Tugas Unit Operasi Dan Proses - Unit Filtrasi

14
TUGAS UNIT OPERASI DAN PROSES UNIT FILTRASI Disusun Oleh: Nama : Febry Dahyani NPM : 0906636825 Jurusan : Teknik Lingkungan

Transcript of Tugas Unit Operasi Dan Proses - Unit Filtrasi

Page 1: Tugas Unit Operasi Dan Proses - Unit Filtrasi

TUGAS UNIT OPERASI DAN PROSES

UNIT FILTRASI

Disusun Oleh:

Nama : Febry Dahyani

NPM : 0906636825

Jurusan : Teknik Lingkungan

TUGAS UNIT OPERASI DAN PROSES

UNIT FILTRASI

Disusun Oleh:

Nama : Febry Dahyani

NPM : 0906636825

Jurusan : Teknik Lingkungan

Page 2: Tugas Unit Operasi Dan Proses - Unit Filtrasi

For Problem 10.1 ; 10.3. ; and 10.4.

A rapid sand filter has a sand bed 30 in. in depth. Pertinent data are:

Specific grafity of the sand = 2,65

Shape factor (ϕ) = 0,75

Porosity (ɛ) = 0.41

Filtration rate = 2,25 gpm/ft2

Operating temperature = 500F (100C)

Table 1. Sieve Analysis

Sieve Size Weight Retained

14-20 0,44

20-28 14,33

28-32 43,22

32-35 27,07

35-42 9,76

42-48 4,22

48-60 0,54

60-65 0,29

65-100 0,13

Page 3: Tugas Unit Operasi Dan Proses - Unit Filtrasi

10.1. Va = (2,25 gal/min) (ft3/7,48gal) (min/60 sec) = 0,005013 ft/sec

v = 1,3101 centitokes at 500F = (1,3101) (1,075 x 10-5) = 1,4084 x 10-6 ft2/sec

NRE = ϕ d Va / v ; CD = 24/ NRE

Table 2. Stratified Data From Sieve Analysis

Sieve Size Weight Retained d (ft) NRE CD CD x/d (ft-1)14-20 0,44 0,003283 0,876 27,38 3720-28 14,33 0,002333 0,623 38,54 236728-32 43,22 0,001779 0,475 50,54 1227832-35 27,07 0,001500 0,400 59,94 1081635-42 9,76 0,001258 0,336 71,47 554542-48 4,22 0,001058 0,282 84,98 338948-60 0,54 0,000888 0,237 101,24 61660-65 0,29 0,000746 0,199 120,51 46865-100 0,13 0,000583 0,156 154,21 344Σ CD x/d 35860 ft-1

Rose equation:

ℎ = 1,067 = 1,0670,75 2,532,17 0,0050130,41 35860 = 3,53 ft

Page 4: Tugas Unit Operasi Dan Proses - Unit Filtrasi

10.3. To be backwashed in ft

The backwashed velocity to expand the bed requires the settling velocity of the largestparticles. The settling velocity, VS, is given by

= 43 ( − 1) /The drag coeffficient, Cd, for the transition range that applies to this problem is given by

= 24 + 3 + 0,34The NRE value is

=For each sieve size, convert d(ft) to d(cm) , d(cm) = d(ft) (30,48 cm/ft). From figure belowthis sentence, a particle d(cm) in diameter and having gravity of 2,65 has settling velocity,VS. The viscosity, v, is 1,3101 centitokes = 1,3101 x 10-2 cm2/sec.

Page 5: Tugas Unit Operasi Dan Proses - Unit Filtrasi
Page 6: Tugas Unit Operasi Dan Proses - Unit Filtrasi

Table 3. Reduced Data From Sieve Analysis

SieveSize

WeightRetained

d (ft) NRE CDVs

(ft/sec)Vb

(ft/sec)ɛe 1 −

14-20 0,44 0,003283 80,2 0,974 0,488 0,00884 0,414 0,00820-28 14,33 0,002333 40,7 1,400 0,343 0,00621 0,414 0,24428-32 43,22 0,001779 27,9 1,767 0,267 0,00483 0,414 0,73732-35 27,07 0,001500 18,3 2,351 0,213 0,00385 0,414 0,46235-42 9,76 0,001258 11,0 3,432 0,161 0,00291 0,414 0,16642-48 4,22 0,001058 7,4 4,694 0,126 0,00229 0,414 0,07248-60 0,54 0,000888 4,6 6,894 0,095 0,00173 0,414 0,00960-65 0,29 0,000746 2,6 11,418 0,068 0,00123 0,414 0,00565-100 0,13 0,000583 1,5 18,497 0,047 0,00085 0,414 0,002Σ 1,706

Page 7: Tugas Unit Operasi Dan Proses - Unit Filtrasi

Table 4. Backwash Flow in gpm/ft2 Require to Expand The Bed

Vb (ft/sec) Vb (ft/min) Rate (gpm/ft2)0,008836 0,530171 3,9656820,006214 0,372861 2,7890040,00483 0,289821 2,1678630,003845 0,230702 1,7256540,002914 0,17485 1,3078810,002285 0,137115 1,0256180,001728 0,10365 0,7753050,00123 0,073823 0,5521930,000855 0,051274 0,383533

To determine head loss at the beginning of the backwash, 1-ɛ and D are substitued for 1-ɛe

and De

hL = (Ss – 1) (1-ɛ) D = (2,65-1) (1-0,41) (2,5) = 2,434 ft (c)

De = (1-ɛ) D Σ = (1–0,41)(2,5) (1,706) = 2,52 ft (d)The backwash rate in this problem is the minimum required to expand the bed. Actually, 15to 20 gpm/ft2 is used to expand a bed for proper agitation cleansing.

Page 8: Tugas Unit Operasi Dan Proses - Unit Filtrasi

10.4. To be backwashed in SI

The backwashed velocity to expand the bed requires the settling velocity of the largestparticles. The settling velocity, VS, is given by

= 43 ( − 1) /The drag coeffficient, Cd, for the transition range that applies to this problem is given by

= 24 + 3 + 0,34The NRE value is

=For each sieve size, convert d(ft) to d(cm) , d(cm) = d(ft) (30,48 cm/ft). From figure belowthis sentence, a particle d(cm) in diameter and having gravity of 2,65 has settling velocity,VS. The viscosity, v, is 1,3101 centitokes = 1,3101 x 10-2 cm2/sec.

Page 9: Tugas Unit Operasi Dan Proses - Unit Filtrasi
Page 10: Tugas Unit Operasi Dan Proses - Unit Filtrasi

Table 5. Reduced Data From Sieve Analysis

SieveSize

WeightRetained

d (m) NRE CDVs

(m/s)Vb

(m/s)ɛe 1 −

14-20 0,44 0,0010006 24,4 1,929 0,106 0,0019 0,414 0,00820-28 14,33 0,0007111 12,4 3,126 0,070 0,0013 0,414 0,24428-32 43,22 0,0005422 8,5 4,187 0,053 0,0010 0,414 0,73732-35 27,07 0,0004572 5,6 5,907 0,041 0,0007 0,414 0,46235-42 9,76 0,0003843 3,4 9,137 0,030 0,0005 0,414 0,16642-48 4,22 0,0003225 2,3 13,002 0,023 0,0004 0,414 0,07248-60 0,54 0,0002707 1,4 19,797 0,017 0,0003 0,414 0,00960-65 0,29 0,0002274 0,8 33,950 0,012 0,0002 0,414 0,00565-100 0,13 0,0001777 0,5 56,340 0,008 0,0001 0,414 0,002Σ 1,706

Page 11: Tugas Unit Operasi Dan Proses - Unit Filtrasi

Table 6. Backwash Flow in gpm/ft2 Require to Expand The Bed

Vb (m/s) Rate (lt/s-m2)0,003467 3,4671050,002296 2,2958420,001732 1,7322350,001339 1,3391420,000987 0,987210,000758 0,75810,000563 0,5628720,000394 0,3939470,00027 0,270333

To determine head los at the beginning of the backwash, 1-ɛ and D are substitued for 1-ɛe andDe

hL = (Ss – 1) (1-ɛ) D = (2,65-1) (1-0,41) (0,76) = 0,74 m (c)

De = (1-ɛ) D Σ = (1–0,41)(0,76) (1,706) = 0,765 m (d)The backwash rate in this problem is the minimum required to expand the bed. Actually, 10,2to 13,6 l/s -m2 is used to expand a bed for proper agitation cleansing.

Page 12: Tugas Unit Operasi Dan Proses - Unit Filtrasi

10.5. Trimedia Filter

Shape factor (ϕ) = 0,9

Filtration Rate = 5 gpm/ft2

Water temperature = 500F (100C)

- Anthracite coal layer

Specific Gravity = 1,2

Porosity (ɛ) = 0,4

d = 1,5 mm = 0,005 ft

D = 18 in = 1,5 ft

Va = (5 gal/min) (ft3/7,48gal) (min/60 sec) = 0,0111 ft/sec

v = 1,3101 centitokes at 500F = (1,3101) (1,075 x 10-5) = 1,4084 x 10-6 ft2/sec

= = 0,9 0,005 .0,01111,4084 10 = 3,55Because NRE >1, the drag equation is

= 24 + 3 + 0,34 = 243,55 + 33,55 + 0,34 = 8,7

Page 13: Tugas Unit Operasi Dan Proses - Unit Filtrasi

ℎ = 1,607 1 = 1,607 .8,7 .1,5 . (0,0111)0,9 .32,17 . (0,4) . 0,005 = 0,00260,0037 = 0,703ft- Sand layer

Specific Gravity = 2,65

Porosity (ɛ) = 0,45

d = 0,8 mm = 0,0026 ft

D = 9 in = 0,75 ft

Va = (5 gal/min) (ft3/7,48gal) (min/60 sec) = 0,0111 ft/sec

v = 1,3101 centitokes at 500F = (1,3101) (1,075 x 10-5) = 1,4084 x 10-6 ft2/sec

= = 0,9 0,0026 .0,01111,4084 10 = 1,84Because NRE >1, the drag equation is

= 24 + 3 + 0,34 = 241,84 + 3√1,84 + 0,34 = 15,6ℎ = 1,607 1 = 1,607 .15,6 .0,75 . (0,0111)0,9 .32,17 . (0,45) . 0,0026 = 0,00230,0031 = 0,751ft

Page 14: Tugas Unit Operasi Dan Proses - Unit Filtrasi

- Garnet layer

Specific Gravity = 1,2

Porosity (ɛ) = 0,5

d = 0,3 mm = 0,001 ft

D = 3 in = 0,25 ft

Va = (5 gal/min) (ft3/7,48gal) (min/60 sec) = 0,0111 ft/sec

v = 1,3101 centitokes at 500F = (1,3101) (1,075 x 10-5) = 1,4084 x 10-6 ft2/sec

= = 0,9 0,001 .0,01111,4084 10 = 7,09Because NRE >1, the drag equation is

= 24 + 3 + 0,34 = 247,09 + 3√7,09 + 0,34 = 4,85ℎ = 1,607 1 = 1,607 .4,85 .0,25 . (0,0111)0,9 .32,17 . (0,5) . 0,001 = 0,000240,0018 = 0,133ftTotal Head Loss = hL1 + hL2 + hL3 = 0,703 + 0,751 + 0,133 = 1,587 ft