• Survey drawings
drawings, TEKLA model).
• Excavation diagrams
• Mobilization drawings
Design and Coordination of Track Works (Metro Projects)
Coordination of Construction Works (CW)
CW Project Management
CW Construction Management
The Company
ARDECO was established by Engineers with long standing activity and experience in
engineering, construction and project management.
ARDECO’s field of expertise has expanded throughout the years and now covers a broad
spectrum of Public and Private Projects.
Main fields of expertise are shortly summarized below.
OUR SCOPE OF WORKS Engineering Services:
Management and coordination of Civil Works Studies
• Survey drawings
• Gas & Steam Turbine pedestals dynamic analysis.
• Excavation diagrams
• Mobilization drawings
Quality Control.
Management Services:
• Construction of Buildings on a Turn-Key basis.
• Erection of Steel Structure works
• Underground Networks (Sewage network, Rain water network, Drainage System network and Fire Fighting System network.
• Internal Roads network
EXTENSION OF COMBINED CYCLE POWER PLANT 701MW
2. Jordan, Samra,
10x125MW, 9E – GAS TURBINES POWER PLANT PROJECT
4. Greece, Revithousa,
POWER PROJECTS Civil Works Design, Coordination & Management
PROJECT PRESENTATION GENERAL DESCRIPRION OF THE PROJECT
PROJECT TITLE EXTENSION OF COMBINED CYCLE POWER PLANT 701MW
PROJECT AREA SYRIA – DAMASCUS – DEIR ALI
PROJECT BUDGET 650.000.000 €
PROJECT OWNER PEEGT (SYRIAN PUBLIC COMPANY) PUBLIC ESTABLISHMENT OF ELECTRICITY FOR GENERATION & TRANSMITION
PROJECT MAIN CONTRACTOR J/V METKA SA – ANSALDO ENERGIA S.P.A
TIMESCHEDULE 36 Months Mid 2010 to End 2013
SHORT PROJECT DESCRIPTION Installation of 2 GT AEV94.3A4 284MW each and one ST type RT 270MW turbines with the appropriate adjacent and auxiliaries structures, working on nat- ural gas and fuel (LDO).
One Cooling Tower (Steel Structure 125m height) and one fin fan cooler unit.
Two Open type Substations one 400kV with five diameters and one 132kV with four diameters. Total area 50.000 m2.
Buildings: Administration Office, Main Control Build- ing, Water Treatment & Water Pretreatment Plant Buildings, etc.
MAIN CIVIL WORKS SUMMARY Power Plant Area: 100.000 m2 , Substation Area: 50.000 m2 Road Works: 3.400 m, Earthworks: 410.000 m3 Concrete Works: 75.000 m3 ,Steel Structures: 5.575 tn Architectural Finishing: 5.260 m2
PROJECT TITLE SAMRA PHASE III ADD-ON COMBINED CYCLE PROJECT
PROJECT AREA JORDAN, SAMRA (35km Northeast from Amman)
PROJECT BUDGET 151.000.000 $
PROJECT MAIN CONTRACTOR
TIMESCHEDULE 28 Months - Autumn 2012 to early 2015
SHORT PROJECT DESCRIPTION Installation of one ST 148.20MW turbine with the appropriate adjacent and auxiliaries structures.
One ACC cooling unit and one fin fan cooler unit.
Buildings: Main Control Building, Water Treatment & Water Pretreatment Plant Buildings, Fire Ser- vice Building etc.
MAIN CIVIL WORKS SUMMARY
Road Works: 500 m , Earthworks: 55.000 m3
Concrete Works: 18.500 m3 , Steel Structures: 2.200 tn
Architectural Finishing: 5.000 m2
ar.DE.CO.
PROJECT TITLE SHAT AL BASRA, 10x125MW, 9E – GAS TURBINES POWER PLANT PROJECT
PROJECT AREA IRAQ, BASRA
CIVIL ENGINEERING & PROJECT MANAGEMENT COST 2.250.000 $
PROJECT OWNER Iraqi Ministry Of Electricity (MoE)
PROJECT MAIN CONTRACTOR METKA SA
TIMESCHEDULE 24 Months - Commencement Mid 2012
SHORT PROJECT DESCRIPTION Installation of 10 units 9E GE, 10 x 125MW, with the appropriate adjacent and auxiliaries struc- tures, working on natural gas and fuel (LDO), as well as all the relevant service buildings. Two GIS units, one 400kV and one 132kV. Tank farm for LDO storage. Buildings: Administration Office, Bachelor Building, Canteer & Restaurant Building, Water Treatment Plant, Workshop Building, Chemical Storage Building, Store etc.
PROJECT TITLE POWER PLANT FOR COGENERATION OF THERMAL AND ELECTRICAL ENERGY 15,5 MW IN REVITHOUSA
PROJECT AREA GREECE - ATHENS –Revithousa Island
PROJECT COST 16.500.000 € (VAT excluded)
CIVIL WORKS COST 2.500.000 € (VAT excluded)
PROJECT OWNER Manager of Natural Gas National System (DESFA SA)
PROJECT MAIN CONTRACTOR BURMEISTER & WAIN SCANDINAVIAN CONTRACTOR A/S (BWSC).
TIMESCHEDULE 12 Months (achieved ahead schedule) Mid 2008 – mid 2009
SHORT PROJECT DESCRIPTION Installation of two GE Turbines 8MW each, with all adjacent auxiliaries and structures, working on nat- ural gas, as well as all the relevant service struc- tures (incl. racks, fin fun cooler, chimney 25m etc).