2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN The objectives Module positioning Module cooling contacts

description

2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts. The objectives Module positioning Module cooling contacts. The objectives. Module positioning: Sufficiently precise initial geometry (< 1mm overall) to ensure module overlaps. - PowerPoint PPT Presentation

Transcript of 2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts

2S Module Workshop, 30 Jan 2012

Module positioning and cooling contacts

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

The objectives

Module positioning

Module cooling contacts

ΔT: 5-7 ºC

• Module positioning: – Sufficiently precise initial geometry (< 1mm overall) to ensure module overlaps.– High stability (<< 0.1 mm) to minimize calibration needs during operation.

• Cooling contacts between module and cooling pipe:– Silicon T max: -20 ºC, or preferably -25 ºC.– ΔT (silicon sensor – coolant) must be ≤ 10 ºC

• To avoid need for very cold coolant.Though, we face a major problem here as the current pipe insulation is designed for -25 ºC and tested to -20 ºC . But, the coolant would need to be -30ºC or lower !

– The available ΔT of 10 ºC splits roughly into• ΔT (within module) < 7 ºC• ΔT (module cooling contact – module support piece – pipe wall) < 2 ºC. • ΔT (pipe wall – fluid) < 1 ºC, which seems achievable with 2-phase CO2.

• Develop and qualify tracker-wide common solutions, keeping in mind different module types (2S, PS, Stereo, Vertical 3D) + Barrel and End-cap geometries.

The objectives

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

Module positioning

• In the present TK there is no common module positioning method– So, we have now a wider experience...

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

Module positioning: TIB

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

Inputs from A. Basti / INFN Pisa

Precision insert

Slot insert

Inserts with clearance

Module positioning: TEC

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

Inputs from M. Wlochal / Aachen

Module positioning: TOB

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

And the net result with TK precision?

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

Already after first cosmic runs the residuals with Track Based Alignment are at ~50um rms, and improve within 2008 to ~30um.Much better than what the mechanics can (reasonably) do!

Module positioning

• Sufficient precision can be reached with the TIB & TEC methods– Smaller and lighter than the TOB method

• Maybe a sufficient precision can be reached even without positioning pins?!– Precision screw + hole / slot ?– Counter sunk screw + 2 holes or 1 hole and 1 slot ?– Use module edge as guide reference ?– Are inserts needed on the module?

• Captive screws (permanently with module) could be excellent to have.– Not fully obvious, due small dimensions

Tasks for 2012-2013:– Analyse the present TK results and set precision requirements for the upgrade

TK.• Impacts the mechanics design from modules up to complete TK, as well as what needs

to be done in terms of pre-alignment and measurements.– Produce test assemblies and measure their mechanical quality (precision,

strength, ...).• Need sample materials/components for these tests !2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

Module cooling contacts

• Different variants of module cooling contacts were applied in the present TK– So, we have now a wider experience...

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

Module cooling: Present TK

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

Support

Module cooling

• Uncertainties in calculation inputs (composites, glues, joints) measurements are necessary, though not fully obvious either (e.g. inputting of power load, availability of correct materials/components)

• For the present tracker calculations and tests done mostly in 2000-2002

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

• Coolant temperature: 5 - 6 ºC.• Module power loads:

– FE-power ~ 0.45 W / APV– Silicon self-heating ~ 0.014W / module @ 5 fb-1,

0.4W / module expected @ 500 fb-1 (10y LHC)

• Silicon mean temp: 13 – 14 ºC• ΔT (silicon - coolant) = 7 – 9 ºC

– Will grow to ~ 10 ºC due self-heating increase

Module cooling currently (TOB)

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

Plots by Christian Barth

DS modules P = 3.6W

SS6 modules P = 2.7 W

SS4 modules P = 1.8 W

Cooling segment #44TOB 1.3.1 (132 modules) off

Module cooling contacts• Estimated power load in a 2S module: ~3.5 W (TOB: 1.8 – 4.4 W)• Following calculations (A. Mussgiller) and present TK experience

ΔT (silicon – coolant) of 10 ºC seems reachable, but is not automatic!– 10 ºC easily ‘lost’ already within the module.

• Good quality dry cooling contact can be sufficient– No need for thermal pastes. Avoid them, they are ‘dirty’– But requires good planarity of the module and support contacts (no gaps,

minimal stresses)– Even a small contact area is enough with these low powers, if the contact is

good.

Tasks for 2012-2013:– Study the support/cooling contacts in the modules

• Is aluminium the choice? Any other candidates?– Study the module support/cooling blocks.

• Is aluminium the choice? Any other candidates?• Geometry and dimensions. Connection to cooling pipe.

– Qualification of assembly glues and methods, for all mechanical/thermal contacts– Produce test assemblies and measure their thermo-mechanical performance.

• Need sample materials/components for these tests !2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

Thank you for your attention.

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

Spare slides

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

2S module, Jan 2012 version

2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN

3D models by A. Conde Garcia / CERN