Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information...

16
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle Physics Gr oup J. Imazato Facility construction team IPNS, KEK

description

Physics at 50-GeV PS - Current guide for facility design - Nuclear & Particle physics with K, π, , , pbar, and other secondary beams –Hypernuclear Spectroscopy –Hyperon-nucleon scattering –Mesons in nuclear matter –Hadron spectroscopy –Kaon rare decays to measure CP parameters –Flavor mixing and other topics beyond the Standard Model –Neutrino oscillation experiment using Super-Kamiokande Nuclear physics with primary beams –Physics with polarized proton beams –High-density matter with heavy-ion beams

Transcript of Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information...

Page 1: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions

Activities of Nuclear and Particle Physics Group

J. ImazatoFacility construction team

IPNS, KEK

Page 2: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Accelerator Complex

Page 3: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Physics at 50-GeV PS- Current guide for facility design -

Nuclear & Particle physics with K, π, , , pbar, and other secondary beams

– Hypernuclear Spectroscopy– Hyperon-nucleon scattering– Mesons in nuclear matter– Hadron spectroscopy– Kaon rare decays to measure CP parameters– Flavor mixing and other topics beyond the Standard Model– Neutrino oscillation experiment using Super-Kamiokande

Nuclear physics with primary beams – Physics with polarized proton beams– High-density matter with heavy-ion beams

Page 4: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Experimental Hall (Phase 2)

Page 5: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

10 4

10 5

10 6

10 7

10 8

KEK 12-GeV PS BNL AGS(23 GeV) 50-GeV PS

Comparison of Beam Intensity

K-1.8

K-1.8

K-1.8

K+0.8

K+0.8

K+0.8

K-0.8

K-0.8

K-1.1

10 4

10 5

10 6

10 7

10 8

KEK 12-GeV PS BNL AGS(23 GeV) 50-GeV PS

Comparison of Beam Intensity

K-1.8

K-1.8

K-1.8

K+0.8

K+0.8

K+0.8

K-0.8

K-0.8

K-1.1•K-(1.8 GeV/c)

(K-,K+), S=-2

•K+(0.8 GeV/c)

K+ rare decay

•K-(1.1 GeV/c)

(K-,π-), S=-1

Aim for secondary beam intensity

Page 6: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Phase 1 and Phase 2

Neutrino to SK

Nuclear/Particle Facility

Page 7: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Experimental Hall (Phase 1)

Page 8: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Construction time schedule (Phase 1)

Page 9: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Construction team

-- Hadron hall/facility group

  -- Hadron beam line group

  -- Target/monitor group

  -- Neutrino facility group

-- Engineering/technology group

-- Cryogenics group

-- Online/electronics group

-- Common support group

About 80 physicists from IPNS and other KEK divisions are involved in the construction team.

Nuclear/particle ------ physics group

Page 10: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Activities of subgroups Hadron hall/facility group

– Basic design of the experiment hall– Basic design of utilities– Radiation safety issues

Hadron bam line group– Primary line design and construction– Secondary line construction– Development of beamline elements

Target/monitor group– Development of a K- hall and targets– Development of beam monitors

Neutrino facility group– Construction of a SC proton beam line– Design of a target station– Construction of a forward detector

Page 11: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

R&D items

High Intensity beam– Water-cooling rotating target– Water-cooling beam dump– Primary beam monitor

High Radiation environment– Radiation-hard magnet and other elements– Remote-handling system (method of maintenance)– Effective radiation shielding– Control of air flow

Page 12: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Restriction from high activation and rigid shielding

It will be not easy to change beam line layout in the future .– needs careful design of beam lines– needs careful selection of an experimental program

Future projects have to secure a beam extraction port from the beginning.– High intensity muon facility– pbar beam (not yet considered in detail !)

Page 13: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

International Cooperation

Nuclear and Particle Physics Facility will be open to the world. “JHF” aims for an international research center.

Participation in the facility construction is welcome.– Beam line construction– Development of the target etc.

Contribution to detector construction is welcome.

Page 14: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Preparation of Detectors

No budget at all for experiments

1. We will make an effort to find budgets.

2. Contributions by user groups (domestic and international) are awaited.

3. Recycling of spectrometers currently used at the 12-GeV PS

– SKS, TOROIDAL, SPES-II, SPES-I, …..

Page 15: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

–Experiment program coordination

The scheme during the construction phase is now under discussion.

Probably:

Director

Nuclear/Particle PhysicsFacility committee

Letter of Intent, Proposal

Selection experimentsDecision of beam line priority

Users committee

Page 16: Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.

Summary

We will try our best to complete an advanced facility . The phase-1 facility should be extended to Phase-2 any time.

Good experimental proposals are awaited. We look forward to the outcome of this workshop.

International cooperation also in the construction phase is welcome.