Data Perencanaan ϒ = 1.98 φ = 11.21 ° q = 2.4 Qv = 500 t M = 250 tm Tinggi Balok Girder = 2m Panjang Tumpuan Min = 1.5 m Tebal Dudukan Balok Girder = 1.5 m Tinggi Abutment (H) = 6m Lebar Abutment ( L) = 8m Tebal Pile Cap = 1m Tebal Dinding Abutment = 0.6 m t/m³ t/m²

description

Sipil

Transcript of pondasi

Page 1: pondasi

Data Perencanaan tanϒ = 1.98 sin oφ = 11.21 ° cos oq = 2.4Qv = 500 tM = 250 tmTinggi Balok Girder = 2 mPanjang Tumpuan Min = 1.5 m

Tebal Dudukan Balok Girder = 1.5 m DIMENSI & BERAT ELEMEN

Tinggi Abutment (H) = 6 m

Lebar Abutment ( L) = 8 m

Tebal Pile Cap = 1 m

Tebal Dinding Abutment = 0.6 m 123456789

10

V1V2V3V4V5V6V7V8V9

V10V11H11V12

H12

t/m³

t/m²

NOMOR ELEMEN

NOTASI GAYA

Page 2: pondasi

0.1779290.175177711

0.9845368 -0.988032Ka = 0.507117Pa = 144.5892v11 25.328805h11 142.35339

DIMENSI & BERAT ELEMEN

LEBAR (m)532.7

0.5 2 2.40.5 1.5 1.82.5 1 6 sf geser 0.6658273

1 0.5 0.61 2.5 6

0.5 0.5 0.32 0.5 1.2 11 0.5 1.22 0.5 1.2

5 1 12

142.35339

KETERANGAN

Berat Sendiri Elemen 1 2.4 0.75 6 1.8Berat Sendiri Elemen 2 1.8 1.25 5.75 2.25Berat Sendiri Elemen 3 6 0.25 4.5 1.5Berat Sendiri Elemen 4 0.6 0.833 3.667 0.4998Berat Sendiri Elemen 5 6 0 4 0Berat Sendiri Elemen 6 0.3 0.667 3.667 -0.2001Berat Sendiri Elemen 7 1.2 1.167 1.167 -1.4004Berat Sendiri Elemen 8 1.2 0 1.25 0 mr 695.86582Berat Sendiri Elemen 9 1.2 1.167 1.167 1.4004 sf guling 4.8882983Berat Sendiri Elemen 10 12 0.5 0 6Tekanan Tanah Aktif 25.328805 2.33 1 59.016115Tekanan Tanah Aktif 142.35339 2.33 1 142.35339Gaya Luar 500 1.25 6.5 625

Gaya Luar 0 1.25 6.5 0

TINGGI (m)

BERAT (Ton)

GAYA (Ton)

X Thdp 0 (m)

Y Thdp 0 (m)

Momen (Ton -m)