The SuperNEMO tracker construction and commissioning · Bg < 10-4 counts/keV/ kg/y • goal for...

5
The SuperNEMO tracker construction and commissioning M. Cascella UCL 1

Transcript of The SuperNEMO tracker construction and commissioning · Bg < 10-4 counts/keV/ kg/y • goal for...

Page 1: The SuperNEMO tracker construction and commissioning · Bg < 10-4 counts/keV/ kg/y • goal for demonstrator m ββ ~ 0.20 - 0.40 eV 2. The SuperNEMO tracker ... • First of four

The SuperNEMO tracker construction and commissioning

M. Cascella UCL

1

Page 2: The SuperNEMO tracker construction and commissioning · Bg < 10-4 counts/keV/ kg/y • goal for demonstrator m ββ ~ 0.20 - 0.40 eV 2. The SuperNEMO tracker ... • First of four

A SuperNEMO module• 2β0ν decay search

• are ν Mayorana or Dirac? mν? Mass hierarchy?

• 5-7kg (15m2) source foil (Se/Nd/Ca)

• calorimeter 4% FWHM@ Qββ

• Tracker ~2000 tracker cells • Full event reconstruction for bg

rejection + high radiopurity -> Bg < 10-4 counts/keV/ kg/y

• goal for demonstrator ⟨mββ⟩ ~ 0.20 - 0.40 eV

2

Page 3: The SuperNEMO tracker construction and commissioning · Bg < 10-4 counts/keV/ kg/y • goal for demonstrator m ββ ~ 0.20 - 0.40 eV 2. The SuperNEMO tracker ... • First of four

The SuperNEMO tracker• octagonal cells operated

in Geiger mode • (tanode -> transverse

coordinate; tcathode -> longitudinal coordinate)

• High radiopurity extremely challenging • Only Duracon, copper and

stainless steel allowed • automated construction +

clean environment

3

Wiring robot

tracker assembly

Page 4: The SuperNEMO tracker construction and commissioning · Bg < 10-4 counts/keV/ kg/y • goal for demonstrator m ββ ~ 0.20 - 0.40 eV 2. The SuperNEMO tracker ... • First of four

Rn emanation tests in MSSL• Every detector

component is tested first with HPGe then for Rn emanation (Rn concentration line)

• SuperNEMO goal: Rn emanation < 0.15 mBq/m3

• Rn trap to filter tracker gas • expected 1010

suppression with He

4

Gas Source Radon Level (µBq/m3)

He Cylinder 70 – 100N2 Cylinder 400 – 1000

N2 Boil-off 90 – 140N2 Rn-Trap 20 ± 12He Rn-Trap < 5

Rn CL

Rn trap

214Po activity from 0.075 m3 of He.

3Volume / m0 20 40 60 80 100

3B

q/m

µM

inim

um D

etec

tabl

e A

ctiv

ity /

0

5

10

15

20

25

30

35

40

45

50

CL = 90 % = 0.23 mBqTrapA

= 0.27 mBqDetAf = 10.0 lpm

= 31.5 %Det∈

= 66.9 %Trap∈

Page 5: The SuperNEMO tracker construction and commissioning · Bg < 10-4 counts/keV/ kg/y • goal for demonstrator m ββ ~ 0.20 - 0.40 eV 2. The SuperNEMO tracker ... • First of four

First Tracker section

• First of four sections completed and under commissioning (first tracks measured), second section 50% assembled

• First section will be shipped to France later this year • On schedule to commission Demonstrator Module in 2016

5