Proposal for Detailed Project Report

63
Proposal for Detailed Project Report S. Sundar Kumar Iyer (IIT K) Chetan Solanki (IIT B) Suddhasatwa Basu (IIT D) Prakash Chandra Ghosh (IIT B) Samit Ray (IIT KGP) Veeresh Dutta (IIT D) R.P. Saini (IIT R) T Sundararajan (IIT M) Parthasarathi Sensarma (IIT K) Harshal Nemade (IIT G) Ψ Pan IIT Solar-research Initiative (PSI)

Transcript of Proposal for Detailed Project Report

Page 1: Proposal for Detailed Project Report

Proposal for

Detailed Project Report

S. Sundar Kumar Iyer (IIT K) Chetan Solanki (IIT B)

Suddhasatwa Basu (IIT D) Prakash Chandra Ghosh (IIT B)

Samit Ray (IIT KGP) Veeresh Dutta (IIT D)

R.P. Saini (IIT R) T Sundararajan (IIT M)

Parthasarathi Sensarma (IIT K) Harshal Nemade (IIT G)

Ψ Pan IIT Solar-research Initiative (PSI)

Page 2: Proposal for Detailed Project Report

Outline

• Goal of PSI

• Overview of initiative

• Sub-themes in the initiative

• Organisational structure

• Proposal for Detailed Project Report

Page 3: Proposal for Detailed Project Report

Ψ Pan IIT Solar-energy Initiative (PSI)

• 9th July, 2008: DST Secretary, Dr.T.Ramasami calls

meeting of representatives from all IITs at Technology

Bhavan, New Delhi

• 19th November, 2008: Second meeting called by

DST Secretary of IIT representatives at Technology

Bhavan, New Delhi

• 12th January, 2009: Brainstorming at IIT Bombay

• 22nd February, 2009: Discussion and Finalisation of

theme for PSI at IIT Kanpur

• 18th September, 2009: Discussion on potential work

packages

Page 4: Proposal for Detailed Project Report

Goal of PSI

Page 5: Proposal for Detailed Project Report

Goal of PSI

1 MW 8 hours per day

Power Generation – state of the art PV and solar thermal technologies– multiple sources

Storage – short term and long termSmart Islanded Grid – can be connected to the main grid if needed

Page 6: Proposal for Detailed Project Report

Why1 MW?

Size of System Main Challenge/ Innovation

Relevance to PSI

10s of Watt•Cost of system

•Battery technology

•Cost, maintenance and replacement of parts

•More relevant for individual institutes than

a Pan-IIT effort

kW to 10s of kW•Small energy storage technology

•Solar power conversion efficiency (hence cost of power)

•Modularity of power conditioners

•More relevant for individual institutes than

a Pan-IIT effort

100s of kW •Generation at low cost

•Storage of energy

•Delivery of energy to consumer

•Possibility of a Pan-IIT effort.

•But the issue of scaling and pooling

energy from different islanded energy

source is not addressed.

1 MW +•Generating power efficiently and

low cost

•Linking up islands of power

generations sources spread out over different pockets

•Can have islanded grid

•May be scaled up and/or connected to

grid – ideal for scaling up

•With improved energy storage technology, can extend duration of

operation

Page 7: Proposal for Detailed Project Report

Why 8 Hours?

• Most industrial and agricultural power needs are during the day

• Requiring power availability at night (when sunlight is not available) shifts focus and cost of the project overwhelmingly to energy storage

Page 8: Proposal for Detailed Project Report

Overview of the Initiative

Page 9: Proposal for Detailed Project Report

The concept: Vertically integrated solar energy initiative for

generation and delivery of 1 MW power, 8 hours a day

Page 10: Proposal for Detailed Project Report

THERMAL

STORAGE

BAT

EL FC

MPPT

C

O

N

S

U

M

E

R

AC

DC-bus

H2

DC-AC

STORAGEGEN

System OverviewCONTROLS

Page 11: Proposal for Detailed Project Report

System Sizing

Load profile 8hrs/day

@1 MW

8 hrs/day

@500 kW

8hrs/day

@250 kW

24 hrs/day

@20 kW

Annual ene-

rgy demand

2920 MWh/a 1460 MWh/a 730 MWh/a 175.2 MWh/a

Components Size Energy

share(%)

Size Energy

share(%)

Size Energy

share(%)

Size Energy

share(%)

PV (kWp) 1728 88 864 88 432 88 115 46

Bat (kWh) 1610 7 805 7 408 7 420 48

Elec (kW) 430

5

215

5

106

5

29

6H2 stor (m3)

@ 200 bar 469 234 117 25

Fuel cell (kW) 760 380 190 25

Only 5% energy is supplied from long term storage

Appendix 2 for more details

Page 12: Proposal for Detailed Project Report

Estimated Component sizes

• Generation Capacity 1.8 MWp-1 MWp of solar thermal

- 800 kWp of solar PV

• Storage

- 1.6 MWh of battery storage - 300 kWh solar thermal storage

- 50 kW of fuel cell system

Page 13: Proposal for Detailed Project Report

Sub-themes in the Initiative

Generation – PV

Generation – Solar Thermal

Power System Design

Storage

Page 14: Proposal for Detailed Project Report

To build capacity for 800 kWp

• Work Package 1:

Silicon based solar cells

value add: -high efficiency crystalline Si, lowering material cost

• Work Package 2 :

Non-Si based (CdTe and CIGS) thin film solar cells

value add: -low cost alternatives to crystalline Si

Industry:

-MoserBaer, Tata BP Solar, Hind High Vacuum, and Solar semiconductor.

Generation: Photovoltaic

Appendix 3 for more details

Page 15: Proposal for Detailed Project Report

Generation: Thermal

To build capacity for 1 MWp

• Work Package:

– An integrated solar thermal system

value add:

- Improved solar radiation collection w/ parabolic mirrors

- Thermal storage using a solar tower

- Storage using thermic fluid (oil)

• Industry:

– Saint Gobain and L&T

Appendix 4 for more details

Page 16: Proposal for Detailed Project Report

System Design

Smart islanded grid, receiving power from

renewable sources and feeds connected loads

• Work Packages

– DC-DC Conversion for Solar PV & Battery charge controller

– Work packge 2 - DC-AC conversion and grid side paralleling & MPPT

– Work Package 3- Instrumentation & Communication

– Work package 4- Power Quality and Network Interactions

Value add

• integrating diverse renewable sources and storage

Appendix 5 for more details

Page 17: Proposal for Detailed Project Report

Storage

Ensure Reliable power supply

• Work Packages

– Battery storage

– Thermal storage

– Hydrogen based storage

Value add

• Integrating diverse storage for short term, intermediate term and long term storage

• Development of Hydrogen Fuel Cells

Page 18: Proposal for Detailed Project Report

Organisational Structure of PSI

Page 19: Proposal for Detailed Project Report

Organizational Chart

Theme Coordinator Co-coordinator

OverallS Sundar Kumar Iyer

IIT K

Chetan Solanki

IIT B

StorageSuddhasatwa Basu

IIT D

Prakash Chandra Ghosh

IIT B

Generation:

Photovoltaic

Samit Ray

IIT KGP

Veeresh Dutta

IIT D

Generation:

Thermal

R.P. Saini

IIT R

T Sundararajan

IIT M

System DesignParthasarathi Sensarma

IIT K

Harshal Nemade

IIT G

Page 20: Proposal for Detailed Project Report

Administrative Structure

Power

System

Design

PSI

Coordination team

Power

Generation

Photovoltaic

Power

Generation

Thermal

Energy

Storage

DST

Work packages Work packages Work packages Work packages

Page 21: Proposal for Detailed Project Report

Structure of PSI

• Overall Goal– Whole team works towards the single goal

– 1 MW power for eight hours per day

• Sub-themes (Thermal and PV generation, controls, storage)– Coordinators and co-coordinators of sub-theme lead a Pan IIT team

– Each sub-theme works towards for overall goal

• Work Packages– Each sub-theme is made up of one or more work packages (pillars)

– Work packages are independent of each other

– Each work package is vertically integrated contributing decisively to the final goal

– Work package leader and team (pan-IIT)

– Work package leader part of the sub-theme team

Page 22: Proposal for Detailed Project Report

The Detailed Project Report

Page 23: Proposal for Detailed Project Report

Deliverables of DPR

• Overview of the project, logistics, and requirements to implement the project

• Pin down technical specifications for every aspect of work package

• Clear description of work packages under each sub-theme

• Work package teams and specific responsibility of each team member

• Clearly specify the innovation the work package brings to the table

• Identify industrial partners who will implement the innovative aspect of work package on the field

Page 24: Proposal for Detailed Project Report

Deadline for Submission of DPR

30th November, 2009

Page 25: Proposal for Detailed Project Report

Planned Budget

• Writing DPR ~ Rs.35 lakhs- Includes meetings of different sub-theme groups- Visits to exisiting power plants - Interaction with expert groups

Page 26: Proposal for Detailed Project Report

Concluding remarks

• Pan IIT Solar Energy Initiative is a critical part of the national mission

• Success of this initiative will – Spur state of the art solar power harnessing

across the country

– Will build pan-IIT teams working on solar energy related technology

• A Detailed Project Report is being put together by the Pan-IIT team.

Page 27: Proposal for Detailed Project Report

THANK YOU!

Page 28: Proposal for Detailed Project Report

Appendix 1

Background slides

Page 29: Proposal for Detailed Project Report

World Electricity Generation

0

4

8

12

16

20

1975 1980 1985 1990 1995 2000 2005 2010

Year

Ele

ctr

icit

y G

en

era

tio

n t

rillio

n k

Wh

/ye

ar)

world

India

Data from: www.eia.doe.gov/emeu/iea/

Page 30: Proposal for Detailed Project Report

India Electricity Generation

0

100

200

300

400

500

600

700

800

1975 1980 1985 1990 1995 2000 2005 2010

Year

Ele

ctr

icit

y G

en

era

tio

n (

billio

n k

Wh

/ y

ea

r)

Data from: www.eia.doe.gov/emeu/iea/

Linear extrapolation

will mean generation

will be 1.2 trillion kWh

Generation by 2020

Page 31: Proposal for Detailed Project Report

Electricity Generation (per capita)

0

1

2

3

4

5

6

7

8

1975 1980 1985 1990 1995 2000 2005 2010

Year

Pe

r C

ap

ita

Ele

ctr

icit

y G

en

era

tio

n (

kW

h/d

ay)

Data from: www.eia.doe.gov/emeu/iea/

world

India

Page 32: Proposal for Detailed Project Report

GDP and Energy Consumption

Data from: www.eia.doe.gov/emeu/iea/ and www.economist.com/media/pdf/QUALITY_OF_LIFE.pdf

0

10000

20000

30000

40000

50000

60000

0 20 40 60 80 100

Per Capital Energy Consumption (kW-hr/day/person)

Pe

r C

ap

ita

Gro

ss

Do

me

sti

c P

rod

uc

t(U

S$

per

pers

on

)

USA

Luxemburg

Norway

Iceland

UAE

Ireland

India

(1.6, 3290)

China

UK

(16.5, 31150)

Page 33: Proposal for Detailed Project Report

Quality of Life vs. Energy Usage

3500

4500

5500

6500

7500

8500

0 20 40 60 80 100

Per Capita Energy Consumption (kWh per day)

Qualit

y o

f Life I

ndex

India

(1.6, 5759)

Quality of Life Index out of a maximum of 10,000

Iceland

Ireland

NorwayUSA

UAE

China

Data from: www.eia.doe.gov/emeu/iea/ and www.economist.com/media/pdf/QUALITY_OF_LIFE.pdf

Energy usage needed for good quality

of life with today’s life-style

UK

(1.6.5, 6917)

Page 34: Proposal for Detailed Project Report

Potential in Electricity Generation

• Linear extrapolation

– 1.2 trillion kWh Generation by 2020

• World per-capita energy generation parity

– 3 trillion kWh per year (at least)

• Maximise quality of life index

– 6 trillion kW per year (at least)

How is this electricity to be generated?

Page 35: Proposal for Detailed Project Report

35

Annual Mean Global IrradianceOn a horizontal plane at the surface of the earth W m-2 averaged over 24 h

With 10% efficient solar cell area of solar cell needed in 2004

India 60 km × 60 km (0.12% area)

Goswami 2000

Page 36: Proposal for Detailed Project Report

National Action Plan on Climate Change

National Solar Mission: The NAPCC aims to promote the development and use of solar energy for power generation and other uses with the ultimate objective of making solar competitive with fossil-based energy options. The plan includes:

• Specific goals for increasing use of solar thermal technologies in urban areas,

industry, and commercial establishments;• A goal of increasing production of photovoltaics to 1000 MW/year; and• A goal of deploying at least 1000 MW of solar thermal power

generation.Other objectives include the establishment of a solar research centre,

increased international collaboration on technology development,strengthening of domestic manufacturing capacity, and increased government funding and international support.

Released 30th June, 2008

Summary on one of the eight national missions envisioned. http://www.pewclimate.org/international/country-policies/india-climate-plan-summary/06-2008Complete document: http://pmindia.nic.in/Pg01-52.pdf

Page 37: Proposal for Detailed Project Report

“…Our vision is to make India’s economic development energy-efficient. Over a period of time, we must pioneer a graduated shift from economic activity based on fossil fuels to one based on non-fossil fuels and from reliance on non-renewable and depleting sources of energy to renewable sources of energy. In this strategy, the sun occupies centre stage, as it should, being literally the original source of all energy. We will pool our scientific, technical and managerial talents, with sufficient financial resources, to develop solar energy as a source of abundant energy to power our economy and to transform the lives of our people. Our success in this endeavour will change the face of India. It would also enable India to help change the destinies of people around the world.”

http://www.pmindia.nic.in/lspeech.asp?id=690

- Prime Minister of India, Dr. Manmohan Singh

30th June, 2008

Emphasis is my own to show relevance of PSI as seen from the speech

Page 38: Proposal for Detailed Project Report

Appendix 2

System Sizing Analysis

Page 39: Proposal for Detailed Project Report

Insolation in Delhi Area

0

0.3

0.6

0.9

1.2

1.5

0 730 1460 2190 2920 3650 4380 5110 5840 6570 7300 8030 8760

Time (hr)

Glo

bal

so

lar

rad

iati

on

( k

W/s

q.m

)

0

9

18

27

36

45

Tem

p (

oC

), W

ind

sp

eed

(m

/s)

Solar radiation Amb. Temp. Wind speed

Page 40: Proposal for Detailed Project Report

SOC 8hrs @1 MW system

0

10

20

30

40

50

60

70

80

90

100

0 730 1460 2190 2920 3650 4380 5110 5840 6570 7300 8030 8760

Time (hr)

SO

C,

Tan

k p

ressu

re (

%)

Bat SOC H2 storage

Page 41: Proposal for Detailed Project Report

SOC for 24hrs @20 kW

0

10

20

30

40

50

60

70

80

90

100

0 730 1460 2190 2920 3650 4380 5110 5840 6570 7300 8030 8760

Time (hr)

SO

C, T

an

k p

res

su

re (

%)

Bat SOC H2 storage

Page 42: Proposal for Detailed Project Report

Cost Estimate for Different Systems

Load profile 8hrs/day

@1 MW

8 hrs/day

@500 kW

8hrs/day

@250 kW

24 hrs/day

@20 kW

Annual ene-

rgy demand

2920 MWh/a 1460 MWh/a 730 MWh/a 175.2 MWh/a

Main Components Cost Estimate in lakh Rs.

PV (kWp) 3110 1555 778 207

Bat (kWh) 113 57 29 29.4

Elec (kW) 721 360 180 120

H2 stor (m3)

@ 200 bar 1950 975 488 104

Fuel cell 1482 741 370 48

Page 43: Proposal for Detailed Project Report

Appendix 3

PV Generation

Page 44: Proposal for Detailed Project Report

WP1 : Development of high efficiency crystalline Si and a-Si heterojunction solar cells

Leader: Prof. C. S. Solanki, IITB (proposed)

Broad Objective

Development of silicon based solar cells with an aim to increase the efficiency and the reduction of cost using single crystalline, multicrystalline and a-Si/c-Si heterojunction solar cells.

Page 45: Proposal for Detailed Project Report

WP1 : OBJECTIVES

1. Development of high efficiency crystalline solar cells• To achieve efficiency of 18 – 20% using new research ideas

• To establish environmental chamber for accelerated testing of modules• To establish lock-in thermography system for shunt investigations

2. Development of high efficiency solar cell at reduced cost• Multicrystalline solar cells with efficiency 18%• Single crystalline solar cells with efficiency 20%• Cost reduction using thinner wafers : 160 µµµµm

3. a-Si / C-Si heterojunction solar cell with effic. 17 – 20%To study the effect of interface on performance

4. TCAD simulation & device level testing of solar cells

5. Design & development of novel antireflection coatings for Si & non-Si solar cells

Page 46: Proposal for Detailed Project Report

Outputs Llist of deliverables / output to be provided under the WP-1

O1.1 Bench mark crystalline Si PV process with efficiency 18 – 20%

O1.2 Facility for TCASD simulation and reliability testing of cells & modules

O1.3 Prototype 1000 cells generating kWp power (1 MW from manufacturer)

O1.4 Reduced cost a-Si thin film solar cell with high efficiency (17 – 20%)

Page 47: Proposal for Detailed Project Report

WP2 : Development of non-Si based (CdTe and CIGS) thin film solar cells as low cost alternatives to crystalline Si

Leader: Prof. V. Dutta, IITD (proposed)

BroadObjective

Development of non-Si based solar cells using CdTe/CdS and CIGS/CdS heterostructures and semiconductor / dye sensitized solar cells with packaging process for reliable operation.

Page 48: Proposal for Detailed Project Report

WP-2 : Objectives1. CdTe based thin film solar cells•Development of spay deposition technology for large area (30x30 cm2) CdTe thin film solar cells with efficiency 5% in

large area and 10% in small area•Establish a thin film solar cell characterization facility

2. CIGS based thin film solar cells•CIGS/CdS heterojunction solar cells using multitarget

sputtering and solution based techniques with an efficiency

of 15 -17 %•Establish the facility of characterization of interfaces

3. Low cost practical DSSC solar cells and packaging process for long term operation• Development of 8-10% efficient DSSC solar cells over 1 cm2 area for operation up to 2000 hr

• Spray deposition technology for DSSC solar cells

Page 49: Proposal for Detailed Project Report

Outputs List of deliverables / output to be provided under the WP - 2

O1.1 Development of spray deposition technology for CdTe thin film and dye sensitized solar cells

O1.2 High efficiency CIGS solar cells on non-Si substrates

O1.3 To establishing the facility for characterization of heterointerfaces & solar cell testing

O1.4 Packaged DSSC solar cells for long term operation

Page 50: Proposal for Detailed Project Report

Appendix 4

Generation: Solar Thermal

Page 51: Proposal for Detailed Project Report

TTPC

PT

TC

FT FC

LT LC

PDT PDC

Air condenser

Middle Steam

Separator

Final Steam

Separator

Steam

TurbineFeed water

TankFeed PumpFeed valve

Parabolic Trough Collector

Porous Inserts

Concentrated Solar Radiation

Fluid Outlet Tout

Glass / Transparent

Outer Tube

Fluid

Inlet Tin

Sun

1 Mwe Solar Power Plant – Direct Steam Generation

Page 52: Proposal for Detailed Project Report

52

Solar Thermal Power Plant – with Thermic Fluid

Page 53: Proposal for Detailed Project Report

Receiver tubes

• Receiver (100 mm tube) placed at focal point of parabola

• Steam produced at 100 bar, 350oC

• Mass flow rate of water~ 1kg/s

• Receiver tubes- Stainless steel with chrome-black coating

Page 54: Proposal for Detailed Project Report

Solar Tower Thermal storage

With helio-stat mirrors, solar energy is concentrated on a phase change material

such as molten salt or water at the top of the tower, and stored to take care

of hourly fluctuations in a thermal power plant.

Page 55: Proposal for Detailed Project Report

Work Plan

• The solar thermal team will carry out the detailed design of the solar thermal plant and the auxiliary thermal storage systems

• For manufacturing of mirrors, high strength tubes/ pressure vessels etc,leading companies such as Saint Gobain and L&T will be contacted.

• Some of the components such turbine and condenser will be bought off-the-shelf.

• The power plant will be established within the first 3 years and detailed data collection & analysis will carried in the last two years.

Page 56: Proposal for Detailed Project Report

Appendix 5

Power System Design

Page 57: Proposal for Detailed Project Report

DC-DC Conversion for Solar PV

& Battery charge controller

•S.K.Mishra (IIT-K), S. Chattopadhyay (IIT Kgp),

•topology determination and design of modular hardware •control algorithm for parallel operation and seamless

integration

•protection features (hardware & software) including system start-up sequence

•SOC (state-of-charge) determination for battery •Charge/discharge control algorithms

•Battery protection & Health monitoring •Communication interface

Page 58: Proposal for Detailed Project Report

DC-AC conversion and grid side

paralleling & MPPT

•P. Sensarma (IIT K), S. Chattopadhyay (IIT Kgp)

•Fixed panel maximum power point tracking algorithms •design of modular hardware

•control algorithms for parallel operation & stability

•protection features (hardware & software) including system start-up sequence

•system operation during normal, contingency and emergency modes

•Synchronization/re-synchronization with utility

Page 59: Proposal for Detailed Project Report

Instrumentation & Communication

H. Nemade (IIT G), A. K. Pradhan (IIT-Kgp),

•Converter communication interfaces

•Relaying & Switchgear •Metering with communication facility

•Phasor measurement •

Page 60: Proposal for Detailed Project Report

Power Quality & Network

Interactions

Mahesh Kumar (IIT M), K. Vasudevan (IIT M), B. Kalyankumar (IIT M)

•Shunt/series active filters for harmonics compensation•Design and fabrication of hardware

•Controls and basic testing •Design of electrical layout (after site finalization)

•Evaluation of active filter performance under different network configurations

•Correction in controls for optimal network performance

Page 61: Proposal for Detailed Project Report

Appendix 6

Budget for DPR

Page 62: Proposal for Detailed Project Report

Budget for writing DPRHead Description Amount (Rs.)

Coordinators Meetings

Two meetings @ Rs.1.5 lakhs x 2

3 00 000

Sub-theme Meetings Four sub-themes

@ Rs.1.5 lakhs x 4 6 00 000

Visit to industrial sites and solar plants

Four visits

@ Rs.2 lakhs x 48 00 000

Technical Support for Collecting

Information and Writing the DPR

Analysis and design, engineering drawings, report

preparation

@ Rs. 3 lakhs x 4 + Rs.2 lakhs x 1

14 00 000

Contingency Books, reports, phone calls, incidental expenses

4 00 000

Total 35 00 000

Page 63: Proposal for Detailed Project Report

Estimated Budget for Initiative

•Development work leading to deliverables

• Implementation 1 MWp, 8 hours plant ~ Rs.55 crores- Infrastructure – Rs. 5 crores

- PV+Thermal generation – Rs.36 crores - Power Electronics – Rs. 4 crores

- Storage – Rs.10 crores