PERSONAL DETAILS - bridge-engineering.cobridge-engineering.co/pdf/cv_eng.pdf · Autolisp, Visual...
Transcript of PERSONAL DETAILS - bridge-engineering.cobridge-engineering.co/pdf/cv_eng.pdf · Autolisp, Visual...
Σελίδα 1 από 6
CURRICULUM VITAE
PERSONAL DETAILS
Last Name: POLYZOGOPOULOS
First Name: IOANNIS
Fathers Name: ATHANASIOS
Date of Birth: 10/ 08/1973
Mobile telephone number: +30 6972022167
Web page: http://www.bridge-engineering.co/
e-mail address [email protected]
STUDIES
9/1991 – 9/1996 Civil Engineering Diploma, D.U.TH. (http://www.duth.gr/)
Structural Engineering. (master level - 5 year degree)
2/1997 Member of Technical Chamber of Greece
DESIGNERS CERTIFICATES (ACCORDING TO EXPERIENCE)
Category (08)
Structural Engineering Design
Grade C’ (maximum given to an individual)
Category (13)
Hydraulics Design
Grade Α’
FOREIGN LANGUAGES
English: Excellent (Cambridge English Proficiency Diploma)
WORK EXPERIENCE
9/2013 – Today
Independent freelancer Structural Engineer – Bridge specialist
http://www.bridge-engineering.co/
4/2005 – 9/2013
ODOMICHANIKI S.A.
Senior Bridge Engineer
3/2002 - 3/2005 FABER MAUNSELL (AECOM)
http://www.aecom.com/
Bridge Engineer
12/1999 - 1/2002 AXON STUDIES S.A.
http://www.axonmel.gr/
Bridge Engineer
2/1997 – 12/1999 ANAPLASI CONSULTING ENGINEERS S.A
http://www.anaplasi.com
Structural Engineer
Σελίδα 2 από 6
SPECIAL SKILLS
DESIGN CODES & STANDARDS
EUROCODES
BRITISH STANDARDS
NEW DIN FACHBERICHT – OLD DIN CODES
AASHTO, CALTRANS
STRUCTURAL DESIGN-CAD SOFTWARE
SOFISTIK (Sofistik AG)
SAP 2000 (CSI Berkley)
STAAD.Pro (Bentley)
STATIK – FAGUS- CEDRUS (Cubus Engineering software)
AutoCAD 2014
CIVIL 3D 2014
INSTANT steel-composite Design (Computer Control Systems S.A.)
Masonry structures design: FEDRA (Runet).
INFORMATION & TECHNOLOGY SKILLS
Visual Basic.
C++, Fortran, Pascal.
MS Office (Word, Excel, Access, Power Point)
MS Project
Autolisp, Visual Lisp.
CONFERENCES – WORKSHOPS- SEMINARS
Cad Design
1996 “AutoCad” (ΤΕΕ - 80 hours)
2012 “Civil 3D” (Ιnfostudio 40 hours)
Management
1999 “ Legislation for the Commissioning of Public Works ”
( ΤΕΕ - 60 hours)
Structural Design
2000 Statik (Ministry of civil works 20 hours)
2004 Sofistik (Sofistik Hellas – 25 hours)
Bridge Design
2003 Design of Seismic Isolation Systems (Ε.Κ.P.Ε. - 20 hours)
2005 Bridge Construction, Modern methods of study-construction and
management (Ε.Κ.P.Ε. - 16 hours)
2007 Earthquake Protection Design of Bridges (N.T.U.A - 10 hours)
2008 Design of concrete according to Eurocode 2 (ΤΕΕ - 10 hours)
2008 Application of Eurocodes in Bridges (ΤΕΕ - 10 hours)
2008 Major Railway Construction Projects in section Tithorea - Domokos
(ERGOSE - 11 hours)
Tunnel Design
2007 New advanced engineering methods of Tunnel Boring
(Ε.Β.Ε.Α – 10 hours)
Earthquake Engineering and Seismology
2008 3rd
Greek Conference on Earthquake Engineering and Engineering
Seismology, 5-7/11/2008, Athens (Caravel – 4days)
Σελίδα 3 από 6
MANAGEMENT EXPERIENCE
Coordination between Structural Design Department and Surveyor, Geotechnical
Design, Road Design, Hydraulic Design and Electromechanical Departments, for
the completion of the main projects involved (Either in-house or with
subcontractors)
Technical documentation, time schedule, calculation of bill of quantities, for all
the main projects involved.
Coordination of the design team containing junior engineers and draftsmen for the
accomplishment of large scaled projects.
DESIGN EXPERIENCE
Design and Check experience of large complicated civil works from the level of
conceptual design up to the level of structural analysis and bar reinforcement
design - drafting including bill of quantities, budget and technical documentation.
Over 25 detailed studies and over 40 final studies of infrastructures civil works
including Road, Railway, Pedestrian Bridges, Cut&Covers, Tunnels, Underpasses,
Box Culverts with reinforced and prestressed concrete sections.
Deck cross section types: solid slabs, voided slabs, box girders, precasted beams.
Pier cross section types: Rectangular, Circular, Double Columned, Hollow, Twin
blades.
Foundation types: Spread foot, Piles, Shafts.
Dynamic analysis of seismic isolated structures.
Experience in designing smaller structures such as retaining walls, steel and
composite structures, wooden structures, concrete buildings, shafts, pump stations,
pipe jacking and rehabilitation – strengthening of old masonry buildings.
MAIN PROJECTS (INDICATIVE) PROJECT OWNER: EGNATIA S.A. (http://www.egnatia.eu)
670 Kilometres Road crossing all Northern Greece, Linking
Port of Igoumenitsa (Italy’s side) with kipi (Turkey’s side).
SEGMENT : 4.1.3s
EMPLOYER: FABER MAUNSELL (AECOM) (http://www.aecom.com/)
INFO LINK: http://www.bridge-engineering.co/cantilever.html
Final Design of Right Branch of Veneticos Bridge at CH. 5+046.94
Construction Method: Balanced cantilever
Bridge total length 650m (85+120+120+120+120+85)
Maximum pier height 63m (Hollow & Twin blade Pier Section)
Girder box Deck section
Pier foundations: shafts
Σελίδα 4 από 6
CONTRACTOR: Joint Venture Bilfinger + Berger (http://www.egnatia.eu)
SEGMENT : Contract C270.
Viaducts through Changhua, Yunlin & Chiayi Counties
EMPLOYER: FABER MAUNSELL (AECOM) (http://www.aecom.com/)
INFO LINK:
http://www.aecom.com/Where+We+Are/Asia/Countries/Taiwan/
_projectsList/Taiwan+High-
Speed+Rail+%E2%80%93+Contracts+C260+and+C270?langua
gehoice=en_US&Go=Go&localeHidden=en_US&localeFlash=e
s_ES
Contract C270 required the design of 38km of standard viaducts through
Changhua, Yunlin & Chiayi Counties and a station guideway at Yunlin.
On Contract C270, the viaduct is up to 28m high, and made up of 35m long
precast post-tensioned concrete box girders simply supported on single columns.
The deck units have free sliding mechanical pot bearings at each corner. Shear
keys at either end of the span provide transverse restraint with one end fixed
longitudinally. Bored piled foundations of 2m diameter and up to 60m long
support the viaduct. Station guide ways are of similar construction but with twin
box-girders and RC portal-frame supports.
PROJECT OWNER: P.A.THE. (Highway crossing Greece from south to north
linking Patra, Athens, Thesaloniki).
PROJECT: HIGHWAY COMPLEX IN LAMIA VICINITY
SEGMENT: SPERXEIOS NEW RIVERBED – RODITSA OVERPASS
EMPLOYER: ODOMICHANIKI S.A.
INFO LINK: http://www.bridge-engineering.co/voided_slab.html
“Final Design of Τ9δ flyover at Roditsa - Highway complex in Lamia vicinity”.
Bridge length 264m, in 250m plane view curve with 5,75m operating width.
Deck Section: prestressed concrete slab with circular voids.
Pier sections: single & double column with pot bearings.
PROJECT OWNER: ERGOSE (Greek National Railways)
PROJECT: COMPLETION OF THE STUDIES OF THE NEW RAILWAY LINE OF
REGULAR WIDTH BETWEEN KORINTHOS - PATRA (PHASE C)
SEGMENT: ANCIENT KORINTHOS - “KIATO” RAILWAY STATION
EMPLOYER: AXON STUDIES S.A. ( http://www.axonmel.gr/)
INFO LINK: http://www.bridge-engineering.co/c&c.html
Cut and Cover (L=436m)
CH. from 17+295.00 to 17+731.00 Underpass of Transverse road 3 in junction with railway line (L=11.10m)
CH. 1 + 717.73.
Flyover of Transverse Road 9 in the junction with the railway line (L=55m) at
CH. 9 + 247,25.
Σελίδα 5 από 6
PROJECT OWNER: ERGOSE (Greek National Railways)
PROJECT: COMPLETION OF THE STUDIES OF THE NEW RAILWAY LINE OF
REGULAR WIDTH BETWEEN KORINTHOS - PATRA (PHASE C)
SEGMENT: ANCIENT KORINTHOS - “KIATO” RAILWAY STATION
EMPLOYER: AXON STUDIES S.A. ( http://www.axonmel.gr/)
INFO LINK: http://www.bridge-engineering.co/precast_beams_rail.html
Final study of precasted prestressed beams railway bridge at southern Greece. The
Bridge accommodates a triple railway line on a plan view curve at the Psathopirgos”
district crossing “Valinaios” river. The new railway line follows the old national
road in a plan view curve of 650m radius. The design speed of the new railway line
is 120km/h. The bridge is formed from 7 precasted preestresed beams of 26m length
bridging 8 spans. The total bridge length is 205m and the deck width is 16.90m. The
prestress is imposed in 2 stages on the precasted beams (full prestress) and in the
transverse direction on the deck slab and on the transverse connecting beams (partial
prestress).
PROJECT OWNER: EYDE – P.A.THE. (Highway crossing Greece from south to
north linking Patra, Athens, Thesaloniki).
PROJECT: P.A.THE HIGHWAY DESIGN
«KLIDI – POLIKASTRO – EUZONOI »
SEGMENT: PART C: END ASPROUS – EUZONOI
EMPLOYER: ODOMICHANIKI S.A.
INFO LINK: http://www.bridge-engineering.co/precast_beams.html
Flyover Τ8d. Precasted prestressed beams 37,80m length, 2,35m height.
Bridging Platanias stream. The bridge lies on 180m plan view curve and is
connected to the abutments via elastomeric bearings.
PROJECT OWNER: EGNATIA S.A. (http://www.egnatia.eu ) 670 Kilometres Road crossing all Northern Greece, Linking Port of
Igoumenitsa (Italy’s side) with kipi (Turkey’s side) . PROJECT: INDEPENDENT CHECK
EMPLOYER: FABER MAUNSELL (AECOM) (http://www.aecom.com/)
Independent check of underpasses K.O. 8 (T2) final design in Egnatia Odos at
CH. 5+046,94
Independent check of underpasses (Τ3) at CH. 16+755,06 (Face 2)
Independent check of the Cut & Cover Entrances of the tunnels S1-S2
(segment 5.2-.3)
Independent check of the entrances of tunnel “Agiou Nikolaou” (segment 0320)
EMPLOYER: NATIONAL TECHNICAL UNIVERSITY (N.T.U.A)
“Strengthening & Rehabilitation of Technological Park in Layrio”. Buildings
Serpieri, Administration, Pharmacy.
Dynamic analysis, strengthening, time – finance schedule.
Σελίδα 6 από 6
PROJECT OWNER: EYDAP (Greek Water Company).
PROJECT: Ddrainage network at Palini Municipal.
EMPLOYER: Dimitris Sotiropoulos and Associates S.A.
INFO LINK: http://www.bridge-engineering.co/pump.html
“Detailed study of sewage pumping station of Palinis drainage network system.”
EMPLOYER: Ministry of Culture “Unification of Archaeological Sites”
“Steel roof structure for the protection of “Nikis” statue in Andrianos Library”.
Web page: http://www.bridge-engineering.co/
References available upon request.