16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz...

23
16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich , Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target

Transcript of 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz...

Page 1: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik

Grigory Gurevich, Yuri Usov

Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target

Page 2: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.
Page 3: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Main technical requirements

• Horizontal Dilution Refrigerator to fit in the CB detector geometry

• Beam along cryostat axis

• φ symmetric, θ>1600

• Thin internal holding coil 0.4 T on 1.5 K radiation shield (longitudinal, transverse)

• Target material loading along the cryostat axis

• Base temperature in the frozen spin mode ≈ 30 mK

Page 4: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

1.5 K radiation shield

25 K radiation shield

Separator (3K) and Evaporator (1.2K) precooling stages (4He)

80 K radiation shield

3He/4He Dilution stageTmin ≈ 23 mK

Polarization ≈ 94% Relaxation ≈ 1500 hours

≈≈

Page 5: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.
Page 6: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

High-temperature heat exchanger (7 stages: from room to 10 K)

Page 7: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Intermediate tube-in-tube heat exchanger: (seven 3-mm capillaries inside a 10-mm tube: from 10 K to 4 K)

Page 8: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Low-temperature heat exchanger (4 stages: from 4 to ~2 K)

Page 9: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

4He Evaporator bath (surrounds and thermally isolates the still bath)

Page 10: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Still bath of the dilution unit

Page 11: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Preliminary heat exchanger of 3He/4He dilution stage(geometric impedance ≈ 2×108 cm-3)

Page 12: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Sintered copper heat exchanger of the dilution unit (10 stages, total area 5 m2 on each side)

Page 13: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Vacuum

C4H10O – 60%30mm

3He/4He – 6%

Page 14: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Loading of the target material into the cryostat

Page 15: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

First variant of the insertAlthough T~30 mK was reached with this insert, its installation required using of critically large loads, while the thermal contacts turned out to be ineffective and unreliable. In spite of high power of the heater it was impossible to reach sufficiently high temperature of the indium gasket for reliable sealing, which resulted in appearing superleaks. The re-cooling line inside the insert was found to be insufficiently effective. The waveguide of a stainless steel tube had too large attenuation. NMR cables were not completely vacuum-tight.

Page 16: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Second variant of the insert

Two-part insert has important advantages: i) a difficult procedure of introducing and vacuum-sealing of the outer insert can be performed at room temperature in usual atmosphere; ii) mounting of the inner insert with the cooled butanol sample inside the cold cryostat can be accomplished very easy, without effort, and do not require the hermetic seal (an indium gasket placed into a slot was used).

Page 17: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.
Page 18: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Internal longitudinal Holding coil(solenoid coil manufactured of 0.227-μm multifilamental NbTi cable and consisting of four layers, each having 600 turns wound around a 0.3-mm

thick copper holder, T ≈ 1.5 K)

Page 19: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Internal transverse Holding coil

Page 20: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Internal transverse Holding coil

Page 21: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.
Page 22: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

SUMMARY

• Working parameters of the dilution cryostat are in agreement with the technical requirements:

- Tmin ≈ 23 mK;- polarization relaxation time ≈ 1500 hours (at T=30 mK);- time to cool from room temperature ≈ 5 hours;- LHe consumption in the frozen spin mode ≈ 2 l/hour

• Internal holding coils provide longitudinal/ transverse field 0.4 Tesla at 30 A

• Any combinations of beam and target polarizations are possible

• Two-part insert makes the sample loading operation easy and convenient

• Future development: New insert, containing light-guides, for active polarized target

Page 23: 16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.

Participants

• JINR (Dubna): N.Borisov, A.Fedorov, V.Kolomiets, L.Kutuzova, A.Lazarev, S.Mironov, A.Neganov, V.Pavlov, Yu.Usov

• INR RAS (Moscow): G.Gurevich, R.Kondratiev, Yu.Vorobiev

• IKPh (Mainz): A.Thomas, M.Martinez