Test beam 27.07.2012 – 10 .08.2012 H6/SPS CERN – Prevessin

8
Test beam 27.07.2012 – 10.08.2012 H6/SPS CERN – Prevessin Theo, Paolo TPC mode, new BNL VMM1 Elx compare to APV25 Trigger scheme (I) 1 x 1 m 2 chamber 17/07/2012 1

description

TPC mode, new BNL VMM1 Elx compare to APV25 Trigger scheme (I ) 1 x 1 m 2 chamber. Test beam 27.07.2012 – 10 .08.2012 H6/SPS CERN – Prevessin. Theo, Paolo. TEST BEAM SETUP Oct2011 (14.10.2011-21.10.2011). Jura. 300 run

Transcript of Test beam 27.07.2012 – 10 .08.2012 H6/SPS CERN – Prevessin

Page 1: Test beam  27.07.2012  –  10 .08.2012  H6/SPS CERN –  Prevessin

1

Test beam 27.07.2012 – 10.08.2012 H6/SPS CERN – Prevessin

Theo, Paolo

• TPC mode, new BNL VMM1 Elx compare to APV25• Trigger scheme (I)• 1 x 1 m2 chamber

17/07/2012

Page 2: Test beam  27.07.2012  –  10 .08.2012  H6/SPS CERN –  Prevessin

2

fingerSci (SA)

Beam profile wire chamber

movable table

725

TEST BEAM SETUP Oct2011 (14.10.2011-21.10.2011)

Si3 Si6Y-inverted

26 26

μM-R18stripsY

Jura

2

20

4730

1155

50

TOP VIEW

SIDE VIEW

Si1

26

s1

s640

New movable table

(π-, +120 GeV/c)

z

x

z

y

y

xx

(π-, +120 GeV/c)

2

20

s1

s360veto Sci

SBSD

10

SB

Saleve

170

15

SC

10

Si1

26

s1

s640

Si6Y-inverted

26

Si3

26

s1

s1s640

s640

μM-R20stripsX

20

μM-R21stripsYX

113

μM-R18 (X-Y) used only as Y-strip chamber

s1

s360

s1

s360

CR2-rLarge mm

1406

2

μM-R

19G

strip

sXU

V

s1

44

16

100

7878

425

300 run<=6989

322 7007<run>=699016.10..2011, 11:30

16.10.11 19:30 rotate chambers by 20 degrees 17/07/2012

Page 3: Test beam  27.07.2012  –  10 .08.2012  H6/SPS CERN –  Prevessin

H6 test beam 27 July – 10 AugSetup Mechanics: Freiburg support frame with provision to rotate the chambers Reference systems:

2 or 4 xy chambers (0.250 mm pitch) – equipped with 1x + 1y APV25 (2 or 4 HDMI cables), mounted on both ends of Freiburg frame

Si telescope (BAT), 3 xy stations at 0.5 – 1 m downstream of MM setup 8 x-strip chambers (0.4 mm pitch) to be tested, mounted on frame back-to-back 1 x 1 m2 MM (single coordinate) Trigger: scintillatorsElectronics: VMM1 (new BNL chip) and APV25 Reference chambers: 8 APV25 (4 HDMI cables) All 8 chambers can be equipped with APV25 for TPC mode studies (remove time jitter

using ref. MMs ?) All 8 chambers can be equipped with BNL chip for data readout (TPC mode) All 8 chambers can be equipped with BNL chip for trigger studies (connected to FPGA

evaluation board)Measurements Systematic studies of BNL chip performance compared to APV25 Measure resolution as function of track angle (for different Edrift), track reconstruction Measure performance of 1 x 1 m2 MM (strip length ≥ 1 m)

17/07/2012 3

Page 4: Test beam  27.07.2012  –  10 .08.2012  H6/SPS CERN –  Prevessin

417/07/2012

Page 5: Test beam  27.07.2012  –  10 .08.2012  H6/SPS CERN –  Prevessin

Tracker(4x) XY chambers

Tracker(4x) XY chambers

Tracker(4x) XY chambers

tracker(4x) XY chambers

FPGAEval Board

External Sci TRG

A P V

APV

16x trigger LVDS

micromegas(8x) X

chambersVMM

VMM

micromegas(8x) X

chambersmicromegas

(8x) X chambersmicromegas

(8x) X chambersmicromegas

(8x) X chambersmicromegas

(8x) X chambersmicromegas

(8x) X chambersmicromegas

(8x) X chambers

4 x HDMI

ADC-Card(APV)

FEC

2012 July Micromegas Test Beam Readout Schematics

VMM1 events APV25 eventsTrigger data

ADC-Card(APV)

FEC

17/07/20125

BN

L D

AQ

car

d

Avne

t LX9

A

Z A

dapt

er

Car

d

VMM

1

switch

16x

New

“C-

Card

DCS

HV/LV, T-H-P

mmdaq PCSDC

Page 6: Test beam  27.07.2012  –  10 .08.2012  H6/SPS CERN –  Prevessin

617/07/2012

Services & Electronics• Gas 93:7 Ar:CO2

• DCS – HV/LV CAEN Mainframe 2527 2x12 Channel Boards Supervision PC connected with Ethernet – PVSS setup LV – ATX supply for min frame of SRS

• DAQ & SDC mmDAQ + monitoring – APV25 Readout through SRS – VMM1 Readout• Slow Control for SRS & VMM1

Page 7: Test beam  27.07.2012  –  10 .08.2012  H6/SPS CERN –  Prevessin

7

H6

Bat 887-EHN1-H6/146Counting room: HNA 447

H2H8

CERN Prevessin

17/07/2012

Page 8: Test beam  27.07.2012  –  10 .08.2012  H6/SPS CERN –  Prevessin

8

Contact Names

Test beam coordination (H6): Paolo Iengo ([email protected], Tel. 168679) Theo Alexopoulos ([email protected], Tel. 0765439098 )

Installation: George Glonti ([email protected], Tel. 0764956663) Givi Sekhniaidze ([email protected], Tel. 164453)

DAQ: Marcin Byszewski ([email protected], Tel. 165537)

DCS: George Iakovidis ([email protected],Tel. 162858)

17/07/2012