CAVIAR Meeting

28
CAVIAR Meeting May 2010 Liam Tallis, Keith Shine, Tom Gardiner, Marc Coleman, Igor Ptashnik

description

CAVIAR Meeting. May 2010 Liam Tallis, Keith Shine, Tom Gardiner, Marc Coleman, Igor Ptashnik. Contents. Assessment of H 2 O Line Intensities Camborne Jungfraujoch Moving Toward the Absolute Calibration Camborne Future Work. Introduction. Assessment of H 2 O Line Intensities. - PowerPoint PPT Presentation

Transcript of CAVIAR Meeting

Page 1: CAVIAR Meeting

CAVIAR Meeting

May 2010

Liam Tallis, Keith Shine, Tom Gardiner, Marc Coleman, Igor Ptashnik

Page 2: CAVIAR Meeting

Contents

• Assessment of H2O Line Intensities– Camborne– Jungfraujoch

• Moving Toward the Absolute Calibration– Camborne

• Future Work

Page 3: CAVIAR Meeting

ASSESSMENT OF H2O LINE INTENSITIES

Introduction

Page 4: CAVIAR Meeting

Introduction

a τw + b τg + c

Page 5: CAVIAR Meeting

ASSESSMENT OF H2O LINE INTENSITIES

Camborne

Page 6: CAVIAR Meeting

Retrieved “a” parametera = 1.02 +/- 0.03

a = 1.20 +/- 0.04a = 1.01 +/- 0.06

Page 7: CAVIAR Meeting

Camborne: Retrieved ‘a’

Spectral Region (cm-1) Retrieved ‘a’

3000 – 8000 0.97 +/- 0.02

8000 – 9200 1.17 +/- 0.05

10000 - 14000 0.98 +/- 0.07

Page 8: CAVIAR Meeting

Retrieved “a” against Pseudo Strength

Page 9: CAVIAR Meeting

Retrieved “a” against Pseudo Strength

Page 10: CAVIAR Meeting

MCT Problems

Page 11: CAVIAR Meeting

MCT Problems

Page 12: CAVIAR Meeting

MCT Problems

Page 13: CAVIAR Meeting

MCT Problems

Page 14: CAVIAR Meeting

Fit Wings of Strong Lines

Page 15: CAVIAR Meeting

Fit All of Weaker Lines

Page 16: CAVIAR Meeting

Retrieved “a” parameter

Page 17: CAVIAR Meeting

MCT Retrieved “a” Numbers

Flight Date Time (U.T.)Solar Zenith Angle

Average a Value Between 820cm-1 and 920cm-1

B396 19 Aug 2008 130941 38.77 0.976131243 38.92 0.979

B400 18 Sep 2008 111459 48.98 1.025

Page 18: CAVIAR Meeting

ASSESSMENT OF H2O LINE INTENSITIES

Jungfraujoch

Page 19: CAVIAR Meeting

Retrieved “a” parametera = 1.00 +/- 0.04

a = 1.17 +/- 0.04a = 0.99 +/- 0.05

Page 20: CAVIAR Meeting

Retrieved “a” parameter

Page 21: CAVIAR Meeting

ABSOLUTE CALIBRATION

Page 22: CAVIAR Meeting

Absolute Calibration

Page 23: CAVIAR Meeting
Page 24: CAVIAR Meeting
Page 25: CAVIAR Meeting
Page 26: CAVIAR Meeting
Page 27: CAVIAR Meeting

FUTURE WORK

Page 28: CAVIAR Meeting

Future Work• Assessment of Line Intensities

– Camborne • Completed; retrieved “a” are consistent with previous work at Reading

– Jungfraujoch• Work has began; will be fairly quick with confirmed water profiles. Initial

results are quite promising to moving closer to band centres

• Absolute Calibration– Camborne

• On going work; need to think in some detail now what is causing difference between model and observations (line lists, continuum model, Kurucz , water profiles.........)

– Jungfraujoch• Calibration data now available; work to begin after Camborne