Construction of New Buildings for IIT Madras Research Park – Phase – II, SH: -
Electrical works – Package-1– Substation works
Reference drawing
REFERENCE DRAWINGS
SCOPE
The scope under this section covers the basic drawings and details to understand.
α) Scope of work
β) Location of equipments
χ) General idea on the entire installation
δ) Material requirements
The reference drawings are basically schematic / diagrammatic to give idea on general
requirements prepared on the basis of preliminary requirements and data available. They are
subject to undergo changes and modifications subject to the finalization of details and
requirements of the clients.
The detailed working drawings and the drawings required for the submission to statutory
authorities shall be the responsibility of the contractor. Contractor shall submit minimum four
copies of the drawings to the Engineer for their scrutiny /approval before issuing to the statutory
authorities and site for execution.
Construction of New Buildings for IIT Madras Research Park – Phase – II, SH: -Electrical works – Package-1– Substation works
Reference drawing
LIST OF DRAWINGS
The following are the list of reference drawings.
Sr.
No.
Drawing No. Rev. No. Title
1a IIT-A-127 R0 Substation Layout (Sheet 1 of 2)
1b IIT-A-127 R0 Substation Layout (Sheet 2 of 2)
2 IIT-A-182 R0 Electrical Schematic SLD
3 IIT-A-183 R0 Main MV Panels GA Diagram
4 IIT-A-184 R0 DG Synchronizing Panels GA Diagram
5a IIT-A-185 R0 Main Electrical Distribution Single Line
Diagram (Sheet 1 of 2)
5b IIT-A-185 R0 Main Electrical Distribution Single Line
Diagram (Sheet 2 of 2)
6 IIT-A-186 R0 Block E LT Electrical Distribution Single Line
Diagram
7 IIT-A-187 R0 Lift Panel Distribution Single Line Diagram
8 IIT-A-188 R0 Substation and Block E Earthing Schematic
Layout
9 IIT-A-189 R0 Body / Neutral Earth pit Details Layout
REV. NO.
JOB. NO.
SCALE
DRG. NO.
TITLE
DRN. BY
APPD.
CHKD. BY
DATE
SERVICE CONSULTANT
FAX : 2418 4804
MUMBAI - 400 014,INDIA
E-MAIL : [email protected]
PHONE : 2418 4802, 2418 4803, Dir : 2418 4801
Dr. AMBEDKAR ROAD, DADAR (E),808 / BOMAN LODGE, NEAR KHODADAD CIRCLE,
ARCHITECT
PROJECT
CLIENTSUBSTATION LAYOUT
ArchitectHafeez29, Bank Street, Mumbai : 400 023, INDIATEL : +91 22 2266 1920 FAX : +91 22 2266 2408WEBSITE - www.hafeezcontractor.comE-MAIL - [email protected]
ContractorGurgaon-122 002. Phone: +91 124 4316 10015th Floor, Tower 9B, DLF Cybercity, Phase III,FEEDBACK INFRASTRUCTURE SERVICES PVT. LTD.
Website: www.feedbackinfra.com
F DBAC
PROJECT MANAGEMENT CONSULTANT
FOR GFCDATE
10.04.14
SHEET
H:\Ele -1\2.0 Electrical high sisde drawing\01_SUBSATION ELEC.EQUIPMENT LAYOUT R2.dwg, 10/31/2014 11:35:14 AM, DWG To PDF.pc3
REV. NO.
JOB. NO.
SCALE
DRG. NO.
TITLE
DRN. BY
APPD.
CHKD. BY
DATE
SERVICE CONSULTANT
FAX : 2418 4804
MUMBAI - 400 014,INDIA
E-MAIL : [email protected]
PHONE : 2418 4802, 2418 4803, Dir : 2418 4801
Dr. AMBEDKAR ROAD, DADAR (E),808 / BOMAN LODGE, NEAR KHODADAD CIRCLE,
ARCHITECT
PROJECT
CLIENTSUBSTATION LAYOUT
ArchitectHafeez29, Bank Street, Mumbai : 400 023, INDIATEL : +91 22 2266 1920 FAX : +91 22 2266 2408WEBSITE - www.hafeezcontractor.comE-MAIL - [email protected]
ContractorGurgaon-122 002. Phone: +91 124 4316 10015th Floor, Tower 9B, DLF Cybercity, Phase III,FEEDBACK INFRASTRUCTURE SERVICES PVT. LTD.
Website: www.feedbackinfra.com
F DBAC
PROJECT MANAGEMENT CONSULTANT
FOR GFCDATE
10.04.14
SHEET
H:\Ele -1\2.0 Electrical high sisde drawing\01_SUBSATION ELEC.EQUIPMENT LAYOUT R2.dwg, 10/31/2014 11:40:01 AM, DWG To PDF.pc3
FAX : 2418 4804
MUMBAI - 400 014,INDIAPHONE : 2418 4802, 2418 4803, Dir : 2418 4801
Dr. AMBEDKAR ROAD, DADAR (E),808 / BOMAN LODGE, NEAR KHODADAD CIRCLE,
ArchitectHafeez29, Bank Street, Mumbai : 400 023, INDIATEL : +91 22 2266 1920 FAX : +91 22 2266 2408WEBSITE - www.hafeezcontractor.comE-MAIL - [email protected]
Contractor
Gurgaon-122 002. Phone: +91 124 4316 10015th Floor, Tower 9B, DLF Cybercity, Phase III,FEEDBACK INFRASTRUCTURE SERVICES PVT. LTD.
Website: www.feedbackinfra.com
F DBAC
E-MAIL : [email protected]
H:\Ele -1\2.0 Electrical high sisde drawing\02_PHASE-2 ELECTRICAL SCHEMATIC.dwg, 10/31/2014 11:47:15 AM, DWG To PDF.pc3
FAX : 2418 4804
MUMBAI - 400 014,INDIAPHONE : 2418 4802, 2418 4803, Dir : 2418 4801
Dr. AMBEDKAR ROAD, DADAR (E),808 / BOMAN LODGE, NEAR KHODADAD CIRCLE,
ArchitectHafeez29, Bank Street, Mumbai : 400 023, INDIATEL : +91 22 2266 1920 FAX : +91 22 2266 2408WEBSITE - www.hafeezcontractor.comE-MAIL - [email protected]
Contractor
Gurgaon-122 002. Phone: +91 124 4316 10015th Floor, Tower 9B, DLF Cybercity, Phase III,FEEDBACK INFRASTRUCTURE SERVICES PVT. LTD.
Website: www.feedbackinfra.com
F DBAC
E-MAIL : [email protected]:\Ele -1\2.0 Electrical high sisde drawing\03_GA DRG OF MAIN MV .dwg, 10/31/2014 11:50:34 AM, DWG To PDF.pc3
FAX : 2418 4804
MUMBAI - 400 014,INDIAPHONE : 2418 4802, 2418 4803, Dir : 2418 4801
Dr. AMBEDKAR ROAD, DADAR (E),808 / BOMAN LODGE, NEAR KHODADAD CIRCLE,
ArchitectHafeez29, Bank Street, Mumbai : 400 023, INDIATEL : +91 22 2266 1920 FAX : +91 22 2266 2408WEBSITE - www.hafeezcontractor.comE-MAIL - [email protected]
Contractor
Gurgaon-122 002. Phone: +91 124 4316 10015th Floor, Tower 9B, DLF Cybercity, Phase III,FEEDBACK INFRASTRUCTURE SERVICES PVT. LTD.
Website: www.feedbackinfra.com
F DBAC
E-MAIL : [email protected]
H:\Ele -1\2.0 Electrical high sisde drawing\04_GA DRG OF DG SYNG PANELS .dwg, 10/31/2014 11:51:42 AM, DWG To PDF.pc3
FAX : 2418 4804
MUMBAI - 400 014,INDIAPHONE : 2418 4802, 2418 4803, Dir : 2418 4801
Dr. AMBEDKAR ROAD, DADAR (E),808 / BOMAN LODGE, NEAR KHODADAD CIRCLE,
ArchitectHafeez29, Bank Street, Mumbai : 400 023, INDIATEL : +91 22 2266 1920 FAX : +91 22 2266 2408WEBSITE - www.hafeezcontractor.comE-MAIL - [email protected]
Contractor
Gurgaon-122 002. Phone: +91 124 4316 10015th Floor, Tower 9B, DLF Cybercity, Phase III,FEEDBACK INFRASTRUCTURE SERVICES PVT. LTD.
Website: www.feedbackinfra.com
F DBAC
E-MAIL : [email protected]
H:\Ele -1\2.0 Electrical high sisde drawing\05_MAIN ELECTRICAL SHEET-1 .dwg, 10/31/2014 11:52:44 AM, DWG To PDF.pc3
FAX : 2418 4804
MUMBAI - 400 014,INDIAPHONE : 2418 4802, 2418 4803, Dir : 2418 4801
Dr. AMBEDKAR ROAD, DADAR (E),808 / BOMAN LODGE, NEAR KHODADAD CIRCLE,
ArchitectHafeez29, Bank Street, Mumbai : 400 023, INDIATEL : +91 22 2266 1920 FAX : +91 22 2266 2408WEBSITE - www.hafeezcontractor.comE-MAIL - [email protected]
Contractor
Gurgaon-122 002. Phone: +91 124 4316 10015th Floor, Tower 9B, DLF Cybercity, Phase III,FEEDBACK INFRASTRUCTURE SERVICES PVT. LTD.
Website: www.feedbackinfra.com
F DBAC
E-MAIL : [email protected]
H:\Ele -1\2.0 Electrical high sisde drawing\02_MAIN ELECTRICAL SHEET-2.dwg, 10/31/2014 11:43:15 AM, DWG To PDF.pc3
FAX : 2418 4804
MUMBAI - 400 014,INDIAPHONE : 2418 4802, 2418 4803, Dir : 2418 4801
Dr. AMBEDKAR ROAD, DADAR (E),808 / BOMAN LODGE, NEAR KHODADAD CIRCLE,
ArchitectHafeez29, Bank Street, Mumbai : 400 023, INDIATEL : +91 22 2266 1920 FAX : +91 22 2266 2408WEBSITE - www.hafeezcontractor.comE-MAIL - [email protected]
Contractor
Gurgaon-122 002. Phone: +91 124 4316 10015th Floor, Tower 9B, DLF Cybercity, Phase III,FEEDBACK INFRASTRUCTURE SERVICES PVT. LTD.
Website: www.feedbackinfra.com
F DBAC
E-MAIL : [email protected]
H:\Ele -1\2.0 Electrical high sisde drawing\06_BLOCK-E SS PANELS SLD .dwg, 10/31/2014 12:25:45 PM, DWG To PDF.pc3
FAX : 2418 4804
MUMBAI - 400 014,INDIAPHONE : 2418 4802, 2418 4803, Dir : 2418 4801
Dr. AMBEDKAR ROAD, DADAR (E),808 / BOMAN LODGE, NEAR KHODADAD CIRCLE,
ArchitectHafeez29, Bank Street, Mumbai : 400 023, INDIATEL : +91 22 2266 1920 FAX : +91 22 2266 2408WEBSITE - www.hafeezcontractor.comE-MAIL - [email protected]
Contractor
Gurgaon-122 002. Phone: +91 124 4316 10015th Floor, Tower 9B, DLF Cybercity, Phase III,FEEDBACK INFRASTRUCTURE SERVICES PVT. LTD.
Website: www.feedbackinfra.com
F DBAC
E-MAIL : [email protected]
H:\Ele -1\2.0 Electrical high sisde drawing\06_BLOCK-E SS PANEL SLD (LIFT PANEL).dwg, 10/31/2014 12:24:18 PM, DWG To PDF.pc3
TRANSFORMER33/11KV, 6.3/8MVA
TRANSFORMER-111/.433KV, 1.25MVA
DG SET-1415V, 1.25MVA
DG SET-2415V, 1.25MVA
DG SET-3415V, 1.25MVA
DG SET-4415V, 1.25MVA
TRANSFORMER-211/.433KV, 1.25MVA
TRANSFORMER-311/.433KV, 1.25MVA
TRANSFORMER-411/.433KV, 1.25MVA
DISTRIBUTION TRANSFORMER`S EARTHING LT DG`S EARTHING
POWER TRANSFORMER EARTHING
33KV, RMG
TNEB PANEL EARTHING
33KV, VCB 11KV VCB PANEL
HT PANELS BODY EARTHING
FLOOR CLDBs
FLOOR CPDBs
FLOOR ELDBs
MV PANELS
RTCC PANEL
UTILITY PANEL
C LIGHTING PANEL
CAPACITOR PANEL
PANEL AND DB's BODY EARTHINGBLOCK-E SUBSTATION
DG SYNC PANEL
LIFT 1 LIFT 2
BLOCK-E LIFT EARTHING
LIFT 3 LIFT 4
SERVICE LIFT
TYPICAL ARRANGEMENT OF
SERVICE LIFT EARTHING
TYPICAL ARRANGEMENT OF
LIGHTNING ARRESTER EARTHING
LIGHTNING ARRESTER
REV. NO.
JOB. NO.
SCALE
DRG. NO.
TITLE
DRN. BY
APPD.
CHKD. BY
DATE
SERVICE CONSULTANT
FAX : 2418 4804
MUMBAI - 400 014,INDIA
E-MAIL : [email protected]
PHONE : 2418 4802, 2418 4803, Dir : 2418 4801
Dr. AMBEDKAR ROAD, DADAR (E),808 / BOMAN LODGE, NEAR KHODADAD CIRCLE,
ARCHITECT
PROJECT
CLIENT SUBSTATION & BLOCK-E
ArchitectHafeez29, Bank Street, Mumbai : 400 023, INDIATEL : +91 22 2266 1920 FAX : +91 22 2266 2408WEBSITE - www.hafeezcontractor.comE-MAIL - [email protected]
ContractorGurgaon-122 002. Phone: +91 124 4316 10015th Floor, Tower 9B, DLF Cybercity, Phase III,FEEDBACK INFRASTRUCTURE SERVICES PVT. LTD.
Website: www.feedbackinfra.com
F DBAC
PROJECT MANAGEMENT CONSULTANT
EARTHING SCHEMATIC LAYOUT
H:\Ele -1\2.0 Electrical high sisde drawing\07_SUBSATION EARTHING SCEMATUIC LAYOUT.dwg, 10/31/2014 12:26:39 PM, DWG To PDF.pc3
REV. NO.
JOB. NO.
SCALE
DRG. NO.
TITLE
DRN. BY
APPD.
CHKD. BY
DATE
SERVICE CONSULTANT
FAX : 2418 4804
MUMBAI - 400 014,INDIA
E-MAIL : [email protected]
PHONE : 2418 4802, 2418 4803, Dir : 2418 4801
Dr. AMBEDKAR ROAD, DADAR (E),808 / BOMAN LODGE, NEAR KHODADAD CIRCLE,
ARCHITECT
PROJECT
CLIENTBODY/NEUTRAL EARTH PIT DETAILS LAYOUT
ArchitectHafeez29, Bank Street, Mumbai : 400 023, INDIATEL : +91 22 2266 1920 FAX : +91 22 2266 2408WEBSITE - www.hafeezcontractor.comE-MAIL - [email protected]
ContractorGurgaon-122 002. Phone: +91 124 4316 10015th Floor, Tower 9B, DLF Cybercity, Phase III,FEEDBACK INFRASTRUCTURE SERVICES PVT. LTD.
Website: www.feedbackinfra.com
F DBAC
PROJECT MANAGEMENT CONSULTANT
H:\Ele -1\2.0 Electrical high sisde drawing\07_SUBSATION EARTHING SCEMATUIC LAYOUT.dwg, 10/31/2014 12:27:12 PM, DWG To PDF.pc3