PV EXPERIENCE 16MW 07.08.2015
-
Upload
pashalis-petalas -
Category
Documents
-
view
17 -
download
0
Transcript of PV EXPERIENCE 16MW 07.08.2015
PORTOFOLIO PV PARK 1 6 MW 01/07/2011- 31/10/2011
Α/Α PLACED
PROJECT NAME OF PROJECT
POWER(MW)
1 BATHYCHORI
BILLIA
PV PARKTERNA ENERGY S.A
5,983
08/03/2010- 08/03/2011
22/05/2012- 31/09/2012 Α/Α PLACED
PROJECT NAME OF PROJECT
POWER(kWp)
1 KΩ PV PARKATHANASIOS P.STAMATIS E.E
99,36
2 KΩ PV PARK P.GEROSTATHIS E.E 99,36
3 KΩ PV PARK P.GEROSTATHIS E.E 99,36
4 ΧΙΟ PV PARK K.LAMPROU E.E 99,36
5 CRETE PV PARK KOXARIANOS S.A 79,92
6 CRETE PV PARK KOXARIANOS S.A 79,92
7 CRETE PV PARK KOXARIANOS S.A 79,92
8 CRETE PV PARK KOXARIANOS S.A 79,92
9 CRETE PV PARK KOXARIANOS S.A 79,92
10 CRETE PV PARK KOXARIANOS S.A 79,92
11 CRETE PV PARK KOXARIANOS S.A 79,92
TOTAL POWER (kWp) 956,8801/11/2012- 15/1/2013 RSEnergy Hellas Solartechnik LTD BOLOS
Α/Α PLACED
PROJECT NAME OF PROJECT
POWER(MW)
1 KOYLIA
HGOYMENITSA
PV PARKECOJULE S.A
2001,00
01/10/2013- 01/21/2014 POWER MACEDONIA S.A KAV ALAGreece
Α/Α PLACED
PROJECT NAME OF PROJECT
POWER(MW)
1 KOKJINO
VILLAGE
KAVALA
PV PARK
POWER MACEDONIA S.A
1800,00
POSITIONS-ROLE IN THE PROJECTCHIEF CONSTRUCTION ENGINNER, INSTALLATION ENGINNER
CONSTRUCTION SUPREVISION, PROJECT MANAGER INSTALLATION ENGINNER, CONSTRUCTION ENGINNER
· RESPONSIBLE TO SET-UP AND ORGANIZE CONSTRUCTION SITE-
PARTICIPATES IN PV PLANT PLANNING
· RESPONSIBLE TO MANAGE/SUPERVISION
SUBCONTRACTORS ,INCLUDING FINAL INSPECTION,PROVIDING
TECHNICAL INFORMATION AND INTERPRETATION OF PLANS,DETAIL
SHEETS AND SPECIFICATIONS.
· CONTROL AND CHECK THE MATERIAL OF EQUIPMENT
· ATTENDANCE OF THE QUANTITY CONTROL AND QUALITY CONTROL OF
MATERIALS.
· SECURES SMOOTH AND COST-EFFICIENT EXECUTION OF INSTALATTION
WORKS-MAINTAINS INSTALATION LOGBOOK ALL PROJECT RELATED
COSTS AND DISCREPANCIES FROM PLANNED FIGURES.
· INSPECTION ALL INCOMING DISPATCH NOTES AND INVOICES AND
CONFIRMS THEIR ACCURANCY.
· IDENTIFY /SELECT LOCAL SUBCONTACTORS AND NEGOTIATES
CONTRACTS WITH THEM.
· REESPONSIPLE FOR QUALITY CONSTRUTION AND QUALITY PROCESSES
AND HEALTH SAFETY PLAN OF SITE.
· COMMUNICATED WITH CUSTOMER AND HIS REPRESENTATIVES AND
LOCAL AUTHORITIES.
· WRITING OF DAILY WORK OF JOURNAL