RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51...

37
RD51-WG7 Report RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis

Transcript of RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51...

Page 1: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

RD51-WG7 ReportRD51-WG7 ReportRD51-WG7 ReportRD51-WG7 Report

RD51 collaboration weekCERN, November 2009Matteo Alfonsi & Yorgos Tsipolitis

RD51 collaboration weekCERN, November 2009Matteo Alfonsi & Yorgos Tsipolitis

Page 2: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

OutlineOutline• Common Experimental Setup– Telescopes– Gas– HV– DAQ

• Results• Next Year

Page 3: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

2009 TB requirements2009 TB requirements• Dimension: around 60x60 cm2 planar

devices; weight: few kg devices• CF4 and flammable gas mixtures• High resolution (better than 70μm)

external tracker• Low or high rate beam, typically MIPS

(pions preferred)• Mechanical Support allowing X-Y

position and rotation • High Magnetic field, sometimes

together with low energy beam

Page 4: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

SPS/H4 line at Prevessin North AreaSPS/H4 line at Prevessin North AreaSPS/H4 line at Prevessin North AreaSPS/H4 line at Prevessin North Area

Height = 1.06 m

R = 1.70 m

Front opening = 2.40 m

Beam direction

Goliath magnet

RD51 setup

Page 5: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Experimental table with TrackersExperimental table with Trackers

GEM Telescope

DUT µMegas DUT Triple GEMBeam

Beam

Micromegas Telescope

Page 6: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Tracker commissioningTracker commissioning

Page 7: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

The Goliath MagnetThe Goliath Magnet

Power: about 2MWMaximum field: 1.4TGap volume: around 8 m3 Max. water pressure: 10 bar

• Looking at the map realized during NA57 experiment, the field seems to drop fast when approaching the border.

Field map realized during NA57 experiment, file decoded by Frascati group

Page 8: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Magnet mechanicsMagnet mechanics

railwheel

Beam

Beam height~ 128 cm

~ 85

cm

Similar table mounted over rails

Rails will extend out of the magnet for about 1m, with two legs for support

Table is moved out of the beam when not used.

More than 8m lenght for cable, to arrive from rack to the farthest part of the magnet, properly using cable trays

TOP VIEW

SIDEVIEW

~ 2.5 m

RAIL SYSTEM:

Page 9: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Provided gas infrastructureProvided gas infrastructure

Goliathmagnet

• Stainless steelStainless steel from from gas zone gas zone to a to a patch panel in the patch panel in the experimental experimental areaarea

• 5 lines5 lines, each with 6mm diam. pipes , each with 6mm diam. pipes for inlet and 10mm diam. pipes as for inlet and 10mm diam. pipes as exhaustexhaust

• A sixth copper line provided by the A sixth copper line provided by the SPS people is downstream GoliathSPS people is downstream Goliath

Our pipes

Slot for 2 racks

Beamdirection

Page 10: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

3 control

signals :

Clock, Track/Hold,

Clear

V2718

Eleni Ntomari 10

Data Acquisition system- Trigger logicData Acquisition system- Trigger logic

Trigger to Sequencer

Scintillators coincidence

trigger

telescopedetectors under test

Page 11: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

11

Data acquisition system- data monitoring

Data acquisition system- data monitoring

11

Eleni Ntomari

The Data acquisition performs 3 tasks: recording the events (from the strips), displaying the events online monitoring

Hit mapsPedestal subtraction

Energies X,Y distributions XY 2 dimensions plot Alignment Trigger Rate History

Maximum readout rate up to 120 events per second

Page 12: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

SLOw Control SYstemSLOw Control SYstem ◦◦◦ ◦◦ ◦◦ ◦◦ Intro Main Init Config Export Prospects

K. Karakostas

Page 13: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

SLOw Control SYstemSLOw Control SYstem •◦◦ ◦◦ ◦◦ ◦◦ Intro Main Init Config Export Prospects

Main Window Status of all vMon iMon Settings Initialization Export data

K. Karakostas

Page 14: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

SLOw Control SYstemSLOw Control SYstem ••• ◦◦ ◦◦ ◦◦ Intro Main Init Config Export Prospects

Direct dual plot with right-click on status of channel.

K. Karakostas

Page 15: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

June test beam resultsJune test beam results

Page 16: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

KLOE2 cylindrical GEMKLOE2 cylindrical GEM

• The best readout layout (X-Y or X-V strips) for the KLOE2 Cylindrical GEM has been studied with a set of 10x10cm2 planar Triple-GEMs.

• The effect of the magnetic field on the performance (efficiency, spatial resolution..) has been studied

Page 17: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

KLOE2 cylindrical GEMKLOE2 cylindrical GEM

Page 18: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

KLOE2 cylindrical GEMKLOE2 cylindrical GEM

Page 19: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

October test beamOctober test beam

Page 20: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Organization of the 5 groups

Main user & daily meetings to organize access & beam setting

Main user & daily meetings to organize access & beam setting

Page 21: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

On going analysis

Bonn GEM TPCBonn GEM TPC

Page 22: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
Page 23: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
Page 24: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Resistive µMegasfor CLAS12 and COMPASS

Resistive µMegasfor CLAS12 and COMPASS

Preliminary results

Page 25: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Resistive µMegasfor CLAS12 and COMPASS

Resistive µMegasfor CLAS12 and COMPASS

Page 26: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Resistive µMegasfor CLAS12 and COMPASS

Resistive µMegasfor CLAS12 and COMPASS

Page 27: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
Page 28: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Micromegas TPCMicromegas TPC

Page 29: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Dedicated trigger system (scintilators)

Small 30x30 THGEM

100x100 THGEM

BEAM

THGEM for COMPASS RICH upgradeTHGEM for COMPASS RICH upgrade

Page 30: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Quartz radiatorQuartz radiator

Window for Window for LASERLASER

THGEM for COMPASS RICH upgradeTHGEM for COMPASS RICH upgrade

Page 31: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

THGEM for COMPASS RICH upgradeTHGEM for COMPASS RICH upgrade

Page 32: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Test Beam for 2010Test Beam for 2010• Please send requests for 2010 TB before the end

of November. It has to be sent to the SPS coordinator by 12 December.

• We plan to group all the requests in three periods (e.g. June, September, November), with 3-4 groups maximum per period

• If you are not sure, still send the request!• Please specify all the details, especially the

excluded periods!• We will send again the form to be filled

tomorrow on the mailing list RD51-ALL

Page 33: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

WG7 organization for 2010WG7 organization for 2010• Please be sure that you are subscribed in the RD51-ALL

mailing list (we will send there important communications!)

• A specific WG7 mailing list has been created for communications internal to WG7, such as next year test beams organization.Please subscribe (accessing the CERN e-groups service - use your CERN NICE/AFS/other authentication) to RD51-WG7 mailing list:https://e-groups.cern.ch/e-groups/Egroup.do?egroupName=RD51-WG7

• WG7 has regular meetings every 2-3 weeks (weekly close to beam period) for test beam organization and common funds for infrastructure

Page 34: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

BackupBackup

Page 35: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

The RD51 installation @ SPS/H4The RD51 installation @ SPS/H4

Gas panel

Setup ASetup A no no

magnetmagnet

electr. rack for setup A

Removable cable tray for

setup A

electr. rack for setup B

Removable cable tray for setup B

Setup BSetup Bwith with

magnetmagnet

DAQPC

Issues for Setup B inside Goliath:

• Electronics rack is in a region with a 5-10mT fringe field

• Cables lenght can arrive up to more than 8 m

Page 36: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Setup “A” outside the magnetSetup “A” outside the magnet• Placed upstream Goliath, composed by a table with

precisely-positioned tracking elements and an external support for the case of very large Detectors Under Test (DUTs)

Beam line

Beam height~ 128 cm

Useful space 3.3 m

Beamelement

Beamelement

Table withDUTsand tracker

Only very large DUTs

Page 37: RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.

Setup “B” inside the magnetSetup “B” inside the magnet