Decommissioning the University of Iowa MC17 Cyclotron
description
Transcript of Decommissioning the University of Iowa MC17 Cyclotron
Decommissioning the University of Iowa MC17 Cyclotron
Tom Hansen, CHP, PMPAmeriphysics, LLC
copyright 2011 - 1 - Ameriphysics, LLC
Introduction
copyright 2011 - 2 - Ameriphysics, LLC
Introduction
Scanditronix MC17 particle accelerator • 18O(p,n)18F• 14N(d,n)15O • 14N (p,α)11C• 16O(p,α)13N
Operated @ 30 uA, 6 hours/week for last 10 years
copyright 2011 - 3 - Ameriphysics, LLC
Pre-Characterization
copyright 2011 - 4 - Ameriphysics, LLC
Characterization
copyright 2011 - 5 - Ameriphysics, LLC
Characterization
copyright 2011 - 6 - Ameriphysics, LLC
Major Activation Products Primary Source
Be-7 target material
Na-22aluminum, magnesium
Na-24 aluminumSc-48 titaniumCr-51 target material
Mn-52 target materialMn-54 copper, brassCo-56 target materialMn-56 copper, brassCo-57 target materialNi-57 nickelCo-58 nickelFe-59 ironCo-60 copper, concreteZn-65 copper, brass
Sb-124alloys in solder and
ball bearings
Total Activity: 137 mCi
Characterization
copyright 2011 - 7 - Ameriphysics, LLC
0 2 4 6 8 10 12 14 16 18 201.00E-06
1.00E-05
1.00E-04
1.00E-03
1.00E-02
1.00E-01
1.00E+00
1.00E+01
1.00E+02
Series1 Be-7
Na-22 Na-24
Sc-48 Cr-51
Mn-52 Mn-54
Co-56 Mn-56
Co-57 Ni-57
Co-58 Fe-59
Co-60 Zn-65
Sb-124
Time (years)
Activ
ity (m
Ci)
Courtesy: John Sunderland, Ph.D.
Establish Removal Path
copyright 2011 - 8 - Ameriphysics, LLC
Establish Removal Path
copyright 2011 - 9 - Ameriphysics, LLC
Establish Removal Path
copyright 2011 - 10 - Ameriphysics, LLC
Package Ancillaries
copyright 2011 - 11 - Ameriphysics, LLC
Package Ancillaries
copyright 2011 - 12 - Ameriphysics, LLC
Remove RF Shield
copyright 2011 - 13 - Ameriphysics, LLC
Material Handling
copyright 2011 - 14 - Ameriphysics, LLC
Material Handling
copyright 2011 - 15 - Ameriphysics, LLC
Material Handling
copyright 2011 - 16 - Ameriphysics, LLC
Material Handling
copyright 2011 - 17 - Ameriphysics, LLC
Material Handling
copyright 2011 - 18 - Ameriphysics, LLC
Material Handling
copyright 2011 - 19 - Ameriphysics, LLC
Material Handling
copyright 2011 - 20 - Ameriphysics, LLC
Material Handling
copyright 2011 - 21 - Ameriphysics, LLC
Material Handling
copyright 2011 - 22 - Ameriphysics, LLC
Loading and Shipping
copyright 2011 - 23 - Ameriphysics, LLC
Loading and Shipping
copyright 2011 - 24 - Ameriphysics, LLC
Loading and Shipping
copyright 2011 - 25 - Ameriphysics, LLC
Loading and Shipping
copyright 2011 - 26 - Ameriphysics, LLC
Project Metrics
• LLRW shipped for disposal: 48,000 lbs. • Time: 324 person-hours over 3 day period• Cost: ~$200,000• Dose: 53 person-mrem (16 mrem max
exposed individual)
copyright 2011 - 27 - Ameriphysics, LLC