REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME...

22
Γολδερ Γολδερ Γολδερ Ασσοχιατεσ Ασσοχιατεσ Ασσοχιατεσ A Mine is a Terrible Thing to Waste A Mine is a Terrible Thing to Waste REMEDIATION OF A REMEDIATION OF A SUBSURFACE HYDROCARBON SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY VACUUM ENHANCED RECOVERY SYSTEM SYSTEM M. Jillian Mitton, M.Sc., P.Eng.-Golder Associates Ltd. Sarah Leonard, B.Sc., E.I.T.-Golder Associates Ltd.

Transcript of REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME...

Page 1: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

Γολδερ Γολδερ ΓολδερΑσσοχιατεσΑσσοχιατεσΑσσοχιατεσ♣♣♣≤≤≤

A Mine is a Terrible Thing to WasteA Mine is a Terrible Thing to Waste

REMEDIATION OF AREMEDIATION OF ASUBSURFACE HYDROCARBONSUBSURFACE HYDROCARBONPLUME AT A MANUFACTURINGPLUME AT A MANUFACTURINGFACILITY IN ALBERTA USING AFACILITY IN ALBERTA USING A

VACUUM ENHANCED RECOVERYVACUUM ENHANCED RECOVERYSYSTEMSYSTEM

M. Jillian Mitton, M.Sc., P.Eng.-Golder Associates Ltd.Sarah Leonard, B.Sc., E.I.T.-Golder Associates Ltd.

Page 2: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

OutlineOutline

Site Description and Background

Nature and Extent of HydrocarbonContamination

Remedial Objective

Remedial Action Plan

Remediation and Results

Summary

Page 3: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

Site Description and BackgroundSite Description and Background

Source

Page 4: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

Geological and Hydrogeological SettingGeological and Hydrogeological Setting

Page 5: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

Nature and Extent of Hydrocarbon ImpactsNature and Extent of Hydrocarbon Impacts

Soil Plume (5,600 m2)

Groundwater Plume

(5,600 m2)

Product Plume

(2,300 m2)

Page 6: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

Remedial ObjectiveRemedial Objective

Remedial Goal - AENV 2001 RiskManagement Guidelines for PetroleumStorage Tank Sites, commercial land-use and fine-grained soil.

Off-Site impacts - reduce all off-siteenvironmental liability by January 2003.

On-Site impacts - contain the impactson site and remediate the Site within a 3to 5 year time frame.

Page 7: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

Remedial Action Plan

The selected remedial action planconsisted of:

1. Excavation and disposal of impacts onthe municipal road and adjacentcommercial property

2. Installation and operation of a vacuumenhanced recovery and treatment systemon the site.

Page 8: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

Off Site RemediationOff Site Remediation

Off site remedial activities began inOctober 2002 and excavation work wascompleted in December 2002.

A total of approximately 2,600 tonnes ofimpacted soil was excavated andtransported off site.

Page 9: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

Off Site RemediationOff Site Remediation

Excavationnext tocommercialbuildingwasconductedin a seriesof slots thatwere thenbackfilledwithfillcrete.

Private Sanitary Sewer

Page 10: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

Off-Site RemediationOff-Site Remediation

Excavation in the road involved re-construction of sanitary and storm sewers anda water line.

Page 11: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

Off-Site ResultsOff-Site Results

Remedial approach was effective inremoving off site liability by 2003.

Post excavation sampling wasconducted in May 2003 and allgroundwater concentrations were belowthe applicable guidelines.

Page 12: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

On Site RemediationOn Site Remediation

A VER pilotstudy wasconducted inAugust 2002.

Results:

- 6 m radiusof influence;

- opt. vacuumof 10” Hg;

- airflow rate~36 scfm;and

- waterpumping rate~2.0 L/min.

Page 13: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

On Site RemediationOn Site Remediation

Site preparation included installing 47 new wells;

Recovery wells were standard 2” diametermonitoring wells completed to depths rangingfrom 5.8 to 6.8 m.

Recovery well heads were installed on new wellsand 16 existing wells.

Page 14: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

On Site RemediationOn Site Remediation

Winterized Recovery Lines

#1

#2 #3

#4

#5

#6

#7

Page 15: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

On Site RemediationOn Site Remediation

Page 16: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

On-Site RemediationOn-Site Remediation

1 2

3 4

Page 17: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

On-Site ResultsOn-Site Results

Operation of the VER system began inJanuary 2003.

Results indicate that groundwater recoveryflow rates have ranged from 0.1 to 5.0 L/minand a total of approximately 11, 400 L ofgroundwater has been recovered over anoperational period of about six months.

The average air flow recovery rate for eachnetwork is 500 scfm.

Page 18: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

On-Site ResultsOn-Site ResultsCorrelation Total BTEX (mg/m3) to PID Reading

0

200

400

600

800

1000

1200

1400

10 110 210 310 410Total BTEX (mg/m3)

PID

Rea

ding

s (p

pm)

Page 19: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

On-SiteOn-Site Results Results

6

7

52/3

47 7 7

Total = 2,600L

0

500

1000

1500

2000

2500

3000

0 500 1000 1500 2000 2500 3000 3500 4000 4500

VER System Run Time (Hours)

Vo

lum

e o

f P

rod

uct

Re

cove

red

in V

ap

ou

r P

ha

se (

L)

#5

#7

#2/3

#6

#7

#1 #5Total Volume of Product = 2,600 L

#3/4

4100

Page 20: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

On-Site ResultsOn-Site Results

Effluent water and ambient airconcentrations indicated that thesystem is effectively treating recoveredgroundwater and vapours.

VER system has removedapproximately 2,600 L of product over 6months.

The system is effectively containingimpacts on the Site.

Page 21: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

Project SummaryProject Summary

Off-site remedial approach waseffective in removing off-site liability by2003

VER system is effectively containingimpacts on the site and recoveringhydrocarbons.

It is anticipated that the Site will beremediated within a 5 year time frame.

Page 22: REMEDIATION OF A SUBSURFACE HYDROCARBON SYSTEM … · REMEDIATION OF A SUBSURFACE HYDROCARBON PLUME AT A MANUFACTURING FACILITY IN ALBERTA USING A VACUUM ENHANCED RECOVERY SYSTEM

QUESTIONS ?