SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and...

14
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3. NICHOLAS SOUCHLAS (10/28/2010)

Transcript of SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and...

Page 1: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)

SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3.

NICHOLAS SOUCHLAS (10/28/2010)

Page 2: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)

Energy deposition from MARS, MARS+MCNP codes.

STANDARD (STUDY II) GEOMETRY,STANDARD SHIELDING(80%WC+20% H2O) GAUSSIAN PROFILE: σx=σy=0.12 cmE=8 GeV, 4MW proton beam

Page 3: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)

STANDARD SOLENOID GEOMETRY, 13 NiTi+Cu+... SC

SC#1 -120<z<57.8 cm Rin=63.3 cm Rout=127.8 cmSC#2 67.8<z<140.7 cm Rin=68.6 cm Rout=101.1 cm SC#6-13 632.5<z<218.7 cm Rin=42.2 cm Rout=45.1-->43.4 cm (TOTAL #

SC=13)

Page 4: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)

NO SHIELDING, DIFFERENT NEUTRON ENERGY CUTOFFS.

Page 5: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)
Page 6: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)

80%WC+20%H2O SHIELDING, DIFFERENT NEUTRON ENERGY CUTOFFS.

Page 7: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)
Page 8: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)
Page 9: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)
Page 10: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)

ENERGY DEPOSITED FOR DIFFERENT COMPOSITIONS OF THE SHIELDING ( x WC+(1-x) H2O )

Page 11: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)
Page 12: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)

DEPOSITED ENERGY BY REMOVING THE MAGNETIC FIELD, USING TWO WAYS: (4=F, B≠0) (4=T, B=0)

Page 13: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)

DEPOSITED ENERGY WHEN RESISITIVE COIL IS REPLACED BY SHIELDING MATERIAL.

Page 14: SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3 ......Deposited energy Power for SC#I, SC#2-13 and total, standard geom., different neutron energy cutoffs (10 to 300 Me V) (MARS+MCNP)

DEPOSITED ENERGY WITH 24 GeV BEAM.