Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

15
Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR Richard Seto UCR Prague July 30, 2005

description

Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR. Richard Seto UCR Prague July 30, 2005. Physics with the NCC. Heavy Ion (A+A) photon Jet : energy loss vs L, ε reaction plane resolution: Si Barrel, Forw Si, NCC, MPC - PowerPoint PPT Presentation

Transcript of Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

Page 1: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

Richard Seto

UCR

Prague

July 30, 2005

Page 2: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

Physics with the NCC Heavy Ion (A+A)

photon Jet : energy loss vs L, ε reaction plane resolution: Si Barrel, Forw Si, NCC, MPC

χC states: screening, deconfinement(?)

p+A direct-photons: Qs vs x, Q2

understand what we are measuring

spin (p+p); ΔG (?) photon-jet W (isolation?)

think more

Page 3: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

Decadal Plan

CuCu

RHIC II?

Page 4: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

Handwaving Timeline for the NCC Run 5 [CuCu 200 14wks; pp 200 10wks] 10/04-6/05

nosecone prototype 1 operational 10/05 – OK CDR 01/06Run 6 [AuAu 63 19wks; pp 500 2wks] 10/05-6/06Run 7 [pp 200 22wks; pp 63 5wks] 10/06-6/07

Nosecone prototype II operational 7/07SMD prototype operational 7/07

Run 8 [AuAu 200 19wks] 10/07-6/08Nosecone 1 SMD 1 engineering 10/08

Run 9 [ pp 500 29wks] 10/08-6/09 Nosecone 1 SMD 1 operational 10/09

Run 10 [dAu 63 29wks] 10/09-6/10 Nosecone 2 SMD 2 operational 10/10

Run 11 [?]

Page 5: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

PHENIX upgrade plans

next year TOF-W HBD MPC

Mu-trig Si Barrel NCC Forw Si

Page 6: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

Run 6 (Auau64(19), pp500(2)) [long pp at 200, pp64] hbd eng run TOF W (inst),HBD (Inst,eng) MPC (Inst: AN, ΔG)

Run 7 (pp 200(22) pp64(5)) [light ion, AuAu64](hbd run: ee) tofw(hi: pt pid)

Run 8 (AuAu200(19)) [OK] (hbd run: ee) mu-trig arm1 (Inst, commission trigger? in pp?)

Run 9 (pp500(29)) [OK] mu-trig arm2(inst, W-sea quarks) Si barrel (i,eng), NCC1 arm (i, eng)NCC1 arm (i, eng) W tagW tag, Forw Si-1 (i,eng:charm)

Run 10 (dAu64(29)) [dAu200(29)] NCC 2nd armNCC 2nd arm (direct photon, (direct photon, ππ00, jets, jets), For Si-2(charm)

Run 11 (?) [Au-Au 200] NCC gamma jet NCC gamma jet

Run 12 (?) [pp200] spin physics- charm, gamma-jet, etc etcspin physics- charm, gamma-jet, etc etc

Upgrade activityBeam RBUPBeam (my proposal)NCC activityNCC activityNCC physicsNCC physics

Page 7: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

CDR – what physics understanding/simulations ? Physics Understanding

pA – understand the variables spin – understand the measurements

Simulations In PISA (pp, pAu, AuAu)

reconstructing π0

direct photons What are the real backgrounds?

Pile up? Need Fast simulation High pt π0

Page 8: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

Find the money…

$5-8M just the material Hope: ½ non-DOE

Plan CDR

end

Page 9: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

1999 2000 2001 2002 2004 2005 2006 2007 2008

2009 2010

Page 10: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

OLD Handwaving Timeline for the NCC

nosecone prototype 1 operational 6/7/05Run 5 [SiSi 200 14wks; pp 200 10wks] 10/3/05

Nosecone prototype II operational 7/14/06Run 6 [AuAu 63 19wks; pp 500 2wks] 10/2/06

SMD prototype operational6/7/07Run 7 [pp 200 22wks; pp 63 5wks] 10/1/2007

Nosecone 1 SMD 1 operational 9/26/08Run 8 [AuAu 200 19wks] 10/1/08

Nosecone 2 SMD 2 operational 5/13/09Run 9 [ pp 500 29wks] 10/1/09Run 10 [dAu 63 29wks] 10/1/10

Page 11: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR
Page 12: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR
Page 13: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

Nosecone Calorimeter

nosecone prototype 1 operational 6/7/05

Run 5 [SiSi 200 14wks; pp 200 10wks] 10/3/05

Nosecone prototype II operational 7/14/06

Run 6 [AuAu 63 19wks; pp 500 2wks] 10/2/06

SMD prototype operational 6/7/07

Run 7 [pp 200 22wks; pp 63 5wks] 10/1/2007

Nosecone 1 SMD 1 operational 9/26/08

Run 8 [AuAu 200 19wks] 10/1/08

Nosecone 2 SMD 2 operational 5/13/09

Run 9 [ pp 500 29wks] 10/1/09

Run 10 [dAu 63 29wks] 10/1/10

Run 11 [pp 63 29]

Run 12 [pAu 200 29]

Run 13 [pSi 200 29]

Run 14 [pAu 250x100 29]

Page 14: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

Proposals

LOI to collaboration 5/24/04

Presentation to PAC 9/1/04

Proposal to NSF 1/3/05

MUON TRIGGER

mutrig prototype 1 operational 6/14/05

Run 5 [SiSi 200 14 wks; pp 200 10wks] 10/3/05

Muon trig proto 2 operational 7/21/06

Run 6 [AuAu 63 19wks; pp 500 2wks] 10/2/06

Muon trig arm1 operational 9/21/07

Run 7 [pp 200 22; pp 63 5] 10/1/07

Muon trig arm2 operational 9/23/08

Run 8 [AuAu 200 19] 10/1/08

Run 9 [ pp 500 29] 10/1/09

Page 15: Physics with the Nosecone Calorimeter, the PHENIX Beam Use Proposal, and the CDR

x

Q (GeV)

1

10-1

10-3

10-2

10-4

CGC

CQF

1 10 100

QCD

Y~0

Y~2

Regions of a nucleus

pQCDcentral armsB

UL

KB

UL

K

pQCD

Muon armsNCC

Peripheral

midCentralCentral Collisions

QS