Theo, Paolo
• TPC mode, new BNL VMM1 Elx compare to APV25• Trigger scheme (I)• 1 x 1 m2 chamber
17/07/2012
2
fingerSci (SA)
Beam profile wire chamber
movable table
725
TEST BEAM SETUP Oct2011 (14.10.2011-21.10.2011)
Si3 Si6Y-inverted
26 26
μM-R18stripsY
Jura
2
20
4730
1155
50
TOP VIEW
SIDE VIEW
Si1
26
s1
s640
New movable table
(π-, +120 GeV/c)
z
x
z
y
y
xx
(π-, +120 GeV/c)
2
20
s1
s360veto Sci
SBSD
10
SB
Saleve
170
15
SC
10
Si1
26
s1
s640
Si6Y-inverted
26
Si3
26
s1
s1s640
s640
μM-R20stripsX
20
μM-R21stripsYX
113
μM-R18 (X-Y) used only as Y-strip chamber
s1
s360
s1
s360
CR2-rLarge mm
1406
2
μM-R
19G
strip
sXU
V
s1
44
16
100
7878
425
300 run<=6989
322 7007<run>=699016.10..2011, 11:30
16.10.11 19:30 rotate chambers by 20 degrees 17/07/2012
H6 test beam 27 July – 10 AugSetup Mechanics: Freiburg support frame with provision to rotate the chambers Reference systems:
2 or 4 xy chambers (0.250 mm pitch) – equipped with 1x + 1y APV25 (2 or 4 HDMI cables), mounted on both ends of Freiburg frame
Si telescope (BAT), 3 xy stations at 0.5 – 1 m downstream of MM setup 8 x-strip chambers (0.4 mm pitch) to be tested, mounted on frame back-to-back 1 x 1 m2 MM (single coordinate) Trigger: scintillatorsElectronics: VMM1 (new BNL chip) and APV25 Reference chambers: 8 APV25 (4 HDMI cables) All 8 chambers can be equipped with APV25 for TPC mode studies (remove time jitter
using ref. MMs ?) All 8 chambers can be equipped with BNL chip for data readout (TPC mode) All 8 chambers can be equipped with BNL chip for trigger studies (connected to FPGA
evaluation board)Measurements Systematic studies of BNL chip performance compared to APV25 Measure resolution as function of track angle (for different Edrift), track reconstruction Measure performance of 1 x 1 m2 MM (strip length ≥ 1 m)
17/07/2012 3
417/07/2012
Tracker(4x) XY chambers
Tracker(4x) XY chambers
Tracker(4x) XY chambers
tracker(4x) XY chambers
FPGAEval Board
External Sci TRG
A P V
APV
16x trigger LVDS
micromegas(8x) X
chambersVMM
VMM
micromegas(8x) X
chambersmicromegas
(8x) X chambersmicromegas
(8x) X chambersmicromegas
(8x) X chambersmicromegas
(8x) X chambersmicromegas
(8x) X chambersmicromegas
(8x) X chambers
4 x HDMI
ADC-Card(APV)
FEC
2012 July Micromegas Test Beam Readout Schematics
VMM1 events APV25 eventsTrigger data
ADC-Card(APV)
FEC
17/07/20125
BN
L D
AQ
car
d
Avne
t LX9
A
Z A
dapt
er
Car
d
VMM
1
switch
16x
New
“C-
Card
”
DCS
HV/LV, T-H-P
mmdaq PCSDC
617/07/2012
Services & Electronics• Gas 93:7 Ar:CO2
• DCS – HV/LV CAEN Mainframe 2527 2x12 Channel Boards Supervision PC connected with Ethernet – PVSS setup LV – ATX supply for min frame of SRS
• DAQ & SDC mmDAQ + monitoring – APV25 Readout through SRS – VMM1 Readout• Slow Control for SRS & VMM1
7
H6
Bat 887-EHN1-H6/146Counting room: HNA 447
H2H8
CERN Prevessin
17/07/2012
8
Contact Names
Test beam coordination (H6): Paolo Iengo ([email protected], Tel. 168679) Theo Alexopoulos ([email protected], Tel. 0765439098 )
Installation: George Glonti ([email protected], Tel. 0764956663) Givi Sekhniaidze ([email protected], Tel. 164453)
DAQ: Marcin Byszewski ([email protected], Tel. 165537)
DCS: George Iakovidis ([email protected],Tel. 162858)
17/07/2012