LG Water Solutions• A dedicated PV for the qualification program • Minimum of one (1) year of...
Transcript of LG Water Solutions• A dedicated PV for the qualification program • Minimum of one (1) year of...
TFNTFC
Nanomaterial
B-va
lue
A-value
Higher Rejection Membrane
Lower Energy Membrane
Jw=A(∆P-∆π)Js=B∆C
LG SW 400 SR 400 (37) 6,000 (22.7) 99.7 99.85 93 28 or 34
LG SW 440 SR 440 (41) 6,600 (25.0) 99.7 99.85 93 28
LG SW 400 GR 400 (37) 7,500 (28.4) 99.7 99.85 93 28 or 34
LG SW 440 GR 440 (41) 8,250 (31.2) 99.7 99.85 93 28
LG SW 400 R 400 (37) 9,000 (34.0) 99.7 99.85 93 28 or 34
LG SW 440 R 440 (41) 9,900 (37.0) 99.7 99.85 93 28
LG SW 400 ES 400 (37) 13,700 (52.0) 99.6 99.80 89 34
LG SW 440 ES 440 (41) 15,070 (57.0) 99.6 99.80 89 28
10
• A dedicated PV for the qualification program• Minimum of one (1) year of operation if initial flux is acceptable• Specific Flux above 0.085 gfd/psi• Maintain 55% Recovery• Monitor Permeate Water Quality• One (1) standard CIP and one (1) aggressive CIP
RO Membrane Qualification ProgramOperating Parameters and Cleaning In Place
Parameter Standard Cleaning Aggressive Cleaning
Solution(1) 2% (wt./wt.) STP(2)
0.2% (wt./wt.) DDBS(3)3% (wt./wt.) STP(2)
0.3% (wt./wt.) DDBS(3)
Cycling 30 min. circulate and 60 min soak (repeat three times)
30 min. circulate and 60 min soak (repeat three times)
Flow rate 38 – 39 gpm (8.6 – 8.9 m3/hr) 38 – 39 gpm (8.6 – 8.9 m3/hr)pH 11.0 ± 0.5 12.0 ± 0.5
Temperature 90 – 100 °F (32.2 – 37.8 °C) 90 – 100 °F (32.2 – 37.8 °C)(4)
(1). Solutions made up using RO product water(2). Sodium tripolyphosphate LD light density (or equivalent) (3). Sodium dodecylbenzene sulfonic acid (or equivalent)(4). LG had requested the Client to perform the aggressive CIP at ambient temperature (28-30 °C) when cleaning with pH 12.
0.04
0.08
0.12
0.16
0.2
gfd/
psi
Specific Flux
LG CIPNon-TFN CIPFull scale CIPFull Scale = Hydranautics ESPA2-LD, Non-TFN: PA BWRO with 34 mil spacer
Full Scale Stage 1
Non-TFN
LG BW 400 ES
Target Specific Flux > 0.085 gfd/psi
0.0%
0.5%
1.0%
1.5%
2.0%
Mar-16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17
%
Operating Date
Normalized Salt Passage
LG CIPNon-TFN CIPFull Scale CIP
Based on Average Feed Cond. ±1,700 µS/cm, Target Salt Passage < 3.5%
LG BW 400 ES
Full Scale Stage 1Non-TFN
Membrane PerformanceLG BW 400 ES Targeted Permeate Organic Carbon
0
0.05
0.1
0.15
0.2
6/20/16 8/30/16 9/16/16 3/13/17 3/16/17 3/27/17 3/27/17(2nd
Sampling)
7/27/17 8/17/17
ppm
Sampling DateFeed TOC = 5 – 10 ppmTarget Permeate TOC < 0.5 ppmMDL (Method Detection Limit) = 0.0331 ppm
Standard CIP on 3/15/17
Aggressive CIP on 8/1/17
< MDL < MDL< MDL < MDL < MDL
Membrane PerformanceLG BW 400 ES Targeted Permeate Total Nitrogen
0
0.5
1
1.5
2
6/20/16 8/30/16 9/16/16 3/13/17 3/16/17 3/27/17 3/27/17 (2ndSampling)
7/27/17 8/17/17
ppm
Sampling Date
Permeate Total Nitrogen TKN nitrite + nitrate
Feed TN = 11 – 16 ppmTarget Permeate TN < 5.0 ppm
Standard CIP on 3/15/17
Aggressive CIP on 8/1/17
Silicon Valley Advanced Water
Purification Center
El Segundo
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0 4 8 12
TOC
*, pp
m
Ozone Dose, ppm
Hydranautics CPA5-LDDow BW30XFRLE400-34Hydranautics ESPA2Lanxess B400FR ASDLG BW400AFRToray TM620D-400
10111213141516
0 1000 2000 3000 4000 5000 6000
gfd
Run Time, hours
System Flux
25.1
20.2
10.9
0
15
30
Comp A Comp B LG BW AFR
nN
Break Tank
CIP Tank
CFHPP 1
HPP 2
Booster/ CIP Pump
Train 1
Train 2
Back
to F
eed
Tank
From Feed Tank
Chemical Dosing
Control Panel / HMI
Local PC Remote PC