X-band component inventory, supply and requests

7
X-BAND COMPONENT INVENTORY, SUPPLY AND REQUESTS G. Riddone Contribution from A. Olyunin RF structure development meeting, 2009.04.08

description

X-band component inventory, supply and requests. G. Riddone Contribution from A. Olyunin RF structure development meeting, 2009.04.08. List of RF components for TBTS. *Still under production. RF Flanges and WR90 bends according to the layout. List of RF components for other projects. - PowerPoint PPT Presentation

Transcript of X-band component inventory, supply and requests

Page 1: X-band component inventory, supply and requests

X-BAND COMPONENT INVENTORY, SUPPLY AND REQUESTSG. Riddone Contribution from A. Olyunin

RF structure development meeting, 2009.04.08

Page 2: X-band component inventory, supply and requests

LIST OF RF COMPONENTS FOR TBTSRF

components Ordered TBTS P1TBTS P2.1 [Δ]

TBTS P2.2[Δ]

Total TBTS

Total Left

Loads

5 from VDL 1 (N5)

6 95 from CINEL 1 (N6) 2

(N7, 8) 2

4 (1 + 3*) from HEEZE [SS430]

1* from CINEL [SS430]

Phase shifters 2 from GYCOM 1 1 1 body

Attenuator 2 from GYCOM + 1 body*

1 1 1 3 0

Splitter 10 from VDL 2 2 4 6

Hybrid4 from CINEL 1

1 101 + 6* from CHINA

Directional couplers 10 from GYCOM 2 (N5,8) 3 1 6 4

*Still under production RF Flanges and WR90 bends according to the layout

Page 3: X-band component inventory, supply and requests

LIST OF RF COMPONENTS FOR OTHER PROJECTS

RF compon

entsTBL

protoTBL

series KEKKlystron test

at SLAC

X-band stand alone test

PSI (a)Trieste

/Elettra

(b)

TERA(d)

Left from TBTS

and TBL proto

Loads 2 (N3,4) 4 2 2 5 1 1 1 7

Phase shifter 1 body

Attenuator 0

Splitter 1 6

Hybrid 10Direction

al couplers

2 (N6) 2 2 6 3 3 2

WR90 bends

( c)

4 (2E and 2H)

TBC 5 (H/E TBC) 5

14 (6E and 8H)

(a): meeting in March 2009, layout still to be finalized (b): for the moment the same needs as for PSI(c): ordered new 50 m WR90 thick, new100 SLAC flanges (d): to be confirmed

Already supplied

09/09 tbc03/10 09/09

Page 4: X-band component inventory, supply and requests

CONCLUSIONS Requirements for other projects to be

confirmed New orders are required (procurement time

may take several months) – if requirements/schedule for other project is confirmed orders became urgent for loads and directional couplers

The available components can be supplied on loan/replacement basis

Trieste/Elettra (Italy) and CAS, HEP (China) would like to collaborate in the design and fabrication of RF components

Page 5: X-band component inventory, supply and requests

X-band stand alone test stand

09/09 03/10

Page 6: X-band component inventory, supply and requests

X-band stand alone test stand

Page 7: X-band component inventory, supply and requests

TERA