Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS,...

13
Navaphon Muangma (Tai) “SRC Weekly Meeting” SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012

Transcript of Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS,...

Page 1: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

SRC Weekly MeetingJune 26, 2012

Revisit Optics for LHRS,

1

June 26, 2012

Page 2: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

LEFT Optics

Re-Calibration of phi

2

June 26, 2012

Page 3: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

SIEVE X & Y RECONSTRUCTION RECALIBRATION OF Φ IS NEEDED

3

June 26, 2012

Page 4: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

Sieve X Y before calibration

With scale Effect on the vertex Z, the change is made to target_Y calculation. This effect only the phi variable as the Sieve Y defined as: Ysieve = L*phitg + Ytg

4

June 26, 2012

Page 5: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

5

June 26, 2012

BEFORE Note: offset in Sieve Y is to the right of the red lines

Page 6: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

Sieve X Y, per foilbefore calibration

Run 1238C12- 13foilsAt 16.5 degree

6

June 26, 2012

Page 7: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

Sieve X Y after calibration

Run 1238C12- 13foilsAt 16.5 degreeSieve In

7

June 26, 2012

Page 8: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

8

June 26, 2012

Page 9: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

Sieve X Y, per foilafter calibration

Run 1238C12- 13foilsAt 16.5 degree

9

June 26, 2012

Page 10: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

DP SCAN ON HYDROGEN

10

June 26, 2012

Page 11: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

11

June 26, 2012

Hydrogen scan. Redline is the momentum setting of the Dipole.

Page 12: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

12

June 26, 2012

Hydrogen scan. Redline is the momentum setting of the Dipole.

Focus on the run 1229, 1231, and 1243 where we have full acceptance, the ideal-mean is approximately the same

Page 13: Navaphon Muangma (Tai) SRC Weekly Meeting SRC Weekly Meeting June 26, 2012 Revisit Optics for LHRS, 1 June 26, 2012.

Navaphon Muangma (Tai)“SRC Weekly Meeting”

Left HRS optics summaryVertexPhiThetaMomentum (half done)

13

June 26, 2012

Phi & Theta

vertex