4
4.6.5.3 EGL, HGL dan Sisa Tekan Rumus-rumus yang digunakan antara lain: EGL x+1 = EGL x - ΔH x−( x+1) HGL x+1 = EGL x+1 + V 2 /2g Sisa Tekan x+1 = HGL x+1 – Elevasi x+1 Keterangan : x = titik sebelumnya x+1 = titik yang dicari Berikut contoh perhitungan HGL, EGL dan sisa tekan pada jalur 1 dan jalur 2, adalah: D = 0,500 m Q = 0,184 m 3 /s V = Q/(0,25 .π. D 2 ) = 0,184 m 3 /s / (0,25 x 3,14 x 0,500 2 ) = 0,938 m/ s V 2 /2g = ( 0,938 m/ s) 2 / 2 ¿ 9,81 m /s 2 = 0,045 m 1. Contoh perhitungan jalur I pada selang 0 - 1 A. Head pompa perhitungan 75,296 m: HGL 0 = Head pompa + Elevasi = 75,296 m + 1000 m = 1.075,296 m EGL 0 = HGL 0 + V 2 /2g = 1.075,296 m + 0 m = 1.075,296 m Sisa Tekan = HGL 0 – Elevasi = 1.075,341 m – 1.000 m = 75,341 m HGL 1 = EGL 0 – V 2 /2g = 1.075,296 m – 0,045 m = 1.075,251 m EGL 1 = EGL 0 - HLtotal = 1.075,296 m – 0,126 m = 1.075,170 m

description

hgl dan egl

Transcript of hgl egl insyaAllah

Page 1: hgl egl insyaAllah

4.6.5.3 EGL, HGL dan Sisa Tekan

Rumus-rumus yang digunakan antara lain:

EGLx+1 = EGLx - ΔH x−( x+1)

HGLx+1 = EGLx+1 + V2/2g

Sisa Tekanx+1 = HGLx+1 – Elevasix+1

Keterangan : x = titik sebelumnya

x+1 = titik yang dicari

Berikut contoh perhitungan HGL, EGL dan sisa tekan pada jalur 1 dan jalur 2, adalah:

D = 0,500 m

Q = 0,184 m3 /s

V = Q/(0,25 .π. D2)

= 0,184 m3 /s / (0,25 x 3,14 x 0,5002)

= 0,938 m/ s

V2/2g = ( 0,938 m/ s)2 / 2 ¿ 9,81 m /s2

= 0,045 m

1. Contoh perhitungan jalur I pada selang 0 - 1

A. Head pompa perhitungan 75,296 m:

HGL0 = Head pompa + Elevasi

= 75,296 m + 1000 m = 1.075,296 m

EGL0 = HGL0 + V2/2g

= 1.075,296 m + 0 m = 1.075,296 m

Sisa Tekan = HGL0 – Elevasi

= 1.075,341 m – 1.000 m = 75,341 m

HGL1 = EGL0 – V2/2g

= 1.075,296 m – 0,045 m = 1.075,251 m

EGL1 = EGL0 - HLtotal

= 1.075,296 m – 0,126 m = 1.075,170 m

Sisa Tekan = HGL1 – Elevasi

= 1.075,251 m – 1.024,7 m = 50,551 m

B. Head pompa pasaran 88,6 m

HGL0 = Head pompa + Elevasi

= 88,6 m + 1000 m = 1.088,6 m

Page 2: hgl egl insyaAllah

EGL0 = HGL0 + V2/2g

= 1.088,6 m + 0 m = 1.088,6m

Sisa Tekan = HGL0 – Elevasi

= 1.088,6 m – 1.000 m = 88,600 m

HGL1 = EGL0 – V2/2g

= 1.088,6 m – 0,045 m = 1.088,555 m

EGL1 = EGL0 – HLtotal

= 1.088,6 m – 0,13 m = 1.088,47 m

Sisa Tekan = HGL1 – Elevasi

= 1.088,555 m – 1.024,7 m = 63,855 m

2. Contoh perhitungan jalur II pada selang 0 – 1

A. Head pompa perhitungan 52,412 m:

HGL0 = Head pompa + Elevasi

= 52,412 m + 999 m = 1.051,412 m

EGL0 = HGL0 + V2/2g

= 1.051,412 m + 0 m = 1.051,412 m

Sisa Tekan = HGL0 – Elevasi

= 1.051,412 m – 999 m = 52,412 m

HGL1 = EGL0 – V2/2g

= 1.051,412 m – 0,045 m = 1.050,367 m

EGL1 = EGL0 – HLtotal

= 1.050,412 m – 0,61 m = 1.050,802 m

Sisa Tekan = HGL1 – Elevasi

= 1.050,367 m – 999,2 m = 52,167 m

B Head pompa pasaran 88,6 m

HGL0 = Head pompa + Elevasi

= 88,6 + 999 M = 1087,6 m

EGL0 = HGL0 + V2/2g

= 1.087,6 m + 0 m = 1.087,645 m

Sisa Tekan = HGL0 – Elevasi

= 1.087,6 m – 999 m = 88,6 m

HGL1 = EGL0 – V2/2g

= 1.087,6 m – 0,045 m = 1.087,555 m

Page 3: hgl egl insyaAllah

EGL1 = EGL0 – HLtotal

= 1.086,99 m – 0,61 m = 1.087,99 m

Sisa Tekan = HGL1 – Elevasi

= 1.086,555 m – 999,2 m = 88,355 m

Perhitungan HGL dan EGL serta sisa tekan untuk jalur terpilih/ jalur alternatif I dan jalur

alternatif II dapat dilihat pada Tabel 4.41 dan 4.42 serta gambar 4.43 dan 4.44

Page 4: hgl egl insyaAllah