C.E.S.S. Limited - Craigie Engineering Sales and Services Ltd - SPECIALISTS IN THE VALUATION, MARKETING, SOURCING, & RELOCATION OF SURPLUS POWER PLANT AND AUXILIARY EQUIPMENT For further information please contact: Mike Craigie CESS Ltd. 45 Hamnavoe, Stromness, Orkney Islands, U.K. KW16 3JQ Tel: +44 (0)7802 916577 E-mail: [email protected] Homepage: http://www.cess.co.uk CESS Ref: STGMM9388 2 X Alstom CFB Boilers & 151MW Siemens Condensing Steam Turbine This power station is a 150MW gross output power plant designed to utilise waste through two Fines Circulating Fluidised bed boilers (Ficirc CFB) Currently the plant is set up to utilise mine waste, Beneficiated Dewatered Tailings (BDT) with moisture content between 30% and 40% and unwashed run of mine coal as Back Up Fuel (BUF). The plant however with its fluidised bed technology is suited to burning a range of waste products within controlled parameters to meet EPA environmental requirements. When operating with mine waste the addition of limestone into the CFB substantially reduces Sox levels and due to the operating temperatures being below 900 ºC Nox emissions are also eliminated. The plant consists of the following main equipment: Plant equipment Maximum continuous rating (MCR) /Output Overload Operating condition OEM 2 x Ficirc CFB Boilers 261 T/H steam 271 T/H 513 ºC @ 106 Bar G Alstom 1 x Condensing Turbine 148 MW 151 MW 106 Bar G 300RPM 50HZ Siemens 1 x Generator 148MW 151 MW 174.1MVA Alstom 1 x Unit transformer 132KV transition line ABB 1 x auxiliary transformer 132 KV to 6.6 KV ABB 2 x Fabric filters Licence < 80μg/m³ Actual < 15μg/m³ Alstom Cooling tower 6 cell timber frame tower Plant Control System 4 – 20 mA (24 V DC) 800 XA system ABB Turbogenerator control System 4 – 20mA ( 24 V DC) Advant system ABB

Transcript of STGMM9388 - 150MW COAL Spec sheet - Craigie ... x Generator 148MW 151 MW 174.1MVA Alstom 1 x Unit...

C.E.S.S. Limited - Craigie Engineering Sales and Services Ltd -

SPECIALISTS IN THE VALUATION, MARKETING, SOURCING, & RELOCATION

OF SURPLUS POWER PLANT AND AUXILIARY EQUIPMENT

For further information please contact: Mike Craigie

CESS Ltd. 45 Hamnavoe, Stromness, Orkney Islands, U.K. KW16 3JQ Tel: +44 (0)7802 916577

E-mail: [email protected] Homepage: http://www.cess.co.uk

CESS Ref: STGMM9388

2 X Alstom CFB Boilers & 151MW Siemens Condensing Steam Turbine

This power station is a 150MW gross output power plant designed to utilise waste through two Fines Circulating Fluidised bed boilers (Ficirc CFB) Currently the plant is set up to utilise mine waste, Beneficiated Dewatered Tailings (BDT) with moisture content between 30% and 40% and unwashed run of mine coal as Back Up Fuel (BUF). The plant however with its fluidised bed technology is suited to burning a range of waste products within controlled parameters to meet EPA environmental requirements. When operating with mine waste the addition of limestone into the CFB substantially reduces Sox levels and due to the operating temperatures being below 900 ºC Nox emissions are also eliminated. The plant consists of the following main equipment: Plant equipment

Maximum continuous rating (MCR) /Output

Overload Operating condition OEM

2 x Ficirc CFB Boilers

261 T/H steam 271 T/H 513 ºC @ 106 Bar G Alstom

1 x Condensing Turbine

148 MW 151 MW 106 Bar G 300RPM 50HZ

Siemens

1 x Generator 148MW 151 MW 174.1MVA Alstom 1 x Unit transformer

132KV transition line

ABB

1 x auxiliary transformer

132 KV to 6.6 KV ABB

2 x Fabric filters

Licence < 80μg/m³ Actual < 15μg/m³ Alstom

Cooling tower 6 cell timber frame tower

Plant Control System

4 – 20 mA (24 V DC) 800 XA system ABB

Turbogenerator control System

4 – 20mA ( 24 V DC) Advant system ABB

C.E.S.S. Limited

CESS Ltd. 45 Hamnavoe, Stromness, Orkney Islands, U.K. KW16 3JQ Tel: +44 (0)7802 916577

E-mail: [email protected] Homepage: http://www.cess.co.uk

2

The boiler Auxiliary plant consists of BDT Pumps, coal feeders, ID and FD fans, Sootblowers, Boiler water Circulating pumps, Auxiliary cooling water pumps and limestone and inert material storage and transfer systems. Balance of plant consists of Process and Instrument air compressors, Coal conveying system, Water treatment plant, Ash collection, distribution and disposal system and River water intake and discharge systems.

C.E.S.S. Limited

CESS Ltd. 45 Hamnavoe, Stromness, Orkney Islands, U.K. KW16 3JQ Tel: +44 (0)7802 916577

E-mail: [email protected] Homepage: http://www.cess.co.uk