WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration...

13
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009

Transcript of WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration...

WP3 Required interfaces for cryostat

design / integration

Patxi DUTHIL SPL 3rd Collaboration Meeting, CERN, GenevaNovember 12th 2009

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 22

Goals & Motivation (WP3 specifications)

Goal

Design and construct a full-scale cryomodule prototype (Part of the SPL Design Study for a Project Proposal in 2011-2012)

Motivation Demonstrate the construction capability, CM with β=1 cavities and SC

quadrupoles; Validate and improve design and construction features Learning of the critical assembly phases Enable RF testing on a multi-cavity assembly (in real operating

conditions) Learning of the critical assembly phases; Validate operation issues, cryogenic cooling principles and acquire

experience Estimate production costs

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 33

SPL project CNRS-IN2P3 Tasks:

1/ To design and integrate the cryostat and to provide cryostat components for one cryomodule prototype;

2/ To design and provide the supporting/guiding system for the string of cavities in the cryostat;

The deliverables: Hardware components

Design and calculation reports, drawing files and design models

Fully documented industrial production files: Material spec. Designed calculations (construction codes) Production drawings Assembly procedures

Quality assurance and safety records

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 44

CNRS/IN2P3 contribution statement

CERN – CEA - CNRS/IN2P3 –> collaboration agreement signed

3rd SPL meeting,

Since then, CNRS/IN2P3 taskforce (already) operational Work slightly began

Conceptual design (biblio…) Vacuum vessel design

But…

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 55

CNRS/IN2P3

Planning

uncompressible

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 66

CNRS/IN2P3 needs for cryostat design on time

…but Needs of general layout specifications

Needs of interfaces specifications

To: Start the design and integration study by the beginning of 2010 = NOW !

→ Short Term need (ST) (by end of 2009)

Carry out this detailed design

→ Mid Term need (MT)

3rd SPL meeting (or conceptual design period):

we should fix the Short Time needs

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 77

Machine layout Longitudinal layout:

Pattern for string of cavities (Short Term)

Sectorization (ST) cryostat (vacuum, cryogenics) beam (vacuum, diagnostic)

Quadripoles (ST) Cold/Warm

Cross sectional layout Cryostat supporting system (ST)

Orientation of RF coupler (vertical): Top/bottom (ST)

Cavity string supporting reference (GRP ?) (ST)

1/2

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 88

Cryogenic layout T°, pressures (ST)

Elements types (valves…) and dimensions (pipes) (ST)

Cooling down protocol (spec. )(ST)

Machine layout 2/2

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 99

RF System Cavity

Outer diameter (LHe vessel) (ST)

Mass (order of) (ST)

Alignment specifications (to be confirmed) (ST)

Alignment outer reference (ST)

String assembly procedure (ST)

Supporting mech interface (MT)

Tuner Type (geometry, motor position…) (ST)

Volume (ST)

Coupler Mech. Interface (MT)

Cooling (MT)

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 1010

Beam dynamics Quadripoles (if SC)

Alignment specifications (ST)

Expected mass and volume (ST)

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 1111

Infrastructure

Cryostat handling (MT) Out of and in the tunnel

Alignment method (2, 3 points) (MT)

CERN cryogenic test facility interface (MT)

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 1212

Instrumentation

Instrumentation needs (MT) Should not be neglected in cryostat integration

Mostly known from users/partners

Might be already specified (feedthroughs…) → (ST)

November 12November 12thth 2009 2009 3 3 rdrd SPL meetingSPL meeting 1313

THANK YOU