CASTOR at CMS Enhancing Forward Physics
Apostolos D. Panagiotou
University of Athenshttp://cmsdoc.cern.ch/castor/
Diffractive & Forward Physics Workshop Antwerp 25-26/10, 2007
CMS Coverage in pT -
CMS fwd calorimetry up to || 5 + Castor + ZDC
0-12 -10 -8 -6 -4 -2 +2 +4 +6 +8 +10 +12
pT (
GeV
)
0.1
1
10
100
1000CMS
T1T1T2 T2RP
pTmax~s exp(-η)
CA
STO
R
CA
STO
RZDCZDC
HF HF
figure adapted from Risto Orava (Diffraction 2006)
Unprecedented coverage at hadron colliders !
CASTOR
ZDC
Physics with CMS Forward Calorimeters
Hadronic Forward (HF)
• Low-x dynamics:• Parton saturation, BFKL/CCFM dynamics, proton structure, multi-parton
scattering• Diffraction• Measurements for cosmic ray data analysis:
• Forward energy and particle flows, minimum bias event structure• Two-photon interactions and peripheral collisions• QED processes to determine luminosity to O(1%), via pp pp ee and pp pp
• Forward physics in pA and AA collisions• New forward physics phenomena:
• Disoriented Chiral Condensates, incoherent pion emission, Centauros, Strangelets….
IP
Recent Developments
1. CASTOR approved by CMS-MB as CMS baseline detector on 21-05-07
2. One calorimeter will be built by end of 2008 (224 channels)
3. FEA calculations completed
4. Prototype construction & assembly study completed
5. Skeleton construction studies completed
6. Full length octant prototype constructed and beam-tested in August, 2007
7. EDR to be completed by end of October 2007
8. CASTOR sim-digi software in HCAL CMSSW-1_7 release
10. Resources approaching required level for completion. Missing ~ 150 k€
New Institutes are Welcome !
Currently working on:- test beam data analysis,- electronics, construction - software ( implementation in simulation of digi & reco…)- physics simulations, …..
Antwerp PMTs, FE, trigger, DAQ, funding; Electronics coordination
Athens Design, Q-plates, SW, MC, funding; Project coordination
CERN Beam test/EDR reports; SW-Physics coordination
Cukurova PMT testing, assembly
DESY FEA, construction, electronics, funding; Project coordination
JINR Dubna Mechanical design; Technical coordination
INR, Moscow Light guides & 2mm Q-plates
ITEP, Moscow Laser/LED calibration system
Northeastern Readout devices, MC, SW, construction
Collaborating Institutes & Tasks
CASTOR Calorimeter Design
Calorimeter (10λI): (2)EM + (12)HD sections, 224 channels
CASTOR Calorimeter on Support
2 (½) calorimeter sections
½ CASTOR
CASTOR Calorimeter Installation
HF
Collar
CASTOR in beam line: Collar platform with HF, Collar and Rotating shielding
HF
CASTORT1
T2
Collar
Rotating
Construction & Commissioning Schedule v1.6 (20-10-07)
CASTOR Prototype Construction/Assembly Study
Design: DUBNAConstruction: DESY, Northeastern
Construction of 32cm long, (½) calorimeter: 4 octants; (2) EM + (2) HD sections
Instrumenting one octant: (4) EM + (4) HD RUs
Front Rear
Octant container
Al plate
Prototype for BT 2007 Full length
Octant
EM section 4 channels
HAD section full length 24 chan.
1 3 31
Construction of Prototype
W-plate
Q-plate
CASTOR beam test 2007
Full-length octant prototype
PR
ELIM
INA
RY
day 2 day 14
PRELIMIN
ARY
HD1μ-
μ- Βeam 50 GeV
EM1
EM3
μ-
μ-
e- Beam
PRELIM
INAR
Y
σ/E
Ch
an
ne
l
PRELIM
INAR
Y
π- Beam
σ/E
Ch
an
ne
l
• Forward Physics spans a broad range of pp and HI high energy physics topics, from fundamental properties of QCD to new physics phenomena.
• Large cross sections ensure early publications on various topics.
• Discovery potential:- Beyond Standard Model (BSM): Large amount of missing transverse energy (MET)
- Higgs: Vector-Boson-Fusion (VBF): Two jets at forward/backward rapidities (pp→jj H X). Lower background than the dominant gluon-gluon fusion channel (see David’s talk).
- Exotics in HI Interactions: “Strangelets”, Disoriented-Chiral-Condensates (DCC)
• CASTOR calorimeter project is progressing fast:
- Lots of data taken in test beam; Analysis under way.
- Engineering design review scheduled for the 31st October. Document in final stage.
- Construction of calorimeter to start in November 2007.
- Aim & need to be in beam line as soon as LHC starts, to take advantage of low lumi runs.
New Institutes are welcome !