Orientation to the Tunnel Duane Ingram. CMS ZDC Positions. Acceptance: θ ≤ 400 μ rad η ≥ 8.5. 140 m. IP. 140 m. IP. IP . IP. LHC arc. Slot. IP. TAN situation . 4 TANs are installed in IP1L&R, IP5L&R Each TAN is equipped with 1 slot corresponding to 10 Copper bars - PowerPoint PPT Presentation

Transcript of Orientation to the Tunnel Duane Ingram

Slide 1

Orientation to the Tunnel

Duane IngramCMS ZDC Positions

140 m140 m

Acceptance: 400 rad 8.5IP2

IP3

IP 4

IP5EDMS 987237Caterina Bertone EN-HE 19 February 20096TAN situation 4 TANs are installed in IP1L&R, IP5L&REach TAN is equipped with 1 slot corresponding to 10 Copper barsTANs are situated in LSS zones with ~0,7 degree slope and 0,4 degrees tiltOverall measured dimension of the slot is 998x94,9x605mm (lxwxh) (inf. to design)Tilt combined with height of the slot (605mm) gives an horizontal shift of 7,5mm in parallel to the machine axis and ~4mm perpendicular to this

IPLHC arcSlotEDMS 8626136

Beam pipe splits 140m from IPZDC LOCATIONBEAMS

Zero Degree Calorimetry for CMSSpectatorsZDCZDC

Quartz Fibers7

ZDC Slot Details of TAN

96 mmZDC SLOT

TAN Neutral Particle AbsorberTo IP

Marble Face TAN Partially AssembledIP8

EDMS 987237Caterina Bertone EN-HE 19 February 20099Mini-crane face - pt5CMS ZDCMire geoEDMS 8626139

IP10

IPCMS Bypass11EDMS 987237Caterina Bertone EN-HE 19 February 200912TAN location and access

chicanechicanechicaneSurface accessSurface accessEDMS 86261312TAN are installed in very narrow tunnel, for ex. Pt 5 is standard LEP tunnel R (3,8m dia)Access is from PM15 lift for pt 1, then throughout chicanes to reach each TANAccess is from PM56 lift at pt5 (dim 1200x800) then throughout chicane and bypass to reach the TANDimension of the materiel arriving in non shutdown is limited by chicanes and liftsAccess during shutdown: point 1 dismantling walls from inside, ie from pt2 ant pt8 (opening of shielded doors), point 5 from pt4 and 6, operning of shielded doors. Access open -> no big materials can accede TAN during run