Steve Kettell , BNL January 27th PIENU Collaboration Meeting · PIENU Collaboration Meeting 1/26/06...

Post on 03-Apr-2020

7 views 0 download

Transcript of Steve Kettell , BNL January 27th PIENU Collaboration Meeting · PIENU Collaboration Meeting 1/26/06...

PIENU Collaboration Meeting 1/26/06 1

E949 CsI endcaps

Steve Kettell , BNL January 27th, 2006

PIENU Collaboration Meeting

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL2

Undoped CsI

§ ρ = 4.5 g/cm3

§ χ0 = 1.86 cm§ RM = 3.8 cm§ Fast: ~45ns @ 310nm; Slow: ~600ns @ 450nm§ F/T ~80% with ~200 p.e./MeV for 5” Quanticon

PMT§ With U330 filter and 3” High Field PMT get

F/T~86% and ~50p.e./MeV on bench

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL3

E949 Detector Overview

CsI Endcaps

E949

PIENU

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL4

End View

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL5

More detail

Upstream ECOD Ring4: 43.4ID Ring3: 25.5

Downstream EC

OD Ring4: 41.5

ID Ring3: 23.6

2x23.6=47.1cm isreasonably well matched to TINA’s46cm diameter

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL6

Assembly View

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL7

Xtal

Ring 1 Ring 2-4A: 7.8-8.0 9.9-11.2B: 6.1 8.6C: 25.0 25.0All dimensions in cm

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL8

PMT and Mount

Hamamatsu High-Field PMTsR5065mod (R4721mod) are fast, UV-glass, good QE~17%, but poor spe resolution

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL9

Possible Schedule

§ Optimistic: both endcaps removed by 3/31/06§ Less optimistic: remove upstream mid-March

and downstream by end of April

§ Allow 2 weeks to uncouple EC’s from iron?

§ Do we remove xtals from EC? 2 weeks (PMT&xtals)?60 tech-days?§ Packing and shipping…

Sam Aronson endorsed and forwarded the following to DOE:“…Some components (endcap vetos) will be lent to TRIUMF before they are sent to Japan. These will be used in a π+→e+ν experiment. The need for these components is for 2-3 years, starting in April 2006, after which they will be shipped to Japan.”

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL10

Backup

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL11

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL12

PIENU Collaboration Meeting 1/26/06 Steve Kettell, BNL13

Fig :Radiation Length vs polar angle

(polar angle)

E787

BVL

)cos( θ

Rad

iatio

n le

ngth

E949

45 degree hole

Photon Veto

rejection ð0

• Rejection of Kπ2 background as a function of acceptance for E787 and E949.• ×2 better rejection at nominal acceptance (80%)

ãNew detectors in blue.

E949

E787