hands-on training certificate
-
Author
janitha-sankalpana -
Category
Documents
-
view
149 -
download
0
Embed Size (px)
Transcript of hands-on training certificate

r口 既 刂Ⅹ1α″g`JJ″ sfr纟纟r
Jicrf‘ I、思 JJrt,‘ Irr
CJJrI″gz乃 @JJ,「F,j″″
5Ⅰ J犭JJ
Date: May6,2014
Handsˉ on Training Certificate
To、VⅡoM IT MAY CONCERN
Ths is to certⅡ ̌th敲 M⒈ Alendra Arachchiε e Janitha sankal,ana (,assnort #:
N2799222),graduate of(]uangzhou Civil Axiation College,has undcrgonc practicaI hands-on
training in our coⅡ cgc as an Aircraft Maintenancc Tcchnician for 360 training hours,
including modiflcations, repair. rcplacements, tcst, opcration and inspcction of aircraft
componellts/items of cqopmclat durllag m句 or chCcks undσ supα访sion of quali丘cd lc∝ulels
on different typcs of aircraft such a$MD-82and Bocing737 DetaⅡ cd training sessions arc as
attachcd

■F丨
HaⅡds-oⅡ Tralnlng sessloⅡ s
3.川rcra】 Au° n∶c/InstrumentaJon (24hours)
燕摧
\
1.Tools us:ng&DisassemblV and assembIv of components(24h0u rs)
No Pr丬 ects Hours AdditionaI Hrs
1 The use ofscreWdrIˇ er 2 1hour fortheory
2 The use of wrench and torque wrench 4 1hourfortheon`
3 The use of rneasurement too!s 6 2hourfortheoγ
4Disassennbly and assembly of WPˉ 6eXhaust
ga$pIpe
61hourfortheoγ
5 DisassembIy and assembly of H-5panels 6 1hour fortheory
2. Introduct:on of fasteners&safetV methods of fasteners(24hours)
No Projects HOurs AdditionaI Hrs
1 IntroduCuon° f fasteners 2
2 safetv wire of fasteners 4 1hour for theory
3 safety wire of pipes 4 o5hour fortheory
4 safety wire of control cable 4 o5hour for theory
5 Cotter pins 4 o5hour for theory
6 safety rnethod of components 6 1hour for theory
No Projects Hours AddItional Hrs
1IntroduCe main electronic system and
power on aircraft4
2Disassemble`assemble and check VHF
antenna4
3DIsassembIe`assembIe and check ADF
antenna3
4 Pitot and static system leak test 4
5 EsD identification and notice 3
6 static discharge wick testing 3
7 evaluation 3

4. sheet Metal Repa:r (24hours)
No Pr丬 ect Tiue Hours Additional Hrs
1 Tools and material recognition; 3h
2Expansion dwg computation and sheet
metaI blanking;3h
3Bending`ro"bending`constriction and
stretch of sheet rnetal;6h
4Gripping` stretch the edge` beading
and correction;6h
5Fabricate a tray or a bucket` both of
thenη coverthe basIc sk"ls above,6h
5.川r condkion svstem(18hours)
No Pr丬 ect Tiue HOurs Add"ionaI Hrs
1
Disassembly`assembly and inspection ofthe
a∶r condition system on the No,7transport
airplane
4 1hourfor theory
2DisassembIy,assembly and inspection of air
condition system on the trident airp丨 ane4 1hourfortheon`
3inspedion and test ofthe air condition
system on the MDˉ 82airplane6 2hour for theory
4
Disassembly and assennb!y ofthe typical
pa"s on the air condition system on the
t"dent airplane
4 1hourfortheo冖 /
6.FueI svstem (18hour⑴
No Pr丬 ect Tide HOurs AdditionaI Hrs
1Disassembly`assembly and inspection ofthe
fuel sy$tem onthe No7transport airplane6 1hour fortheo冖 /
2DisassembIy`assembly and inspectIon ofthe
fueIsystem on the t"dent airplane6 1hourfortheoγ
3inspedion and test ofthe fueIsystem on the
MDˉ82airpIane6 1hourfortheon`
'“
w△
△
ι,
'

7. ControI sVstem (30hours)
No Pr丬 ect Πue HOurs Additional Hrs
1 Draw bar adJustment of the contrd system 4 1hourfortheoγ
2Disassembly`assembly and inspedion ofthe
a"eron system4 1hourfortheoγ
3Tension force inspedion of the steeltight
wIre4 1hourfortheoγ
4 Measure the a"eron angle on the plane 6 !h°urf° rtheoγ
5 Lubrication for the controI system 6 1hourfor theorv
6lnsρ ection ofthe contro!system on thθ
MD82airplane6 1hourfortheop`
8. "onˉ Damage Test (20hours)
No Project TitIe Hours AdditionaI Hrs
1 Permeating test 4 1hourfor theory
2 Magnetic test 4 1hourfortheorv
3 VltrasonIc test 6 2hours fortheoγ
4 Vortex test 6 2hours fortheorv
9. HvdrauI:c sVstem (30hours)
No Pr丬ects Hours Additional Hrs
1
Disassennbly and assembly ofthe hydrau"c
pump`a钍 enJon forthe safety of hydrau"c
o"use
4
2 Inspedion ofthe accumuhtor presq竺 二E 4
3 CIean the f"ter e∶ ement ofthe ΥL-28f"ter 4
4MaintenanCe forthe main f"terin the
hVdrau"c system4
一bReplace the hydrau"c piρ e"nein the wheel
We"ofthe landing gear4
6Inspection ofthe moisture proof sand in the
f"ter
4
7 lnspectbn the return"ne】 kerin the tank 2
8lnspection ofthe main ac0Vmulator pressure
and refi"ing the accumulator
4

10.日 ect"Cal sVstem l36HOurs)
No Pr丬 ect Ⅱde hours AdditionalaI Hrs
1 Introduction of power suppIy system 2
2 Maintenance0f DC generator 2
3 Maintenance of AC generator 3
4 Maintenance ofinverter 2
5 MaintenanCe of TR 2
6AnaIVzing p0Wer supply mode of
BOdng/Airbus h a"kndj ofc0nd由on3
7 Maintenance of aircra仕 bo⒒eγ 4
8
supply ρoWerto MD82aircraft on ground2
9lntroduction of eIeCtricaI elements and lights
svstem
2
10IdentifVing and measu"ng of eled"caI
eIements
4
11Connecti0n` checking and energizing of Υ7
aircra仕 taxing and Ianding|ight
4
12Connection、 CheCkIng and energizing of other
aircraR landing"ght
4
△3 Exam 2
11.struCture Repair (18h° u rs)
Addit∶onaIaI
Hrs
ProjeCt TitIe

12.fue∶、 lubr∶ cat∶ng o"on the engine (30hours)
No Pr丬 ect Tiue hours AdditionalaI Hrs
1 maintenance ofthe fuelf"ter 2
2DisassembIy`assembIy and insρ edi0n ofthe
fuel nozzIe on the W6engine3
3DisassembIy`assembly and inspection ofthe
fuel nozzh on the fa"et2
4
Doassembly,assennbly and inspection of fuel
nozzle on the engine of the No,7transpo"
airplane
2
5 maintenance ofthe low pressure fue!f"ter 2
6 Inspection ofthe magneJc plug on the fanlet 3
7Disassemb丨y`assemnbly and inspedion of the
lubricating o"tank on the W6engine4
8Disassembly,assembly and inspection of the
mediunn fue丨 pu"np onthe W6engine4
9Disassennbly`assembly and inspection of the
lubricating part on the VV6engine4
10Disassembly`assemb!y ond inspedion of
Iubricating oⅡ ρurnp on the CFM56-3engine4
13.landing gear (36h° u rs)
No Project T∶ tIe hours AdditionaIaI Hrs
1 inspect the landing gear carefu"y 2
2disassembly and assemblV of the tˇ re on the
737airρ lane3
3d‘ assemblV and assembly of th只 brake pan
on the737airplane3
4disassembly and assembly of the neutra丨 part
on the front wheel4
5 speciaIinspection of the torsionρ roof arm 4
6 IubriCation ofthe nose Wheelsystem 2
7disassembIy and assembly of the brake part
onthe AN-ˉ 24airplane2

8Disassembly`assembly and inspedion of the
brake part4
9sρecialinspection of the main shock absorber
strut2
10 inspedion ofthe wheeland the tyre ρresure 1
11Disassemnbly,assennbIy and inspection of the
upρ erlock of the landing gear3
12inspedion of the hand crank for pu仗 ing d°wn
the Ianding gearto rneet an emergency2
13 inspection ofthe Ianding gear svsteln 4
14.Pneuma刂 c/ˇacuum&oxvgen svstem(16hours)
No Pr叼 ect TkIe hours AdditionaIal Hrs
1
Disassembly、 assennbIy and inspedion ofthe
Pneumauc/Vacuum&oxygen system on the
trident airρ Iane
4 1hour for the°γ
2Disassembly, assembIy and inspection of
subsystem LRu4 1hourfortheoγ
3serVer、 inspedion and test of VaCuum
&oXygen system on the t"dent airplane4 1hourfortheoγ
4Disassembly and assembly ofthe typical pa仗 s
system4 1hourfortheoγ
15.Prope"er(12hours)
No Pr丬 ect Tiue hours AdditionaIaI Hrs
1D‘assemb丨y`assembly and inspe¢ bn ρf thePropeller on the CuJao-6
5 1hourfortheoγ
2DisassennbIy`assembly and inspeCtion of the
Prope"er component on the Υu-7airplane5 1hourfortheoγ
3inspection and test of subsystem anti-ice on
the prope"er, ∶2 1hourfor theorV