Information 425-452-6800 m3475A-3.19_ind The Transportation Department has been working with the community and the Bellevue School District to develop a traffic safety strategy for select streets near Tyee Middle School. Project Features ρ Installed school zone signing around Tyee Middle School in 2018 ρ Build a new sidewalk separated by a landscaped planter on the west side of 138th Avenue SE between Allen Road and SE 40th Street (next to Tyee Middle School) ρ Construct a mini-roundabout designed to accommodate large vehicles, with enhanced crosswalks, to replace the temporary traffic circle at 138th Avenue SE and SE 40th Street ρ Paint white lines to designate parking shoulders on 138th Ave SE/136th Place SE corridor, between SE 40th Street and SE 37th Street, to narrow the road and reduce vehicle speeds. Same concept installed on 146th Avenue SE, south of SE 37th Street ρ Construct colored concrete pavement across 136th Place SE and 146th Avenue SE south of SE 37th Street with Residential Area signs to highlight neighborhood entrances Project Funding Neighborhood Safety, Connectivity and Congestion Levy, Neighborhood Sidewalks Program, Neighborhood Traffic Safety Program with a total budget of $925,000 Project Schedule Currently in design; construction expected to begin summer 2019. Contact Vanessa Humphreys, P.E. Project manager 425-452-6103 [email protected] Project Information BellevueWA.gov/eastgatetyeetraffic April 2019 Project Update Eastgate/Tyee Traffic Safety Improvement Project Update Planning Design Construction Title VI Notice to the Public: It is the City of Bellevue’s policy to assure that no person shall on the grounds of race, color, national origin or sex, as provided by the Title VI of the Civil Rights Acts of 1964, be excluded from participating in, be denied the benefits of, or be otherwise discriminated against under any of its federally funded program and activities. Any person who believes his/her Title VI protection has been violated may file a complaint with the Title VI Coordinator. For Title VI complaint forms and advice, please contact the Title VI Coordinator at 425-452-4496. SE 40th St Tyee Middle School PARKING SHOULDER MINI ROUNDABOUT LANDSCAPE STRIP SIDEWALK SIDEWALK SIDEWALK ENHANCED CROSSWALKS 138th Ave SE Eastgate/Tyee Traffic Safety Improvement Projects

Transcript of Project Update - Bellevue · Project Update Eastgate/Tyee Traffic Safety Improvement Project Update...

Page 1: Project Update - Bellevue · Project Update Eastgate/Tyee Traffic Safety Improvement Project Update PlanningDesignConstruction Title VI Notice to the Public: It is the City of Bellevue’s

Information

425-452-6800

m34

75A-

3.19

_ind

The Transportation Department has been working with the community and the Bellevue School District to develop a traffic safety strategy for select streets near Tyee Middle School.

Project Features ρ Installed school zone signing around Tyee

Middle School in 2018

ρ Build a new sidewalk separated by a landscaped planter on the west side of 138th Avenue SE between Allen Road and SE 40th Street (next to Tyee Middle School)

ρ Construct a mini-roundabout designed to accommodate large vehicles, with enhanced crosswalks, to replace the temporary traffic circle at 138th Avenue SE and SE 40th Street

ρ Paint white lines to designate parking shoulders on 138th Ave SE/136th Place SE corridor, between SE 40th Street and SE 37th Street, to narrow the road and reduce vehicle speeds. Same concept installed on 146th Avenue SE, south of SE 37th Street

ρ Construct colored concrete pavement across 136th Place SE and 146th Avenue SE south of SE 37th Street with Residential Area signs to highlight neighborhood entrances

Project FundingNeighborhood Safety, Connectivity and Congestion Levy, Neighborhood Sidewalks Program, Neighborhood Traffic Safety Program with a total budget of $925,000

Project ScheduleCurrently in design; construction expected to begin summer 2019.

ContactVanessa Humphreys, P.E. Project manager 425-452-6103 [email protected]

Project InformationBellevueWA.gov/eastgatetyeetraffic

April 2019

Project UpdateEastgate/Tyee Traffic SafetyImprovement Project Update

Planning Design Construction

Title VI Notice to the Public: It is the City of Bellevue’s policy to assure that no person shall on the grounds of race, color, national origin or sex, as provided by the Title VI of the Civil Rights Acts of 1964, be excluded from participating in, be denied the benefits of, or be otherwise discriminated against under any of its federally funded program and activities. Any person who believes his/her Title VI protection has been violated may file a complaint with the Title VI Coordinator. For Title VI complaint forms and advice, please contact the Title VI Coordinator at 425-452-4496.

SE 40th St

Tyee Middle School

PARKING SHOULDER

MINI ROUNDABOUT

LANDSCAPE STRIP

SIDEWALK SIDEWALK

SIDEWALK

ENHANCEDCROSSWALKS

138t

h Av

e SE

Eastgate/Tyee Traffic SafetyImprovement Projects

Page 2: Project Update - Bellevue · Project Update Eastgate/Tyee Traffic Safety Improvement Project Update PlanningDesignConstruction Title VI Notice to the Public: It is the City of Bellevue’s

Transportation DepartmentPO Box 90012Bellevue WA 98009-9012

ProjectUpdateEastgate / Tyee Traffic Safety Improvement Project Update

Project Update

Eastgate / Tyee Traffic Safety Improvement Project Update

Map not to scale

146th Avenue SE Traffic Safety Improvement

Mock up of colored concrete on 146th Avenue SE, also to be installed on 136th Place SE. More information about this and other traffic safety improvements on reverse side.