Project NICA. Concept of collider detector (I)

27

description

Project NICA. Concept of collider detector (I). Requirements. Fit into accelerator geometry. Angular acceptance  4 . Frequency of events detection 10 4 Hz. Events mean multiplicity 600. Momentum resolution of charged particles < 1%. Detection of γ . - PowerPoint PPT Presentation

Transcript of Project NICA. Concept of collider detector (I)

Page 1: Project NICA. Concept  of collider detector (I)
Page 2: Project NICA. Concept  of collider detector (I)

Requirements

• Fit into accelerator geometry.• Angular acceptance 4 .• Frequency of events detection 104 Hz.• Events mean multiplicity 600.• Momentum resolution of charged particles <

1%.• Detection of γ.• Detection of short-lived (charm) particles is

not required.

Page 3: Project NICA. Concept  of collider detector (I)

Concept of detector

3,5 м

4,5 м

А

1

2

4

5

6

7

8

9

10

11

1 м

А

3

8. Electromagnetic and hadron calorimeters.9. Muons detector.

10. Accelerator chamber. 11. Collider beam.

The setup is symmetric respect the plane A-A. The right part of the setup is not shown. Setup overall dimensions are: along the beam 7 m, diameter – 4.5 m.

1. Beams intercept point.2. Silicon vertex detector.3. Toroidal magnet with drift

tubes trekker.4. Toroidal magnet coil (8 coils).5. Multiplicity detector,

electromagnetic and hadron calorimeters, TOF system (RPC).

6. Accelerator quad. 7. Multiplicity detector and TOF

system (RPC).

Page 4: Project NICA. Concept  of collider detector (I)

Setup main parameters

Module Element dimensionor pitch.

Channel number,

thousand.

Silicon vertex detector. 0.2 – 0.5 mm 50

Drift tubes tracker. 6 mm 25

Toroidal magnet. 2 m 2.5 m -

Barrel EM and hadron calorimeters.

15 15 cm2 15

Barrel Time of flight system (TOF, RPC).

1515 cm2 12

Wall TOF (RPC). 1515 cm2 32

Wall EM and hadron calorimeters.

1515 cm2 40

Muon drift tubes detector. 5 cm 0.5

Page 5: Project NICA. Concept  of collider detector (I)

Distinctive feature of particles detection and identification.

1. Silicon vertex detector pitch is chosen to be 0.2 – 0.5 mm which is 10 times higher then technologically possible now. This choice provides 10 times chipper device. Coordinate accuracy 0.1 mm of single measurement is quite sufficient for hyperons detection and reconstruction of events with multiplicity 600.

2. Rotation of particle with momentum 2 GeV/c in magnetic spectrometer is 60 mrad. It is to be compared with angle of multiple scattering in drift tubes tracker – 0.4 mrad. Momentum resolution is estimated to be 0.6%.

3. High demand is shown to accuracy of TOF measurement. Difference of TOF of electron and pion with momentum 0.5 GeV/c (decay of and mesons) on basis of 1.5 m is 400 ps. TOF system must have resolution 50 – 80 ps. (RPC).

Page 6: Project NICA. Concept  of collider detector (I)

Distinctive feature of particles detection and identification.

4. Electromagnetic calorimeter with shower maximum detection may drastically improve capability of electron – hadron separation.

Page 7: Project NICA. Concept  of collider detector (I)
Page 8: Project NICA. Concept  of collider detector (I)

The paramount important parameters of present research are energy density and temperature of hadronic matter. These values are determined by primary energy of nuclei and its impact parameter. An another independent way to control thermodynamic state of system is to select events with predetermined multiplicity of secondary products. Technical way to achieve this goal is implement effective high multiplicity trigger sensitive both to charged and neutral secondary.

The domain of very high multiplicity z > 4, z=n/<n> was not yet studied (VHM) nether in NN nor in AA collisions. The higher is multiplicity the higher is energy dissipation, higher is achievable density and deeper is thermalization process. Near the threshold of reaction all particles get small relative momentum. The kinetic energy approaches to potential one what is necessary condition for onset of phase transitions. In thermalized cold and dense hadronic gas as consequence of multiboson interference a number of collective effects may show up.

Page 9: Project NICA. Concept  of collider detector (I)

Comparison of longitudinal and transverse momenta behavior in

c.m.s.zp xp

pp 70 GeV

20 30 40 50 60 70 n

0.2

0

p x

pz

Manifestation of “transverse flow” ?

Complete thermalization?

Manifestation of longitudinal flow ?

Page 10: Project NICA. Concept  of collider detector (I)

Multiplicity distribution in Pb+Pb interactions at Elab =160 A Gevas measured by WA98 setup at CERN

104

101

Page 11: Project NICA. Concept  of collider detector (I)

One can extrapolate data to 6 order of magnitude down and presumably reach multiplicity 840. One can speculate to reach a new mechanism of hadronization and a new fashion of phase transitions. Since we are plane to collect 5109 central events per year we may get 5103 very exotic and possibly unusual events.

Page 12: Project NICA. Concept  of collider detector (I)

Cost and manpower estimate.

Page 13: Project NICA. Concept  of collider detector (I)

Lay-out of the SVD setup at U - 70.

• Scheme of the SVD installation at U - 70.

• С1, С2 -beam scintillation and Si-hodoscope;

• С3, С4 - target station and vertex Si-detector;

• 1, 2, 3-the drift tubes track system;

• 4 - magnetic spectrometer proportional chambers;

• 5- threshold Cherenkov counter;

• 6 - scintillation hodoscope;• 7 - electromagnetic

calorimeter.}

Page 14: Project NICA. Concept  of collider detector (I)

SVD hall

U-70 proton beam

Page 15: Project NICA. Concept  of collider detector (I)

Setup schematic view.

Micro strip VD, 10 000 channels.

Drift tubes tracker, 2400 channels

Magnetic spectrometer, 10 000 ch.

Cherenkov counter, 36 ch.

EMC, 1500 cells.

Page 16: Project NICA. Concept  of collider detector (I)

Silicon micro strip vertex detector. An exsample of foil targets imaging.

4 mm

Page 17: Project NICA. Concept  of collider detector (I)

Silicon micro strip vertex detector. An exsample of pC interaction event.

28 charged tracks

Page 18: Project NICA. Concept  of collider detector (I)

Silicon vertex detector

40 cm

Page 19: Project NICA. Concept  of collider detector (I)

Module of drift tubes tracker.

1 m

Page 20: Project NICA. Concept  of collider detector (I)

Assembly od drift tubes tracker.

Page 21: Project NICA. Concept  of collider detector (I)

Charm particle D0 detection

pC D0 X, 70 GeV.

Page 22: Project NICA. Concept  of collider detector (I)

Search for pentaquark +, 2005.K_0 found in magnetic spectrometer.

1.500 1.600

Total statistics:

Signal=392,

Backg=1990.

Significance=8σ.

Page 23: Project NICA. Concept  of collider detector (I)

Cost and manpower of two components of SVD setup at U-70.

• Silicon vertex detector. 10 000 channels. Designed and implemented 1999 – 2002, Selenograd and MSU. Cost: 250 th. $. Manpower: 4 persons. Cost per channel: 25 $.

• Drift tubes tracker. 2400 channels. Designed and implemented 2003 – 2005, PPL JINR. Cost: 55 th. $. Manpower: 4 persons with 30% occupancy. Cost per channel: 22 $.

Page 24: Project NICA. Concept  of collider detector (I)

Cost estimate.Element, work Materials and

equipment, M$

Workshop,Men-power,

M$

Silicon vertex detector. 1.3 (1.2) 1.2

Drift tubes tracker. 2.1 (0.45) 0.7

Toroidal magnet. 1.2 0.5

Barrel EM and hadron calorimeters. 1.2 1.5

Barrel Time of flight system (TOF, RPC). 2.5 1.5

Wall TOF (RPC). 4.5 2.1

Wall EM and hadron calorimeters. 9.5 2.0

Muon drift tubes detector. 0.08 0.3

Data acquisition system. 0.06 0.1

Software development. 0.01 0.

Total 22.45 9.9

* As estimated from SVD (U-70)

Page 25: Project NICA. Concept  of collider detector (I)

Some expert’s remarks.

• Peter Senger.1. Do not build TRD -- Agree.2. Do not build Silicon vertex detector. – Interesting idea to think about.3. Do not build calorimeters -- Agree do not build hadron calorimeters. But EM calorimeters are very important.4. Detailed feasibility studies have not been made and will take years. -- Disagree. 5. The time for realization is strongly underestimated.

-- Disagree. • N.Xu.

1. A pair of ZDC are needed. -- Not sure. Need to think.2. Take a staged approach of detector construction.

-- Agree. Good idea.

Page 26: Project NICA. Concept  of collider detector (I)
Page 27: Project NICA. Concept  of collider detector (I)

We are optimistic and looking forward to see NICA operation.