr · Installation of 400 KV high voltage cables for the...

Page 1: PROJECTS' REFERENCE LIST - atermon.com.gr · Installation of 400 KV high voltage cables for the interconnection of the 390 MW Power Plant to the PPC ... the 400 kV HV Switchyard Thessaloniki-HV

Item PROJECT DESCRIPTION LENGTH CUSTOMER AREA CONTRACTUAL PRICE (EURO)

CONTRACTUAL DATES

PROJECT COMPLETION

PROJECT START

3 Overhead & Underground Transmission Networks 150kV & 400kV

3.1Overhead Transmission Line 150 KV between the

distribution center of N. Smyrni and the S/S of Argyroupolis

4.800 ΜPublic Power

Corporation S.A. / ATTICA Region

Attica 2.054.112,00 1996-1998 1998 1996

3.2 Installation of underground cables 150 KV - Sections: Cholargos - Pagrati, ATTICA region 6.600 Μ

Public Power Corporation S.A. / ATTICA Region

Attica 1.030.042,00 2002 - 2003 2003 10-2002

3.3 Installation of underground cables 150 KV - Sections: Amarousio - Vrilisia, ATTICA region 4.800 Μ

Public Power Corporation S.A. / ATTICA Region

Attica 726.674,42 2002-2003 2003 10-2002

3.4 Installation of underground cables 150 KV - Sections: Vrilissia - Palini, ATTICA region 9.600 Μ

Public Power Corporation S.A. / ATTICA Region

Attica 1.412.384,72 2002-2003 2003 10-2002

3.5Construction of Overhead Transmission Lines

20KV/150KV for the interconnection of the Panahaikos Wind Park to the PPC substation.

6.300 M AREVA HELLAS ACHAIA 800.000,00 2005 - 2006 2006 06-2005

3.6Procurement, management, construction &

commissioning on turnkey basis of the 400kV Overhead Transmission Line (OHTL) for Thisvi CCPP

20.000 ΜTHISVI POWER GENERATION

PLANT S.A.VIOTIA 13.000.000,00 2009 - 2010 2010 2009

3.7Installation of 400 KV high voltage cables for the

interconnection of the 390 MW Power Plant to the PPC grid

4.500 M ELPEDISON S.A. THES/NIKI 1.487.000,00 2004 - 2005 2005 2004

3.8 Construction of the Overhead Transmission Line (OHTL) 400 KV Tithorea -Chaironia - Thiva 2.000 Μ Public Power

Corporation S.A.FTHIOTIDA -

VIOTIA 270.000,00 2010 - 2011 2011 2010

3.9 Construction of the Overhead Transmission Line (OHTL) 150 KV s/s Aisimi - N. Santa 7.300 Μ Thrace Wind

S.A. EVROS 394.000,00 2011 2011 2011

3.10 Construction of the Overhead Transmission Line (OHTL) 150 KV s/s Marathia 1.000 Μ EDF / IEN FOKIDA 50.000,00 2010 - 2011 2011 2010

3.11 Interconnection of the s/s of the wind park Agionori to the National grid WPKo/IWPKo KORINTHIA 240.000,00 2011 2011 2011

PROJECTS' REFERENCE LIST

Page 2: PROJECTS' REFERENCE LIST - atermon.com.gr · Installation of 400 KV high voltage cables for the interconnection of the 390 MW Power Plant to the PPC ... the 400 kV HV Switchyard Thessaloniki-HV

Item PROJECT DESCRIPTION LENGTH CUSTOMER AREA CONTRACTUAL PRICE (EURO)

CONTRACTUAL DATES

PROJECT COMPLETION

PROJECT START

3 Overhead & Underground Transmission Networks 150kV & 400kV

PROJECTS' REFERENCE LIST

3.12 Commisionning & Installation of underground cables 150KV Aliveri - Rethimnon 13.500 Μ Public Power

Corporation S.A. Evoia - Rethimnon 5.200.000,00 2011 - 2013 2013 2011

3.13

Procurement of Materials and Erection of the 400 kV OHTL from HV Switchyard Lagadas (Thessaloniki) up to HV Switchyard Filippoi (Kavala), including the variation of the 400 kV HV Switchyard Thessaloniki-HV Switchyard

Philippoi (entrance at Philippoi Switchyard). Contract Order: DAPM-99339

115.000 m PPC/ADMIE North Greece 26.796.613,82 2014 - 2016 under construction 2014

3.14

Procurement and installation of underground XLPE insulated 150kV cables and pilot cables between the:

Pallini High Voltage Terminal – Ampelokipoi Distribution Center & Eleftherias Distribution Centre – Ampelokipoi

Distribution Center(in J/V ATERMON S.A.– NEXANS S.A.

ATERMON's participation 50%)

17.300 m

HEDNO S.A. (Hellenic Electricity

Distribution Network

Operator S.A.)

Attica 8.890.000,00 2015 - 2017 under construction 2015