Progress with grounding and shielding
description
Transcript of Progress with grounding and shielding
Progress with grounding and shielding
SCT system test
Contents
• Description of grounding scheme
• Noise injection technique
• Results - new option!!
Grounding Schemes
50μm
PPF1
PPF0
VME
Shunt shield
Cooling Block + Disk
DGND
VDD
30m
PPF2100μm
Choke
ModuleWiggly
Support frame
Cu Box
50μm
PPF1
PPF2
PPF0
VME
Cooling Block + Disk
DGND
VDD
30m100μm
Choke
ModuleWiggly
Support frame
Cu Box
Ned’s
Smithy’s
@ PPF1 - HV return line shorted to shield HV line AC coupled to shield via 10nF cap
10nF
@ PPF1 for both schemes
• VDD to DGND 4.7μF
• VCC to AGND 4.7μF
• VCC, VDD, AGND, DGND, all signal lines to shield 1μF ()
• HV to HV-return 10nF
On Disk
Support structurePPF0
Shield
DGND
Thermal
Shield
Radial andannular Alfoils
Coolingpipes +blocks
OR
GND
Disk
OR n/c
Noise injection technique• Single threshold scan with
2fC injected charge– reference scan– scan under different
conditions
• Assume gain = 55
• plot noise difference with respect to the reference
Front side master
Backsidemaster chip
Backsideend chip
Results noise injection into tapesbefore some modifications
Red- Smithy’sBlack - Ned’s
Best Scheme - New Option
• ADD DC connection at PPF0 from DGND to shield to Smithy’s scheme
• Noise reduced to order 300 electrons from 2500!
• BUT not been repeated since.– More measurement are on going