ADIT Installation Guide - Knauf Australia4 Cleaneo Adit ADIT A 356,5 mm 356,5 mm 55 mm Min. 55 mm 50...

10
Out-of-the-Box Acoustic Solutions ADIT Installation Guide

Transcript of ADIT Installation Guide - Knauf Australia4 Cleaneo Adit ADIT A 356,5 mm 356,5 mm 55 mm Min. 55 mm 50...

  • Out-of-the-Box Acoustic Solutions

    ADITInstallation Guide

  • 2

    Cleaneo Adit

    ADIT

    1,0

    0,8

    0,6

    0,4

    0,2

    0,0

    α

    Hz400020001000500250125

    α 0,65 0,90 0,90 0,85 0,800,25

    1,0

    0,8

    0,6

    0,4

    0,2

    0,0

    s

    Hz400020001000500250125

    s 0,77 0,78 0,76 0,64 0,730,87

    s 0,57 0,62 0,56 0,53 0,570,73

    Tangent, 55 mm installation depth, 33 mm mineral wool αw: 0.90, NRC: 0.85

    Before Adit 0,76s

    After Adit 0,60s

    REVERBERATION TIMEMeasurement before and after Adit

    ACOUSTICS EDGES

    Edge B(bevelled edge)Mitred and glued long edges

    ACOUSTIC WALL PANELS

    ADIT

  • 3

    Cleaneo Adit

    ADIT

    PERFORATION

    Tangent 4x14 mm, 10/20 mm c/cPerforation 2400 mm: 24.5%Perforation 1200 mm: 23.9%

    PERFORATION

  • 4

    Cleaneo Adit

    ADIT

    A

    356,5 mm

    356,5 mm

    55 mm

    Min. 55 mm 50 mm600 mm

    1 2

    Legend:

    45 mm Z-profilePanel edge

    A = Min. 55 mm

    Fig. 1

    Best Practice: Use of clean cotton gloves when handling product elements will ensure a good result and a wall without fingermarks.

    MEASURING

    • Use the gypsum template supplied to mark the positions of the Zprofiles.

    Z-PROFILES

    • Install the Z profiles horizontally. Choose the method of securing theangles in accordance with the substrate.

    • The large flange on the Z profiles must be secured to the wall.

    • When installing several Adit elements in continuation of each otherit will be an advantage to stagger the joints of the uppermost Zprofiles by half a length in relation to the joints of the elements inorder to ensure that the elements are level.

    END COVER

    • Where elements do not run from wall to wall, use the end coverssupplied to cover the mineral wool at the visible ends. Push the endcover behind the Z profiles and secure with a screw through thepre-bored hole.

    INSULATION

    • Install the plastic-wrapped mineral wool between the Z profiles.

    INSTALLATION GUIDE - HORIZONTAL ORIENTATION

  • 5

    Cleaneo Adit

    ADIT

    1 2

    SECURING

    • Lock the element in position at the bottom with the help of the holddown clips supplied.

    END PROFILE

    • Where end covers are installed the associated Adit elements shouldbe capped with an end profile.

    • Push the end profile over the end of the element.

    • The smallest flange must cover the front of the element.

    • Lock the end profile in place using the end profile clip.

    INSTALLATION

    • Tilt the Adit element over the top profile.

    CUTTING

    • Cut the elements to size from the front with a fine-toothed saw.

    INSTALLATION

    • Lower the element over the top profile.

    • The element is now in position but can still be adjustedlongitudinally.

    • Elements should be butted up to one another/the adjacent wall.Where the elements stop in the middle of the wall, fit the suppliedend covers and profiles as illustrated below.

    INSTALLATION OF ADIT PANELS

    • Push the edge of the Adit panel with the largest fold under thelower profile and press it upwards.

    INSTALLATION GUIDE - HORIZONTAL ORIENTATION

  • 6

    Cleaneo Adit

    ADIT

    Z profileHold down clip

    End cover profile

    End profile

    Insulation

    Adit

    DETAILS

    ADIT

    - HORIZONTAL ORIENTATION

  • 7

    Cleaneo Adit

  • 8

    Cleaneo Adit

    356,5 mm

    356,5 mm

    55 mm

    Min. 55 mm

    Legend:

    45 mm Z-profile

    Panel edgeA = 50 mmB = 2400 mm

    ASecond row Second row

    Third row

    Third row

    Mid row

    A

    B

    Fig. 1

    Best Practice: Use of clean cotton gloves when handling product elements will ensure a good result and a wall without fingermarks.

    INSTALLATION GUIDE

    MEASURING• Use the gypsum template supplied to mark the positions of

    the Z profiles.• The Z-profile must be centered vertically so the distance from

    the end of the Z-profile to the end of the Adit panel is 50 mmin both top and bottom. See fig. 1.

    Z-PROFILES• Install the Z profiles vertically Choose the method of securing

    the angles in accordance with the substrate.• The large flange on the Z profiles must be secured to the

    wall.

    END COVER• Use the end covers supplied to cover the mineral wool at the

    visible ends. Push the end cover behind the Z profiles andsecure with a screw through the pre-bored hole.

    INSULATION• Install the plastic-wrapped mineral wool between the Z

    profiles.

    - VERTICAL ORIENTATION

  • 9

    Cleaneo Adit

    1

    2

    END PROFILE• Where end covers are installed the associated Adit elements

    should be capped with an end profile.• Push the end profile over the end of the element.• The smallest flange must cover the front of the element.• Lock the end profile in place using the end profile clip.

    INSTALLATION• Tilt the Adit element over the right profile.

    SECURING• Screw fix using the applied white painted screw.

    INSTALLATION• Press the element over the right profile.• The element is now in position but can still be adjusted

    vertically.• Establish a temporary support for the Adit panel to rest on

    while screw fixing.

    INSTALLATION OF ADIT PANELS• Push the edge of the Adit panel with the largest fold under

    the left profile and press it inwards.

    PREPARING PANELS• Prepare the screw points through the perforations.• See distances in fig. 1• Drill 6 mm holes in the top points of the 6 perforation holes.• Add the applied 6 mm plug in each hole.

    ADIT

    INSTALLATION GUIDE - VERTICAL ORIENTATION

    1

    2

    END PROFILE• Where end covers are installed the associated Adit elements

    should be capped with an end profile.• Push the end profile over the end of the element.• The smallest flange must cover the front of the element.• Lock the end profile in place using the end profile clip.

    INSTALLATION• Tilt the Adit element over the right profile.

    SECURING• Screw fix using the applied white painted screw.

    INSTALLATION• Press the element over the right profile.• The element is now in position but can still be adjusted

    vertically.• Establish a temporary support for the Adit panel to rest on

    while screw fixing.

    INSTALLATION OF ADIT PANELS• Push the edge of the Adit panel with the largest fold under

    the left profile and press it inwards.

    PREPARING PANELS• Prepare the screw points through the perforations.• See distances in fig. 1• Drill 6 mm holes in the top points of the 6 perforation holes.• Add the applied 6 mm plug in each hole.

    ADIT

    INSTALLATION GUIDE - VERTICAL ORIENTATION

    1

    2

    END PROFILE• Where end covers are installed the associated Adit elements

    should be capped with an end profile.• Push the end profile over the end of the element.• The smallest flange must cover the front of the element.• Lock the end profile in place using the end profile clip.

    INSTALLATION• Tilt the Adit element over the right profile.

    SECURING• Screw fix using the applied white painted screw.

    INSTALLATION• Press the element over the right profile.• The element is now in position but can still be adjusted

    vertically.• Establish a temporary support for the Adit panel to rest on

    while screw fixing.

    INSTALLATION OF ADIT PANELS• Push the edge of the Adit panel with the largest fold under

    the left profile and press it inwards.

    PREPARING PANELS• Prepare the screw points through the perforations.• See distances in fig. 1• Drill 6 mm holes in the top points of the 6 perforation holes.• Add the applied 6 mm plug in each hole.

    ADIT

    INSTALLATION GUIDE - VERTICAL ORIENTATION

  • 10

    Cleaneo Adit

    Knauf Plasterboard Pty LtdABN 61 003 621 01031 Military RoadMatraville NSW 2036

    Customer Service 1300 724 505knauf.solutions

    August 2019

    ADIT

    PRODUCT NAME SAP NO. W x L x H

    Z45 profile 199089 45 x 2300

    End cover profile 215384 20 x 360 x 40

    Wall channel 199108 25 x 32/7.5 x 450

    Insulation 199062 33 x 350 x 575

    Measuring template 356,5 mm55 mm 657259 55 x 356.5

    Hold down clip 316313 -

    End profile clip 108961 -

    ACCESSORIES 2400 MM

    Knauf Australia

    1300 724 505www.knauf.solutions

    Knauf Plasterboard Pty Ltd ABN 61 0003 621 010 31 Military Road MatravilleNSW 2036

    by

    SURFACEFoil-covered surface with pre-impregnated white paper NCS S0300-N (RAL 9016).Gloss 10.Tested for chemical resistance in accordance with DIN 68 861, FIRA BS 3962 and NEMA LD-3-1991.

    WEIGHT KG/m2

    Tile weight: 8.0Transportation weight: 11.8Installed weight: 12.1