Impact of Variability on Control Performance Metrics James D. McCalley Harpole Professor of Electrical & Computer Engineering Iowa State University 1

description

James D. McCalley Harpole Professor of Electrical & Computer Engineering Iowa State University. Impact of Variability on Control Performance Metrics. Wind penetration is small now, so NERC says decreasing freq gov charac β not due to wind , - PowerPoint PPT Presentation

Transcript of Impact of Variability on Control Performance Metrics

Page 1: Impact of Variability on               Control Performance Metrics

Impact of Variability on Control Performance Metrics

James D. McCalleyHarpole Professor of Electrical & Computer Engineering

Iowa State University

1

Page 2: Impact of Variability on               Control Performance Metrics

Impact of variability on control performance1. Wind penetration is small now, so NERC says

decreasing freq gov charac β not due to wind,Source: “Comments Of The North American Electric Reliability Corporation Following September 23 Frequency Response Technical Conference,” Oct. 14, 2010

but…at higher wind penetrations, • β will decrease if non-wind units with primary control

are displaced by wind units without primary control; • Reduced inertia and increased net load variability will

cause greater frequency excursions.2. Will higher wind penetrations degrade freq perf in

terms of NERC’s Control performance metrics?Each Balancing Authority shall achieve, as a minimum,• Requirement 1: CPS1 compliance of 100%• Requirement 2: CPS2 compliance of 90%• Potential requirements: BAAL and others….

Page 3: Impact of Variability on               Control Performance Metrics

3

Control performance standardsControl Performance Standards CPS1 and CPS2 evolved from earlier metrics and were enacted by NERC in 1997 to evaluate a balancing area’s frequency control performance in normal interconnected power system operations.

The motivation underlying CPS is to ensure a targeted long term frequency control performance of the entire interconnection.

CPS measures each balancing area’s frequency control performance in achieving control objectives.

N.Jaleeli and ,L.VanSlyck, “Control performance standards and procedures for interconnected operation,” Electric Power Research Institute, Dublin, Ohio, Tech.Rep. TR-107813, Apr.1997.N.Jaleeli and L.S.Vanslyk, “NERC’s new control performance standards. IEEE Trans. Power Syst.,” vol.14, pp.1092-1099, Aug.1999.

Page 4: Impact of Variability on               Control Performance Metrics

4

Control performance standards

NERC Standard BAL-001-0.1a — “Real power balancing control performance,” http://www.nerc.com/files/BAL-001-0_1a.pdf.

CPS1 CPS2

Page 5: Impact of Variability on               Control Performance Metrics

5

CPS1:a measure of a balancing area’s long term (12 mo) frequency performance. • Control objective - bound excursions of 1-minute average

frequency error over 12 months in the interconnection. • Measures control performance by comparing how well a

balancing area’s ACE performs in conjunction with the frequency error of the interconnection.

FBPPACEtieP

stieatie

||)( ,,

min1min1

min1 ||10F

BACECP

Ref: M. Terbrueggen, “Control Performance Standards” 2002

Average ACE, ΔF over 1 min to compute:

10B to give units of Hz.

ΔF is an interconnection measure. ΔPtie is a balancing area measure. When ΔF<0, the interconnection needs generation, so desire BA to make ΔPtie large ACE>0 (helping). If ACE<0, it means BA is undergenerating “hurting.”

So we want to see CP negative, large in mag.

Page 6: Impact of Variability on               Control Performance Metrics

6

CPS1:a measure of a balancing area’s long term (12 mo) frequency performance. • Control objective - bound excursions of 1-minute average

frequency error over 12 months in the interconnection. • Measures control performance by comparing how well a

balancing area’s ACE performs in conjunction with the frequency error of the interconnection.

ε1 =target bound for 12 month of 1min avg freq error. e.g., 0.018Hz in EI, 0.228Hz in WECC, 0.020 Hz for ERCOT. Must be squared to normalize Hz2 in numerator.

FBPPACE stieatie ||)( ,,

%100100)2(1 CFCPS

21

12min1

)()(

MonthCPCF

min1min1

min1 ||10F

BACECP

Ref: M. Terbrueggen, “Control Performance Standards” 2002

Average ACE, ΔF over 1 min to compute:

Average CP 1min over 12 mo to compute:

Page 7: Impact of Variability on               Control Performance Metrics

7

CPS1:a measure of a balancing area’s long term (12 mo) frequency performance. • Control objective - bound excursions of 1-minute average

frequency error over 12 months in the interconnection. • Measures control performance by comparing how well a

balancing area’s ACE performs in conjunction with the frequency error of the interconnection.

Problem: balancing area can grossly over- or under-generate (as long as it is opposite frequency error) and get very good CPS1, yet impact its neighbors with excessive flows (large ACEPtie,a>>Ptie,s).

FBPPACE stieatie ||)( ,,

%100100)2(1 CFCPS

21

12min1

)()(

MonthCPCF

min1min1

min1 ||10F

BACECP

Ref: M. Terbrueggen, “Control Performance Standards” 2002

Average ACE, ΔF over 1 min to compute:

Average CP 1min over 12 mo to compute:

Page 8: Impact of Variability on               Control Performance Metrics

CPS2: measure of a balancing area’s ACE over all 10-minute periods in a month. • Control objective – limit ACE variations & bound

unscheduled power flows between balancing areas. • Developed to address “problem” of previous slide.

10 101.65 10 10i sL B B

• BS=sum of B values for all control areas.• ε10 =target bound for 12 mo RMS of10-min avg freq

error: e.g., 0.0057Hz in EI, 0.0073 for the WI and ERCOT.• In 2003, the 10Bs were ~ -5692 mw/0.1hz for EI, -1825

mw/0.1hz for WEEC, -920 mw/0.1Hz for ERCOT.

Requirement: |ACE10min |<

CPS2=100%-(Percent of 10 min periods in violation)>90%

• L10 is max value within which ACE10min must be controlled

8

Page 9: Impact of Variability on               Control Performance Metrics

Simulation System• Two Area System (Area A and Area B)

Wind power is assumed in area A • Each area consists of 10 conventional units, with inertia and with speed

governing• Based points are computed from net load forecast made 7.5 min ahead,

with an assumed error of 1% for load and 4.5% for wind.• Wind penetration levels- 6%, 10%, 13%, 17%, 21%, 25% (Pw/Pnw) are

considered (by capacity).• Wind is assumed to displace conventional units• Actual sec-by-sec p.u. value of load and of wind power data from one

wind farm is used.

A BWind units

Con units Con

units

9C. Wang and J. McCalley, “Impact of Wind Power on Control Performance Standards,” under review, IEEE Trans on Pwr Sys.

Page 10: Impact of Variability on               Control Performance Metrics

2 Area Simulation System

FBPPACE stieatie ||)( ,,

)(1 tP regNL

)(2 tP regNL

C. Wang and J. McCalley, “Impact of Wind Power on Control Performance Standards,” under review, IEEE Trans on Pwr Sys.

Page 11: Impact of Variability on               Control Performance Metrics

)()(

)()()()(

)()()()(

)]([)]([)(

11

,11,11

,1,111

,111

tPtP

tPtPtPtP

tPtPtPtP

tPtPtP

regw

regL

fcstwwfcstLL

fcstwfcstLwL

RTEDGNLregNL

)(

)()(

)()(

)]([)]([)(

2

,22

,22

,222

tP

tPtP

tPtP

tPtPtP

regL

fcstLL

fcstLL

RTEDGNLregNL

Area 1 input Area 2 input

Inputs for 2 Area Simulation System

The sec-by-sec generation levels in each case (PG1,RTED and PG2,RTED) are determined by linearly interpolating between their respective 5 minute load and wind forecasts.

C. Wang and J. McCalley, “Impact of Wind Power on Control Performance Standards,” under review, IEEE Trans on Pwr Sys.

Page 12: Impact of Variability on               Control Performance Metrics

Study results

0% 6.67% 10.14% 13.71% 17.37% 21.12% 24.94%0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

Nor

mal

ized

CP

S1

Sco

re

Wind Energy Penetration Level in Area 1

Case ACase B

0% 6.67% 10.14% 13.71% 17.37% 21.12% 24.94%0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1N

orm

aliz

ed C

PS

2 S

core

in A

rea

1

Wind Energy Penetration Level in Area 1

Case ACase B

Normalized CPS1

Normalized CPS2

Case A: Area 1, Area 2 have same size.Case B: Area 1 unchanged. Area 2 load and gen scaled up by 10.

12

Conclusions:1. CPS1 and CPS2 deteriorates

with increasing wind penetration.2. The effect is larger for “smaller”

interconnections.

C. Wang and J. McCalley, “Impact of Wind Power on Control Performance Standards,” under review, IEEE Trans on Pwr Sys.

Page 13: Impact of Variability on               Control Performance Metrics

Study resultsMeasures to improve CPS1, CPS2:• M1: Increase primary frequency control capability in Area 1 • M2: Increase the forecast accuracy of wind power• M3: Control wind power output to be no more than a band around forecasted value• M4: Combining control areas.

CPS1 AND CPS2 SCORE WITH DIFFERENT MEASURES AT 25% WIND POWER ENERGY PENETRATION LEVEL IN AREA1, CASE A

Measures CPS1 Improvement over Original

CPS1

CPS2 Improvement over Original

CPS2 M1 52.93% 31.74% 59.71% 3.75%

M2 * 65.58% 63.21% 71.22% 23.75% M2 ** 92.90% 131.21% 100% 75.00%

M3 60.76% 51.22% 66.19% 15.00% M4 73.84% 83.78% - -

In M2*, NRMSE of wind power forecast is assumed to be 3%; In M2**, NRMSE of wind power forecast is assumed to be 0%.

CPS1 AND CPS2 SCORE WITH DIFFERENT MEASURES AT 25% WIND POWER ENERGY PENETRATION LEVEL IN AREA 1, CASE B

Measures CPS1 Improvement over Original

CPS1

CPS2 Improvement over Original

CPS2 M1 91.50% 4.61% 96.52% 2.21% M2 * 93.78% 7.21% 98.61% 4.41% M2 ** 96.56% 10.40% 100% 5.88% M3 91.16% 4.22% 97.92% 3.68% M4 99.07% 13.25% - -

In M2*, NRMSE of wind power forecast is assumed to be 3%; In M2**, NRMSE of wind power forecast is assumed to be 0%.

13C. Wang and J. McCalley, “Impact of Wind Power on Control Performance Standards,” under review, IEEE Trans on Pwr Sys.

Page 14: Impact of Variability on               Control Performance Metrics

Why Does CPS1 CPS2 Degradation Matter?

NERC penalties Indication of greater frequency variability:

Some loads may lose performance (induction motors) UFLS relay operation Volts per Hz relay operation Lifetime reduction of turbine blades Frequency dip may increase for given loss of generation

Indication of greater ACE variability: Increased inadvertent flows Increase control action of generators

Indication BA is “leaning on” othersQUESTION: Why do we divide the interconnection into BAs?

MOST IMPORTANT FACTORS

Page 15: Impact of Variability on               Control Performance Metrics

Solutions to variability & uncertainty1. Do nothing: fossil-plants provide reg & LF (and die ).2. Improve forecasts (M2)3. Increase control of the wind generation

a. Control wind to band around forecasted value (M3)b. Provide wind with primary control

• Reg down (4%/sec), but spills wind following the control • Reg up, but spills wind continuously

c. Limit wind generation ramp rates• Limit of increasing ramp is easy to do• Limit of decreasing ramp is harder, but good forecasting can warn

of impending decrease and plant can begin decreasing in advance4. Increase non-wind MW ramping capability during periods of

expected high variability using one or more of the below (M1):a. Conventional generation b. Load controlc. Storaged. Expand control areas

5. Combine control areas (M4)15

%/min $/mbtu $/kw LCOE,$/mwhr

Coal 1-5 2.27 2450 64

Nuclear 1-5 0.70 3820 73

NGCC 5-10 5.05 984 80

CT 20 5.05 685 95

Diesel 40 13.8115