Done To Do Done 228 Th Source Measured γ and n emission (see separate note) 1 custom (14.8 kBq @LNGS) and 2 commercial sources (40.9 kBq @LNGS, 24.0 kBq @UZH) available Calibration System All 3 absorber rings mounted One lowering system including absorber successfully tested manually Radio purity of material approved by final screening Francis Froborg on behalf of TG12 Status of Calibration

Transcript of Done To Do Done - Max-Planck-Institut für Kernphysik€¦ · Done 228Th Source Measured and n...

Page 1: Done To Do Done - Max-Planck-Institut für Kernphysik€¦ · Done 228Th Source Measured and n emission (see separate note) 1 custom (14.8 kBq @LNGS) and 2 commercial sources (40.9

Done To Do

Done

228Th Source

Measured γ and n emission (see separate note)

1 custom (14.8 kBq @LNGS) and 2 commercial sources(40.9 kBq @LNGS, 24.0 kBq @UZH) available

Calibration System

All 3 absorber rings mounted

One lowering system includingabsorber successfully testedmanually

Radio purity of materialapproved by final screening

Francis Froborg on behalf of TG12 Status of Calibration

Page 2: Done To Do Done - Max-Planck-Institut für Kernphysik€¦ · Done 228Th Source Measured and n emission (see separate note) 1 custom (14.8 kBq @LNGS) and 2 commercial sources (40.9

Done To Do

To Do

Custom 228Th Source

Estimate background from sources in parking position (finalizing)B < 10−4 cts/(keV kg y)

Estimate background due to neutron activated isotopes (in progress)During calibration mostly 41Ar plus 51Cr, 56Mn, 59Ni in the cryostat wall

Source production

Calibration System

Test motor for lowering system (this week)

Pulse Shape Analysis

Updating MaGe on Phase I detector specifications (started)

Data Analysis

See Laura’s talk tomorrow

Francis Froborg on behalf of TG12 Status of Calibration