No. Mesin Nama Mesin Waktu Setup Mesin 1 Flexible Work Benches 0 2 Band Saw Machine 25 3 Circular Saw Machine 15 4 Radial Drilling Machine 22 5 Belt & Disc Sander Machine 12 6 Spray Gun 37 7 Paint Sprayer 14 8 Sander Machine 1 16 9 Sander Machine 2 18 10 Adjustable Work Benches 1 0 11 Adjustable Work Benches 2 0 12 Adjustable Work Benches 3 0 13 Steel Work Benches A 0 14 Steel Work Benches B 0 15 Steel Work Benches C 0 16 Steel Work Benches D 0 17 Basic Packing A 0 18 Basic Packing B 0 19 Basic Packing C 0 20 Basic Packing D 0 21 Drying Area 0 Jam Kerja Senin-Jumat 08.30 - 16.30 Istirahat 12.00 - 13.00 Hari Kerja/Bulan 22 hari

description

ndfjnd

Transcript of Lembar Kerja Kelompok 5

Page 1: Lembar Kerja Kelompok 5

No. Mesin Nama Mesin Waktu Setup Mesin % Reliabilitas Mesin1 Flexible Work Benches 0 1002 Band Saw Machine 25 853 Circular Saw Machine 15 1004 Radial Drilling Machine 22 905 Belt & Disc Sander Machine 12 1006 Spray Gun 37 907 Paint Sprayer 14 908 Sander Machine 1 16 909 Sander Machine 2 18 9010 Adjustable Work Benches 1 0 9511 Adjustable Work Benches 2 0 10012 Adjustable Work Benches 3 0 9513 Steel Work Benches A 0 10014 Steel Work Benches B 0 10015 Steel Work Benches C 0 10016 Steel Work Benches D 0 10017 Basic Packing A 0 10018 Basic Packing B 0 10019 Basic Packing C 0 10020 Basic Packing D 0 10021 Drying Area 0 100

Jam KerjaSenin-Jumat 08.30 - 16.30

Istirahat 12.00 - 13.00

Hari Kerja/Bulan 22 hari

Page 2: Lembar Kerja Kelompok 5

% Skrap Σ Setup Mesin % Daur Ulang No Kelompok0 0 0 53 2 02 2 04 2 20 Asumsi Drying Area2 1 15 No Kelompok0 1 0 50 1 00 0 152 0 150 2 50 1 00 1 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 0

Page 3: Lembar Kerja Kelompok 5

% Lembur Effiesiensi Pabrik No.15 91 1

23

Asumsi Drying Area 4Kelonggaran Penggunaan (%) Kelonggaran Lalu Lintas (%) 5

266 52 678910111213141516171819202122232425262728293031

Page 4: Lembar Kerja Kelompok 5

Nama Mesin P (m) L (m) No.Flexible Work Benches 1.7 0.75 1

Band Saw Machine 1.5 0.65 2Circular Saw Machine 1.37 0.75 3Radial Driling Machine 1.65 0.55 4

Belt & Disc Sander Machine 1.05 0.65 5Spray Gun 1.35 0.8 6

Paint Sprayer 1.6 0.65 7Sander Machine 1 1.5 1 8Sander Machine 2 1.4 0.8 9

Adjustable Work Benches 1 1.25 0.75 10Adjustable Work Benches 2 1.4 0.65 11Adjustable Work Benches 3 1.5 0.65 12

Steel Work Benches A 1.45 0.85 13Steel Work Benches B 1.45 0.8 14Steel Work Benches C 1.45 0.75 15Steel Work Benches D 1.45 0.6 16

Basic Packing A 1.5 0.65 17Basic Packing B 1.2 0.45 18Basic Packing C 1.35 0.6 19Basic Packing D 1.35 0.5 20Lemari Aksesoris 5.5 0.5 21

Conveyor 15 1 22Operator 1 1 23

Tempat Bahan Baku Utama 3.2 1 24Tempat Barang Jadi Utama 3.2 1 25

Tempat Sampah 0.35 0.3 26Input 0.5 0.4 27

Output 0.5 0.4 28Drying Area 2.25 1 29

Paint Sprayer 1 1.6 0.65 30Paint Sprayer 2 1.6 0.65

Page 5: Lembar Kerja Kelompok 5

Nama Mesin P (m) L (m)Flexible Work Benches 1.7 0.75

Band Saw Machine 1.5 0.65Circular Saw Machine 1.37 0.75Radial Driling Machine 1.65 0.55

Belt & Disc Sander Machine 1.05 0.65Spray Gun 1.35 0.8

Sander Machine 1 1.5 1Sander Machine 2 1.4 0.8

Adjustable Work Benches 1 1.25 0.75Adjustable Work Benches 2 1.4 0.65Adjustable Work Benches 3 1.5 0.65

Steel Work Benches A 1.45 0.85Steel Work Benches B 1.45 0.8Steel Work Benches C 1.45 0.75Steel Work Benches D 1.45 0.6

Basic Packing A 1.5 0.65Basic Packing B 1.2 0.45Basic Packing C 1.35 0.6Basic Packing D 1.35 0.5Lemari Aksesoris 5.5 0.5

Conveyor 15 1Operator 1 1

Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

Tempat Sampah 0.35 0.3Input 0.5 0.4

Output 0.5 0.4Drying Area 2.25 1

Paint Sprayer 1 1.6 0.65Paint Sprayer 2 1.6 0.65

Page 6: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER B

No. Nama Operasi Nama Mesin

(PE-29) Kabin (Balok Kayu P = 55 mm, L = 35 mm, T = 50 mm)1 pcs

O-1 Diukur P = 55 mm, L = 35 mm, T = 50 mm Flexible Work BenchesO-2 Dipotong t = 50 mm Circular Saw MachineO-3 Dibor Bagian Atas D = 11 mm Radial Drilling MachineO-4 Diamplas Halus Belt & Disc Sander MachineO-5 Didempul (Dempul) Adjustable Work Benches 3O-6 Dikeringkan Drying AreaO-7 Diamplas Halus Sander Machine 2O-8 Dicat (Cat Putih) Paint SprayerO-9 Dikeringkan Drying AreaO-10 Dicat (Cat Merah) Paint SprayerO-11 Dikeringkan Drying Area

(PE-28) Pin Kabin (Silinder Kayu D = 10 mm, T = 70 mm)1 pcs

O-12 Diukur D = 10 mm, T = 70 mm Flexible Work BenchesO-13 Dipotong T = 70 mm Band Saw MachineO-14 Dibor Bagian Atas D = 5 mm, T = 2 mm Radial Drilling MachineO-15 Diamplas Halus Belt & Disc Sander MachineO-16 Didempul (Dempul) Adjustable Work Benches 3O-17 Dikeringkan Drying AreaO-18 Diamplas Sander Machine 2O-19 Dicat (Cat Putih) Paint SprayerO-20 Dikeringkan Drying AreaO-21 Dicat (Cat Hijau) Paint SprayerO-22 Dikeringkan Drying Area

Page 7: Lembar Kerja Kelompok 5

(PE-51) Chasis Kontainer (Balok Kayu P = 200 mm, L = 25 mm, T = 25 mm)1 pcs

O-23 Diukur P = 200 mm, L = 25 mm, T = 25 mm Flexible Work BenchesO-24 Dipotong P = 200 mm, L = 25 mm, T = 25 mm Band Saw MachineO-25 Diamplas Belt & Disc Sander MachineO-26 Dibor Bagian Atas D = 5 mm, H = 25 mm Radial Drilling MachineO-27 Dibor Bagian Atas D = 5 mm, H = 25 mm Radial Drilling MachineO-28 Dibor Bagian Bawah D = 5 mm, H = 15 mm Radial Drilling MachineO-29 Diamplas Halus Belt & Disc Sander MachineO-30 Didempul (Dempul) Adjustable Work Benches 3O-31 Dikeringkan Drying AreaO-32 Diamplas Sander Machine 2O-33 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-34 Dikeringkan Drying Area

(PE-16) Seal Roda (Silinder Kayu D = 25 mm, T = 10 mm)8 pcs

O-36 Diukur D = 25 mm, T = 10 mm Flexible Work BenchesO-37 Dipotong T = 10 mm Circular Saw MachineO-38 Dibor Bagian Atas D = 5 mm, H = 10 mm Radial Drilling MachineO-39 Diamplas Halus Belt & Disc Sander MachineO-40 Didempul (Dempul) Adjustable Work Benches 3O-41 Dikeringkan Drying AreaO-42 Diamplas Sander Machine 2O-43 Dicat (Cat Putih) Paint SprayerO-44 Dikeringkan Drying AreaO-45 Dicat (Cat Biru) Paint SprayerO-46 Dikeringkan Drying AreaO-47 Diukur D = 25 mm, T = 10 mm Flexible Work BenchesO-48 Dipotong T = 10 mm Circular Saw MachineO-49 Dibor Bagian Atas D = 5 mm, H = 10 mm Radial Drilling MachineO-50 Diamplas Halus Belt & Disc Sander MachineO-51 Didempul (Dempul) Adjustable Work Benches 3O-52 Dikeringkan Drying AreaO-53 Diamplas Sander Machine 2O-54 Dicat (Cat Putih) Paint SprayerO-55 Dikeringkan Drying AreaO-56 Dicat (Cat Biru) Paint SprayerO-57 Dikeringkan Drying AreaO-58 Diukur D = 25 mm, T = 10 mm Flexible Work BenchesO-59 Dipotong T = 10 mm Circular Saw MachineO-60 Dibor Bagian Atas D = 5 mm, H = 10 mm Radial Drilling MachineO-61 Diamplas Halus Belt & Disc Sander MachineO-62 Didempul (Dempul) Adjustable Work Benches 3

Page 8: Lembar Kerja Kelompok 5

O-63 Dikeringkan Drying AreaO-64 Diamplas Sander Machine 2O-65 Dicat (Cat Putih) Paint SprayerO-66 Dikeringkan Drying AreaO-67 Dicat (Cat Biru) Paint SprayerO-68 Dikeringkan Drying AreaO-69 Diukur D = 25 mm, T = 10 mm Flexible Work BenchesO-70 Dipotong T = 10 mm Circular Saw MachineO-71 Dibor Bagian Atas D = 5 mm, H = 10 mm Radial Drilling MachineO-72 Diamplas Halus Belt & Disc Sander MachineO-73 Didempul (Dempul) Adjustable Work Benches 3O-74 Dikeringkan Drying AreaO-75 Diamplas Sander Machine 2O-76 Dicat (Cat Putih) Paint SprayerO-77 Dikeringkan Drying AreaO-78 Dicat (Cat Biru) Paint SprayerO-79 Dikeringkan Drying AreaO-80 Diukur D = 25 mm, T = 10 mm Flexible Work BenchesO-81 Dipotong T = 10 mm Circular Saw MachineO-82 Dibor Bagian Atas D = 5 mm, H = 10 mm Radial Drilling MachineO-83 Diamplas Halus Belt & Disc Sander MachineO-84 Didempul (Dempul) Adjustable Work Benches 3O-85 Dikeringkan Drying AreaO-86 Diamplas Sander Machine 2O-87 Dicat (Cat Putih) Paint SprayerO-88 Dikeringkan Drying AreaO-89 Dicat (Cat Biru) Paint SprayerO-90 Dikeringkan Drying AreaO-91 Diukur D = 25 mm, T = 10 mm Flexible Work BenchesO-92 Dipotong T = 10 mm Circular Saw MachineO-93 Dibor Bagian Atas D = 5 mm, H = 10 mm Radial Drilling MachineO-94 Diamplas Halus Belt & Disc Sander MachineO-95 Didempul (Dempul) Adjustable Work Benches 3O-96 Dikeringkan Drying AreaO-97 Diamplas Sander Machine 2O-98 Dicat (Cat Putih) Paint SprayerO-99 Dikeringkan Drying Area

O-100 Dicat (Cat Biru) Paint SprayerO-101 Dikeringkan Drying AreaO-102 Diukur D = 25 mm, T = 10 mm Flexible Work BenchesO-103 Dipotong T = 10 mm Circular Saw MachineO-104 Dibor Bagian Atas D = 5 mm, H = 10 mm Radial Drilling MachineO-105 Diamplas Halus Belt & Disc Sander Machine

Page 9: Lembar Kerja Kelompok 5

O-106 Didempul (Dempul) Adjustable Work Benches 3O-107 Dikeringkan Drying AreaO-108 Diamplas Sander Machine 2O-109 Dicat (Cat Putih) Paint SprayerO-110 Dikeringkan Drying AreaO-111 Dicat (Cat Biru) Paint SprayerO-112 Dikeringkan Drying AreaO-113 Diukur D = 25 mm, T = 10 mm Flexible Work BenchesO-114 Dipotong T = 10 mm Circular Saw MachineO-115 Dibor Bagian Atas D = 5 mm, H = 10 mm Radial Drilling MachineO-116 Diamplas Halus Belt & Disc Sander MachineO-117 Didempul (Dempul) Adjustable Work Benches 3O-118 Dikeringkan Drying AreaO-119 Diamplas Sander Machine 2O-120 Dicat (Cat Putih) Paint SprayerO-121 Dikeringkan Drying AreaO-122 Dicat (Cat Biru) Paint SprayerO-123 Dikeringkan Drying Area

(PE-15) Poros (Silinder Kayu D = 10 mm, T = 70 mm)4 pcs

O-124 Diukur D = 10 mm, T = 70 mm Flexible Work BenchesO-125 Dipotong T = 70 mm Circular Saw MachineO-126 Diamplas Halus Belt & Disc Sander MachineO-127 Didempul (Dempul) Adjustable Work Benches 3O-128 Dikeringkan Drying AreaO-129 Diamplas Sander Machine 2O-130 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-131 Dikeringkan Drying AreaO-132 Diukur D = 10 mm, T = 70 mm Flexible Work BenchesO-133 Dipotong T = 70 mm Circular Saw MachineO-134 Diamplas Halus Belt & Disc Sander MachineO-135 Didempul (Dempul) Adjustable Work Benches 3O-136 Dikeringkan Drying AreaO-137 Diamplas Sander Machine 2O-138 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-139 Dikeringkan Drying AreaO-140 Diukur D = 10 mm, T = 70 mm Flexible Work BenchesO-141 Dipotong T = 70 mm Circular Saw MachineO-142 Diamplas Halus Belt & Disc Sander MachineO-143 Didempul (Dempul) Adjustable Work Benches 3O-144 Dikeringkan Drying AreaO-145 Diamplas Sander Machine 2O-146 Dilapis Pernis (Pernis) Adjustable Work Benches 2

Page 10: Lembar Kerja Kelompok 5

O-147 Dikeringkan Drying AreaO-148 Diukur D = 10 mm, T = 70 mm Flexible Work BenchesO-149 Dipotong T = 70 mm Circular Saw MachineO-150 Diamplas Halus Belt & Disc Sander MachineO-151 Didempul (Dempul) Adjustable Work Benches 3O-152 Dikeringkan Drying AreaO-153 Diamplas Sander Machine 2O-154 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-155 Dikeringkan Drying Area

(PE-17) Roda (Silinder Kayu D = 35 mm, T = 10 mm)8 pcs

O-156 Diukur D = 35 mm, T = 10 mm Flexible Work BenchesO-157 Dipotong T = 10 mm Circular Saw MachineO-158 Dibor D = 5 mm Radial Drilling MachineO-159 Diamplas Halus Belt & Disc Sander MachineO-160 Didempul (Dempul) Adjustable Work Benches 3O-161 Dikeringkan Drying AreaO-162 Diamplas Sander Machine 2O-163 Dicat (Cat Putih) Paint SprayerO-164 Dikeringkan Drying AreaO-165 Dicat (Cat Kuning) Paint SprayerO-166 Dikeringkan Drying AreaO-167 Diukur D = 35 mm, T = 10 mm Flexible Work BenchesO-168 Dipotong T = 10 mm Circular Saw MachineO-169 Dibor D = 5 mm Radial Drilling MachineO-170 Diamplas Halus Belt & Disc Sander MachineO-171 Didempul (Dempul) Adjustable Work Benches 3O-172 Dikeringkan Drying AreaO-173 Diamplas Sander Machine 2O-174 Dicat (Cat Putih) Paint SprayerO-175 Dikeringkan Drying AreaO-176 Dicat (Cat Kuning) Paint SprayerO-177 Dikeringkan Drying AreaO-178 Diukur D = 35 mm, T = 10 mm Flexible Work BenchesO-179 Dipotong T = 10 mm Circular Saw MachineO-180 Dibor D = 5 mm Radial Drilling MachineO-181 Diamplas Halus Belt & Disc Sander MachineO-182 Didempul (Dempul) Adjustable Work Benches 3O-183 Dikeringkan Drying AreaO-184 Diamplas Sander Machine 2O-185 Dicat (Cat Putih) Paint SprayerO-186 Dikeringkan Drying AreaO-187 Dicat (Cat Kuning) Paint Sprayer

Page 11: Lembar Kerja Kelompok 5

O-188 Dikeringkan Drying AreaO-189 Diukur D = 35 mm, T = 10 mm Flexible Work BenchesO-190 Dipotong T = 10 mm Circular Saw MachineO-191 Dibor D = 5 mm Radial Drilling MachineO-192 Diamplas Halus Belt & Disc Sander MachineO-193 Didempul (Dempul) Adjustable Work Benches 3O-194 Dikeringkan Drying AreaO-195 Diamplas Sander Machine 2O-196 Dicat (Cat Putih) Paint SprayerO-197 Dikeringkan Drying AreaO-198 Dicat (Cat Kuning) Paint SprayerO-199 Dikeringkan Drying AreaO-200 Diukur D = 35 mm, T = 10 mm Flexible Work BenchesO-201 Dipotong T = 10 mm Circular Saw MachineO-202 Dibor D = 5 mm Radial Drilling MachineO-203 Diamplas Halus Belt & Disc Sander MachineO-204 Didempul (Dempul) Adjustable Work Benches 3O-205 Dikeringkan Drying AreaO-206 Diamplas Sander Machine 2O-207 Dicat (Cat Putih) Paint SprayerO-208 Dikeringkan Drying AreaO-209 Dicat (Cat Kuning) Paint SprayerO-210 Dikeringkan Drying AreaO-211 Diukur D = 35 mm, T = 10 mm Flexible Work BenchesO-212 Dipotong T = 10 mm Circular Saw MachineO-213 Dibor D = 5 mm Radial Drilling MachineO-214 Diamplas Halus Belt & Disc Sander MachineO-215 Didempul (Dempul) Adjustable Work Benches 3O-216 Dikeringkan Drying AreaO-217 Diamplas Sander Machine 2O-218 Dicat (Cat Putih) Paint SprayerO-219 Dikeringkan Drying AreaO-220 Dicat (Cat Kuning) Paint SprayerO-221 Dikeringkan Drying AreaO-222 Diukur D = 35 mm, T = 10 mm Flexible Work BenchesO-223 Dipotong T = 10 mm Circular Saw MachineO-224 Dibor D = 5 mm Radial Drilling MachineO-225 Diamplas Halus Belt & Disc Sander MachineO-226 Didempul (Dempul) Adjustable Work Benches 3O-227 Dikeringkan Drying AreaO-228 Diamplas Sander Machine 2O-229 Dicat (Cat Putih) Paint SprayerO-230 Dikeringkan Drying Area

Page 12: Lembar Kerja Kelompok 5

O-231 Dicat (Cat Kuning) Paint SprayerO-232 Dikeringkan Drying AreaO-233 Diukur D = 35 mm, T = 10 mm Flexible Work BenchesO-234 Dipotong T = 10 mm Circular Saw MachineO-235 Dibor D = 5 mm Radial Drilling MachineO-236 Diamplas Halus Belt & Disc Sander MachineO-237 Didempul (Dempul) Adjustable Work Benches 3O-238 Dikeringkan Drying AreaO-239 Diamplas Sander Machine 2O-240 Dicat (Cat Putih) Paint SprayerO-241 Dikeringkan Drying AreaO-242 Dicat (Cat Kuning) Paint SprayerO-243 Dikeringkan Drying Area

(PE-32) Atap Barrier (Balok Kayu P = 75 mm, L = 60 mm, T = 10 mm)1 pcs

O-246 Diukur P = 75 mm, L = 60 mm, T = 10 mm Flexible Work BenchesO-247 Dipotong T = 10 mm Circular Saw MachineO-248 Dibor Bagian Atas D = 11mm, T= 10 mm Radial Drilling MachineO-249 Diamplas Halus Belt & Disc Sander MachineO-250 Didempul (Dempul) Adjustable Work Benches 3O-251 Dikeringkan Drying AreaO-252 Diamplas Sander Machine 2O-253 Dicat (Cat Putih) Paint SprayerO-254 Dikeringkan Drying AreaO-255 Dicat (Cat Merah) Paint SprayerO-256 Dikeringkan Drying Area

(PE-33) Barrier (Balok Kayu P = 75 mm, L = 60 mm, T = 15 mm)1 pcs

O-257 Diukur P = 75 mm, L = 60 mm, T = 15 mm Flexible Work BenchesO-258 Dipotong T = 15 mm Circular Saw MachineO-259 Dibor Bagian Atas D = 10 mm, T = 15 mm Radial Drilling MachineO-260 Dibor Bagian Depan D = 10 mm, T = 30 mm Radial Drilling MachineO-261 Diamplas Halus Belt & Disc Sander MachineO-262 Didempul (Dempul) Adjustable Work Benches 3O-263 Dikeringkan Drying AreaO-264 Diamplas Sander Machine 2O-265 Dicat (Cat Putih) Paint SprayerO-266 Dikeringkan Drying AreaO-267 Dicat (Cat Coklat) Paint SprayerO-268 Dikeringkan Drying Area

(PE-31) Sirine Truk (Silinder Kayu D = 30 mm, T = 20 mm)1 pcs

O-269 Diukur D = 30 mm, T = 20 mm Flexible Work Benches

Page 13: Lembar Kerja Kelompok 5

O-270 Dipotong T = 20 mm Circular Saw MachineO-271 Diamplas Halus Belt & Disc Sander MachineO-272 Didempul (Dempul) Adjustable Work Benches 3O-273 Dikeringkan Drying AreaO-274 Diamplas Sander Machine 2O-275 Dicat (Cat Putih) Paint SprayerO-276 Dikeringkan Drying AreaO-277 Dicat (Cat Coklat) Paint SprayerO-278 Dikeringkan Drying Area

(PE-30) Pin Barrier (Silinder Kayu D = 10 mm, T = 20 mm)1 pcs

O-279 Diukur D = 10 mm, T = 20 mm Flexible Work BenchesO-280 Dipotong T = 20 mm Band Saw MachineO-281 Diamplas Halus Belt & Disc Sander MachineO-282 Didempul (Dempul) Adjustable Work Benches 3O-283 Dikeringkan Drying AreaO-284 Diamplas Sander Machine 2O-285 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-286 Dikeringkan Drying Area

(PE-37) Upper Back Body (Balok Kayu P = 140 mm, L = 35 mm, T = 10 mm)1 pcs

O-288 Diukur P = 140 mm, L = 35 mm, T = 10 mm Flexible Work BenchesO-289 Dipotong T = 10 mm Circular Saw MachineO-290 Dibor Bagian Atas D = 11 mm, T = 5 mm Radial Drilling MachineO-291 Dibor Bagian Atas D = 11 mm, T = 5 mm Radial Drilling MachineO-292 Diamplas Halus Belt & Disc Sander MachineO-293 Didempul (Dempul) Adjustable Work Benches 3O-294 Dikeringkan Drying AreaO-295 Diamplas Sander Machine 1O-296 Dicat (Cat Putih) Paint SprayerO-297 Dikeringkan Drying AreaO-298 Dicat (Cat Kuning) Paint SprayerO-299 Dikeringkan Drying Area

(PE-36) Lower Back Body (Balok Kayu P = 160 mm, L = 25 mm, T = 15 mm)1 pcs

O-300 Diukur P = 160 mm, L = 25 mm, T = 15 mm Flexible Work BenchesO-301 Dipotong P = 160 mm Band Saw MachineO-302 Diamplas Halus Belt & Disc Sander MachineO-303 Didempul (Dempul) Adjustable Work Benches 3O-304 Dikeringkan Drying AreaO-305 Diamplas Sander Machine 2O-306 Dicat (Cat Putih) Paint SprayerO-307 Dikeringkan Drying Area

Page 14: Lembar Kerja Kelompok 5

O-308 Dicat (Cat Coklat) Paint SprayerO-309 Dikeringkan Drying Area

(PE-38) Pin Back Body (Silinder Kayu D = 10 mm, T = 120 mm)1 pcs

O-310 Diukur D = 10 mm, T = 120 mm Flexible Work BenchesO-311 Dipotong T = 120 mm Circular Saw MachineO-312 Diamplas Halus Belt & Disc Sander MachineO-313 Didempul (Dempul) Adjustable Work Benches 3O-314 Dikeringkan Drying AreaO-315 Diamplas Sander Machine 2O-316 Dicat (Cat Putih) Paint SprayerO-317 Dikeringkan Drying AreaO-318 Dicat (Cat Hijau) Paint SprayerO-319 Dikeringkan Drying Area

(PE-35) Alas Truk (Balok Kayu P = 290 mm, L = 75 mm, T = 10 mm)1 pcs

O-320 Diukur P = 290 mm, L = 75 mm, T = 10 mm Flexible Work BenchesO-321 Dipotong P = 290 mm Band Saw MachineO-322 Dibor Bagian Atas D = 5 mm, T = 10 mm Radial Drilling MachineO-323 Dibor Bagian Atas D = 5 mm, T = 10 mm Radial Drilling MachineO-324 Diamplas Halus Belt & Disc Sander MachineO-325 Didempul (Dempul) Adjustable Work Benches 3O-326 Dikeringkan Drying AreaO-327 Diamplas Sander Machine 2O-328 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-329 Dikeringkan Drying Area

(PE-45) Pin Chasis (Silinder Kayu D = 10 mm, T = 15 mm)2 pcs

O-333 Diukur T = 15 mm Flexible Work BenchesO-334 Dipotong T = 15 mm Circular Saw MachineO-335 Diamplas Halus Belt & Disc Sander MachineO-336 Didempul (Dempul) Adjustable Work Benches 3O-337 Dikeringkan Drying AreaO-338 Diamplas Sander Machine 2O-339 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-340 Dikeringkan Drying AreaO-341 Diukur T = 15 mm Flexible Work BenchesO-342 Dipotong T = 15 mm Circular Saw MachineO-343 Diamplas Halus Belt & Disc Sander MachineO-344 Didempul (Dempul) Adjustable Work Benches 3O-345 Dikeringkan Drying AreaO-346 Diamplas Sander Machine 2O-347 Dilapis Pernis (Pernis) Adjustable Work Benches 2

Page 15: Lembar Kerja Kelompok 5

O-348 Dikeringkan Drying Area(PE-46) Alas Kontainer (Balok Kayu P = 215 mm, L = 45 mm, T = 10 mm)

1 pcsO-349 Diukur P = 215 mm, L = 45 mm, T = 10 mm Flexible Work BenchesO-350 Dipotong P = 215 mm, L = 45 mm, T = 10 mm Circular Saw MachineO-351 Dibor Bagian Atas D = 8 mm Radial Drilling MachineO-352 Dibor Bagian Atas D = 8 mm Radial Drilling MachineO-353 Dibor Bagian Atas D = 8 mm Radial Drilling MachineO-354 Dibor Bagian Atas D = 8 mm Radial Drilling MachineO-355 Dibor Bagian Bawah D = 5 mm, H = 10 mm Radial Drilling MachineO-356 Dibor Bagian Bawah D = 5 mm, H = 10 mm Radial Drilling MachineO-357 Diamplas Halus Belt & Disc Sander MachineO-358 Didempul (Dempul) Adjustable Work Benches 3O-359 Dikeringkan Drying AreaO-360 Diamplas Sander Machine 2O-361 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-362 Dikeringkan Drying Area

(PE-47) Pin Alas Kontainer (Silinder Kayu D= 10 mm, T = 35 mm)4 pcs

O-363 Diukur T = 35 mm Flexible Work BenchesO-364 Dipotong T = 35 mm Band Saw MachineO-365 Diamplas Halus Belt & Disc Sander MachineO-366 Didempul (Dempul) Adjustable Work Benches 3O-367 Dikeringkan Drying AreaO-368 Diamplas Sander Machine 2O-369 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-370 Dikeringkan Drying AreaO-371 Diukur T = 35 mm Flexible Work BenchesO-372 Dipotong T = 35 mm Band Saw MachineO-373 Diamplas Halus Belt & Disc Sander MachineO-374 Didempul (Dempul) Adjustable Work Benches 3O-375 Dikeringkan Drying AreaO-376 Diamplas Sander Machine 2O-377 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-378 Dikeringkan Drying AreaO-379 Diukur T = 35 mm Flexible Work BenchesO-380 Dipotong T = 35 mm Band Saw MachineO-381 Diamplas Halus Belt & Disc Sander MachineO-382 Didempul (Dempul) Adjustable Work Benches 3O-383 Dikeringkan Drying AreaO-384 Diamplas Sander Machine 2O-385 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-386 Dikeringkan Drying Area

Page 16: Lembar Kerja Kelompok 5

O-387 Diukur T = 35 mm Flexible Work BenchesO-388 Dipotong T = 35 mm Band Saw MachineO-389 Diamplas Halus Belt & Disc Sander MachineO-390 Didempul (Dempul) Adjustable Work Benches 3O-391 Dikeringkan Drying AreaO-392 Diamplas Sander Machine 2O-393 Dilapis Pernis (Pernis) Adjustable Work Benches 2O-394 Dikeringkan Drying Area

(PE-48) Beban Persegi Panjang (Balok Kayu P = 40 mm, L = 30 mm, T = 10 mm)1 pcs

O-396 Diukur P = 40 mm, L = 30 mm, T = 10 mm Flexible Work BenchesO-397 Dipotong P = 40 mm, L = 30 mm, T = 10 mm Band Saw MachineO-398 Dibor dari Titik Tengah D = 8 mm, H = 10 mm Radial Drilling MachineO-399 Dibor dari Titik Tengah D = 8 mm, H = 10 mm Radial Drilling MachineO-400 Dibor dari Titik Tengah D = 8 mm, H = 10 mm Radial Drilling MachineO-401 Dibor dari Titik Tengah D = 8 mm, H = 10 mm Radial Drilling MachineO-402 Diamplas Halus Belt & Disc Sander MachineO-403 Didempul (Dempul) Adjustable Work Benches 3O-404 Dikeringkan Drying AreaO-405 Diamplas Sander Machine 2O-406 Dicat (Cat Putih) Spray GunO-407 Dikeringkan Drying AreaO-408 Dicat (Cat Merah) Paint SprayerO-409 Dikeringkan Drying Area

(PE-49) Pin Beban T (Silinder Kayu D = 10 mm, T = 20 mm)1 pcs

O-410 Diukur D = 10 mm, T = 20 mm Flexible Work BenchesO-411 Dipotong T = 20 mm Band Saw MachineO-412 Dibor Di Titik Pusat D = 8 mm, H = 20 mm Radial Drilling MachineO-413 Diamplas Halus Belt & Disc Sander MachineO-414 Didempul (Dempul) Adjustable Work Benches 3O-415 Dikeringkan Drying AreaO-416 Diamplas Sander Machine 2O-417 Dicat (Cat Putih) Paint SprayerO-418 Dikeringkan Drying AreaO-419 Dicat (Cat Coklat) Paint SprayerO-420 Dikeringkan Drying Area

(PE-50) Beban T (Silinder Kayu D = 30 mm, T = 20 mm)1 pcs

O-421 Diukur D = 30 mm, T = 20 mm Flexible Work BenchesO-422 Dipotong T = 20 mm Band Saw MachineO-423 Dibor Di Titik Pusat D = 8 mm, H = 20 mm Radial Drilling MachineO-424 Diamplas Halus Belt & Disc Sander Machine

Page 17: Lembar Kerja Kelompok 5

O-425 Didempul (Dempul) Adjustable Work Benches 3O-426 Dikeringkan Drying AreaO-427 Diamplas Sander Machine 2O-428 Dicat (Cat Putih) Paint SprayerO-429 Dikeringkan Drying AreaO-430 Dicat (Cat Merah) Paint SprayerO-431 Dikeringkan Drying Area

SSSA41 pcs

O-330 Direkatkan (Perekat) Adjustable Work Benches 1SSSA3

1 pcsO-287 Direkatkan (Perekat) Adjustable Work Benches 1

SSSA21 pcs

O-244 Direkatkan (Perekat) Adjustable Work Benches 1SSSA1

1 pcsO-35 Direkatkan (Male Connector dan Perekat) Adjustable Work Benches 1

SSA41 pcs

O-432 Direkatkan (Perekat) Adjustable Work Benches 1SSA3

1 pcsO-395 Direkatkan (Perekat) Adjustable Work Benches 1

SSA21 pcs

O-331 Direkatkan (Female Connector dan Perekat) Adjustable Work Benches 1SSA1

1 pcsO-245 Direkatkan (Perekat) Adjustable Work Benches 1

SA21 pcs

O-433 Direkatkan (Perekat) Adjustable Work Benches 1SA1

1 pcsO-332 Direkatkan (Perekat) Adjustable Work Benches 1

A21 pcs

O-434 Direkatkan (Label Truk Kontainer B) Steel Work Benches DA1

1 pcsO-435 Dikemas ( Isolasi dan Kardus) Basic Packing D

Page 18: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER B

Waktu Baku (menit) Waktu Baku (detik) Waktu Setup (Detik)

0.28 16.8 00.27 16.2 396000.16 9.6 580800.36 21.6 158400.41 24.6 01.2 72 0

0.55 33 00.65 39 18480

6 360 00.55 33 18480

6 360 0

0.25 15 00.1 6 660000.1 6 58080

0.15 9 158400.16 9.6 00.3 18 0

0.18 10.8 00.12 7.2 18480

6 360 00.31 18.6 18480

3 180 0

Page 19: Lembar Kerja Kelompok 5

0.4 24 00.47 28.2 660000.35 21 158400.35 21 580800.35 21 580800.32 19.2 580800.65 39 158400.65 39 00.31 18.6 00.25 15 00.4 24 06 360 0

0.23 13.8 00.32 19.2 396000.1 6 58080

0.39 23.4 158400.21 12.6 01.2 72 00.4 24 0

0.53 31.8 184805 300 0

0.54 32.4 184805.5 330 0

0.23 13.8 00.32 19.2 396000.1 6 58080

0.39 23.4 158400.21 12.6 01.2 72 00.4 24 0

0.53 31.8 184805 300 0

0.54 32.4 184805.5 330 0

0.23 13.8 00.32 19.2 396000.1 6 58080

0.39 23.4 158400.21 12.6 0

Page 20: Lembar Kerja Kelompok 5

1.2 72 00.4 24 0

0.53 31.8 184805 300 0

0.54 32.4 184805.5 330 0

0.23 13.8 00.32 19.2 396000.1 6 58080

0.39 23.4 158400.21 12.6 01.2 72 00.4 24 0

0.53 31.8 184805 300 0

0.54 32.4 184805.5 330 0

0.23 13.8 00.32 19.2 396000.1 6 58080

0.39 23.4 158400.21 12.6 01.2 72 00.4 24 0

0.53 31.8 184805 300 0

0.54 32.4 184805.5 330 0

0.23 13.8 00.32 19.2 396000.1 6 58080

0.39 23.4 158400.21 12.6 01.2 72 00.4 24 0

0.53 31.8 184805 300 0

0.54 32.4 184805.5 330 0

0.23 13.8 00.32 19.2 396000.1 6 58080

0.39 23.4 15840

Page 21: Lembar Kerja Kelompok 5

0.21 12.6 01.2 72 00.4 24 0

0.53 31.8 184805 300 0

0.54 32.4 184805.5 330 0

0.23 13.8 00.32 19.2 396000.1 6 58080

0.39 23.4 158400.21 12.6 01.2 72 00.4 24 0

0.53 31.8 184805 300 0

0.54 32.4 184805.5 330 0

0.3 18 00.4 24 39600

0.14 8.4 158400.39 23.4 01.15 69 00.3 18 0

0.35 21 05 300 0

0.3 18 00.4 24 39600

0.14 8.4 158400.39 23.4 01.15 69 00.3 18 0

0.35 21 05 300 0

0.3 18 00.4 24 39600

0.14 8.4 158400.39 23.4 01.15 69 00.3 18 0

0.35 21 0

Page 22: Lembar Kerja Kelompok 5

5 300 00.3 18 00.4 24 39600

0.14 8.4 158400.39 23.4 01.15 69 00.3 18 0

0.35 21 05 300 0

0.3 18 00.2 12 39600

0.15 9 580800.34 20.4 158400.22 13.2 01.05 63 00.26 15.6 00.38 22.8 18480

3 180 00.25 15 184804.5 270 00.3 18 00.2 12 39600

0.15 9 580800.34 20.4 158400.22 13.2 01.05 63 00.26 15.6 00.38 22.8 18480

3 180 00.25 15 184804.5 270 00.3 18 00.2 12 39600

0.15 9 580800.34 20.4 158400.22 13.2 01.05 63 00.26 15.6 00.38 22.8 18480

3 180 00.25 15 18480

Page 23: Lembar Kerja Kelompok 5

4.5 270 00.3 18 00.2 12 39600

0.15 9 580800.34 20.4 158400.22 13.2 01.05 63 00.26 15.6 00.38 22.8 18480

3 180 00.25 15 184804.5 270 00.3 18 00.2 12 39600

0.15 9 580800.34 20.4 158400.22 13.2 01.05 63 00.26 15.6 00.38 22.8 18480

3 180 00.25 15 184804.5 270 00.3 18 00.2 12 39600

0.15 9 580800.34 20.4 158400.22 13.2 01.05 63 00.26 15.6 00.38 22.8 18480

3 180 00.25 15 184804.5 270 00.3 18 00.2 12 39600

0.15 9 580800.34 20.4 158400.22 13.2 01.05 63 00.26 15.6 00.38 22.8 18480

3 180 0

Page 24: Lembar Kerja Kelompok 5

0.25 15 184804.5 270 00.3 18 00.2 12 39600

0.15 9 580800.34 20.4 158400.22 13.2 01.05 63 00.26 15.6 00.38 22.8 18480

3 180 00.25 15 184804.5 270 0

0.3 18 00.17 10.2 396000.1 6 58080

0.303 18.18 158400.57 34.2 00.31 18.6 00.86 51.6 00.38 22.8 184806.5 390 0

0.525 31.5 184806 360 0

0.3 18 00.17 10.2 396000.29 17.4 580800.28 16.8 580800.31 18.6 158400.31 18.6 02.04 122.4 00.21 12.6 00.31 18.6 184806.5 390 0

0.35 21 184806 360 0

0.3 18 0

Page 25: Lembar Kerja Kelompok 5

0.18 10.8 396000.33 19.8 158400.38 22.8 0

2 120 00.18 10.8 00.63 37.8 184804.5 270 0

0.55 33 184806 360 0

0.3 18 00.01 0.6 660000.13 7.8 158400.11 6.6 00.51 30.6 00.78 46.8 00.44 26.4 06.5 390 0

0.3 18 00.41 24.6 396000.09 5.4 580800.38 22.8 580800.51 30.6 158400.32 19.2 00.36 21.6 00.6 36 0

0.31 18.6 184806.5 390 0

0.395 23.7 184806.5 390 0

0.3 18 00.01 0.6 660000.13 7.8 158400.11 6.6 00.31 18.6 00.78 46.8 00.44 26.4 18480

6 360 0

Page 26: Lembar Kerja Kelompok 5

0.96 57.6 184806 360 0

0.21 12.6 00.32 19.2 396000.57 34.2 158400.25 15 00.23 13.8 00.54 32.4 00.28 16.8 18480

6 360 00.41 24.6 18480

6 360 0

0.31 18.6 00.31 18.6 660000.13 7.8 580800.13 7.8 580800.22 13.2 158400.41 24.6 0

2 120 00.44 26.4 00.35 21 06.5 390 0

0.4 24 00.27 16.2 396000.24 14.4 158400.65 39 00.35 21 00.49 29.4 00.35 21 05.5 330 00.4 24 0

0.27 16.2 396000.24 14.4 158400.65 39 00.35 21 00.49 29.4 00.35 21 0

Page 27: Lembar Kerja Kelompok 5

5.5 330 0

0.4 24 00.37 22.2 396000.15 9 580800.15 9 580800.15 9 580800.15 9 580800.19 11.4 580800.19 11.4 580800.35 21 158400.55 33 00.35 21 00.31 18.6 00.29 17.4 0

6 360 0

0.4 24 00.1 6 66000

0.13 7.8 158400.11 6.6 01.1 66 0

0.18 10.8 00.46 27.6 0

3 180 00.4 24 00.1 6 66000

0.13 7.8 158400.11 6.6 01.1 66 0

0.18 10.8 00.46 27.6 0

3 180 00.4 24 00.1 6 66000

0.13 7.8 158400.11 6.6 01.1 66 0

0.18 10.8 00.46 27.6 0

3 180 0

Page 28: Lembar Kerja Kelompok 5

0.4 24 00.1 6 66000

0.13 7.8 158400.11 6.6 01.1 66 0

0.18 10.8 00.46 27.6 0

3 180 0

0.4 24 00.37 22.2 660000.17 10.2 580800.17 10.2 580800.17 10.2 580800.17 10.2 580800.2 12 15840

0.12 7.2 03 180 0

0.28 16.8 00.31 18.6 488403.5 210 0

0.31 18.6 184804 240 0

0.3 18 00.1 6 66000

0.16 9.6 580800.15 9 158400.24 14.4 01.1 66 0

0.25 15 00.11 6.6 184800.75 45 00.25 15 18480

3 180 0

0.3 18 00.37 22.2 660000.11 6.6 580800.22 13.2 15840

Page 29: Lembar Kerja Kelompok 5

0.22 13.2 03 180 0

0.27 16.2 00.24 14.4 18480

3 180 00.29 17.4 184805.5 330 0

0.12 7.2 0

0.15 9 0

0.11 6.6 0

0.16 9.6 0

0.12 7.2 0

0.09 5.4 0

0.07 4.2 0

0.16 9.6 0

0.28 16.8 0

0.19 11.4 0

0.12 7.2 0

0.2 12 0

Page 30: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER B

Kelompok 5

No. Praktikan:

Kapasitas Produksi 327334332324

Efisiensi Produksi: 91Persentase Lembur Pabrik: 15

Kapasitas Mesin Teoritis/Bulan % Skrap Jumlah Yang Diharapkan Per Bulan

33000 0 362.318531777.78 2 355.0721

51700 4 343.618224933.33 2 337.759222536.59 0 337.7592

7700 0 337.759216800 2 332

13741.54 0 3321540 0 332

16240 0 3321540 0 332

36960 0 366.053781400 3 355.072182720 4 343.618259840 2 337.759257750 0 337.759230800 0 337.7592

51333.33 2 33274433.33 0 332

1540 0 33228812.9 0 332

3080 0 332

WED / 1A WED / 1A WED / 1A

Page 31: Lembar Kerja Kelompok 5

23100 0 397.644317319.15 3 385.71525645.71 2 379.138123634.29 4 366.907923634.29 4 355.0721

25850 4 343.618213809.23 2 337.759214215.38 0 337.759229806.45 0 337.7592

36960 2 33223100 0 3321540 0 332

40173.91 0 5343.77726812.5 2 5236.901582720 4 5067.9692

23015.38 2 4981.554544000 0 4981.55457700 0 4981.5545

23100 2 4896.613216852.83 0 4896.6132

1848 0 4896.613216540.74 0 4896.6132

1680 0 4896.613240173.91 0 4896.613226812.5 2 4798.680982720 4 4643.8847

23015.38 2 4564.701144000 0 4564.70117700 0 4564.7011

23100 2 4486.867716852.83 0 4486.8677

1848 0 4486.867716540.74 0 4486.8677

1680 0 4486.867740173.91 0 4486.867726812.5 2 4397.130382720 4 4255.2874

23015.38 2 4182.729944000 0 4182.7299

Page 32: Lembar Kerja Kelompok 5

7700 0 4182.729923100 2 4111.4095

16852.83 0 4111.40951848 0 4111.4095

16540.74 0 4111.40951680 0 4111.4095

40173.91 0 4111.409526812.5 2 4029.181382720 4 3899.2077

23015.38 2 3832.721744000 0 3832.72177700 0 3832.7217

23100 2 3767.369416852.83 0 3767.3694

1848 0 3767.369416540.74 0 3767.3694

1680 0 3767.369440173.91 0 3767.369426812.5 2 3692.02282720 4 3572.9245

23015.38 2 3512.00244000 0 3512.0027700 0 3512.002

23100 2 3452.118316852.83 0 3452.1183

1848 0 3452.118316540.74 0 3452.1183

1680 0 3452.118340173.91 0 3452.118326812.5 2 3383.075982720 4 3273.9444

23015.38 2 3218.119944000 0 3218.11997700 0 3218.1199

23100 2 3163.247216852.83 0 3163.2472

1848 0 3163.247216540.74 0 3163.2472

1680 0 3163.247240173.91 0 3163.247226812.5 2 3099.982382720 4 2999.9829

23015.38 2 2948.8297

Page 33: Lembar Kerja Kelompok 5

44000 0 2948.82977700 0 2948.8297

23100 2 2898.548716852.83 0 2898.5487

1848 0 2898.548716540.74 0 2898.5487

1680 0 2898.548740173.91 0 2898.548726812.5 2 2840.577782720 4 2748.9462

23015.38 2 2702.073544000 0 2702.07357700 0 2702.0735

23100 2 265616852.83 0 2656

1848 0 265616540.74 0 2656

1680 0 2656

30800 0 1652.138721450 2 1619.0959

64114.29 2 1591.488423692.31 0 1591.48848034.78 0 1591.488430800 2 1564.351726400 0 1564.35171848 0 1564.3517

30800 0 1564.351721450 2 1533.0647

64114.29 2 1506.924123692.31 0 1506.92418034.78 0 1506.924130800 2 1481.229326400 0 1481.22931848 0 1481.2293

30800 0 1481.229321450 2 1451.6047

64114.29 2 1426.853123692.31 0 1426.85318034.78 0 1426.853130800 2 1402.523626400 0 1402.5236

Page 34: Lembar Kerja Kelompok 5

1848 0 1402.523630800 0 1402.523621450 2 1374.4731

64114.29 2 1351.036723692.31 0 1351.03678034.78 0 1351.036730800 2 132826400 0 13281848 0 1328

30800 0 5343.77742900 2 5236.9015

55146.67 4 5067.969226400 2 4981.554542000 0 4981.55458800 0 4981.5545

35538.46 2 4896.613223505.26 0 4896.6132

3080 0 4896.613235728 0 4896.6132

2053.33 0 4896.613230800 0 4896.613242900 2 4798.6809

55146.67 4 4643.884726400 2 4564.701142000 0 4564.70118800 0 4564.7011

35538.46 2 4486.867723505.26 0 4486.8677

3080 0 4486.867735728 0 4486.8677

2053.33 0 4486.867730800 0 4486.867742900 2 4397.1303

55146.67 4 4255.287426400 2 4182.729942000 0 4182.72998800 0 4182.7299

35538.46 2 4111.409523505.26 0 4111.4095

3080 0 4111.409535728 0 4111.4095

Page 35: Lembar Kerja Kelompok 5

2053.33 0 4111.409530800 0 4111.409542900 2 4029.1813

55146.67 4 3899.207726400 2 3832.721742000 0 3832.72178800 0 3832.7217

35538.46 2 3767.369423505.26 0 3767.3694

3080 0 3767.369435728 0 3767.3694

2053.33 0 3767.369430800 0 3767.369442900 2 3692.022

55146.67 4 3572.924526400 2 3512.00242000 0 3512.0028800 0 3512.002

35538.46 2 3452.118323505.26 0 3452.1183

3080 0 3452.118335728 0 3452.1183

2053.33 0 3452.118330800 0 3452.118342900 2 3383.0759

55146.67 4 3273.944426400 2 3218.119942000 0 3218.11998800 0 3218.1199

35538.46 2 3163.247223505.26 0 3163.2472

3080 0 3163.247235728 0 3163.2472

2053.33 0 3163.247230800 0 3163.247242900 2 3099.9823

55146.67 4 2999.982926400 2 2948.829742000 0 2948.82978800 0 2948.8297

35538.46 2 2898.548723505.26 0 2898.5487

3080 0 2898.5487

Page 36: Lembar Kerja Kelompok 5

35728 0 2898.54872053.33 0 2898.548730800 0 2898.548742900 2 2840.5777

55146.67 4 2748.946226400 2 2702.073542000 0 2702.07358800 0 2702.0735

35538.46 2 265623505.26 0 2656

3080 0 265635728 0 2656

2053.33 0 2656

30800 0 362.318550470.59 2 355.0721

82720 4 343.618229623.76 2 337.759216210.53 0 337.759229806.45 0 337.759210744.19 2 33223505.26 0 3321421.54 0 332

17013.33 0 3321540 0 332

30800 0 374.395850470.59 2 366.907928524.14 4 355.072129542.86 4 343.618228954.84 2 337.759229806.45 0 337.75924529.41 0 337.759244000 2 332

28812.9 0 3321421.54 0 33225520 0 3321540 0 332

30800 0 350.6308

Page 37: Lembar Kerja Kelompok 5

47666.67 2 343.618227200 2 337.7592

24315.79 0 337.75924620 0 337.7592

51333.33 2 33214177.78 0 3322053.33 0 33216240 0 3321540 0 332

30800 0 354.2456814000 3 343.6182

69046.15 2 337.759284000 0 337.7592

18117.65 0 337.759211846.15 2 332

21000 0 3321421.54 0 332

30800 0 368.011920926.83 2 360.651791911.11 4 349.017821768.42 4 337.7592

17600 2 33228875 0 332

25666.67 0 33215400 0 332

28812.9 0 3321421.54 0 332

22612.66 0 3321421.54 0 332

30800 0 354.2456814000 3 343.6182

69046.15 2 337.759284000 0 337.7592

29806.45 0 337.759211846.15 2 332

20300 0 3321540 0 332

Page 38: Lembar Kerja Kelompok 5

9304.17 0 3321540 0 332

44000 0 350.630826812.5 2 343.6182

15747.37 2 337.759236960 0 337.7592

40173.91 0 337.759217111.11 2 332

31900 0 3321540 0 332

21785.37 0 3321540 0 332

29806.45 0 378.255626258.06 3 366.907963630.77 4 355.072163630.77 4 343.6182

40800 2 337.759222536.59 0 337.7592

4620 0 337.759221000 2 33226400 0 332

1421.54 0 332

23100 0 740.614531777.78 2 725.8022

37400 2 713.426514215.38 0 713.4265

26400 0 713.426518857.14 2 701.2617

26400 0 701.26171680 0 701.2617

23100 0 701.261731777.78 2 687.2365

37400 2 675.518314215.38 0 675.5183

26400 0 675.518318857.14 2 664

26400 0 664

Page 39: Lembar Kerja Kelompok 5

1680 0 664

23100 0 426.86723189.19 2 418.329755146.67 4 404.835255146.67 4 391.77655146.67 4 379.138155146.67 4 366.907943536.84 4 355.072143536.84 4 343.618225645.71 2 337.7592

16800 0 337.759226400 0 337.7592

29806.45 2 33231862.07 0 332

1540 0 332

23100 0 1721.328781400 3 1669.6888

69046.15 2 1641.218684000 0 1641.21868400 0 1641.2186

51333.33 2 1613.23420086.96 0 1613.234

3080 0 1613.23423100 0 1613.23481400 3 1564.837

69046.15 2 1538.154784000 0 1538.15478400 0 1538.1547

51333.33 2 1511.927420086.96 0 1511.9274

3080 0 1511.927423100 0 1511.927481400 3 1466.5696

69046.15 2 1441.562984000 0 1441.56298400 0 1441.5629

51333.33 2 1416.982620086.96 0 1416.9826

3080 0 1416.9826

Page 40: Lembar Kerja Kelompok 5

23100 0 1416.982681400 3 1374.4731

69046.15 2 1351.036784000 0 1351.03678400 0 1351.0367

51333.33 2 132820086.96 0 1328

3080 0 1328

23100 0 403.892822000 3 391.776

48658.82 4 379.138148658.82 4 366.907948658.82 4 355.072148658.82 4 343.6182

44880 2 337.759277000 0 337.75923080 0 337.7592

33000 2 33227180.65 0 332

2640 0 33228812.9 0 332

2310 0 332

30800 0 366.053781400 3 355.072151700 4 343.618259840 2 337.759238500 0 337.75928400 0 337.7592

36960 2 33281200 0 33212320 0 33235728 0 3323080 0 332

30800 0 366.053722000 3 355.072175200 4 343.618240800 2 337.7592

Page 41: Lembar Kerja Kelompok 5

42000 0 337.75923080 0 337.7592

34222.22 2 33237216.67 0 332

3080 0 33230800 0 3321680 0 332

77000 0 332

61600 0 332

84000 0 332

57750 0 332

77000 0 332

102666.67 0 332

132000 0 332

57750 0 332

33000 0 332

48631.58 0 332

77000 0 332

46200 0 332

Page 42: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER B

Unit Truk Kontainer AUnit Loko Beban A Unit Truk Kontainer B Unit Loko Beban B%%

Jumlah Yang Disiapkan Per Bulan Produksi Pada Efisiensi Reliabilitas Mesin (%)

362.3185 398.1522 100362.3185 398.1522 100355.0721 390.1891 90343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 90332 364.8352 100332 364.8352 90332 364.8352 100

366.0537 402.2568 100366.0537 402.2568 85355.0721 390.1891 90343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 90332 364.8352 100332 364.8352 90332 364.8352 100

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Page 43: Lembar Kerja Kelompok 5

397.6443 436.9718 100397.6443 436.9718 85385.715 423.8626 100

379.1381 416.6353 90366.9079 403.1955 90355.0721 390.1891 90343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 100332 364.8352 100

5343.777 5872.2824 1005343.777 5872.2824 100

5236.9015 5754.8368 905067.9692 5569.1969 1004981.5545 5474.2357 954981.5545 5474.2357 1004981.5545 5474.2357 904896.6132 5380.8936 904896.6132 5380.8936 1004896.6132 5380.8936 904896.6132 5380.8936 1004896.6132 5380.8936 1004896.6132 5380.8936 1004798.6809 5273.2757 904643.8847 5103.17 1004564.7011 5016.1551 954564.7011 5016.1551 1004564.7011 5016.1551 904486.8677 4930.6238 904486.8677 4930.6238 1004486.8677 4930.6238 904486.8677 4930.6238 1004486.8677 4930.6238 1004486.8677 4930.6238 1004397.1303 4832.0113 904255.2874 4676.14 1004182.7299 4596.4065 95

Page 44: Lembar Kerja Kelompok 5

4182.7299 4596.4065 1004182.7299 4596.4065 904111.4095 4518.0324 904111.4095 4518.0324 1004111.4095 4518.0324 904111.4095 4518.0324 1004111.4095 4518.0324 1004111.4095 4518.0324 1004029.1813 4427.6718 903899.2077 4284.8436 1003832.7217 4211.7821 953832.7217 4211.7821 1003832.7217 4211.7821 903767.3694 4139.9664 903767.3694 4139.9664 1003767.3694 4139.9664 903767.3694 4139.9664 1003767.3694 4139.9664 1003767.3694 4139.9664 1003692.022 4057.167 90

3572.9245 3926.2907 1003512.002 3859.3429 953512.002 3859.3429 1003512.002 3859.3429 90

3452.1183 3793.5366 903452.1183 3793.5366 1003452.1183 3793.5366 903452.1183 3793.5366 1003452.1183 3793.5366 1003452.1183 3793.5366 1003383.0759 3717.6658 903273.9444 3597.7411 1003218.1199 3536.3955 953218.1199 3536.3955 1003218.1199 3536.3955 903163.2472 3476.0958 903163.2472 3476.0958 1003163.2472 3476.0958 903163.2472 3476.0958 1003163.2472 3476.0958 1003163.2472 3476.0958 1003099.9823 3406.574 902999.9829 3296.6845 100

Page 45: Lembar Kerja Kelompok 5

2948.8297 3240.4722 952948.8297 3240.4722 1002948.8297 3240.4722 902898.5487 3185.2184 902898.5487 3185.2184 1002898.5487 3185.2184 902898.5487 3185.2184 1002898.5487 3185.2184 1002898.5487 3185.2184 1002840.5777 3121.514 902748.9462 3020.82 1002702.0735 2969.3115 952702.0735 2969.3115 1002702.0735 2969.3115 90

2656 2918.6813 902656 2918.6813 1002656 2918.6813 902656 2918.6813 100

1652.1387 1815.537 1001652.1387 1815.537 1001619.0959 1779.2263 1001591.4884 1748.8884 951591.4884 1748.8884 1001591.4884 1748.8884 901564.3517 1719.0678 1001564.3517 1719.0678 1001564.3517 1719.0678 1001564.3517 1719.0678 1001533.0647 1684.6865 1001506.9241 1655.9605 951506.9241 1655.9605 1001506.9241 1655.9605 901481.2293 1627.7245 1001481.2293 1627.7245 1001481.2293 1627.7245 1001481.2293 1627.7245 1001451.6047 1595.17 1001426.8531 1567.9704 951426.8531 1567.9704 1001426.8531 1567.9704 901402.5236 1541.2347 100

Page 46: Lembar Kerja Kelompok 5

1402.5236 1541.2347 1001402.5236 1541.2347 1001402.5236 1541.2347 1001374.4731 1510.41 1001351.0367 1484.6557 951351.0367 1484.6557 1001351.0367 1484.6557 90

1328 1459.3407 1001328 1459.3407 100

5343.777 5872.2824 1005343.777 5872.2824 100

5236.9015 5754.8368 905067.9692 5569.1969 1004981.5545 5474.2357 954981.5545 5474.2357 1004981.5545 5474.2357 904896.6132 5380.8936 904896.6132 5380.8936 1004896.6132 5380.8936 904896.6132 5380.8936 1004896.6132 5380.8936 1004896.6132 5380.8936 1004798.6809 5273.2757 904643.8847 5103.17 1004564.7011 5016.1551 954564.7011 5016.1551 1004564.7011 5016.1551 904486.8677 4930.6238 904486.8677 4930.6238 1004486.8677 4930.6238 904486.8677 4930.6238 1004486.8677 4930.6238 1004486.8677 4930.6238 1004397.1303 4832.0113 904255.2874 4676.14 1004182.7299 4596.4065 954182.7299 4596.4065 1004182.7299 4596.4065 904111.4095 4518.0324 904111.4095 4518.0324 1004111.4095 4518.0324 90

Page 47: Lembar Kerja Kelompok 5

4111.4095 4518.0324 1004111.4095 4518.0324 1004111.4095 4518.0324 1004029.1813 4427.6718 903899.2077 4284.8436 1003832.7217 4211.7821 953832.7217 4211.7821 1003832.7217 4211.7821 903767.3694 4139.9664 903767.3694 4139.9664 1003767.3694 4139.9664 903767.3694 4139.9664 1003767.3694 4139.9664 1003767.3694 4139.9664 1003692.022 4057.167 90

3572.9245 3926.2907 1003512.002 3859.3429 953512.002 3859.3429 1003512.002 3859.3429 90

3452.1183 3793.5366 903452.1183 3793.5366 1003452.1183 3793.5366 903452.1183 3793.5366 1003452.1183 3793.5366 1003452.1183 3793.5366 1003383.0759 3717.6658 903273.9444 3597.7411 1003218.1199 3536.3955 953218.1199 3536.3955 1003218.1199 3536.3955 903163.2472 3476.0958 903163.2472 3476.0958 1003163.2472 3476.0958 903163.2472 3476.0958 1003163.2472 3476.0958 1003163.2472 3476.0958 1003099.9823 3406.574 902999.9829 3296.6845 1002948.8297 3240.4722 952948.8297 3240.4722 1002948.8297 3240.4722 902898.5487 3185.2184 902898.5487 3185.2184 100

Page 48: Lembar Kerja Kelompok 5

2898.5487 3185.2184 902898.5487 3185.2184 1002898.5487 3185.2184 1002898.5487 3185.2184 1002840.5777 3121.514 902748.9462 3020.82 1002702.0735 2969.3115 952702.0735 2969.3115 1002702.0735 2969.3115 90

2656 2918.6813 902656 2918.6813 1002656 2918.6813 902656 2918.6813 100

362.3185 398.1522 100362.3185 398.1522 100355.0721 390.1891 90343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 90332 364.8352 100332 364.8352 90332 364.8352 100

374.3958 411.424 100374.3958 411.424 100366.9079 403.1955 90355.0721 390.1891 90343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 90332 364.8352 100332 364.8352 90332 364.8352 100

350.6308 385.3086 100

Page 49: Lembar Kerja Kelompok 5

350.6308 385.3086 100343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 90332 364.8352 100332 364.8352 90332 364.8352 100

354.2456 389.2809 100354.2456 389.2809 85343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 100332 364.8352 100

368.0119 404.4087 100368.0119 404.4087 100360.6517 396.3205 90349.0178 383.536 90337.7592 371.164 100

332 364.8352 95332 364.8352 100332 364.8352 90332 364.8352 90332 364.8352 100332 364.8352 90332 364.8352 100

354.2456 389.2809 100354.2456 389.2809 85343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 90332 364.8352 100

Page 50: Lembar Kerja Kelompok 5

332 364.8352 90332 364.8352 100

350.6308 385.3086 100350.6308 385.3086 100343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 90332 364.8352 100332 364.8352 90332 364.8352 100

378.2556 415.6655 100378.2556 415.6655 85366.9079 403.1955 90355.0721 390.1891 90343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 100332 364.8352 100

740.6145 813.8621 100740.6145 813.8621 100725.8022 797.5848 100713.4265 783.9852 95713.4265 783.9852 100713.4265 783.9852 90701.2617 770.6173 100701.2617 770.6173 100701.2617 770.6173 100701.2617 770.6173 100687.2365 755.2049 100675.5183 742.3278 95675.5183 742.3278 100675.5183 742.3278 90

664 729.6703 100

Page 51: Lembar Kerja Kelompok 5

664 729.6703 100

426.867 469.0846 100426.867 469.0846 100

418.3297 459.703 90404.8352 444.8738 90391.776 430.5231 90

379.1381 416.6353 90366.9079 403.1955 90355.0721 390.1891 90343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 100332 364.8352 100

1721.3287 1891.57 1001721.3287 1891.57 851669.6888 1834.8229 1001641.2186 1803.5369 951641.2186 1803.5369 1001641.2186 1803.5369 901613.234 1772.7846 1001613.234 1772.7846 1001613.234 1772.7846 1001613.234 1772.7846 851564.837 1719.6011 100

1538.1547 1690.2799 951538.1547 1690.2799 1001538.1547 1690.2799 901511.9274 1661.4587 1001511.9274 1661.4587 1001511.9274 1661.4587 1001511.9274 1661.4587 851466.5696 1611.6149 1001441.5629 1584.1351 951441.5629 1584.1351 1001441.5629 1584.1351 901416.9826 1557.1237 1001416.9826 1557.1237 100

Page 52: Lembar Kerja Kelompok 5

1416.9826 1557.1237 1001416.9826 1557.1237 851374.4731 1510.41 1001351.0367 1484.6557 951351.0367 1484.6557 1001351.0367 1484.6557 90

1328 1459.3407 1001328 1459.3407 100

403.8928 443.8382 100403.8928 443.8382 85391.776 430.5231 90

379.1381 416.6353 90366.9079 403.1955 90355.0721 390.1891 90343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 90332 364.8352 100332 364.8352 90332 364.8352 100

366.0537 402.2568 100366.0537 402.2568 85355.0721 390.1891 90343.6182 377.6024 100337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 90332 364.8352 100332 364.8352 90332 364.8352 100

366.0537 402.2568 100366.0537 402.2568 85355.0721 390.1891 90343.6182 377.6024 100

Page 53: Lembar Kerja Kelompok 5

337.7592 371.164 95337.7592 371.164 100337.7592 371.164 90

332 364.8352 90332 364.8352 100332 364.8352 90332 364.8352 100

332 364.8352 95

332 364.8352 95

332 364.8352 95

332 364.8352 95

332 364.8352 95

332 364.8352 95

332 364.8352 95

332 364.8352 95

332 364.8352 95

332 364.8352 95

332 364.8352 100

332 364.8352 100

Page 54: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER B

% Daur Ulang Tanpa Daur Ulang Daur Ulang Jumlah Mesin Teoritis

0 362.3185 0 0.010 362.3185 0 0.0120 357.9356 2.8635 0.0115 344.6522 1.034 0.020 337.7592 0 0.020 337.7592 0 0.0515 338.7755 1.0163 0.020 332 0 0.030 332 0 0.240 332 0 0.020 332 0 0.24

0 366.0537 0 0.010 366.0537 0 0.0120 357.9356 2.8635 0.0115 344.6522 1.034 0.010 337.7592 0 0.010 337.7592 0 0.0115 338.7755 1.0163 0.010 332 0 0.010 332 0 0.240 332 0 0.010 332 0 0.12

Page 55: Lembar Kerja Kelompok 5

0 397.6443 0 0.020 397.6443 0 0.0315 386.8756 1.1606 0.0220 382.1957 3.0576 0.0220 369.8668 2.9589 0.0220 357.9356 2.8635 0.0215 344.6522 1.034 0.030 337.7592 0 0.030 337.7592 0 0.0115 338.7755 1.0163 0.010 332 0 0.020 332 0 0.24

0 5343.777 0 0.150 5343.777 0 0.2220 5279.1346 42.2331 0.0815 5083.2189 15.2497 0.240 4981.5545 0 0.130 4981.5545 0 0.7115 4996.5441 14.9896 0.260 4896.6132 0 0.350 4896.6132 0 2.910 4896.6132 0 0.360 4896.6132 0 3.20 4896.6132 0 0.130 4896.6132 0 0.220 4837.3799 38.699 0.0715 4657.8583 13.9736 0.220 4564.7011 0 0.120 4564.7011 0 0.6515 4578.4364 13.7353 0.240 4486.8677 0 0.330 4486.8677 0 2.670 4486.8677 0 0.330 4486.8677 0 2.930 4486.8677 0 0.120 4486.8677 0 0.1820 4432.591 35.4607 0.0615 4268.0917 12.8043 0.20 4182.7299 0 0.11

Page 56: Lembar Kerja Kelompok 5

0 4182.7299 0 0.615 4195.3158 12.5859 0.220 4111.4095 0 0.30 4111.4095 0 2.440 4111.4095 0 0.30 4111.4095 0 2.690 4111.4095 0 0.110 4111.4095 0 0.1720 4061.6747 32.4934 0.0615 3910.9405 11.7328 0.190 3832.7217 0 0.10 3832.7217 0 0.5515 3844.2545 11.5328 0.20 3767.3694 0 0.270 3767.3694 0 2.240 3767.3694 0 0.280 3767.3694 0 2.460 3767.3694 0 0.10 3767.3694 0 0.1520 3721.7964 29.7744 0.0515 3583.6755 10.751 0.170 3512.002 0 0.090 3512.002 0 0.515 3522.5697 10.5677 0.190 3452.1183 0 0.250 3452.1183 0 2.050 3452.1183 0 0.250 3452.1183 0 2.260 3452.1183 0 0.090 3452.1183 0 0.1420 3410.3588 27.2829 0.0515 3283.7958 9.8514 0.160 3218.1199 0 0.080 3218.1199 0 0.4615 3227.8033 9.6834 0.170 3163.2472 0 0.230 3163.2472 0 1.880 3163.2472 0 0.230 3163.2472 0 2.070 3163.2472 0 0.090 3163.2472 0 0.1320 3124.9822 24.9999 0.0515 3009.0099 9.027 0.14

Page 57: Lembar Kerja Kelompok 5

0 2948.8297 0 0.080 2948.8297 0 0.4215 2957.7028 8.8731 0.160 2898.5487 0 0.210 2898.5487 0 1.720 2898.5487 0 0.210 2898.5487 0 1.90 2898.5487 0 0.080 2898.5487 0 0.1220 2863.4856 22.9079 0.0415 2757.2179 8.2717 0.130 2702.0735 0 0.070 2702.0735 0 0.3915 2710.2041 8.1306 0.140 2656 0 0.190 2656 0 1.580 2656 0 0.20 2656 0 1.74

0 1652.1387 0 0.060 1652.1387 0 0.0815 1623.9678 4.8719 0.030 1591.4884 0 0.080 1591.4884 0 0.2215 1596.2772 4.7888 0.060 1564.3517 0 0.070 1564.3517 0 0.930 1564.3517 0 0.060 1564.3517 0 0.0815 1537.6777 4.613 0.030 1506.9241 0 0.070 1506.9241 0 0.2115 1511.4585 4.5344 0.060 1481.2293 0 0.060 1481.2293 0 0.880 1481.2293 0 0.050 1481.2293 0 0.0815 1455.9726 4.3679 0.020 1426.8531 0 0.070 1426.8531 0 0.215 1431.1465 4.2934 0.060 1402.5236 0 0.06

Page 58: Lembar Kerja Kelompok 5

0 1402.5236 0 0.830 1402.5236 0 0.050 1402.5236 0 0.0715 1378.6089 4.1358 0.020 1351.0367 0 0.070 1351.0367 0 0.1815 1355.102 4.0653 0.050 1328 0 0.060 1328 0 0.79

0 5343.777 0 0.190 5343.777 0 0.1420 5279.1346 42.2331 0.1215 5083.2189 15.2497 0.210 4981.5545 0 0.140 4981.5545 0 0.6215 4996.5441 14.9896 0.170 4896.6132 0 0.250 4896.6132 0 1.750 4896.6132 0 0.170 4896.6132 0 2.620 4896.6132 0 0.170 4896.6132 0 0.1320 4837.3799 38.699 0.1115 4657.8583 13.9736 0.190 4564.7011 0 0.130 4564.7011 0 0.5715 4578.4364 13.7353 0.160 4486.8677 0 0.230 4486.8677 0 1.60 4486.8677 0 0.150 4486.8677 0 2.40 4486.8677 0 0.160 4486.8677 0 0.1120 4432.591 35.4607 0.115 4268.0917 12.8043 0.180 4182.7299 0 0.120 4182.7299 0 0.5215 4195.3158 12.5859 0.140 4111.4095 0 0.210 4111.4095 0 1.470 4111.4095 0 0.14

Page 59: Lembar Kerja Kelompok 5

0 4111.4095 0 2.20 4111.4095 0 0.150 4111.4095 0 0.1120 4061.6747 32.4934 0.0915 3910.9405 11.7328 0.160 3832.7217 0 0.110 3832.7217 0 0.4815 3844.2545 11.5328 0.130 3767.3694 0 0.20 3767.3694 0 1.340 3767.3694 0 0.130 3767.3694 0 2.020 3767.3694 0 0.130 3767.3694 0 0.120 3721.7964 29.7744 0.0815 3583.6755 10.751 0.150 3512.002 0 0.10 3512.002 0 0.4415 3522.5697 10.5677 0.120 3452.1183 0 0.180 3452.1183 0 1.230 3452.1183 0 0.120 3452.1183 0 1.850 3452.1183 0 0.120 3452.1183 0 0.0920 3410.3588 27.2829 0.0715 3283.7958 9.8514 0.140 3218.1199 0 0.090 3218.1199 0 0.415 3227.8033 9.6834 0.110 3163.2472 0 0.160 3163.2472 0 1.130 3163.2472 0 0.110 3163.2472 0 1.690 3163.2472 0 0.110 3163.2472 0 0.0820 3124.9822 24.9999 0.0715 3009.0099 9.027 0.120 2948.8297 0 0.080 2948.8297 0 0.3715 2957.7028 8.8731 0.10 2898.5487 0 0.150 2898.5487 0 1.03

Page 60: Lembar Kerja Kelompok 5

0 2898.5487 0 0.10 2898.5487 0 1.550 2898.5487 0 0.10 2898.5487 0 0.0720 2863.4856 22.9079 0.0615 2757.2179 8.2717 0.110 2702.0735 0 0.070 2702.0735 0 0.3415 2710.2041 8.1306 0.090 2656 0 0.140 2656 0 0.950 2656 0 0.090 2656 0 1.42

0 362.3185 0 0.010 362.3185 0 0.0120 357.9356 2.8635 0.0115 344.6522 1.034 0.010 337.7592 0 0.020 337.7592 0 0.0115 338.7755 1.0163 0.040 332 0 0.020 332 0 0.260 332 0 0.020 332 0 0.24

0 374.3958 0 0.010 374.3958 0 0.0120 369.8668 2.9589 0.0220 357.9356 2.8635 0.0115 344.6522 1.034 0.010 337.7592 0 0.010 337.7592 0 0.0815 338.7755 1.0163 0.010 332 0 0.010 332 0 0.260 332 0 0.020 332 0 0.24

0 350.6308 0 0.01

Page 61: Lembar Kerja Kelompok 5

0 350.6308 0 0.0115 344.6522 1.034 0.010 337.7592 0 0.020 337.7592 0 0.0815 338.7755 1.0163 0.010 332 0 0.030 332 0 0.180 332 0 0.020 332 0 0.24

0 354.2456 0 0.010 354.2456 0 015 344.6522 1.034 0.010 337.7592 0 00 337.7592 0 0.0215 338.7755 1.0163 0.030 332 0 0.020 332 0 0.26

0 368.0119 0 0.010 368.0119 0 0.0220 363.5602 2.9085 020 351.8325 2.8147 0.0215 338.7755 1.0163 0.020 332 0 0.010 332 0 0.0115 332 0 0.030 332 0 0.010 332 0 0.260 332 0 0.020 332 0 0.26

0 354.2456 0 0.010 354.2456 0 015 344.6522 1.034 0.010 337.7592 0 00 337.7592 0 0.0115 338.7755 1.0163 0.030 332 0 0.020 332 0 0.24

Page 62: Lembar Kerja Kelompok 5

0 332 0 0.040 332 0 0.24

0 350.6308 0 0.010 350.6308 0 0.0115 344.6522 1.034 0.020 337.7592 0 0.010 337.7592 0 0.0115 338.7755 1.0163 0.020 332 0 0.010 332 0 0.240 332 0 0.020 332 0 0.24

0 378.2556 0 0.010 378.2556 0 0.0220 369.8668 2.9589 0.0120 357.9356 2.8635 0.0115 344.6522 1.034 0.010 337.7592 0 0.020 337.7592 0 0.0815 338.7755 1.0163 0.020 332 0 0.010 332 0 0.26

0 740.6145 0 0.040 740.6145 0 0.0315 727.9862 2.184 0.020 713.4265 0 0.060 713.4265 0 0.0315 715.5732 2.1467 0.050 701.2617 0 0.030 701.2617 0 0.460 701.2617 0 0.030 701.2617 0 0.0215 689.3044 2.0679 0.020 675.5183 0 0.050 675.5183 0 0.0315 677.551 2.0327 0.040 664 0 0.03

Page 63: Lembar Kerja Kelompok 5

0 664 0 0.43

0 426.867 0 0.020 426.867 0 0.0220 421.7033 3.3736 0.0120 408.1 3.2648 0.0120 394.9355 3.1595 0.0120 382.1957 3.0576 0.0120 369.8668 2.9589 0.0120 357.9356 2.8635 0.0115 344.6522 1.034 0.010 337.7592 0 0.020 337.7592 0 0.0115 338.7755 1.0163 0.010 332 0 0.010 332 0 0.24

0 1721.3287 0 0.080 1721.3287 0 0.0315 1674.7129 5.0241 0.030 1641.2186 0 0.020 1641.2186 0 0.2115 1646.1571 4.9385 0.040 1613.234 0 0.090 1613.234 0 0.580 1613.234 0 0.080 1613.234 0 0.0315 1569.5456 4.7086 0.020 1538.1547 0 0.020 1538.1547 0 0.215 1542.7831 4.6284 0.040 1511.9274 0 0.080 1511.9274 0 0.540 1511.9274 0 0.070 1511.9274 0 0.0215 1470.9826 4.413 0.020 1441.5629 0 0.020 1441.5629 0 0.1915 1445.9006 4.3377 0.030 1416.9826 0 0.080 1416.9826 0 0.51

Page 64: Lembar Kerja Kelompok 5

0 1416.9826 0 0.070 1416.9826 0 0.0215 1378.6089 4.1358 0.020 1351.0367 0 0.020 1351.0367 0 0.1815 1355.102 4.0653 0.030 1328 0 0.070 1328 0 0.47

0 403.8928 0 0.020 403.8928 0 0.0220 394.9355 3.1595 0.0120 382.1957 3.0576 0.0120 369.8668 2.9589 0.0120 357.9356 2.8635 0.0115 344.6522 1.034 0.010 337.7592 0 0.010 337.7592 0 0.1215 338.7755 1.0163 0.010 332 0 0.010 332 0 0.140 332 0 0.010 332 0 0.16

0 366.0537 0 0.010 366.0537 0 0.0120 357.9356 2.8635 0.0115 344.6522 1.034 0.010 337.7592 0 0.010 337.7592 0 0.0415 338.7755 1.0163 0.010 332 0 00 332 0 0.030 332 0 0.010 332 0 0.12

0 366.0537 0 0.010 366.0537 0 0.0220 357.9356 2.8635 0.0115 344.6522 1.034 0.01

Page 65: Lembar Kerja Kelompok 5

0 337.7592 0 0.010 337.7592 0 0.1215 338.7755 1.0163 0.010 332 0 0.010 332 0 0.120 332 0 0.010 332 0 0.22

5 332 0 0

5 332 0 0.01

5 332 0 0

5 332 0 0.01

5 332 0 0

5 332 0 0

5 332 0 0

5 332 0 0.01

5 332 0 0.01

5 332 0 0.01

0 332 0 0

0 332 0 0.01

Page 66: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER A

No

(PE-28) Pin Kabin (Silinder Kayu D = 10 mm, T = 70 mm1

O-1O-2O-3O-4O-5O-6O-7O-8O-9O-10O-11(PE-29) Kabin (Balok Kayu P = 55 mm, L = 35 mm, T = 50 mm

1O-12O-13O-14O-15O-16O-17O-18O-19O-20O-21O-22

Page 67: Lembar Kerja Kelompok 5

(PE-30) Pin Barrier (Silinder Kayu D = 10 mm, T = 70 mm1

O-24O-25O-26O-27O-28O-29O-30O-31(PE-31) Silinder Truk (Silinder Kayu D = 30 mm, T = 20 mm)

1O-32O-33O-34O-35O-36O-37O-38O-39O-40O-41(PE-32) Atap Barrier (Balok Kayu P = 75 mm, L = 60 mm, T = 10 mm)

1O-42O-43O-44O-45O-46O-47O-48O-49O-50O-51O-52(PE-33) Barrier (Balok Kayu P = 75 mm, L = 60 mm, T = 15 mm)

1O-53O-54O-55O-56O-57O-58

Page 68: Lembar Kerja Kelompok 5

O-59O-60O-61O-62O-63O-64(PE-34) Chasis Truk (Balok Kayu P = 280 mm, L = 25 mm, T = 25 mm)

1O-67O-68O-69O-70O-71O-72O-73O-74O-75O-76O-77O-78O-79O-80(PE-17) Roda (Silinder Kayu D = 35 mm, T = 10 mm)

8O-81O-82O-83O-84O-85O-86O-87O-88O-89O-90O-91O-92O-93O-94O-95O-96O-97O-98O-99

Page 69: Lembar Kerja Kelompok 5

O-100O-101O-102O-103O-104O-105O-106O-107O-108O-109O-110O-111O-112O-113O-114O-115O-116O-117O-118O-119O-120O-121O-122O-123O-124O-125O-126O-127O-128O-129O-130O-131O-132O-133O-134O-135O-136O-137O-138O-139O-140O-141O-142

Page 70: Lembar Kerja Kelompok 5

O-143O-144O-145O-146O-147O-148O-149O-150O-151O-152O-153O-154O-155O-156O-157O-158O-159O-160O-161O-162O-163O-164O-165O-166O-167O-168(PE-15) Poros Roda (Silinder Kayu D = 10 mm, T = 70 mm)

4O-169O-170O-171O-172O-173O-174O-175O-176O-177O-178O-179O-180O-181O-182O-183

Page 71: Lembar Kerja Kelompok 5

O-184O-185O-186O-187O-188O-189O-190O-191O-192O-193O-194O-195O-196O-197O-198O-199O-200(PE-16) Seal Roda (Silinder Kayu D = 25mm, T = 10 mm)

8O-201O-202O-203O-204O-205O-206O-207O-208O-209O-210O-211O-212O-213O-214O-215O-216O-217O-218O-219O-220O-221O-222O-223O-224

Page 72: Lembar Kerja Kelompok 5

O-225O-226O-227O-228O-229O-230O-231O-232O-233O-234O-235O-236O-237O-238O-239O-240O-241O-242O-243O-244O-245O-246O-247O-248O-249O-250O-251O-252O-253O-254O-255O-256O-257O-258O-259O-260O-261O-262O-263O-264O-265O-266O-267

Page 73: Lembar Kerja Kelompok 5

O-268O-269O-270O-271O-272O-273O-274O-275O-276O-277O-278O-279O-280O-281O-282O-283O-284O-285O-286O-287O-288(PE-35) Alas Truk (Balok Kayu P = 290 mm, L = 75 mm, T = 10 mm)

1O-290O-291O-292O-293O-294O-295O-296O-297O-298O-299(PE-36) Lower Back Body (Balok Kayu P = 160 mm, L = 25 mm, T = 15 mm)

1O-300O-301O-302O-303O-304O-305O-306O-307

Page 74: Lembar Kerja Kelompok 5

O-308O-309(PE-37) Upper Back Body (Balok Kayu P = 140 mm, L = 35 mm, T = 10 mm)

1O-310O-311O-312O-313O-314O-315O-316O-317O-318O-319O-320O-321(PE-38) Pin Back Body (Silinder Kayu D = 10 mm, T = 120 mm)

1O-322O-323O-324O-325O-326O-327O-328O-329O-330O-331(PE-14) Lampu (Silinder Kayu D = 14 mm, T = 10 mm)

2O-335O-336O-337O-338O-339O-340O-341O-342O-343O-344O-345O-346O-347

Page 75: Lembar Kerja Kelompok 5

O-348O-349O-350O-351O-352O-353O-354O-355O-356(PE-39) Pin Bumper (Silinder Kayu D = 5 mm, T = 15 mm)

1O-357O-358O-359O-360O-361O-362O-363O-364(PE-40) Bumper Truk (Balok Kayu P = 65 mm, L = 24 mm, T = 7 mm)

1O-365O-366O-367O-368O-369O-370O-371O-372O-373O-374O-375O-376(PE-13) Pin Lampu (Silinder Kayu D = 5 mm, T = 10 mm)

2O-377O-378O-379O-380O-381O-382O-383O-384

Page 76: Lembar Kerja Kelompok 5

O-385O-386O-387O-388O-389O-390O-391O-392O-393O-394O-395O-396(PE-41) Pin Beban P (Silinder Kayu D = 10 mm, T = 15 mm)

1O-398O-399O-400O-401O-402O-403O-404O-405O-406O-407O-408(PE-42) Beban Segitiga (Balok Kayu P = 45 mm, L = 40 mm, T = 10 mm)

1O-409O-410O-411O-412O-413O-414O-415O-416O-417O-418O-419O-420O-421(PE-43) Beban P (Silinder Kayu D = 30 mm, T = 15 mm)

1O-422

Page 77: Lembar Kerja Kelompok 5

O-423O-424O-425O-426O-427O-428O-429O-430O-431O-432(PE-44)

4O-433O-434O-435O-436O-437O-438O-439O-440O-441O-442O-443O-444O-445O-446O-447O-448O-449O-450O-451O-452O-453O-454O-455O-456O-457O-458O-459O-460O-461O-462O-463

Page 78: Lembar Kerja Kelompok 5

O-464(SSSA-4) Sub Sub Sub AssemblyO-332(SSSA-3) Sub Sub Sub AssemblyO-289(SSSA-2) Sub Sub Sub AssemblyO-65(SSSA-1) Sub Sub Sub AssemblyO-23(SSA-4) Sub Sub AssemblyO-465(SSA-3) Sub Sub AssemblyO-397(SSA-2) Sub Sub AssemblyO-333(SSA-1) Sub Sub AssemblyO-66(SA-2) Sub AssemblyO-466(SA-1) Sub AssemblyO-334(A-2) AssemblyO-467(A-1) AssemblyO-468

Page 79: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER A

Nama Operasi

(PE-28) Pin Kabin (Silinder Kayu D = 10 mm, T = 70 mmpcsDiukur = D = 10 , t = 70 mmDipotong = t = 70 mmDibor Bagian Atas = d = 5 mm, t = 2 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplas Dicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-29) Kabin (Balok Kayu P = 55 mm, L = 35 mm, T = 50 mmpcsDiukur = p = 55 mm, l = 35 mm, t = 50 mmDipotong = t = 50 mmDibor Bagian Atas = D = 11 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

Page 80: Lembar Kerja Kelompok 5

(PE-30) Pin Barrier (Silinder Kayu D = 10 mm, T = 70 mmpcsDiukur = D = 10 , t = 20 mmDipotong = t = 20 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-31) Silinder Truk (Silinder Kayu D = 30 mm, T = 20 mm)pcsDiukur = D = 30 , t = 20 mmDipotong = t = 20 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-32) Atap Barrier (Balok Kayu P = 75 mm, L = 60 mm, T = 10 mm)pcsDiukur = p = 55 mm, l = 35 mm, t = 50 mmDipotong = t = 10 mmDibor Bagian Atas = D = 11 mmDihaluskan PermukaanyaDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat coklat 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-33) Barrier (Balok Kayu P = 75 mm, L = 60 mm, T = 15 mm)pcsDiukur = p = 75 mm, l = 60 mm, t = 15 mmDipotong = t = 15 mmDibor Bagian Atas = D = 10 mm, t = 15 mmDibor Bagian Depan = D = 10 mm, t= 30 mmDihaluskan PermukaanyaDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)

Page 81: Lembar Kerja Kelompok 5

DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat kuning 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-34) Chasis Truk (Balok Kayu P = 280 mm, L = 25 mm, T = 25 mm)pcsDiukur = p = 280 mm, l = 60 mm, t = 15 mmDipotong = t = 15 mmDibor Bagian Atas = D = 11 mm, t = 5 mmDibor Bagian Atas = D = 11 mm, t = 5 mmDibor Bagian Samping = D = 11 mm, t = 5 mmDibor Bagian Samping = D = 11 mm, t = 5 mmDihaluskan PermukaanyaDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-17) Roda (Silinder Kayu D = 35 mm, T = 10 mm)pcsDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)

Page 82: Lembar Kerja Kelompok 5

DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplas

Page 83: Lembar Kerja Kelompok 5

Dicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-15) Poros Roda (Silinder Kayu D = 10 mm, T = 70 mm)pcsDiukur = D = 10 mm, t = 70 mmDipotong = p = 70 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)DikeringkanDiukur = D = 10 mm, t = 70 mmDipotong = p = 70 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)

Page 84: Lembar Kerja Kelompok 5

DikeringkanDiukur = D = 10 mm, t = 70 mmDipotong = p = 70 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)DikeringkanDiukur = D = 10 mm, t = 70 mmDipotong = p = 70 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-16) Seal Roda (Silinder Kayu D = 25mm, T = 10 mm)pcsDiukur = D = 25 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 25 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 25 mm, t = 10 mmDipotong = t = 10 mm

Page 85: Lembar Kerja Kelompok 5

Dibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 25 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 25 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 25 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 25 mm, t = 10 mm

Page 86: Lembar Kerja Kelompok 5

Dipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 25 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-35) Alas Truk (Balok Kayu P = 290 mm, L = 75 mm, T = 10 mm)pcsDiukur = p = 290 mm, l = 75 mm, t = 10 mmDipotong = p = 290 mmDibor Bagian Atas = D = 5 mm, t = 10 mmDibor Bagian Atas = D = 5 mm, t = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-36) Lower Back Body (Balok Kayu P = 160 mm, L = 25 mm, T = 15 mm)pcsDiukur = p = 160 mm, l = 25 mm, t = 15 mmDipotong = t = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)Dikeringkan

Page 87: Lembar Kerja Kelompok 5

Dicat (cat kuning 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-37) Upper Back Body (Balok Kayu P = 140 mm, L = 35 mm, T = 10 mm)pcsDiukur = p = 140 mm, l = 35mm , t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 11 mm, t = 5 mmDibor Bagian Atas = D = 11 mm, t = 5 mmDihaluskan PermukaanyaDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat kuning 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-38) Pin Back Body (Silinder Kayu D = 10 mm, T = 120 mm)pcsDiukur = D = 10 mm, t = 120 mmDipotong = t = 120 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat coklat 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-14) Lampu (Silinder Kayu D = 14 mm, T = 10 mm)pcsDiukur = D = 14 mm, t = 10 mmDipotong = t = 10 mmDibuat Kemiringan Pada Bagian Atas = R = 9 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 14 mm, t = 10 mmDipotong = t = 10 mm

Page 88: Lembar Kerja Kelompok 5

Dibuat Kemiringan Pada Bagian Atas = R = 9 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-39) Pin Bumper (Silinder Kayu D = 5 mm, T = 15 mm)pcsDiukur = D = 5 mm, t = 10 mmDipotong = t = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-40) Bumper Truk (Balok Kayu P = 65 mm, L = 24 mm, T = 7 mm)pcsDiukur = p = 65 mm, l = 24 mm , t = 7 mmDipotong = p = 65 mm, l = 24 mm , t = 7 mmDibor Bagian Depan = D = 3 mm, H = 10 mmDibor Bagian Depan = D = 3 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-13) Pin Lampu (Silinder Kayu D = 5 mm, T = 10 mm)pcsDiukur = D = 5 mm, t = 10 mmDipotong = t = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)Dikeringkan

Page 89: Lembar Kerja Kelompok 5

Dicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 5 mm, t = 10 mmDipotong = t = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-41) Pin Beban P (Silinder Kayu D = 10 mm, T = 15 mm)pcsDiukur = D = 10 mm, t = 15 mmDipotong = t = 15 mmDibor Di Titik Pusat = D = 8 mm, H = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-42) Beban Segitiga (Balok Kayu P = 45 mm, L = 40 mm, T = 10 mm)pcsDiukur = p = 45 mm, l = 40 mm , t = 10 mmDipotong = p = 45 mm, l = 40 mm , t = 10 mmDibor Dari Titik tengah = D = 8 mm, H = 5 mmDibor Dari Titik tengah = D = 8 mm, H = 5 mmDibor Dari Lubang Pertama = D = 5 mm, H = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-43) Beban P (Silinder Kayu D = 30 mm, T = 15 mm)pcsDiukur = D = 30 mm, t = 15 mm

Page 90: Lembar Kerja Kelompok 5

Dipotong = t = 15 mmDibor Di Titik Pusat = D = 8 mm, H = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat kuning 100 ml(t = 30 cm, d = 20 cm)DikeringkanPin Beban Bawah (Silinder Kayu D = 10 mm, T = 20 mm0pcsDiukur = D = 10 mm, t = 20 mmDipotong = t = 20 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)DikeringkanDiukur = D = 10 mm, t = 20 mmDipotong = t = 20 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)DikeringkanDiukur = D = 10 mm, t = 20 mmDipotong = t = 20 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)DikeringkanDiukur = D = 10 mm, t = 20 mmDipotong = t = 20 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)

Page 91: Lembar Kerja Kelompok 5

Dikeringkan(SSSA-4) Sub Sub Sub Assembly

Direkatkan (perekat 60 gr (t = 200 mm, d = 100 mm))(SSSA-3) Sub Sub Sub Assembly

Direkatkan (Female connector 1 pcs (P = 38 mm, L =11 mm, T = 6,5 mm)) (perekat 60 g(t = 200 mm,d = 100 mm(SSSA-2) Sub Sub Sub Assembly

Direkatkan (perekat 60 gr (t = 200 mm, d = 100 mm))(SSSA-1) Sub Sub Sub Assembly

Direkatkan (perekat 60 gr (t = 200 mm, d = 100 mm))(SSA-4) Sub Sub Assembly

Direkatkan (perekat 60 gr (t = 200 mm, d = 100 mm))(SSA-3) Sub Sub Assembly

Direkatkan (perekat 60 gr (t = 200 mm, d = 100 mm))(SSA-2) Sub Sub Assembly

Direkatkan (perekat 60 gr (t = 200 mm, d = 100 mm))(SSA-1) Sub Sub Assembly

Direkatkan (perekat 60 gr (t = 200 mm, d = 100 mm)) (male connector 1 pcs (P = 38 mm, L =11 mm, T = 6,5 mm)) (SA-2) Sub Assembly

Direkatkan (perekat 60 gr (t = 200 mm, d = 100 mm))(SA-1) Sub Assembly

Direkatkan (perekat 60 gr (t = 200 mm, d = 100 mm))(A-2) Assembly

Dirakit (Label Truk Kontainer A, 1 pcs ( P = 200 mm, L = 60 mm))(A-1) Assembly

Dikemas (Isolasi, 1 pcs (p = 100 cm, d = 5 cm) (Kardus, 1 pcs ( P =600 mm, L = 200 mm, T = 60 mm))

Page 92: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER A

Kelompok

No. Praktikan:

Kapasitas Produksi

Efisiensi Produksi:Persentase Lembur Pabrik:

Nama Mesin Waktu Baku(menit) Waktu Baku(detik)

Flexible Work Benches 0.4 24Band Saw Machine 0.2 12Radial Drilling Machine 0.38 22.8Belt & Disc Sander Machine 0.27 16.2Adjustable Work Benches 2 0.35 21Drying Area 6.1 366Sander Machine 2 0.37 22.2Paint Sprayer 0.344 20.64Drying Area 5.5 330Paint Sprayer 0.22 13.2Drying Area 6 360

Flexible Work Benches 0.3 18Circular Saw Machine 0.22 13.2Radial Drilling Machine 0.18 10.8Belt & Disc Sander Machine 0.59 35.4Adjustable Work Benches 2 0.65 39Drying Area 6.3 378Sander Machine 2 0.41 24.6Spray Gun 0.65 39Drying Area 5.4 324Paint Sprayer 0.55 33Drying Area 6.5 390

Page 93: Lembar Kerja Kelompok 5

Flexible Work Benches 0.32 19.2Band Saw Machine 0.1 6Belt & Disc Sander Machine 0.23 13.8Adjustable Work Benches 2 0.11 6.6Drying Area 6 360Sander Machine 2 0.12 7.2Adjustable Work Benches 2 0.24 14.4Drying Area 2.5 150

Flexible Work Benches 0.28 16.8Circular Saw Machine 0.2 12Belt & Disc Sander Machine 0.36 21.6Adjustable Work Benches 2 0.38 22.8Drying Area 6 360Sander Machine 2 0.11 6.6Paint Sprayer 0.23 13.8Drying Area 3 180Paint Sprayer 0.25 15Drying Area 3 180

Flexible Work Benches 0.4 24Circular Saw Machine 0.17 10.2Radial Drilling Machine 0.3 18Belt & Disc Sander Machine 0.3 18Adjustable Work Benches 2 0.47 28.2Drying Area 4.5 270Sander Machine 2 0.26 15.6Paint Sprayer 0.38 22.8Drying Area 4 240Paint Sprayer 0.525 31.5Drying Area 5 300

Flexible Work Benches 0.3 18Circular Saw Machine 0.14 8.4Radial Drilling Machine 0.4 24Radial Drilling Machine 0.4 24Belt & Disc Sander Machine 0.33 19.8Adjustable Work Benches 2 0.21 12.6

Page 94: Lembar Kerja Kelompok 5

Drying Area 4.1 246Sander Machine 2 0.21 12.6Paint Sprayer 0.27 16.2Drying Area 0.75 45Paint Sprayer 0.41 24.6Drying Area 5.3 318

Flexible Work Benches 0.3 18Circular Saw Machine 0.41 24.6Radial Drilling Machine 0.19 11.4Radial Drilling Machine 0.19 11.4Radial Drilling Machine 0.47 28.2Radial Drilling Machine 0.47 28.2Belt & Disc Sander Machine 0.79 47.4Adjustable Work Benches 2 0.12 7.2Drying Area 6 360Sander Machine 2 0.16 9.6Paint Sprayer 0.73 43.8Drying Area 0.28 16.8Paint Sprayer 0.75 45Drying Area 6 360

Flexible Work Benches 0.3 18Circular Saw Machine 0.17 10.2Radial Drilling Machine 0.15 9Belt & Disc Sander Machine 0.303 18.18Adjustable Work Benches 2 0.57 34.2Drying Area 6 360Sander Machine 2 0.26 15.6Paint Sprayer 0.38 22.8Drying Area 6.5 390Paint Sprayer 0.25 15Drying Area 6.5 390Flexible Work Benches 0.3 18Circular Saw Machine 0.17 10.2Radial Drilling Machine 0.15 9Belt & Disc Sander Machine 0.303 18.18Adjustable Work Benches 2 0.57 34.2Drying Area 6 360Sander Machine 2 0.26 15.6Paint Sprayer 0.38 22.8

Page 95: Lembar Kerja Kelompok 5

Drying Area 6.5 390Paint Sprayer 0.25 15Drying Area 6.5 390Flexible Work Benches 0.3 18Circular Saw Machine 0.17 10.2Radial Drilling Machine 0.15 9Belt & Disc Sander Machine 0.303 18.18Adjustable Work Benches 2 0.57 34.2Drying Area 6 360Sander Machine 2 0.26 15.6Paint Sprayer 0.38 22.8Drying Area 6.5 390Paint Sprayer 0.25 15Drying Area 6.5 390Flexible Work Benches 0.3 18Circular Saw Machine 0.17 10.2Radial Drilling Machine 0.15 9Belt & Disc Sander Machine 0.303 18.18Adjustable Work Benches 2 0.57 34.2Drying Area 6 360Sander Machine 2 0.26 15.6Paint Sprayer 0.38 22.8Drying Area 6.5 390Paint Sprayer 0.25 15Drying Area 6.5 390Flexible Work Benches 0.3 18Circular Saw Machine 0.17 10.2Radial Drilling Machine 0.15 9Belt & Disc Sander Machine 0.303 18.18Adjustable Work Benches 2 0.57 34.2Drying Area 6 360Sander Machine 2 0.26 15.6Paint Sprayer 0.38 22.8Drying Area 6.5 390Paint Sprayer 0.25 15Drying Area 6.5 390Flexible Work Benches 0.3 18Circular Saw Machine 0.17 10.2Radial Drilling Machine 0.15 9Belt & Disc Sander Machine 0.303 18.18Adjustable Work Benches 2 0.57 34.2Drying Area 6 360Sander Machine 2 0.26 15.6

Page 96: Lembar Kerja Kelompok 5

Paint Sprayer 0.38 22.8Drying Area 6.5 390Paint Sprayer 0.25 15Drying Area 6.5 390Flexible Work Benches 0.3 18Circular Saw Machine 0.17 10.2Radial Drilling Machine 0.15 9Belt & Disc Sander Machine 0.303 18.18Adjustable Work Benches 2 0.57 34.2Drying Area 6 360Sander Machine 2 0.26 15.6Paint Sprayer 0.38 22.8Drying Area 6.5 390Paint Sprayer 0.25 15Drying Area 6.5 390Flexible Work Benches 0.3 18Circular Saw Machine 0.17 10.2Radial Drilling Machine 0.15 9Belt & Disc Sander Machine 0.303 18.18Adjustable Work Benches 2 0.57 34.2Drying Area 6 360Sander Machine 2 0.26 15.6Paint Sprayer 0.38 22.8Drying Area 6.5 390Paint Sprayer 0.25 15Drying Area 6.5 390

Flexible Work Benches 0.5 30Circular Saw Machine 0.35 21Belt & Disc Sander Machine 0.19 11.4Adjustable Work Benches 2 0.24 14.4Drying Area 4 240Sander Machine 2 0.25 15Adjustable Work Benches 2 0.75 45Drying Area 6 360Flexible Work Benches 0.5 30Circular Saw Machine 0.35 21Belt & Disc Sander Machine 0.19 11.4Adjustable Work Benches 2 0.24 14.4Drying Area 4 240Sander Machine 2 0.25 15Adjustable Work Benches 2 0.75 45

Page 97: Lembar Kerja Kelompok 5

Drying Area 6 360Flexible Work Benches 0.5 30Circular Saw Machine 0.35 21Belt & Disc Sander Machine 0.19 11.4Adjustable Work Benches 2 0.24 14.4Drying Area 4 240Sander Machine 2 0.25 15Adjustable Work Benches 2 0.75 45Drying Area 6 360Flexible Work Benches 0.5 30Circular Saw Machine 0.35 21Belt & Disc Sander Machine 0.19 11.4Adjustable Work Benches 2 0.24 14.4Drying Area 4 240Sander Machine 2 0.25 15Adjustable Work Benches 2 0.75 45Drying Area 6 360

Flexible Work Benches 0.4 24Circular Saw Machine 0.4 24Radial Drilling Machine 0.4 24Belt & Disc Sander Machine 0.3 18Adjustable Work Benches 2 0.42 25.2Drying Area 4 240Sander Machine 2 0.46 27.6Paint Sprayer 0.53 31.8Drying Area 4 240Paint Sprayer 0.54 32.4Drying Area 6 360Flexible Work Benches 0.4 24Circular Saw Machine 0.4 24Radial Drilling Machine 0.4 24Belt & Disc Sander Machine 0.3 18Adjustable Work Benches 2 0.42 25.2Drying Area 4 240Sander Machine 2 0.46 27.6Paint Sprayer 0.53 31.8Drying Area 4 240Paint Sprayer 0.54 32.4Drying Area 6 360Flexible Work Benches 0.4 24Circular Saw Machine 0.4 24

Page 98: Lembar Kerja Kelompok 5

Radial Drilling Machine 0.4 24Belt & Disc Sander Machine 0.3 18Adjustable Work Benches 2 0.42 25.2Drying Area 4 240Sander Machine 2 0.46 27.6Paint Sprayer 0.53 31.8Drying Area 4 240Paint Sprayer 0.54 32.4Drying Area 6 360Flexible Work Benches 0.4 24Circular Saw Machine 0.4 24Radial Drilling Machine 0.4 24Belt & Disc Sander Machine 0.3 18Adjustable Work Benches 2 0.42 25.2Drying Area 4 240Sander Machine 2 0.46 27.6Paint Sprayer 0.53 31.8Drying Area 4 240Paint Sprayer 0.54 32.4Drying Area 6 360Flexible Work Benches 0.4 24Circular Saw Machine 0.4 24Radial Drilling Machine 0.4 24Belt & Disc Sander Machine 0.3 18Adjustable Work Benches 2 0.42 25.2Drying Area 4 240Sander Machine 2 0.46 27.6Paint Sprayer 0.53 31.8Drying Area 4 240Paint Sprayer 0.54 32.4Drying Area 6 360Flexible Work Benches 0.4 24Circular Saw Machine 0.4 24Radial Drilling Machine 0.4 24Belt & Disc Sander Machine 0.3 18Adjustable Work Benches 2 0.42 25.2Drying Area 4 240Sander Machine 2 0.46 27.6Paint Sprayer 0.53 31.8Drying Area 4 240Paint Sprayer 0.54 32.4Drying Area 6 360Flexible Work Benches 0.4 24

Page 99: Lembar Kerja Kelompok 5

Circular Saw Machine 0.4 24Radial Drilling Machine 0.4 24Belt & Disc Sander Machine 0.3 18Adjustable Work Benches 2 0.42 25.2Drying Area 4 240Sander Machine 2 0.46 27.6Paint Sprayer 0.53 31.8Drying Area 4 240Paint Sprayer 0.54 32.4Drying Area 6 360Flexible Work Benches 0.4 24Circular Saw Machine 0.4 24Radial Drilling Machine 0.4 24Belt & Disc Sander Machine 0.3 18Adjustable Work Benches 2 0.42 25.2Drying Area 4 240Sander Machine 2 0.46 27.6Paint Sprayer 0.53 31.8Drying Area 4 240Paint Sprayer 0.54 32.4Drying Area 6 360

Flexible Work Benches 0.35 21Band Saw Machine 0.11 6.6Radial Drilling Machine 0.13 7.8Radial Drilling Machine 0.13 7.8Belt & Disc Sander Machine 0.2 12Adjustable Work Benches 2 0.5 30Drying Area 5.4 324Sander Machine 2 0.57 34.2Adjustable Work Benches 2 0.22 13.2Drying Area 6.5 390

Flexible Work Benches 0.26 15.6Band Saw Machine 0.32 19.2Belt & Disc Sander Machine 0.18 10.8Adjustable Work Benches 2 0.19 11.4Drying Area 4 240Sander Machine 2 0.48 28.8Paint Sprayer 0.24 14.4Drying Area 4.5 270

Page 100: Lembar Kerja Kelompok 5

Paint Sprayer 0.51 30.6Drying Area 6 360

Flexible Work Benches 0.3 18Circular Saw Machine 0.41 24.6Radial Drilling Machine 0.09 5.4Radial Drilling Machine 0.1 6Belt & Disc Sander Machine 0.29 17.4Adjustable Work Benches 2 0.32 19.2Drying Area 0.26 15.6Sander Machine 2 0.2 12Paint Sprayer 0.28 16.8Drying Area 1.5 90Paint Sprayer 0.41 24.6Drying Area 6.5 390

Flexible Work Benches 0.2 12Circular Saw Machine 0.1 6Belt & Disc Sander Machine 0.17 10.2Adjustable Work Benches 2 0.28 16.8Drying Area 3.5 210Sander Machine 2 0.35 21Paint Sprayer 0.35 21Drying Area 2.5 150Paint Sprayer 0.19 11.4Drying Area 3 180

Flexible Work Benches 0.3 18Circular Saw Machine 0.42 25.2Band Saw Machine 0.29 17.4Belt & Disc Sander Machine 0.25 15Adjustable Work Benches 2 0.32 19.2Drying Area 5 300Sander Machine 2 0.29 17.4Paint Sprayer 0.32 19.2Drying Area 6.5 390Paint Sprayer 0.33 19.8Drying Area 6 360Flexible Work Benches 0.3 18Circular Saw Machine 0.42 25.2

Page 101: Lembar Kerja Kelompok 5

Band Saw Machine 0.29 17.4Belt & Disc Sander Machine 0.25 15Adjustable Work Benches 2 0.32 19.2Drying Area 5 300Sander Machine 2 0.29 17.4Paint Sprayer 0.32 19.2Drying Area 6.5 390Paint Sprayer 0.33 19.8Drying Area 6 360

Flexible Work Benches 0.3 18Circular Saw Machine 0.1 6Belt & Disc Sander Machine 0.42 25.2Adjustable Work Benches 2 0.4 24Drying Area 2.5 150Sander Machine 2 0.15 9Adjustable Work Benches 2 0.25 15Drying Area 3 180

Flexible Work Benches 0.3 18Circular Saw Machine 0.4 24Radial Drilling Machine 0.41 24.6Radial Drilling Machine 0.41 24.6Belt & Disc Sander Machine 0.31 18.6Adjustable Work Benches 2 0.25 15Drying Area 5 300Sander Machine 2 0.23 13.8Paint Sprayer 0.53 31.8Drying Area 4 240Paint Sprayer 0.42 25.2Drying Area 6 360

Flexible Work Benches 0.2 12Circular Saw Machine 0.1 6Belt & Disc Sander Machine 0.6 36Adjustable Work Benches 2 0.15 9Drying Area 2 120Sander Machine 2 0.61 36.6Paint Sprayer 0.11 6.6Adjustable Work Benches 2 2 120

Page 102: Lembar Kerja Kelompok 5

Paint Sprayer 0.15 9Drying Area 3 180Flexible Work Benches 0.2 12Circular Saw Machine 0.1 6Belt & Disc Sander Machine 0.6 36Adjustable Work Benches 2 0.15 9Drying Area 2 120Sander Machine 2 0.61 36.6Paint Sprayer 0.11 6.6Adjustable Work Benches 2 2 120Paint Sprayer 0.15 9Drying Area 3 180

Flexible Work Benches 0.2 12Band Saw Machine 0.1 6Radial Drilling Machine 0.9 54Belt & Disc Sander Machine 0.15 9Adjustable Work Benches 2 0.21 12.6Drying Area 2 120Sander Machine 2 0.21 12.6Paint Sprayer 0.15 9Drying Area 6 360Paint Sprayer 0.25 15Drying Area 3 180

Flexible Work Benches 0.22 13.2Circular Saw Machine 0.23 13.8Radial Drilling Machine 0.1 6Radial Drilling Machine 0.1 6Radial Drilling Machine 0.12 7.2Belt & Disc Sander Machine 0.31 18.6Adjustable Work Benches 2 0.75 45Drying Area 6.5 390Sander Machine 2 0.31 18.6Paint Sprayer 5.05 303Drying Area 6 360Paint Sprayer 0.31 18.6Drying Area 6.5 390

Flexible Work Benches 0.21 12.6

Page 103: Lembar Kerja Kelompok 5

Band Saw Machine 0.6 36Radial Drilling Machine 0.18 10.8Belt & Disc Sander Machine 0.2 12Adjustable Work Benches 2 0.18 10.8Drying Area 5 300Sander Machine 2 0.33 19.8Paint Sprayer 0.24 14.4Drying Area 5 300Paint Sprayer 0.25 15Drying Area 6 360

Flexible Work Benches 0.18 10.8Band Saw Machine 0.1 6Belt & Disc Sander Machine 0.1 6Adjustable Work Benches 2 0.12 7.2Drying Area 2 120Sander Machine 1 0.24 14.4Adjustable Work Benches 2 0.15 9Drying Area 3 180Flexible Work Benches 0.18 10.8Band Saw Machine 0.1 6Belt & Disc Sander Machine 0.1 6Adjustable Work Benches 2 0.12 7.2Drying Area 2 120Sander Machine 1 0.24 14.4Adjustable Work Benches 2 0.15 9Drying Area 3 180Flexible Work Benches 0.18 10.8Band Saw Machine 0.1 6Belt & Disc Sander Machine 0.1 6Adjustable Work Benches 2 0.12 7.2Drying Area 2 120Sander Machine 1 0.24 14.4Adjustable Work Benches 2 0.15 9Drying Area 3 180Flexible Work Benches 0.18 10.8Band Saw Machine 0.1 6Belt & Disc Sander Machine 0.1 6Adjustable Work Benches 2 0.12 7.2Drying Area 2 120Sander Machine 1 0.24 14.4Adjustable Work Benches 2 0.15 9

Page 104: Lembar Kerja Kelompok 5

Drying Area 3 180

Adjustable Work Benches 1 0.17 10.2

Adjustable Work Benches 1 0.16 9.6

Adjustable Work Benches 1 0.15 9

Adjustable Work Benches 1 0.06 3.6

Adjustable Work Benches 1 0.16 9.6

Adjustable Work Benches 1 0.19 11.4

Adjustable Work Benches 1 0.16 9.6

Adjustable Work Benches 1 0.19 11.4

Adjustable Work Benches 1 0.13 7.8

Adjustable Work Benches 1 0.18 10.8

Steel Work Benches C 0.16 9.6

Basic Packing C 0.2 12

Page 105: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER A

5

327 Unit Truk Kontainer A334 Unit Loko Beban A332 Unit Truk Kontainer B324 Unit Loko Beban B91 %15 %

Waktu Setup(detik) Kapasitas mesin teoris/bulan %Skrap

0 23100 066000 40700 358080 21768.42 415840 33244.44 2

0 26400 00 1514.75 00 24972.97 2

18480 25965.12 00 1680 0

18480 40600 00 1540 0

0 30800 039600 39000 258080 45955.56 415840 15213.56 2

0 14215.38 00 1466.67 00 22536.59 2

48840 12963.08 00 1711.11 0

18480 16240 00 1421.54 0

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Page 106: Lembar Kerja Kelompok 5

0 28875 066000 81400 315840 39026.09 2

0 84000 00 1540 00 77000 20 38500 00 3696 0

0 33000 039600 42900 215840 24933.33 2

0 24315.79 00 1540 00 84000 2

18480 38834.78 00 3080 0

18480 35728 00 3080 0

0 23100 039600 50470.59 258080 27573.33 415840 29920 2

0 19659.57 00 2053.33 00 35538.46 2

18480 23505.26 00 2310 0

18480 17013.33 00 1848 0

0 30800 039600 61285.71 258080 20680 458080 20680 415840 27200 2

0 44000 0

Page 107: Lembar Kerja Kelompok 5

0 2253.66 00 44000 2

18480 33081.48 00 12320 0

18480 21785.37 00 1743.4 0

0 30800 039600 20926.83 258080 43536.84 458080 43536.84 458080 17600 458080 17600 415840 11362.03 2

0 77000 00 1540 00 57750 2

18480 12235.62 00 33000 0

18480 11909.33 00 1540 0

0 30800 039600 50470.59 258080 55146.67 415840 29623.76 2

0 16210.53 00 1540 00 35538.46 2

18480 23505.26 00 1421.54 0

18480 35728 00 1421.54 00 30800 0

39600 50470.59 258080 55146.67 415840 29623.76 2

0 16210.53 00 1540 00 35538.46 2

18480 23505.26 0

Page 108: Lembar Kerja Kelompok 5

0 1421.54 018480 35728 0

0 1421.54 00 30800 0

39600 50470.59 258080 55146.67 415840 29623.76 2

0 16210.53 00 1540 00 35538.46 2

18480 23505.26 00 1421.54 0

18480 35728 00 1421.54 00 30800 0

39600 50470.59 258080 55146.67 415840 29623.76 2

0 16210.53 00 1540 00 35538.46 2

18480 23505.26 00 1421.54 0

18480 35728 00 1421.54 00 30800 0

39600 50470.59 258080 55146.67 415840 29623.76 2

0 16210.53 00 1540 00 35538.46 2

18480 23505.26 00 1421.54 0

18480 35728 00 1421.54 00 30800 0

39600 50470.59 258080 55146.67 415840 29623.76 2

0 16210.53 00 1540 00 35538.46 2

Page 109: Lembar Kerja Kelompok 5

18480 23505.26 00 1421.54 0

18480 35728 00 1421.54 00 30800 0

39600 50470.59 258080 55146.67 415840 29623.76 2

0 16210.53 00 1540 00 35538.46 2

18480 23505.26 00 1421.54 0

18480 35728 00 1421.54 00 30800 0

39600 50470.59 258080 55146.67 415840 29623.76 2

0 16210.53 00 1540 00 35538.46 2

18480 23505.26 00 1421.54 0

18480 35728 00 1421.54 0

0 18480 039600 24514.29 215840 47242.11 2

0 38500 00 2310 00 36960 20 12320 00 1540 00 18480 0

39600 24514.29 215840 47242.11 2

0 38500 00 2310 00 36960 20 12320 0

Page 110: Lembar Kerja Kelompok 5

0 1540 00 18480 0

39600 24514.29 215840 47242.11 2

0 38500 00 2310 00 36960 20 12320 00 1540 00 18480 0

39600 24514.29 215840 47242.11 2

0 38500 00 2310 00 36960 20 12320 00 1540 0

0 23100 039600 21450 258080 20680 415840 29920 2

0 22000 00 2310 00 20086.96 2

18480 16852.83 00 2310 0

18480 16540.74 00 1540 00 23100 0

39600 21450 258080 20680 415840 29920 2

0 22000 00 2310 00 20086.96 2

18480 16852.83 00 2310 0

18480 16540.74 00 1540 00 23100 0

39600 21450 2

Page 111: Lembar Kerja Kelompok 5

58080 20680 415840 29920 2

0 22000 00 2310 00 20086.96 2

18480 16852.83 00 2310 0

18480 16540.74 00 1540 00 23100 0

39600 21450 258080 20680 415840 29920 2

0 22000 00 2310 00 20086.96 2

18480 16852.83 00 2310 0

18480 16540.74 00 1540 00 23100 0

39600 21450 258080 20680 415840 29920 2

0 22000 00 2310 00 20086.96 2

18480 16852.83 00 2310 0

18480 16540.74 00 1540 00 23100 0

39600 21450 258080 20680 415840 29920 2

0 22000 00 2310 00 20086.96 2

18480 16852.83 00 2310 0

18480 16540.74 00 1540 00 23100 0

Page 112: Lembar Kerja Kelompok 5

39600 21450 258080 20680 415840 29920 2

0 22000 00 2310 00 20086.96 2

18480 16852.83 00 2310 0

18480 16540.74 00 1540 00 23100 0

39600 21450 258080 20680 415840 29920 2

0 22000 00 2310 00 20086.96 2

18480 16852.83 00 2310 0

18480 16540.74 00 1540 0

0 26400 066000 74000 358080 63630.77 458080 63630.77 415840 44880 2

0 18480 00 1711.11 00 16210.53 20 42000 00 1421.54 0

0 35538.46 066000 25437.5 315840 49866.67 2

0 48631.58 00 2310 00 19250 2

18480 37216.67 00 2053.33 0

Page 113: Lembar Kerja Kelompok 5

18480 17513.73 00 1540 0

0 30800 039600 20926.83 258080 91911.11 458080 82720 415840 30951.72 2

0 28875 00 35538.46 00 46200 2

18480 31900 00 6160 0

18480 21785.37 00 1421.54 0

0 46200 039600 85800 215840 52800 2

0 33000 00 2640 00 26400 2

18480 25520 00 3696 0

18480 47010.53 00 3080 0

0 30800 039600 20428.57 266000 28068.97 315840 35904 2

0 28875 00 1848 00 31862.07 2

18480 27912.5 00 1421.54 0

18480 27066.67 00 1540 00 30800 0

39600 20428.57 2

Page 114: Lembar Kerja Kelompok 5

66000 28068.97 315840 35904 2

0 28875 00 1848 00 31862.07 2

18480 27912.5 00 1421.54 0

18480 27066.67 00 1540 0

0 30800 039600 85800 215840 21371.43 2

0 23100 00 3696 00 61600 20 36960 00 3080 0

0 30800 039600 21450 258080 20175.61 458080 20175.61 415840 28954.84 2

0 36960 00 1848 00 40173.91 2

18480 16852.83 00 2310 0

18480 21266.67 00 1540 0

0 46200 039600 85800 215840 14960 2

0 61600 00 4620 00 15147.54 2

18480 81200 00 4620 0

Page 115: Lembar Kerja Kelompok 5

18480 59546.67 00 3080 00 46200 0

39600 85800 215840 14960 2

0 61600 00 4620 00 15147.54 2

18480 81200 00 4620 0

18480 59546.67 00 3080 0

0 46200 066000 81400 358080 9191.11 415840 59840 2

0 44000 00 4620 00 44000 2

18480 59546.67 00 1540 0

18480 35728 00 3080 0

0 42000 039600 37304.35 258080 82720 458080 82720 458080 68933.33 415840 28954.84 2

0 12320 00 1421.54 00 29806.45 2

18480 1768.71 00 1540 0

18480 28812.9 00 1421.54 0

0 44000 0

Page 116: Lembar Kerja Kelompok 5

66000 13566.67 358080 45955.56 415840 44880 2

0 51333.33 00 1848 00 28000 2

18480 37216.67 00 1848 0

18480 35728 00 1540 0

0 51333.33 066000 81400 315840 89760 2

0 77000 00 4620 00 38500 00 61600 00 3080 00 51333.33 0

66000 81400 315840 89760 2

0 77000 00 4620 00 38500 00 61600 00 3080 00 51333.33 0

66000 81400 315840 89760 2

0 77000 00 4620 00 38500 00 61600 00 3080 00 51333.33 0

66000 81400 315840 89760 2

0 77000 00 4620 00 38500 00 61600 0

Page 117: Lembar Kerja Kelompok 5

0 3080 0

0 54352.94 0

0 57750 0

0 61600 0

0 154000 0

0 57750 0

0 48631.58 0

0 57750 0

0 48631.58 0

0 71076.92 0

0 51333.33 0

0 57750 0

0 46200 0

Page 118: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER A

Jumlah Diharapkan per bulan Jumlah Disiapkan per bulan Produksi Pada efisiensi

360.5409 360.5409 396.1988349.7247 360.5409 396.1988338.4433 349.7247 384.3129332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

356.8619 356.8619 392.1559349.7247 356.8619 392.1559338.4433 349.7247 384.3129332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

Page 119: Lembar Kerja Kelompok 5

348.9106 348.9106 383.4182338.4433 348.9106 383.4182332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407

345.3503 345.3503 379.5058338.4433 345.3503 379.5058332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

356.8619 356.8619 392.1559349.7247 356.8619 392.1559338.4433 349.7247 384.3129332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

368.7573 368.7573 405.2278361.3822 368.7573 405.2278349.7247 361.3822 397.1233338.4433 349.7247 384.3129332.6725 338.4433 371.9157332.6725 332.6725 365.5742

Page 120: Lembar Kerja Kelompok 5

332.6725 332.6725 365.5742327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

393.7509 393.7509 432.6933385.8759 393.7509 432.6933373.4283 385.8759 424.0395361.3822 373.4283 410.3608349.7247 361.3822 397.1233338.4433 349.7247 384.3129332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

5263.2983 5263.2983 5783.84435158.0323 5263.2983 5783.84434991.6441 5158.0323 5668.16744906.5308 4991.6441 5485.32324906.5308 4906.5308 5391.79214906.5308 4906.5308 5391.79214822.8688 4906.5308 5391.79214822.8688 4822.8688 5299.85584822.8688 4822.8688 5299.85584822.8688 4822.8688 5299.85584822.8688 4822.8688 5299.85584822.8688 4822.8688 5299.85584726.4114 4822.8688 5299.85584573.9465 4726.4114 5193.85874495.9554 4573.9465 5026.31484495.9554 4495.9554 4940.61034495.9554 4495.9554 4940.61034419.2942 4495.9554 4940.61034419.2942 4419.2942 4856.3673

Page 121: Lembar Kerja Kelompok 5

4419.2942 4419.2942 4856.36734419.2942 4419.2942 4856.36734419.2942 4419.2942 4856.36734419.2942 4419.2942 4856.36734330.9083 4419.2942 4856.36734191.2016 4330.9083 4759.23994119.7367 4191.2016 4605.7164119.7367 4119.7367 4527.18324119.7367 4119.7367 4527.18324049.4904 4119.7367 4527.18324049.4904 4049.4904 4449.98954049.4904 4049.4904 4449.98954049.4904 4049.4904 4449.98954049.4904 4049.4904 4449.98954049.4904 4049.4904 4449.98953968.5006 4049.4904 4449.98953840.4844 3968.5006 4360.98973774.9997 3840.4844 4220.31253774.9997 3774.9997 4148.35133774.9997 3774.9997 4148.35133710.6316 3774.9997 4148.35133710.6316 3710.6316 4077.61713710.6316 3710.6316 4077.61713710.6316 3710.6316 4077.61713710.6316 3710.6316 4077.61713710.6316 3710.6316 4077.61713636.419 3710.6316 4077.6171

3519.1152 3636.419 3996.06483459.1102 3519.1152 3867.15963459.1102 3459.1102 3801.223459.1102 3459.1102 3801.223400.1284 3459.1102 3801.223400.1284 3400.1284 3736.40483400.1284 3400.1284 3736.40483400.1284 3400.1284 3736.40483400.1284 3400.1284 3736.40483400.1284 3400.1284 3736.40483332.1258 3400.1284 3736.40483224.6379 3332.1258 3661.67673169.6541 3224.6379 3543.55813169.6541 3169.6541 3483.13643169.6541 3169.6541 3483.13643115.6079 3169.6541 3483.1364

Page 122: Lembar Kerja Kelompok 5

3115.6079 3115.6079 3423.74493115.6079 3115.6079 3423.74493115.6079 3115.6079 3423.74493115.6079 3115.6079 3423.74493115.6079 3115.6079 3423.74493053.2957 3115.6079 3423.74492954.8023 3053.2957 3355.272904.4195 2954.8023 3247.03552904.4195 2904.4195 3191.66982904.4195 2904.4195 3191.66982854.8958 2904.4195 3191.66982854.8958 2854.8958 3137.24812854.8958 2854.8958 3137.24812854.8958 2854.8958 3137.24812854.8958 2854.8958 3137.24812854.8958 2854.8958 3137.24812797.7979 2854.8958 3137.24812707.5464 2797.7979 3074.50322661.3796 2707.5464 2975.32572661.3796 2661.3796 2924.5932661.3796 2661.3796 2924.593

2616 2661.3796 2924.5932616 2616 2874.72532616 2616 2874.72532616 2616 2874.72532616 2616 2874.7253

1627.2567 1627.2567 1788.19421594.7116 1627.2567 1788.19421567.5199 1594.7116 1752.43031567.5199 1567.5199 1722.54931567.5199 1567.5199 1722.54931540.7919 1567.5199 1722.54931540.7919 1540.7919 1693.17791540.7919 1540.7919 1693.17791540.7919 1540.7919 1693.17791509.9761 1540.7919 1693.17791484.2293 1509.9761 1659.31441484.2293 1484.2293 1631.02121484.2293 1484.2293 1631.02121458.9215 1484.2293 1631.02121458.9215 1458.9215 1603.2104

Page 123: Lembar Kerja Kelompok 5

1458.9215 1458.9215 1603.21041458.9215 1458.9215 1603.21041429.7431 1458.9215 1603.21041405.3643 1429.7431 1571.14631405.3643 1405.3643 1544.35641405.3643 1405.3643 1544.35641381.4012 1405.3643 1544.35641381.4012 1381.4012 1518.02331381.4012 1381.4012 1518.02331381.4012 1381.4012 1518.02331353.7732 1381.4012 1518.02331330.6898 1353.7732 1487.66291330.6898 1330.6898 1462.29651330.6898 1330.6898 1462.2965

1308 1330.6898 1462.29651308 1308 1437.36261308 1308 1437.3626

5263.2983 5263.2983 5783.84435158.0323 5263.2983 5783.84434991.6441 5158.0323 5668.16744906.5308 4991.6441 5485.32324906.5308 4906.5308 5391.79214906.5308 4906.5308 5391.79214822.8688 4906.5308 5391.79214822.8688 4822.8688 5299.85584822.8688 4822.8688 5299.85584822.8688 4822.8688 5299.85584822.8688 4822.8688 5299.85584822.8688 4822.8688 5299.85584726.4114 4822.8688 5299.85584573.9465 4726.4114 5193.85874495.9554 4573.9465 5026.31484495.9554 4495.9554 4940.61034495.9554 4495.9554 4940.61034419.2942 4495.9554 4940.61034419.2942 4419.2942 4856.36734419.2942 4419.2942 4856.36734419.2942 4419.2942 4856.36734419.2942 4419.2942 4856.36734419.2942 4419.2942 4856.36734330.9083 4419.2942 4856.3673

Page 124: Lembar Kerja Kelompok 5

4191.2016 4330.9083 4759.23994119.7367 4191.2016 4605.7164119.7367 4119.7367 4527.18324119.7367 4119.7367 4527.18324049.4904 4119.7367 4527.18324049.4904 4049.4904 4449.98954049.4904 4049.4904 4449.98954049.4904 4049.4904 4449.98954049.4904 4049.4904 4449.98954049.4904 4049.4904 4449.98953968.5006 4049.4904 4449.98953840.4844 3968.5006 4360.98973774.9997 3840.4844 4220.31253774.9997 3774.9997 4148.35133774.9997 3774.9997 4148.35133710.6316 3774.9997 4148.35133710.6316 3710.6316 4077.61713710.6316 3710.6316 4077.61713710.6316 3710.6316 4077.61713710.6316 3710.6316 4077.61713710.6316 3710.6316 4077.61713636.419 3710.6316 4077.6171

3519.1152 3636.419 3996.06483459.1102 3519.1152 3867.15963459.1102 3459.1102 3801.223459.1102 3459.1102 3801.223400.1284 3459.1102 3801.223400.1284 3400.1284 3736.40483400.1284 3400.1284 3736.40483400.1284 3400.1284 3736.40483400.1284 3400.1284 3736.40483400.1284 3400.1284 3736.40483332.1258 3400.1284 3736.40483224.6379 3332.1258 3661.67673169.6541 3224.6379 3543.55813169.6541 3169.6541 3483.13643169.6541 3169.6541 3483.13643115.6079 3169.6541 3483.13643115.6079 3115.6079 3423.74493115.6079 3115.6079 3423.74493115.6079 3115.6079 3423.74493115.6079 3115.6079 3423.74493115.6079 3115.6079 3423.7449

Page 125: Lembar Kerja Kelompok 5

3053.2957 3115.6079 3423.74492954.8023 3053.2957 3355.272904.4195 2954.8023 3247.03552904.4195 2904.4195 3191.66982904.4195 2904.4195 3191.66982854.8958 2904.4195 3191.66982854.8958 2854.8958 3137.24812854.8958 2854.8958 3137.24812854.8958 2854.8958 3137.24812854.8958 2854.8958 3137.24812854.8958 2854.8958 3137.24812797.7979 2854.8958 3137.24812707.5464 2797.7979 3074.50322661.3796 2707.5464 2975.32572661.3796 2661.3796 2924.5932661.3796 2661.3796 2924.593

2616 2661.3796 2924.5932616 2616 2874.72532616 2616 2874.72532616 2616 2874.72532616 2616 2874.7253

372.559 372.559 409.4055361.3822 372.559 409.4055349.7247 361.3822 397.1233338.4433 349.7247 384.3129332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407

348.9106 348.9106 383.4182338.4433 348.9106 383.4182332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407

Page 126: Lembar Kerja Kelompok 5

327 327 359.3407327 327 359.3407

368.7573 368.7573 405.2278361.3822 368.7573 405.2278349.7247 361.3822 397.1233338.4433 349.7247 384.3129332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

345.3503 345.3503 379.5058338.4433 345.3503 379.5058332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

775.2797 775.2797 851.9557759.7741 775.2797 851.9557736.9809 759.7741 834.9166724.4145 736.9809 809.8691724.4145 724.4145 796.0599724.4145 724.4145 796.0599712.0624 724.4145 796.0599712.0624 712.0624 782.4862712.0624 712.0624 782.4862712.0624 712.0624 782.4862712.0624 712.0624 782.4862712.0624 712.0624 782.4862697.8212 712.0624 782.4862

Page 127: Lembar Kerja Kelompok 5

676.8866 697.8212 766.8365665.3449 676.8866 743.8314665.3449 665.3449 731.1482665.3449 665.3449 731.1482

654 665.3449 731.1482654 654 718.6813654 654 718.6813654 654 718.6813654 654 718.6813

345.3503 345.3503 379.5058338.4433 345.3503 379.5058332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407

368.7573 368.7573 405.2278361.3822 368.7573 405.2278349.7247 361.3822 397.1233338.4433 349.7247 384.3129332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

729.4607 729.4607 801.6052714.8715 729.4607 801.6052702.6821 714.8715 785.5731702.6821 702.6821 772.1781702.6821 702.6821 772.1781690.7006 702.6821 772.1781690.7006 690.7006 759.0116690.7006 690.7006 759.0116

Page 128: Lembar Kerja Kelompok 5

690.7006 690.7006 759.0116690.7006 690.7006 759.0116690.7006 690.7006 759.0116676.8866 690.7006 759.0116665.3449 676.8866 743.8314665.3449 665.3449 731.1482665.3449 665.3449 731.1482

654 665.3449 731.1482654 654 718.6813654 654 718.6813654 654 718.6813654 654 718.6813

360.5409 360.5409 396.1988349.7247 360.5409 396.1988338.4433 349.7247 384.3129332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

381.0493 381.0493 418.7355373.4283 381.0493 418.7355361.3822 373.4283 410.3608349.7247 361.3822 397.1233338.4433 349.7247 384.3129332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

360.5409 360.5409 396.1988

Page 129: Lembar Kerja Kelompok 5

349.7247 360.5409 396.1988338.4433 349.7247 384.3129332.6725 338.4433 371.9157332.6725 332.6725 365.5742332.6725 332.6725 365.5742

327 332.6725 365.5742327 327 359.3407327 327 359.3407327 327 359.3407327 327 359.3407

1582.6947 1582.6947 1739.22491535.2139 1582.6947 1739.22491509.0367 1535.2139 1687.04821509.0367 1509.0367 1658.28211509.0367 1509.0367 1658.28211509.0367 1509.0367 1658.28211509.0367 1509.0367 1658.28211509.0367 1509.0367 1658.28211509.0367 1509.0367 1658.28211463.7656 1509.0367 1658.28211438.8067 1463.7656 1608.53361438.8067 1438.8067 1581.10631438.8067 1438.8067 1581.10631438.8067 1438.8067 1581.10631438.8067 1438.8067 1581.10631438.8067 1438.8067 1581.10631438.8067 1438.8067 1581.10631395.6425 1438.8067 1581.10631371.8452 1395.6425 1533.67311371.8452 1371.8452 1507.52221371.8452 1371.8452 1507.52221371.8452 1371.8452 1507.52221371.8452 1371.8452 1507.52221371.8452 1371.8452 1507.52221371.8452 1371.8452 1507.52221330.6898 1371.8452 1507.5222

1308 1330.6898 1462.29651308 1308 1437.36261308 1308 1437.36261308 1308 1437.36261308 1308 1437.3626

Page 130: Lembar Kerja Kelompok 5

1308 1308 1437.3626

327 327 359.3407

327 327 359.3407

327 327 359.3407

327 327 359.3407

327 327 359.3407

327 327 359.3407

327 327 359.3407

327 327 359.3407

327 327 359.3407

327 327 359.3407

327 327 359.3407

327 327 359.3407

Page 131: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER A

Realibitas Mesin(%) %Daur Ulang Tanpa Daur Ulang

100 0 360.540985 0 360.540990 20 352.5451

100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 32790 0 327

100 0 327

100 0 356.8619100 0 356.8619

90 20 352.5451100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 32790 0 327

100 0 327

Page 132: Lembar Kerja Kelompok 5

100 0 348.910685 0 348.9106

100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.6735100 0 327100 0 327

100 0 345.3503100 0 345.3503100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 32790 0 327

100 0 327

100 0 356.8619100 0 356.8619

90 20 352.5451100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 32790 0 327

100 0 327

100 0 368.7573100 0 368.7573

90 20 364.296690 20 352.5451

100 15 339.4617100 0 332.6725

Page 133: Lembar Kerja Kelompok 5

100 0 332.672590 15 333.673590 0 327

100 0 32790 0 327

100 0 327

100 0 393.7509100 0 393.7509

90 20 388.987890 20 376.439890 20 364.296690 20 352.5451

100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 32790 0 327

100 0 327

100 0 5263.2983100 0 5263.2983

90 20 5199.6293100 15 5006.6641100 0 4906.5308100 0 4906.5308

90 15 4921.294790 0 4822.8688

100 0 4822.868890 0 4822.8688

100 0 4822.8688100 0 4822.8688100 0 4822.8688

90 20 4764.5276100 15 4587.7096100 0 4495.9554100 0 4495.9554

90 15 4509.483990 0 4419.2942

Page 134: Lembar Kerja Kelompok 5

100 0 4419.294290 0 4419.2942

100 0 4419.2942100 0 4419.2942100 0 4419.2942

90 20 4365.835100 15 4203.813100 0 4119.7367100 0 4119.7367

90 15 4132.133190 0 4049.4904

100 0 4049.490490 0 4049.4904

100 0 4049.4904100 0 4049.4904100 0 4049.4904

90 20 4000.5046100 15 3852.0405100 0 3774.9997100 0 3774.9997

90 15 3786.358890 0 3710.6316

100 0 3710.631690 0 3710.6316

100 0 3710.6316100 0 3710.6316100 0 3710.6316

90 20 3665.745100 15 3529.7043100 0 3459.1102100 0 3459.1102

90 15 3469.518890 0 3400.1284

100 0 3400.128490 0 3400.1284

100 0 3400.1284100 0 3400.1284100 0 3400.1284

90 20 3358.9978100 15 3234.3409100 0 3169.6541100 0 3169.6541

90 15 3179.1917

Page 135: Lembar Kerja Kelompok 5

90 0 3115.6079100 0 3115.6079

90 0 3115.6079100 0 3115.6079100 0 3115.6079100 0 3115.6079

90 20 3077.9191100 15 2963.6934100 0 2904.4195100 0 2904.4195

90 15 2913.15990 0 2854.8958

100 0 2854.895890 0 2854.8958

100 0 2854.8958100 0 2854.8958100 0 2854.8958

90 20 2820.3608100 15 2715.6935100 0 2661.3796100 0 2661.3796

90 15 2669.387890 0 2616

100 0 261690 0 2616

100 0 2616

100 0 1627.2567100 0 1627.2567100 15 1599.5101100 0 1567.5199100 0 1567.5199

90 15 1572.2366100 0 1540.7919100 0 1540.7919100 0 1540.7919100 0 1540.7919100 15 1514.5197100 0 1484.2293100 0 1484.2293

90 15 1488.6954100 0 1458.9215

Page 136: Lembar Kerja Kelompok 5

100 0 1458.9215100 0 1458.9215100 0 1458.9215100 15 1434.0452100 0 1405.3643100 0 1405.3643

90 15 1409.5931100 0 1381.4012100 0 1381.4012100 0 1381.4012100 0 1381.4012100 15 1357.8467100 0 1330.6898100 0 1330.6898

90 15 1334.6939100 0 1308100 0 1308

100 0 5263.2983100 0 5263.2983

90 20 5199.6293100 15 5006.6641100 0 4906.5308100 0 4906.5308

90 15 4921.294790 0 4822.8688

100 0 4822.868890 0 4822.8688

100 0 4822.8688100 0 4822.8688100 0 4822.8688

90 20 4764.5276100 15 4587.7096100 0 4495.9554100 0 4495.9554

90 15 4509.483990 0 4419.2942

100 0 4419.294290 0 4419.2942

100 0 4419.2942100 0 4419.2942100 0 4419.2942

Page 137: Lembar Kerja Kelompok 5

90 20 4365.835100 15 4203.813100 0 4119.7367100 0 4119.7367

90 15 4132.133190 0 4049.4904

100 0 4049.490490 0 4049.4904

100 0 4049.4904100 0 4049.4904100 0 4049.4904

90 20 4000.5046100 15 3852.0405100 0 3774.9997100 0 3774.9997

90 15 3786.358890 0 3710.6316

100 0 3710.631690 0 3710.6316

100 0 3710.6316100 0 3710.6316100 0 3710.6316

90 20 3665.745100 15 3529.7043100 0 3459.1102100 0 3459.1102

90 15 3469.518890 0 3400.1284

100 0 3400.128490 0 3400.1284

100 0 3400.1284100 0 3400.1284100 0 3400.1284

90 20 3358.9978100 15 3234.3409100 0 3169.6541100 0 3169.6541

90 15 3179.191790 0 3115.6079

100 0 3115.607990 0 3115.6079

100 0 3115.6079100 0 3115.6079

Page 138: Lembar Kerja Kelompok 5

100 0 3115.607990 20 3077.9191

100 15 2963.6934100 0 2904.4195100 0 2904.4195

90 15 2913.15990 0 2854.8958

100 0 2854.895890 0 2854.8958

100 0 2854.8958100 0 2854.8958100 0 2854.8958

90 20 2820.3608100 15 2715.6935100 0 2661.3796100 0 2661.3796

90 15 2669.387890 0 2616

100 0 261690 0 2616

100 0 2616

100 0 372.55985 0 372.55990 20 364.296690 20 352.5451

100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.6735100 0 327100 0 327

100 0 348.910685 0 348.9106

100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 327

Page 139: Lembar Kerja Kelompok 5

90 0 327100 0 327

100 0 368.7573100 0 368.7573

90 20 364.296690 20 352.5451

100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 32790 0 327

100 0 327

100 0 345.3503100 0 345.3503100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 32790 0 327

100 0 327

100 0 775.2797100 0 775.2797

85 0 759.7741100 15 739.1985100 0 724.4145100 0 724.4145

90 15 726.594390 0 712.0624

100 0 712.062490 0 712.0624

100 0 712.0624100 0 712.0624100 0 712.0624

Page 140: Lembar Kerja Kelompok 5

85 0 697.8212100 15 678.9234100 0 665.3449100 0 665.3449

90 15 667.346990 0 654

100 0 65490 0 654

100 0 654

100 0 345.3503100 0 345.3503100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.6735100 0 327100 0 327

100 0 368.7573100 0 368.7573

90 20 364.296690 20 352.5451

100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 32790 0 327

100 0 327

100 0 729.4607100 0 729.4607100 15 717.0226100 0 702.6821100 0 702.6821

90 15 704.796590 0 690.7006

100 0 690.7006

Page 141: Lembar Kerja Kelompok 5

90 0 690.7006100 0 690.7006100 0 690.7006100 0 690.7006100 15 678.9234100 0 665.3449100 0 665.3449

90 15 667.346990 0 654

100 0 65490 0 654

100 0 654

100 0 360.540985 0 360.540990 20 352.5451

100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 32790 0 327

100 0 327

100 0 381.0493100 0 381.0493

90 20 376.439890 20 364.296690 20 352.5451

100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 32790 0 327

100 0 327

100 0 360.5409

Page 142: Lembar Kerja Kelompok 5

85 0 360.540990 20 352.5451

100 15 339.4617100 0 332.6725100 0 332.6725

90 15 333.673590 0 327

100 0 32790 0 327

100 0 327

100 0 1582.694785 0 1582.6947

100 15 1539.8334100 0 1509.0367100 0 1509.0367

90 15 1509.0367100 0 1509.0367100 0 1509.0367100 0 1509.0367

85 0 1509.0367100 15 1468.1701100 0 1438.8067100 0 1438.8067

90 15 1438.8067100 0 1438.8067100 0 1438.8067100 0 1438.8067

85 0 1438.8067100 15 1399.842100 0 1371.8452100 0 1371.8452

90 15 1371.8452100 0 1371.8452100 0 1371.8452100 0 1371.8452

85 0 1371.8452100 15 1334.6939100 0 1308100 0 1308

90 15 1308100 0 1308

Page 143: Lembar Kerja Kelompok 5

100 0 1308

95 5 327

95 5 327

95 5 327

95 5 327

95 5 327

95 5 327

95 5 327

95 5 327

95 5 327

95 5 327

100 0 327

100 0 327

Page 144: Lembar Kerja Kelompok 5

ROUTING SHEET TRUK KONTAINER A

Daur Ulang Jumlah Mesin Teoritis

0 0.020 0.01

2.8204 0.021.0184 0.01

0 0.010 0.24

1.001 0.020 0.020 0.210 0.010 0.23

0 0.010 0.01

2.8204 0.011.0184 0.02

0 0.030 0.25

1.001 0.020 0.030 0.210 0.020 0.25

Page 145: Lembar Kerja Kelompok 5

0 0.010 0.01

1.0184 0.010 00 0.24

1.001 0.010 0.010 0.1

0 0.010 0.01

1.0184 0.010 0.020 0.24

1.001 00 0.010 0.120 0.010 0.12

0 0.020 0.01

2.8204 0.021.0184 0.01

0 0.020 0.18

1.001 0.010 0.020 0.160 0.020 0.19

0 0.010 0.01

2.9144 0.022.8204 0.021.0184 0.01

0 0.01

Page 146: Lembar Kerja Kelompok 5

0 0.161.001 0.01

0 0.010 0.030 0.020 0.21

0 0.010 0.02

3.1119 0.013.0115 0.012.9144 0.032.8204 0.021.0184 0.03

0 00 0.24

1.001 0.010 0.030 0.010 0.030 0.23

0 0.190 0.11

41.597 0.1115.02 0.19

0 0.330 3.5

14.7639 0.170 0.250 3.730 0.160 3.730 0.170 0.11

38.1162 0.113.7631 0.17

0 0.30 3.21

13.5285 0.150 0.23

Page 147: Lembar Kerja Kelompok 5

0 3.420 0.150 3.420 0.160 0.1

34.9267 0.112.6114 0.16

0 0.280 2.94

12.3964 0.140 0.210 3.130 0.140 3.130 0.140 0.09

32.004 0.0911.5561 0.14

0 0.260 2.69

11.3591 0.130 0.190 2.870 0.130 2.870 0.130 0.08

29.326 0.0810.5891 0.13

0 0.230 2.47

10.4086 0.120 0.180 2.630 0.120 2.630 0.120 0.07

26.872 0.079.703 0.12

0 0.210 2.26

9.5376 0.11

Page 148: Lembar Kerja Kelompok 5

0 0.160 2.410 0.110 2.410 0.110 0.07

24.6234 0.078.8911 0.11

0 0.20 2.07

8.7395 0.10 0.150 2.210 0.10 2.210 0.10 0.06

22.5629 0.068.1471 0.1

0 0.180 1.9

8.0082 0.090 0.140 2.020 0.090 2.02

0 0.10 0.07

4.7985 0.040 0.040 0.75

4.7167 0.050 0.140 1.10 0.090 0.07

4.5436 0.040 0.040 0.71

4.4661 0.050 0.13

Page 149: Lembar Kerja Kelompok 5

0 1.040 0.090 0.07

4.3021 0.030 0.040 0.67

4.2288 0.050 0.120 0.990 0.080 0.06

4.0735 0.030 0.040 0.63

4.0041 0.040 0.120 0.93

0 0.250 0.27

41.597 0.315.02 0.18

0 0.250 2.33

14.7639 0.30 0.350 2.290 0.360 3.440 0.230 0.25

38.1162 0.2813.7631 0.17

0 0.220 2.14

13.5285 0.270 0.320 2.10 0.330 3.150 0.210 0.23

Page 150: Lembar Kerja Kelompok 5

34.9267 0.2612.6114 0.15

0 0.210 1.96

12.3964 0.250 0.290 1.930 0.30 2.890 0.190 0.21

32.004 0.2311.5561 0.14

0 0.190 1.8

11.3591 0.230 0.270 1.770 0.270 2.650 0.180 0.19

29.326 0.2110.5891 0.13

0 0.170 1.65

10.4086 0.210 0.250 1.620 0.250 2.430 0.160 0.17

26.872 0.29.703 0.12

0 0.160 1.51

9.5376 0.190 0.230 1.480 0.230 2.220 0.15

Page 151: Lembar Kerja Kelompok 5

0 0.1624.6234 0.18

8.8911 0.110 0.150 1.38

8.7395 0.180 0.210 1.360 0.210 2.040 0.140 0.15

22.5629 0.178.1471 0.1

0 0.130 1.27

8.0082 0.160 0.190 1.240 0.190 1.87

0 0.020 0.01

2.9144 0.012.8204 0.011.0184 0.01

0 0.020 0.21

1.001 0.030 0.010 0.25

0 0.010 0.02

1.0184 0.010 0.010 0.16

1.001 0.020 0.010 0.18

Page 152: Lembar Kerja Kelompok 5

0 0.020 0.23

0 0.010 0.02

2.9144 02.8204 0.011.0184 0.01

0 0.010 0.01

1.001 0.010 0.010 0.060 0.020 0.25

0 0.010 0

1.0184 0.010 0.010 0.14

1.001 0.020 0.020 0.10 0.010 0.12

0 0.030 0.040 0.03

2.2176 0.020 0.030 0.43

2.1798 0.030 0.030 0.550 0.030 0.510 0.030 0.04

Page 153: Lembar Kerja Kelompok 5

0 0.032.0368 0.02

0 0.030 0.4

2.002 0.030 0.030 0.510 0.030 0.47

0 0.010 0

1.0184 0.020 0.020 0.1

1.001 0.010 0.010 0.12

0 0.010 0.02

2.9144 0.022.8204 0.021.0184 0.01

0 0.010 0.2

1.001 0.010 0.020 0.160 0.020 0.23

0 0.020 0.01

2.1511 0.050 0.010 0.17

2.1144 0.060 0.010 0.16

Page 154: Lembar Kerja Kelompok 5

0 0.010 0.250 0.020 0.01

2.0368 0.050 0.010 0.16

2.002 0.050 0.010 0.160 0.010 0.23

0 0.010 0.01

2.8204 0.051.0184 0.01

0 0.010 0.08

1.001 0.010 0.010 0.230 0.010 0.12

0 0.010 0.01

3.0115 0.012.9144 0.012.8204 0.011.0184 0.01

0 0.030 0.26

1.001 0.010 0.230 0.230 0.010 0.25

0 0.01

Page 155: Lembar Kerja Kelompok 5

0 0.032.8204 0.011.0184 0.01

0 0.010 0.2

1.001 0.010 0.010 0.190 0.010 0.23

0 0.030 0.03

4.6195 0.020 0.020 0.360 0.050 0.030 0.540 0.030 0.02

4.4045 0.020 0.020 0.340 0.050 0.030 0.510 0.030 0.02

4.1995 0.020 0.020 0.330 0.040 0.020 0.490 0.030 0.02

4.0041 0.020 0.020 0.310 0.040 0.02

Page 156: Lembar Kerja Kelompok 5

0 0.47

0 0.01

0 0.01

0 0.01

0 0

0 0.01

0 0.01

0 0.01

0 0.01

0 0.01

0 0.01

0 0.01

0 0.01

Page 157: Lembar Kerja Kelompok 5

ROUTING SHEET LOKO BEBAN B

No Nama Operasi Nama Mesin Keja

(PE-03) Cerobong (Balok Kayu P=15mm, L=25mm, T=80mm)1 pcs

O-1 Diukur balok kayu t=80mm Flexible Work BenchesO-2 Dipotong p=15mm Band Saw MachineO-3 Diamplas Halus Belt & Disc Sander MachineO-4 Didempul (dempul) Adjustable Work Benches 3O-5 Dikeringkan Drying AreaO-6 Diamplas Akhir Sander Machine 1O-7 Dicat (cat biru) Paint SprayerO-8 Dikeringkan Drying Area

(PE-04) Mesin Diesel (P= 40mm, L=35mm, T=20mm)1 pcs

O-9 Diukur p=40mm Flexible Work BenchesO-10 Dipotong p=40mm Band Saw MachineO-11 Dibor dari pusat D=10mm, h=25mm Radial Drilling MachineO-12 Dibor dari pusat D=2mm, h=5mm Radial Drilling MachineO-13 Diamplas Halus Belt & Disc Sander MachineO-14 Didempul (dempul) Adjustable Work Benches 3O-15 Dikeringkan Drying AreaO-16 Diamplas Akhir Sander Machine 1O-17 Dicat (cat hitam) Paint SprayerO-18 Dikeringkan Drying Area

(PE-01) Body Kabin Loko (Balok Kayu P= 45mm, L=30mm, T=40mm)1 pcs

O-19 Diukur p=45mm, l=30mm, t=40mm Flexible Work BenchesO-20 Dipotong p=45, l=30mm, t=40mm Circular Saw MachineO-21 Diamplas Halus Belt & Disc Sander MachineO-22 Dibor bagian atas D=10mm, t=18mm Radial Drilling MachineO-23 Dibor bagian atas D=10mm, t=18mm Radial Drilling MachineO-24 Dibor bagian atas D=10mm, t=18mm Radial Drilling MachineO-25 Dibor bagian bawah D=10mm, t=15mm Radial Drilling MachineO-26 Dibor bagian bawah D=10mm, t=15mm Radial Drilling MachineO-27 Dianplas Halus Belt & Disc Sander MachineO-28 Didempul (dempul) Adjustable Work Benches 3O-29 Dikeringkan Drying AreaO-30 Diamplas Akhir Sander Machine 1

Page 158: Lembar Kerja Kelompok 5

O-31 Dicat (cat merah) Paint SprayerO-32 Dikeringkan Drying Area

(PE-02) Atap Loko (Balok Kayu P= 45mm, L=55mm, T=10mm)1 pcs

O-33 Diukur p=45mm, l=55mm, t=10mm Flexible Work BenchesO-34 Dipotong p=45, l=55mm, t=10mm Band Saw MachineO-35 Diamplas Halus Belt & Disc Sander MachineO-36 Dibor bagian atas D=6mm, h=20mm Radial Drilling MachineO-37 Dibor bagian atas D=6mm, h=20mm Radial Drilling MachineO-38 Dibor bagian bawah D=6mm, h=20mm Radial Drilling MachineO-39 Diamplas Halus Belt & Disc Sander MachineO-40 Didempul (dempul) Adjustable Work Benches 3O-41 Dikeringkan Drying AreaO-42 Diamplas Akhir Sander Machine 1O-43 Dicat (cat biru) Paint SprayerO-44 Dikeringkan Drying Area

(PE-07) Dinding Samping (Balok Kayu P= 60mm, L=15mm, T=50mm)2 pcs

O-46 Diukur p=60mm, l=15mm, t=50mm Flexible Work Bencheso-47 Dipotong DL=55mm, DD=10mm, t=20mm Band Saw MachineO-48 Dibor di titik pusat D=30mm, h=15mm Radial Drilling MachineO-49 Diamplas Halus Belt & Disc Sander MachineO-50 Didempul (dempul) Adjustable Work Benches 3O-51 Dikeringkan Drying AreaO-52 Diamplas sander Machine 2O-53 Dicat (cat putih) Paint SprayerO-54 Dikeringkan Drying AreaO-55 Dicat (cat hijau) Paint SprayerO-56 Dikeringkan Drying AreaO-57 Diukur p=60mm, l=15mm, t=50mm Flexible Work BenchesO-58 Dipotong DL=55mm, DD=10mm, t=20mm Band Saw MachineO-59 Dibor di titik pusat D=30mm, h=15mm Radial Drilling MachineO-60 Diamplas Halus Belt & Disc Sander MachineO-61 Didempul (dempul) Adjustable Work Benches 3O-62 Dikeringkan Drying AreaO-63 Diamplas sander Machine 2O-64 Dicat (cat putih) Paint SprayerO-65 Dikeringkan Drying AreaO-66 Dicat (cat hijau) Paint SprayerO-67 Dikeringkan Drying Area

(PE-08) Dinding Belakang (Balok Kayu P= 40mm, L=10mm, T=40mm)1 pcs

O-68 Diukur D=30mm, t=10mm Flexible Work BenchesO-69 Dipotong t=10mm Circular Saw MachineO-70 Dibor D=5mm Radial Drilling MachineO-71 Diamplas Halus Belt & Disc Sander MachineO-72 Didempul (dempul) Adjustable Work Benches 3O-73 Dikeringkan Adjustable Work Benches 1

Page 159: Lembar Kerja Kelompok 5

O-74 Diamplas Sander Machine 2O-75 Dicat (cat putih) Paint SprayerO-76 Dikeringkan Drying AreaO-77 Dicat (cat biru) Paint SprayerO-78 Dikeringkan Drying Area

(PE-09) Pin Bumper (Silinder Kayu D= 55mm, T=8mm)1 pcs

O-80 Diukur D=55mm, t=8mm Flexible Work BenchesO-81 Dipotong t=8mm Circular Saw MachineO-82 Diamplas Halus Belt & Disc Sander MachineO-83 Didempul (dempul) Adjustable Work Benches 3O-84 Dikeringkan Drying AreaO-85 Diamplas Sander Machine 2O-86 Dicat (cat putih) Paint SprayerO-87 Dicat (cat putih) Paint SprayerO-88 Dikeringkan Drying Area

(PE-12) Pin Chasis (Silinder Kayu D= 10mm, T=20mm)2 pcs

O-89 Diukur t=20mm Flexible Work BenchesO-90 Dipotong t=20mm Circular Saw MachineO-91 Diamplas Halus Belt & Disc Sander MachineO-92 Didempul (dempul) Adjustable Work Benches 3O-93 Dikeringkan Drying AreaO-94 Diamplas Sander Machine 1O-95 Dilapis Pernis (pernis) Adjustable Work Benches 2O-96 Dikeringkan Drying AreaO-97 Diukur t=20mm Flexible Work BenchesO-98 Dipotong t=20mm Circular Saw MachineO-99 Diamplas Halus Belt & Disc Sander MachineO-100 Didempul (dempul) Adjustable Work Benches 3O-101 Dikeringkan Drying AreaO-102 Diamplas Sander Machine 1O-103 Dilapis Pernis (pernis) Adjustable Work Benches 2O-104 Dikeringkan Drying Area

(PE-11) Chasis Loko (Balok Kayu D= 150mm, L=25mm, T=25mm)1 pcs

O-105 Diukur p=150mm, l=25mm, t=25mm Flexible Work BenchesO-106 Dipotong p=150mm, l=25mm, t=25mm Band Saw MachineO-107 Dipotong sisi miring depan Band Saw MachineO-108 Dipotong Fillet Bawah Band Saw MachineO-109 Dihaluskan sisi Fillet Bawah Sander Machine 2O-110 Dibor bagian samping D=5mm, h=25mm Radial Drilling MachineO-111 Dibor bagian samping D=5mm, h=25mm Radial Drilling MachineO-112 Dibor bagian atas D=5mm, h=15mm Radial Drilling MachineO-113 Dibor bagian atas D=5mm, h=15mm Radial Drilling MachineO-114 Diamplas Halus Belt & Disc Sander MachineO-115 Didempul (dempul) Adjustable Work Benches 3O-116 Dikeringkan Drying Area

Page 160: Lembar Kerja Kelompok 5

O-117 Diamplas Sander Machine 2O-118 Dicat (cat kuning) Paint SprayerO-119 Dikeringkan Drying Area

(PE-10) Bumper Loko (Balok Kayu P= 50mm, L=8mm, T=25mm)1 pcs

O-120 Diukur p=50mm, l=8mm, t=25mm Flexible Work BenchesO-121 Dipotong p=50mm, l=8mm, t=25mm Circular Saw MachineO-122 Dibor bagian depan D=3mm, h=10mm Radial Drilling MachineO-123 Dibor bagian depan D=3mm, h=10mm Radial Drilling MachineO-124 Diamplas Halus Belt & Disc Sander MachineO-125 Didempul (dempul) Adjustable Work Benches 3O-126 Dikeringkan Drying AreaO-127 Diamplas Sander Machine 1O-128 Dicat (cat putih) Paint SprayerO-129 Dikeringkan Drying AreaO-130 Dicat (cat hijau) Paint SprayerO-131 Dikeringkan Drying Area

(PE-13) Pin Lampu (Silinder Kayu D=5mm, T=15mm)2 pcs

O-133 Diukur D=5mm, t=15mm Flexible Work BenchesO-134 Dipotong D=5mm, t=15mm Circular Saw MachineO-135 Dibuat Kemiringan pada Bagian Atas r=9mm Band Saw MachineO-136 Diamplas Halus Belt & Disc Sander MachineO-137 Didempul (dempul) Adjustable Work Benches 3O-138 Dikeringkan Drying AreaO-139 Diamplas Sander Machine 2O-140 Dilapis Pernis (pernis) Adjustable Work Benches 2O-141 Dikeringkan Drying AreaO-142 Dicat (cat merah) Paint SprayerO-143 Dikeringkan Drying AreaO-144 Diukur D=5mm, t=15mm Flexible Work BenchesO-145 Dipotong D=5mm, t=15mm Circular Saw MachineO-146 Dibuat Kemiringan pada Bagian Atas r=9mm Band Saw MachineO-147 Diamplas Halus Belt & Disc Sander MachineO-148 Didempul (dempul) Adjustable Work Benches 3O-149 Dikeringkan Drying AreaO-150 Diamplas Sander Machine 2O-151 Dilapis Pernis (pernis) Adjustable Work Benches 2O-152 Dikeringkan Drying AreaO-153 Dicat (cat merah) Paint SprayerO-154 Dikeringkan Drying Area

(PE-14) Lampu (Silinder Kayu D=16mm, T=10mm)2 pcs

O-155 Diukur D=16mm, t=10mm Flexible Work BenchesO-156 Dipotong t=10mm Circular Saw MachineO-157 Diamplas Halus Belt & Disc Sander MachineO-158 Didempul (dempul) Adjustable Work Benches 3O-159 Dikeringkan Drying Area

Page 161: Lembar Kerja Kelompok 5

O-160 Diamplas Sander Machine 1O-161 Dicat (cat putih) Paint SprayerO-162 Dikeringkan Drying AreaO-163 Dicat (cat merah) Paint SprayerO-164 Dikeringkan Drying AreaO-165 Diukur D=16mm, t=10mm Flexible Work BenchesO-166 Dipotong t=10mm Circular Saw MachineO-167 Diamplas Halus Belt & Disc Sander MachineO-168 Didempul (dempul) Adjustable Work Benches 3O-169 Dikeringkan Drying AreaO-170 Diamplas Sander Machine 1O-171 Dicat (cat putih) Paint SprayerO-172 Dikeringkan Drying AreaO-173 Dicat (cat merah) Paint SprayerO-174 Dikeringkan Drying Area

(PE-15) Poros Roda (Silinder Kayu D=10mm, T=65mm)4 pcs

O-177 Diukur D=10mm, t=65mm Flexible Work BenchesO-178 Dipotong t=65mm Circular Saw MachineO-179 Diamplas Halus Belt & Disc Sander MachineO-180 Didempul (dempul) Adjustable Work Benches 3O-181 Dikeringkan Drying AreaO-182 Diamplas Sander Machine 1O-183 Dicat (cat coklat) Paint SprayerO-184 Dikeringkan Drying AreaO-185 Diukur D=10mm, t=65mm Flexible Work BenchesO-186 Dipotong t=65mm Circular Saw MachineO-187 Diamplas Halus Belt & Disc Sander MachineO-188 Didempul (dempul) Adjustable Work Benches 3O-189 Dikeringkan Drying AreaO-190 Diamplas Sander Machine 1O-191 Dicat (cat coklat) Paint SprayerO-192 Dikeringkan Drying AreaO-193 Diukur D=10mm, t=65mm Flexible Work BenchesO-194 Dipotong t=65mm Circular Saw MachineO-195 Diamplas Halus Belt & Disc Sander MachineO-196 Didempul (dempul) Adjustable Work Benches 3O-197 Dikeringkan Drying AreaO-198 Diamplas Sander Machine 1O-199 Dicat (cat coklat) Paint SprayerO-200 Dikeringkan Drying AreaO-201 Diukur D=10mm, t=65mm Flexible Work BenchesO-202 Dipotong t=65mm Circular Saw MachineO-203 Diamplas Halus Belt & Disc Sander MachineO-204 Didempul (dempul) Adjustable Work Benches 3O-205 Dikeringkan Drying AreaO-206 Diamplas Sander Machine 1O-207 Dicat (cat coklat) Paint Sprayer

Page 162: Lembar Kerja Kelompok 5

O-208 Dikeringkan Drying Area(PE-16) Seal Roda (Silinder Kayu D=20mm, T=10mm)

8 pcsO-209 Diukur D=20mm, t=10mm Flexible Work BenchesO-210 Dipotong t=10mm Circular Saw MachineO-211 Dibor bagian atas D=5mm, h=10mm Radial Drilling MachineO-212 Diamplas Halus Belt & Disc Sander MachineO-213 Didempul (dempul) Adjustable Work Benches 3O-214 Dikeringkan Drying AreaO-215 Diamplas Sander Machine 2O-216 Dicat (cat putih) Paint SprayerO-217 Dikeringkan Drying AreaO-218 Dicat (pernis cat merah) Paint SprayerO-219 Dikeringkan Drying AreaO-220 Diukur D=20mm, t=10mm Flexible Work BenchesO-221 Dipotong t=10mm Circular Saw MachineO-222 Dibor bagian atas D=5mm, h=10mm Radial Drilling MachineO-223 Diamplas Halus Belt & Disc Sander MachineO-224 Didempul (dempul) Adjustable Work Benches 3O-225 Dikeringkan Drying AreaO-226 Diamplas Sander Machine 2O-227 Dicat (cat putih) Paint SprayerO-228 Dikeringkan Drying AreaO-229 Dicat (pernis cat merah) Paint SprayerO-230 Dikeringkan Drying AreaO-231 Diukur D=20mm, t=10mm Flexible Work BenchesO-232 Dipotong t=10mm Circular Saw MachineO-233 Dibor bagian atas D=5mm, h=10mm Radial Drilling MachineO-234 Diamplas Halus Belt & Disc Sander MachineO-235 Didempul (dempul) Adjustable Work Benches 3O-236 Dikeringkan Drying AreaO-237 Diamplas Sander Machine 2O-238 Dicat (cat putih) Paint SprayerO-239 Dikeringkan Drying AreaO-240 Dicat (pernis cat merah) Paint SprayerO-241 Dikeringkan Drying AreaO-242 Diukur D=20mm, t=10mm Flexible Work BenchesO-243 Dipotong t=10mm Circular Saw MachineO-244 Dibor bagian atas D=5mm, h=10mm Radial Drilling MachineO-245 Diamplas Halus Belt & Disc Sander MachineO-246 Didempul (dempul) Adjustable Work Benches 3O-247 Dikeringkan Drying AreaO-248 Diamplas Sander Machine 2O-249 Dicat (cat putih) Paint SprayerO-250 Dikeringkan Drying AreaO-251 Dicat (pernis cat merah) Paint SprayerO-252 Dikeringkan Drying AreaO-253 Diukur D=20mm, t=10mm Flexible Work Benches

Page 163: Lembar Kerja Kelompok 5

O-254 Dipotong t=10mm Circular Saw MachineO-255 Dibor bagian atas D=5mm, h=10mm Radial Drilling MachineO-256 Diamplas Halus Belt & Disc Sander MachineO-257 Didempul (dempul) Adjustable Work Benches 3O-258 Dikeringkan Drying AreaO-259 Diamplas Sander Machine 2O-260 Dicat (cat putih) Paint SprayerO-261 Dikeringkan Drying AreaO-262 Dicat (pernis cat merah) Paint SprayerO-263 Dikeringkan Drying AreaO-264 Diukur D=20mm, t=10mm Flexible Work BenchesO-265 Dipotong t=10mm Circular Saw MachineO-266 Dibor bagian atas D=5mm, h=10mm Radial Drilling MachineO-267 Diamplas Halus Belt & Disc Sander MachineO-268 Didempul (dempul) Adjustable Work Benches 3O-269 Dikeringkan Drying AreaO-270 Diamplas Sander Machine 2O-271 Dicat (cat putih) Paint SprayerO-272 Dikeringkan Drying AreaO-273 Dicat (pernis cat merah) Paint SprayerO-274 Dikeringkan Drying AreaO-275 Diukur D=20mm, t=10mm Flexible Work BenchesO-276 Dipotong t=10mm Circular Saw MachineO-277 Dibor bagian atas D=5mm, h=10mm Radial Drilling MachineO-278 Diamplas Halus Belt & Disc Sander MachineO-279 Didempul (dempul) Adjustable Work Benches 3O-280 Dikeringkan Drying AreaO-281 Diamplas Sander Machine 2O-282 Dicat (cat putih) Paint SprayerO-283 Dikeringkan Drying AreaO-284 Dicat (pernis cat merah) Paint SprayerO-285 Dikeringkan Drying AreaO-286 Diukur D=20mm, t=10mm Flexible Work BenchesO-287 Dipotong t=10mm Circular Saw MachineO-288 Dibor bagian atas D=5mm, h=10mm Radial Drilling MachineO-289 Diamplas Halus Belt & Disc Sander MachineO-290 Didempul (dempul) Adjustable Work Benches 3O-291 Dikeringkan Drying AreaO-292 Diamplas Sander Machine 2O-293 Dicat (cat putih) Paint SprayerO-294 Dikeringkan Drying AreaO-295 Dicat (pernis cat merah) Paint SprayerO-296 Dikeringkan Drying Area

(PE-17) Roda (Silinder Kayu D=35mm, T=10mm)8 pcs

O-297 Diukur D=35mm, t=10mm Flexible Work BenchesO-298 Dipotong t=10mm Circular Saw MachineO-299 Dibor D=5mm Radial Drilling Machine

Page 164: Lembar Kerja Kelompok 5

O-300 Diamplas Halus Belt & Disc Sander MachineO-301 Didempul (dempul) (dempul) Adjustable Work Benches 3O-302 Dikeringkan Drying AreaO-303 Diamplas Sander Machine 2O-304 Dicat (cat putih) Paint SprayerO-305 Dikeringkan Drying AreaO-306 Dicat (cat biru) Paint SprayerO-307 Dikeringkan Drying AreaO-308 Diukur D=35mm, t=10mm Flexible Work BenchesO-309 Dipotong t=10mm Circular Saw MachineO-310 Dibor D=5mm Radial Drilling MachineO-311 Diamplas Halus Belt & Disc Sander MachineO-312 Didempul (dempul) (dempul) Adjustable Work Benches 3O-313 Dikeringkan Drying AreaO-314 Diamplas Sander Machine 2O-315 Dicat (cat putih) Paint SprayerO-316 Dikeringkan Drying AreaO-317 Dicat (cat biru) Paint SprayerO-318 Dikeringkan Drying AreaO-319 Diukur D=35mm, t=10mm Flexible Work BenchesO-320 Dipotong t=10mm Circular Saw MachineO-321 Dibor D=5mm Radial Drilling MachineO-322 Diamplas Halus Belt & Disc Sander MachineO-323 Didempul (dempul) (dempul) Adjustable Work Benches 3O-324 Dikeringkan Drying AreaO-325 Diamplas Sander Machine 2O-326 Dicat (cat putih) Paint SprayerO-327 Dikeringkan Drying AreaO-328 Dicat (cat biru) Paint SprayerO-329 Dikeringkan Drying AreaO-330 Diukur D=35mm, t=10mm Flexible Work BenchesO-331 Dipotong t=10mm Circular Saw MachineO-332 Dibor D=5mm Radial Drilling MachineO-333 Diamplas Halus Belt & Disc Sander MachineO-334 Didempul (dempul) (dempul) Adjustable Work Benches 3O-335 Dikeringkan Drying AreaO-336 Diamplas Sander Machine 2O-337 Dicat (cat putih) Paint SprayerO-338 Dikeringkan Drying AreaO-339 Dicat (cat biru) Paint SprayerO-340 Dikeringkan Drying AreaO-341 Diukur D=35mm, t=10mm Flexible Work BenchesO-342 Dipotong t=10mm Circular Saw MachineO-343 Dibor D=5mm Radial Drilling MachineO-344 Diamplas Halus Belt & Disc Sander MachineO-345 Didempul (dempul) (dempul) Adjustable Work Benches 3O-346 Dikeringkan Drying AreaO-347 Diamplas Sander Machine 2

Page 165: Lembar Kerja Kelompok 5

O-348 Dicat (cat putih) Paint SprayerO-349 Dikeringkan Drying AreaO-350 Dicat (cat biru) Paint SprayerO-351 Dikeringkan Drying AreaO-352 Diukur D=35mm, t=10mm Flexible Work BenchesO-353 Dipotong t=10mm Circular Saw MachineO-354 Dibor D=5mm Radial Drilling MachineO-355 Diamplas Halus Belt & Disc Sander MachineO-356 Didempul (dempul) (dempul) Adjustable Work Benches 3O-357 Dikeringkan Drying AreaO-358 Diamplas Sander Machine 2O-359 Dicat (cat putih) Paint SprayerO-360 Dikeringkan Drying AreaO-361 Dicat (cat biru) Paint SprayerO-362 Dikeringkan Drying AreaO-363 Diukur D=35mm, t=10mm Flexible Work BenchesO-364 Dipotong t=10mm Circular Saw MachineO-365 Dibor D=5mm Radial Drilling MachineO-366 Diamplas Halus Belt & Disc Sander MachineO-367 Didempul (dempul) (dempul) Adjustable Work Benches 3O-368 Dikeringkan Drying AreaO-369 Diamplas Sander Machine 2O-370 Dicat (cat putih) Paint SprayerO-371 Dikeringkan Drying AreaO-372 Dicat (cat biru) Paint SprayerO-373 Dikeringkan Drying AreaO-374 Diukur D=35mm, t=10mm Flexible Work BenchesO-375 Dipotong t=10mm Circular Saw MachineO-376 Dibor D=5mm Radial Drilling MachineO-377 Diamplas Halus Belt & Disc Sander MachineO-378 Didempul (dempul) (dempul) Adjustable Work Benches 3O-379 Dikeringkan Drying AreaO-380 Diamplas Sander Machine 2O-381 Dicat (cat putih) Paint SprayerO-382 Dikeringkan Drying AreaO-383 Dicat (cat biru) Paint SprayerO-384 Dikeringkan Drying Area

(PE-19) Chasis Beban (Balok Kayu P=1170mm, L=25mm, T=25mm)1 pcs

O-386 Diukur p=1170mm, l=25mm,t=25mm Flexible Work BenchesO-387 Dipotong p=1170, l=25mm, t=25mm Circular Saw MachineO-388 Diamplas Belt & Disc Sander MachineO-389 Dibor bagian atas D=5mm, h=25mm Radial Drilling MachineO-390 Dibor bagian atas D=5mm, h=25mm Radial Drilling MachineO-391 Dibor bagian bawah D=5mm, h=15mm Radial Drilling MachineO-392 Diamplas Halus Belt & Disc Sander MachineO-393 Didempul (dempul) Adjustable Work Benches 3O-394 Dikeringkan Drying Area

Page 166: Lembar Kerja Kelompok 5

O-395 Diamplas Sander Machine 1O-396 Dilapis Pernis (pernis) Adjustable Work Benches 2O-397 Dikeringkan Drying Area

(PE-24) Pin Dinding (Silinder Kayu D=6mm, T=15mm)3 pcs

O-398 Diukur D=6mm, t=15mm Flexible Work BenchesO-399 Dipotong t=10mm Band Saw MachineO-400 Diamplas Halus Belt & Disc Sander MachineO-401 Didempul (dempul) Adjustable Work Benches 3O-402 Dikeringkan Drying AreaO-403 Diamplas Sander Machine 1O-404 Didempul (dempul) (pernis) Adjustable Work Benches 3O-405 Dikeringkan Drying AreaO-406 Diukur D=6mm, t=15mm Flexible Work BenchesO-407 Dipotong t=10mm Band Saw MachineO-408 Diamplas Halus Belt & Disc Sander MachineO-409 Didempul (dempul) Adjustable Work Benches 3O-410 Dikeringkan Drying AreaO-411 Diamplas Sander Machine 1O-412 Didempul (dempul) (pernis) Adjustable Work Benches 3O-413 Dikeringkan Drying AreaO-414 Diukur D=6mm, t=15mm Flexible Work BenchesO-415 Dipotong t=10mm Band Saw MachineO-416 Diamplas Halus Belt & Disc Sander MachineO-417 Didempul (dempul) Adjustable Work Benches 3O-418 Dikeringkan Drying AreaO-419 Diamplas Sander Machine 1O-420 Didempul (dempul) (pernis) Adjustable Work Benches 3O-421 Dikeringkan Drying Area

(PE-21) Alas Beban (Balok Kayu P=190mm, L=55mm, T=10mm)1 pcs

O-422 Diukur p=60mm, l=52mm, t=15mm Flexible Work BenchesO-423 Dipotong t=45mm Circular Saw MachineO-424 Dibor bagian atas D=8mm Radial Drilling MachineO-425 Dibor bagian atas D=8mm Radial Drilling MachineO-426 Dibor bagian atas D=8mm Radial Drilling MachineO-427 Dibor bagian atas D=8mm Radial Drilling MachineO-428 Dibor bagian bawah D=5mm h=10mm Radial Drilling MachineO-429 Dibor bagian bawah D=5mm h=10mm Radial Drilling MachineO-430 Diamplas Halus Belt & Disc Sander MachineO-431 Didempul (dempul) Adjustable Work Benches 3O-432 Dikeringkan Drying AreaO-433 Diamplas Sander Machine 1O-434 Dicat (cat kuning) Paint SprayerO-435 Dikeringkan Drying Area

(PE-20) Pin Alas Beban (Silinder Kayu D=10mm, T=15mm)4 pcs

O-436 Diukur D=10mm, t=15mm Flexible Work Benches

Page 167: Lembar Kerja Kelompok 5

O-437 Dipotong p=40mm Band Saw MachineO-438 Diamplas Halus Belt & Disc Sander MachineO-439 Didempul (dempul) (dempul) Adjustable Work Benches 3O-440 Dikeringkan Drying AreaO-441 Diamplas Sander Machine 2O-442 Dilapis Pernis (pernis) Adjustable Work Benches 2O-443 Dikeringkan Drying AreaO-444 Diukur D=10mm, t=15mm Flexible Work BenchesO-445 Dipotong p=40mm Band Saw MachineO-446 Diamplas Halus Belt & Disc Sander MachineO-447 Didempul (dempul) (dempul) Adjustable Work Benches 3O-448 Dikeringkan Drying AreaO-449 Diamplas Sander Machine 2O-450 Dilapis Pernis (pernis) Adjustable Work Benches 2O-451 Dikeringkan Drying AreaO-452 Diukur D=10mm, t=15mm Flexible Work BenchesO-453 Dipotong p=40mm Band Saw MachineO-454 Diamplas Halus Belt & Disc Sander MachineO-455 Didempul (dempul) (dempul) Adjustable Work Benches 3O-456 Dikeringkan Drying AreaO-457 Diamplas Sander Machine 2O-458 Dilapis Pernis (pernis) Adjustable Work Benches 2O-459 Dikeringkan Drying AreaO-460 Diukur D=10mm, t=15mm Flexible Work BenchesO-461 Dipotong p=40mm Band Saw MachineO-462 Diamplas Halus Belt & Disc Sander MachineO-463 Didempul (dempul) (dempul) Adjustable Work Benches 3O-464 Dikeringkan Drying AreaO-465 Diamplas Sander Machine 2O-466 Dilapis Pernis (pernis) Adjustable Work Benches 2O-467 Dikeringkan Drying Area

(PE-25) Beban Kubus (Balok Kayu P=30mm, L=30mm, T=30mm)1 pcs

O-469 Diukur p=30mm, l=30mm, t=30mm Flexible Work BenchesO-470 Dipotong t=30mm Circular Saw MachineO-471 Dibor D=10mm Radial Drilling MachineO-472 Diamplas Halus Belt & Disc Sander MachineO-473 Didempul (dempul) Adjustable Work Benches 3O-474 Dikeringkan Drying AreaO-475 Diamplas Sander Machine 2O-476 Dicat (cat putih) Paint SprayerO-477 Dikeringkan Drying AreaO-478 Dicat (cat merah) Paint SprayerO-479 Dikeringkan Drying Area

(PE-26) Body Pin Beban (Silinder Kayu D=10mm, T=40mm)4 pcs

O-480 Diukur D=10mm, t=40mm Flexible Work BenchesO-481 Dipotong t=80mm Circular Saw Machine

Page 168: Lembar Kerja Kelompok 5

O-482 Dihaluskan permukaannya Belt & Disc Sander MachineO-483 Didempul (dempul) Adjustable Work Benches 3O-484 Dikeringkan Drying AreaO-485 Diamplas Sander Machine 2O-486 Dicat (cat putih) Spray GunO-487 Dikeringkan Adjustable Work Benches 2O-488 Dicat (cat merah) Paint SprayerO-489 Dikeringkan Drying AreaO-490 Diukur D=10mm, t=40mm Flexible Work BenchesO-491 Dipotong t=80mm Circular Saw MachineO-492 Dihaluskan permukaannya Belt & Disc Sander MachineO-493 Didempul (dempul) Adjustable Work Benches 3O-494 Dikeringkan Drying AreaO-495 Diamplas Sander Machine 2O-496 Dicat (cat putih) Spray GunO-497 Dikeringkan Adjustable Work Benches 2O-498 Dicat (cat merah) Paint SprayerO-499 Dikeringkan Drying AreaO-500 Diukur D=10mm, t=40mm Flexible Work BenchesO-501 Dipotong t=80mm Circular Saw MachineO-502 Dihaluskan permukaannya Belt & Disc Sander MachineO-503 Didempul (dempul) Adjustable Work Benches 3O-504 Dikeringkan Drying AreaO-505 Diamplas Sander Machine 2O-506 Dicat (cat putih) Spray GunO-507 Dikeringkan Adjustable Work Benches 2O-508 Dicat (cat merah) Paint SprayerO-509 Dikeringkan Drying AreaO-510 Diukur D=10mm, t=40mm Flexible Work BenchesO-511 Dipotong t=80mm Circular Saw MachineO-512 Dihaluskan permukaannya Belt & Disc Sander MachineO-513 Didempul (dempul) Adjustable Work Benches 3O-514 Dikeringkan Drying AreaO-515 Diamplas Sander Machine 2O-516 Dicat (cat putih) Spray GunO-517 Dikeringkan Adjustable Work Benches 2O-518 Dicat (cat merah) Paint SprayerO-519 Dikeringkan Drying Area

(PE-27) Head Pin Beban (Silinder Kayu D=15mm, T=10mm)3 pcs

O-520 Diukur d=15mm, t=10mm Flexible Work BenchesO-521 Dipotong p=200mm, l=25mm, t=25mm Band Saw MachineO-522 Diamplas Belt & Disc Sander MachineO-523 Dibor bagian atas D=5mm, h=25mm Radial Drilling MachineO-524 Dibor bagian atas D=5mm, h=25mm Radial Drilling MachineO-525 Dibor bagian bawah D=5mm, h=15mm Radial Drilling MachineO-526 Diamplas Halus Belt & Disc Sander MachineO-527 Didempul (dempul) (dempul) Adjustable Work Benches 3

Page 169: Lembar Kerja Kelompok 5

O-528 Dikeringkan Drying AreaO-529 Diamplas Sander Machine 1O-530 Dilapis Pernis (pernis) Adjustable Work Benches 2O-531 Dikeringkan Drying AreaO-532 Diukur d=15mm, t=10mm Flexible Work BenchesO-533 Dipotong p=200mm, l=25mm, t=25mm Band Saw MachineO-534 Diamplas Belt & Disc Sander MachineO-535 Dibor bagian atas D=5mm, h=25mm Radial Drilling MachineO-536 Dibor bagian atas D=5mm, h=25mm Radial Drilling MachineO-537 Dibor bagian bawah D=5mm, h=15mm Radial Drilling MachineO-538 Diamplas Halus Belt & Disc Sander MachineO-539 Didempul (dempul) (dempul) Adjustable Work Benches 3O-540 Dikeringkan Drying AreaO-541 Diamplas Sander Machine 1O-542 Dilapis Pernis (pernis) Adjustable Work Benches 2O-543 Dikeringkan Drying AreaO-544 Diukur d=15mm, t=10mm Flexible Work BenchesO-545 Dipotong p=200mm, l=25mm, t=25mm Band Saw MachineO-546 Diamplas Belt & Disc Sander MachineO-547 Dibor bagian atas D=5mm, h=25mm Radial Drilling MachineO-548 Dibor bagian atas D=5mm, h=25mm Radial Drilling MachineO-549 Dibor bagian bawah D=5mm, h=15mm Radial Drilling MachineO-550 Diamplas Halus Belt & Disc Sander MachineO-551 Didempul (dempul) (dempul) Adjustable Work Benches 3O-552 Dikeringkan Drying AreaO-553 Diamplas Sander Machine 1O-554 Dilapis Pernis (pernis) Adjustable Work Benches 2O-555 Dikeringkan Drying Area

(SSA-7) Sub Sub Assembly1 pcs

O-556 Dirakit (perekat) Adjustable Work Benches 1(SSA-6) Sub Sub Assembly

1 pcsO-468 Direkatkan (perekat) Adjustable Work Benches 1

(SSA-5) Sub Sub Assembly1 pcs

O-385 Direkatkan (perekat) Adjustable Work Benches 1(SSA-4) Sub Sub Assembly

1 pcsO-175 Direkatkan (perekat) Adjustable Work Benches 1

(SSA-3) Sub Sub Assembly1 pcs

O-132 Direkatkan (perekat) Adjustable Work Benches 1(SSA-2) Sub Sub Assembly

1 pcsO-79 Direkatkan (perekat) Adjustable Work Benches 1

(SSA-1) Sub Sub Assembly1 pcs

Page 170: Lembar Kerja Kelompok 5

O-45 Direkatkan (perekat) Adjustable Work Benches 1(SA-2) Sub Assembly

1 pcsO-557 Male Connector (perekat) Adjustable Work Benches 1

(SA-1) Sub Assembly1 pcs

O-176 Direkatkan Female Connector (perekat) Adjustable Work Benches 3(A-2) Assembly

1 pcsO-558 Dirakit (label loko beban B) Steel Work Benches B

(A-1) Assembly1 pcs

O-559 Dikemas (isolasi kardus) Basic Packing B

Page 171: Lembar Kerja Kelompok 5

Kelompok 5Kapasitas Produksi 327 Unit Truk Kontainer A

334 Unit Loko Beban A332 Unit Truk Kontainer B324 Unit Loko Beban B

Efisiensi Produksi: 91 %Persentase Lembur Pabrik: 15 %

Waktu Baku Waktu Baku(detik) Waktu Setup(detik)

0.6 36 0 154000.57 34.2 66000 14280.70.69 41.4 15840 13008.70.44 26.4 0 210006.5 390 0 1421.540.25 15 0 369602.71 162.6 18480 3295.946.5 390 0 1421.54

0.5 30 0 184800.54 32.4 66000 15074.070.33 19.8 58080 25066.670.23 13.8 58080 35965.220.66 39.6 15840 136000.85 51 0 10870.596.54 392.4 0 1412.840.35 21 0 264002.33 139.8 18480 3833.488.5 510 0 1087.06

0.6 36 0 154000.75 45 39600 114400.52 31.2 15840 17261.540.3 18 58080 27573.330.3 18 58080 27573.330.3 18 58080 27573.330.28 16.8 58080 29542.860.28 16.8 58080 29542.860.63 37.8 15840 14247.620.77 46.2 0 120002.13 127.8 0 4338.030.25 15 0 36960

Kapasitas mesin teoris/bulan

Page 172: Lembar Kerja Kelompok 5

2.6 156 18480 3435.387 420 0 1320

0.3 18 0 308000.65 39 66000 12523.080.48 28.8 15840 187000.69 41.4 58080 11988.410.69 41.4 58080 11988.410.28 16.8 58080 29542.860.75 45 15840 119680.65 39 0 14215.382.22 133.2 0 4162.160.25 15 0 369602.7 162 18480 3308.156.5 390 0 1421.54

0.4 24 0 231000.77 46.2 66000 10571.430.12 7.2 58080 68933.330.25 15 15840 359040.24 14.4 0 385004.6 276 0 2008.70.25 15 0 369602.24 134.4 18480 3987.5

7 420 0 13202.25 135 18480 3969.787.5 450 0 12320.4 24 0 231000.77 46.2 66000 10571.430.12 7.2 58080 68933.330.25 15 15840 359040.24 14.4 0 385004.6 276 0 2008.70.25 15 0 369602.24 134.4 18480 3987.5

7 420 0 13202.25 135 18480 3969.787.5 450 0 1232

0.3 18 0 308000.62 37.2 39600 13838.710.18 10.8 58080 45955.560.43 25.8 15840 20874.422.43 145.8 0 3802.474.78 286.8 0 1933.05

Page 173: Lembar Kerja Kelompok 5

0.33 19.8 0 280002.42 145.2 18480 3690.916.5 390 0 1421.542.1 126 18480 4253.336.52 391.2 0 1417.18

0.4 24 0 231000.63 37.8 39600 13619.050.58 34.8 15840 15475.862.25 135 0 4106.676.5 390 0 1421.540.84 50.4 0 110000.24 14.4 18480 37216.670.24 14.4 18480 37216.67

6 360 0 1540

0.32 19.2 0 288750.77 46.2 39600 11142.860.67 40.2 15840 13397.010.99 59.4 0 9333.336.5 390 0 1421.540.85 51 0 10870.590.85 51 0 10870.593.1 186 0 2980.650.32 19.2 0 288750.77 46.2 39600 11142.860.67 40.2 15840 13397.010.99 59.4 0 9333.336.5 390 0 1421.540.85 51 0 10870.590.85 51 0 10870.593.1 186 0 2980.65

0.34 20.4 0 27176.470.77 46.2 66000 10571.430.63 37.8 66000 12920.630.92 55.2 66000 8847.830.82 49.2 0 11268.290.4 24 58080 206800.4 24 58080 206800.38 22.8 58080 21768.420.38 22.8 58080 21768.420.66 39.6 15840 136000.71 42.6 0 13014.083.4 204 0 2717.65

Page 174: Lembar Kerja Kelompok 5

0.29 17.4 0 31862.071.45 87 18480 6160

6 360 0 1540

0.38 22.8 0 24315.790.15 9 39600 572000.45 27 58080 18382.220.45 27 58080 18382.220.32 19.2 15840 280500.29 17.4 0 31862.076.75 405 0 1368.890.83 49.8 0 11132.532.14 128.4 18480 4173.83

6 360 0 15400.42 25.2 18480 21266.676.75 405 0 1368.89

0.28 16.8 0 330000.57 34.2 39600 15052.630.35 21 66000 23257.140.22 13.2 15840 408000.25 15 0 36960

3 180 0 30800.29 17.4 0 31862.070.32 19.2 0 288753.5 210 0 26400.27 16.2 18480 33081.48

3 180 0 30800.28 16.8 0 330000.57 34.2 39600 15052.630.35 21 66000 23257.140.22 13.2 15840 408000.25 15 0 36960

3 180 0 30800.29 17.4 0 31862.070.32 19.2 0 288753.5 210 0 26400.27 16.2 18480 33081.48

3 180 0 3080

0.4 24 0 231000.44 26.4 39600 195000.6 36 15840 149600.19 11.4 0 48631.585.5 330 0 1680

Page 175: Lembar Kerja Kelompok 5

0.31 18.6 0 29806.450.53 31.8 18480 16852.830.42 25.2 0 220000.54 32.4 18480 16540.746.5 390 0 1421.540.4 24 0 231000.44 26.4 39600 195000.6 36 15840 149600.19 11.4 0 48631.585.5 330 0 16800.31 18.6 0 29806.450.53 31.8 18480 16852.830.42 25.2 0 220000.54 32.4 18480 16540.746.5 390 0 1421.54

0.4 24 0 231000.43 25.8 39600 19953.490.18 10.8 15840 49866.670.6 36 0 154000.62 37.2 0 14903.230.32 19.2 0 288750.45 27 18480 19848.896.5 390 0 1421.540.4 24 0 231000.43 25.8 39600 19953.490.18 10.8 15840 49866.670.6 36 0 154000.62 37.2 0 14903.230.32 19.2 0 288750.45 27 18480 19848.896.5 390 0 1421.540.4 24 0 231000.43 25.8 39600 19953.490.18 10.8 15840 49866.670.6 36 0 154000.62 37.2 0 14903.230.32 19.2 0 288750.45 27 18480 19848.896.5 390 0 1421.540.4 24 0 231000.43 25.8 39600 19953.490.18 10.8 15840 49866.670.6 36 0 154000.62 37.2 0 14903.230.32 19.2 0 288750.45 27 18480 19848.89

Page 176: Lembar Kerja Kelompok 5

6.5 390 0 1421.54

0.25 15 0 369600.42 25.2 39600 20428.570.56 33.6 58080 14771.430.71 42.6 15840 12642.250.45 27 0 20533.33

5 300 0 18480.34 20.4 0 27176.470.39 23.4 18480 22902.565.5 330 0 16800.54 32.4 18480 16540.745.8 348 0 1593.10.25 15 0 369600.42 25.2 39600 20428.570.56 33.6 58080 14771.430.71 42.6 15840 12642.250.45 27 0 20533.33

5 300 0 18480.34 20.4 0 27176.470.39 23.4 18480 22902.565.5 330 0 16800.54 32.4 18480 16540.745.8 348 0 1593.10.25 15 0 369600.42 25.2 39600 20428.570.56 33.6 58080 14771.430.71 42.6 15840 12642.250.45 27 0 20533.33

5 300 0 18480.34 20.4 0 27176.470.39 23.4 18480 22902.565.5 330 0 16800.54 32.4 18480 16540.745.8 348 0 1593.10.25 15 0 369600.42 25.2 39600 20428.570.56 33.6 58080 14771.430.71 42.6 15840 12642.250.45 27 0 20533.33

5 300 0 18480.34 20.4 0 27176.470.39 23.4 18480 22902.565.5 330 0 16800.54 32.4 18480 16540.745.8 348 0 1593.10.25 15 0 36960

Page 177: Lembar Kerja Kelompok 5

0.42 25.2 39600 20428.570.56 33.6 58080 14771.430.71 42.6 15840 12642.250.45 27 0 20533.33

5 300 0 18480.34 20.4 0 27176.470.39 23.4 18480 22902.565.5 330 0 16800.54 32.4 18480 16540.745.8 348 0 1593.10.25 15 0 369600.42 25.2 39600 20428.570.56 33.6 58080 14771.430.71 42.6 15840 12642.250.45 27 0 20533.33

5 300 0 18480.34 20.4 0 27176.470.39 23.4 18480 22902.565.5 330 0 16800.54 32.4 18480 16540.745.8 348 0 1593.10.25 15 0 369600.42 25.2 39600 20428.570.56 33.6 58080 14771.430.71 42.6 15840 12642.250.45 27 0 20533.33

5 300 0 18480.34 20.4 0 27176.470.39 23.4 18480 22902.565.5 330 0 16800.54 32.4 18480 16540.745.8 348 0 1593.10.25 15 0 369600.42 25.2 39600 20428.570.56 33.6 58080 14771.430.71 42.6 15840 12642.250.45 27 0 20533.33

5 300 0 18480.34 20.4 0 27176.470.39 23.4 18480 22902.565.5 330 0 16800.54 32.4 18480 16540.745.8 348 0 1593.1

0.38 22.8 0 24315.790.3 18 39600 286000.18 10.8 58080 45955.56

Page 178: Lembar Kerja Kelompok 5

0.37 22.2 15840 24259.460.66 39.6 0 140006.3 378 0 1466.670.56 33.6 0 165000.58 34.8 18480 154006.5 390 0 1421.540.65 39 18480 13741.546.2 372 0 1490.320.38 22.8 0 24315.790.3 18 39600 286000.18 10.8 58080 45955.560.37 22.2 15840 24259.460.66 39.6 0 140006.3 378 0 1466.670.56 33.6 0 165000.58 34.8 18480 154006.5 390 0 1421.540.65 39 18480 13741.546.2 372 0 1490.320.38 22.8 0 24315.790.3 18 39600 286000.18 10.8 58080 45955.560.37 22.2 15840 24259.460.66 39.6 0 140006.3 378 0 1466.670.56 33.6 0 165000.58 34.8 18480 154006.5 390 0 1421.540.65 39 18480 13741.546.2 372 0 1490.320.38 22.8 0 24315.790.3 18 39600 286000.18 10.8 58080 45955.560.37 22.2 15840 24259.460.66 39.6 0 140006.3 378 0 1466.670.56 33.6 0 165000.58 34.8 18480 154006.5 390 0 1421.540.65 39 18480 13741.546.2 372 0 1490.320.38 22.8 0 24315.790.3 18 39600 286000.18 10.8 58080 45955.560.37 22.2 15840 24259.460.66 39.6 0 140006.3 378 0 1466.670.56 33.6 0 16500

Page 179: Lembar Kerja Kelompok 5

0.58 34.8 18480 154006.5 390 0 1421.540.65 39 18480 13741.546.2 372 0 1490.320.38 22.8 0 24315.790.3 18 39600 286000.18 10.8 58080 45955.560.37 22.2 15840 24259.460.66 39.6 0 140006.3 378 0 1466.670.56 33.6 0 165000.58 34.8 18480 154006.5 390 0 1421.540.65 39 18480 13741.546.2 372 0 1490.320.38 22.8 0 24315.790.3 18 39600 286000.18 10.8 58080 45955.560.37 22.2 15840 24259.460.66 39.6 0 140006.3 378 0 1466.670.56 33.6 0 165000.58 34.8 18480 154006.5 390 0 1421.540.65 39 18480 13741.546.2 372 0 1490.320.38 22.8 0 24315.790.3 18 39600 286000.18 10.8 58080 45955.560.37 22.2 15840 24259.460.66 39.6 0 140006.3 378 0 1466.670.56 33.6 0 165000.58 34.8 18480 154006.5 390 0 1421.540.65 39 18480 13741.546.2 372 0 1490.32

0.4 24 0 231000.53 31.8 39600 16188.680.35 21 15840 25645.710.65 39 58080 12726.150.65 39 58080 12726.150.32 19.2 58080 258500.75 45 15840 119680.55 33 0 16800

6 360 0 1540

Page 180: Lembar Kerja Kelompok 5

0.25 15 0 369600.66 39.6 0 140006.5 390 0 1421.54

0.35 21 0 264000.54 32.4 66000 15074.070.32 19.2 15840 280500.35 21 0 264000.33 19.8 0 28000

0.125 7.5 0 739200.72 43.2 0 12833.330.26 15.6 0 35538.460.35 21 0 264000.54 32.4 66000 15074.070.32 19.2 15840 280500.35 21 0 264000.33 19.8 0 28000

0.125 7.5 0 739200.72 43.2 0 12833.330.26 15.6 0 35538.460.35 21 0 264000.54 32.4 66000 15074.070.32 19.2 15840 280500.35 21 0 264000.33 19.8 0 28000

0.125 7.5 0 739200.72 43.2 0 12833.330.26 15.6 0 35538.46

0.4 24 0 231000.41 24.6 39600 20926.830.15 9 58080 55146.670.15 9 58080 55146.670.15 9 58080 55146.670.15 9 58080 55146.670.38 22.8 58080 21768.420.38 22.8 58080 21768.420.35 21 15840 25645.710.75 45 0 123200.65 39 0 14215.380.31 18.6 0 29806.450.45 27 18480 19848.896.5 390 0 1421.54

0.4 24 0 23100

Page 181: Lembar Kerja Kelompok 5

0.1 6 66000 814000.27 16.2 15840 33244.44

0.273 16.38 0 33846.156.5 390 0 1421.540.78 46.8 0 11846.150.44 26.4 0 210006.5 390 0 1421.540.4 24 0 231000.1 6 66000 814000.27 16.2 15840 33244.44

0.273 16.38 0 33846.156.5 390 0 1421.540.78 46.8 0 11846.150.44 26.4 0 210006.5 390 0 1421.540.4 24 0 231000.1 6 66000 814000.27 16.2 15840 33244.44

0.273 16.38 0 33846.156.5 390 0 1421.540.78 46.8 0 11846.150.44 26.4 0 210006.5 390 0 1421.540.4 24 0 231000.1 6 66000 814000.27 16.2 15840 33244.44

0.273 16.38 0 33846.156.5 390 0 1421.540.78 46.8 0 11846.150.44 26.4 0 210006.5 390 0 1421.54

0.4 24 0 231000.18 10.8 39600 47666.670.57 34.2 58080 14512.280.55 33 15840 163200.36 21.6 0 25666.670.35 21 0 264000.33 19.8 0 280000.51 30.6 18480 17513.730.31 18.6 0 29806.450.35 21 18480 255204.8 288 0 1925

0.2 12 0 462000.13 7.8 39600 66000

Page 182: Lembar Kerja Kelompok 5

0.33 19.8 15840 272000.27 16.2 0 34222.220.24 14.4 0 385000.44 26.4 0 210000.18 10.8 48840 46811.110.31 18.6 0 29806.450.39 23.4 18480 22902.562.5 150 0 36960.2 12 0 462000.13 7.8 39600 660000.33 19.8 15840 272000.27 16.2 0 34222.220.24 14.4 0 385000.44 26.4 0 210000.18 10.8 48840 46811.110.31 18.6 0 29806.450.39 23.4 18480 22902.562.5 150 0 36960.2 12 0 462000.13 7.8 39600 660000.33 19.8 15840 272000.27 16.2 0 34222.220.24 14.4 0 385000.44 26.4 0 210000.18 10.8 48840 46811.110.31 18.6 0 29806.450.39 23.4 18480 22902.562.5 150 0 36960.2 12 0 462000.13 7.8 39600 660000.33 19.8 15840 272000.27 16.2 0 34222.220.24 14.4 0 385000.44 26.4 0 210000.18 10.8 48840 46811.110.31 18.6 0 29806.450.39 23.4 18480 22902.562.5 150 0 3696

0.2 12 0 462000.17 10.2 66000 47882.350.35 21 15840 25645.710.35 21 58080 23634.290.35 21 58080 23634.290.32 19.2 58080 258500.35 21 15840 25645.710.35 21 0 26400

Page 183: Lembar Kerja Kelompok 5

0.31 18.6 0 29806.450.25 15 0 369600.4 24 0 231002.5 150 0 36960.2 12 0 462000.17 10.2 66000 47882.350.35 21 15840 25645.710.35 21 58080 23634.290.35 21 58080 23634.290.32 19.2 58080 258500.35 21 15840 25645.710.35 21 0 264000.31 18.6 0 29806.450.25 15 0 369600.4 24 0 231002.5 150 0 36960.2 12 0 462000.17 10.2 66000 47882.350.35 21 15840 25645.710.35 21 58080 23634.290.35 21 58080 23634.290.32 19.2 58080 258500.35 21 15840 25645.710.35 21 0 264000.31 18.6 0 29806.450.25 15 0 369600.4 24 0 231002.5 150 0 3696

0.15 9 0 61600

0.18 10.8 0 51333.33

0.15 9 0 61600

0.14 8.4 0 66000

0.05 3 0 184800

0.14 8.4 0 66000

Page 184: Lembar Kerja Kelompok 5

0.12 7.2 0 77000

0.19 11.4 0 48631.58

0.13 7.8 0 71076.92

0.15 9 0 61600

0.2 12 0 46200

Page 185: Lembar Kerja Kelompok 5

% skrap Jumlah yang Diharapkan per bulan Jumlah Disiapkan per bulan

0 339.8148 339.81483 329.6204 339.81482 324 329.62040 324 3240 324 3240 324 3240 324 3240 324 324

0 362.8468 362.84683 351.9614 362.84684 340.6078 351.96144 329.6204 340.60782 324 329.62040 324 3240 324 3240 324 3240 324 3240 324 324

0 403.1433 403.14332 395.0804 403.14332 388.3438 395.08044 375.8166 388.34384 363.6935 375.81664 351.9614 363.69354 340.6078 351.96144 329.6204 340.60782 324 329.62040 324 3240 324 3240 324 324

Page 186: Lembar Kerja Kelompok 5

0 324 3240 324 324

0 381.4459 381.44593 370.0025 381.44592 363.6935 370.00254 351.9614 363.69354 340.6078 351.96144 329.6204 340.60782 324 329.62040 324 3240 324 3240 324 3240 324 3240 324 324

0 787.7506 787.75063 764.1181 787.75064 739.4691 764.11812 726.8603 739.46910 726.8603 726.86030 726.8603 726.86032 714.4665 726.86030 714.4665 714.46650 714.4665 714.46650 714.4665 714.46650 714.4665 714.46650 714.4665 714.46653 693.0325 714.46654 670.6766 693.03252 659.2408 670.67660 659.2408 659.24080 659.2408 659.24082 648 659.24080 648 6480 648 6480 648 6480 648 648

0 353.588 353.5882 346.5162 353.5884 335.3383 346.51622 329.6204 335.33830 329.6204 329.62040 329.6204 329.6204

Page 187: Lembar Kerja Kelompok 5

2 324 329.62040 324 3240 324 3240 324 3240 324 324

0 342.1819 342.18192 335.3383 342.18192 329.6204 335.33830 329.6204 329.62040 329.6204 329.62042 324 329.62040 324 3240 324 3240 324 324

0 698.3305 698.33052 684.3639 698.33052 672.6947 684.36390 672.6947 672.69470 672.6947 672.69470 672.6947 672.69470 672.6947 672.69470 672.6947 672.69470 672.6947 672.69472 659.2408 672.69472 648 659.24080 648 6480 648 6480 648 6480 648 6480 648 648

0 426.1857 426.18573 413.4001 426.18573 400.9981 413.40013 388.9682 400.99812 382.3358 388.96824 370.0024 382.33584 358.0668 370.00244 346.5162 358.06684 335.3383 346.51622 329.6204 335.33830 329.6204 329.62040 329.6204 329.6204

Page 188: Lembar Kerja Kelompok 5

2 324 329.62040 324 3240 324 324

0 359.1443 359.14432 351.9614 359.14434 340.6078 351.96144 329.6204 340.60782 324 329.62040 324 3240 324 3240 324 3240 324 3240 324 3240 324 3240 324 324

0 768.1671 768.16712 752.8038 768.16713 730.2197 752.80382 717.7686 730.21970 717.7686 717.76860 717.7686 717.76862 705.5298 717.76860 705.5298 705.52980 705.5298 705.52980 705.5298 705.52980 705.5298 705.52980 705.5298 705.52982 691.4192 705.52983 670.6766 691.41922 659.2408 670.67660 659.2408 659.24080 659.2408 659.24082 648 659.24080 648 6480 648 6480 648 6480 648 648

0 698.3305 698.33052 684.3639 698.33052 672.6947 684.36390 672.6947 672.69470 672.6947 672.6947

Page 189: Lembar Kerja Kelompok 5

0 672.6947 672.69470 672.6947 672.69470 672.6947 672.69470 672.6947 672.69470 672.6947 672.69470 672.6947 672.69472 659.2408 672.69472 648 659.24080 648 6480 648 6480 648 6480 648 6480 648 6480 648 6480 648 648

0 1505.1404 1505.14042 1475.0376 1505.14042 1449.8865 1475.03760 1449.8865 1449.88650 1449.8865 1449.88650 1449.8865 1449.88650 1449.8865 1449.88650 1449.8865 1449.88650 1449.8865 1449.88652 1420.8888 1449.88652 1396.661 1420.88880 1396.661 1396.6610 1396.661 1396.6610 1396.661 1396.6610 1396.661 1396.6610 1396.661 1396.6610 1396.661 1396.6612 1368.7278 1396.6612 1345.3894 1368.72780 1345.3894 1345.38940 1345.3894 1345.38940 1345.3894 1345.38940 1345.3894 1345.38940 1345.3894 1345.38940 1345.3894 1345.38942 1318.4816 1345.38942 1296 1318.48160 1296 12960 1296 12960 1296 12960 1296 1296

Page 190: Lembar Kerja Kelompok 5

0 1296 1296

0 5215.0112 5215.01122 5110.711 5215.01124 4945.8493 5110.7112 4861.5169 4945.84930 4861.5169 4861.51690 4861.5169 4861.51692 4778.6224 4861.51690 4778.6224 4778.62240 4778.6224 4778.62240 4778.6224 4778.62240 4778.6224 4778.62240 4778.6224 4778.62242 4683.05 4778.62244 4531.9838 4683.052 4454.7083 4531.98380 4454.7083 4454.70830 4454.7083 4454.70832 4378.7503 4454.70830 4378.7503 4378.75030 4378.7503 4378.75030 4378.7503 4378.75030 4378.7503 4378.75030 4378.7503 4378.75032 4291.1753 4378.75034 4152.7503 4291.17532 4081.9411 4152.75030 4081.9411 4081.94110 4081.9411 4081.94112 4012.3393 4081.94110 4012.3393 4012.33930 4012.3393 4012.33930 4012.3393 4012.33930 4012.3393 4012.33930 4012.3393 4012.33932 3932.0925 4012.33934 3805.2508 3932.09252 3740.3669 3805.25080 3740.3669 3740.36690 3740.3669 3740.36692 3676.5894 3740.36690 3676.5894 3676.58940 3676.5894 3676.58940 3676.5894 3676.58940 3676.5894 3676.58940 3676.5894 3676.5894

Page 191: Lembar Kerja Kelompok 5

2 3603.0576 3676.58944 3486.8299 3603.05762 3427.3755 3486.82990 3427.3755 3427.37550 3427.3755 3427.37552 3368.9348 3427.37550 3368.9348 3368.93480 3368.9348 3368.93480 3368.9348 3368.93480 3368.9348 3368.93480 3368.9348 3368.93482 3301.5561 3368.93484 3195.0543 3301.55612 3140.5749 3195.05430 3140.5749 3140.57490 3140.5749 3140.57492 3087.0245 3140.57490 3087.0245 3087.02450 3087.0245 3087.02450 3087.0245 3087.02450 3087.0245 3087.02450 3087.0245 3087.02452 3025.284 3087.02454 2927.6942 3025.2842 2877.7736 2927.69420 2877.7736 2877.77360 2877.7736 2877.77362 2828.7042 2877.77360 2828.7042 2828.70420 2828.7042 2828.70420 2828.7042 2828.70420 2828.7042 2828.70420 2828.7042 2828.70422 2772.1301 2828.70424 2682.7066 2772.13012 2636.9633 2682.70660 2636.9633 2636.96330 2636.9633 2636.96332 2592 2636.96330 2592 25920 2592 25920 2592 25920 2592 2592

0 5215.0112 5215.01122 5110.711 5215.01124 4945.8493 5110.711

Page 192: Lembar Kerja Kelompok 5

2 4861.5169 4945.84930 4861.5169 4861.51690 4861.5169 4861.51692 4778.6224 4861.51690 4778.6224 4778.62240 4778.6224 4778.62240 4778.6224 4778.62240 4778.6224 4778.62240 4778.6224 4778.62242 4683.05 4778.62244 4531.9838 4683.052 4454.7083 4531.98380 4454.7083 4454.70830 4454.7083 4454.70832 4378.7503 4454.70830 4378.7503 4378.75030 4378.7503 4378.75030 4378.7503 4378.75030 4378.7503 4378.75030 4378.7503 4378.75032 4291.1753 4378.75034 4152.7503 4291.17532 4081.9411 4152.75030 4081.9411 4081.94110 4081.9411 4081.94112 4012.3393 4081.94110 4012.3393 4012.33930 4012.3393 4012.33930 4012.3393 4012.33930 4012.3393 4012.33930 4012.3393 4012.33932 3932.0925 4012.33934 3805.2508 3932.09252 3740.3669 3805.25080 3740.3669 3740.36690 3740.3669 3740.36692 3676.5894 3740.36690 3676.5894 3676.58940 3676.5894 3676.58940 3676.5894 3676.58940 3676.5894 3676.58940 3676.5894 3676.58942 3603.0576 3676.58944 3486.8299 3603.05762 3427.3755 3486.82990 3427.3755 3427.37550 3427.3755 3427.37552 3368.9348 3427.3755

Page 193: Lembar Kerja Kelompok 5

0 3368.9348 3368.93480 3368.9348 3368.93480 3368.9348 3368.93480 3368.9348 3368.93480 3368.9348 3368.93482 3301.5561 3368.93484 3195.0543 3301.55612 3140.5749 3195.05430 3140.5749 3140.57490 3140.5749 3140.57492 3087.0245 3140.57490 3087.0245 3087.02450 3087.0245 3087.02450 3087.0245 3087.02450 3087.0245 3087.02450 3087.0245 3087.02452 3025.284 3087.02454 2927.6942 3025.2842 2877.7736 2927.69420 2877.7736 2877.77360 2877.7736 2877.77362 2828.7042 2877.77360 2828.7042 2828.70420 2828.7042 2828.70420 2828.7042 2828.70420 2828.7042 2828.70420 2828.7042 2828.70422 2772.1301 2828.70424 2682.7066 2772.13012 2636.9633 2682.70660 2636.9633 2636.96330 2636.9633 2636.96332 2592 2636.96330 2592 25920 2592 25920 2592 25920 2592 2592

0 377.5536 377.55362 370.0025 377.55362 363.6935 370.00254 351.9614 363.69354 340.6078 351.96144 329.6204 340.60782 324 329.62040 324 3240 324 324

Page 194: Lembar Kerja Kelompok 5

0 324 3240 324 3240 324 324

0 1121.3941 1121.39413 1087.7523 1121.39412 1069.2049 1087.75230 1069.2049 1069.20490 1069.2049 1069.20490 1069.2049 1069.20490 1069.2049 1069.20490 1069.2049 1069.20490 1069.2049 1069.20493 1037.1288 1069.20492 1019.4445 1037.12880 1019.4445 1019.44450 1019.4445 1019.44450 1019.4445 1019.44450 1019.4445 1019.44450 1019.4445 1019.44450 1019.4445 1019.44453 988.8612 1019.44452 972 988.86120 972 9720 972 9720 972 9720 972 9720 972 972

0 409.4782 409.47822 401.2886 409.47824 388.3438 401.28864 375.8166 388.34384 363.6935 375.81664 351.9614 363.69354 340.6078 351.96144 329.6204 340.60782 324 329.62040 324 3240 324 3240 324 3240 324 3240 324 324

0 1679.8508 1679.8508

Page 195: Lembar Kerja Kelompok 5

3 1629.4553 1679.85082 1601.6712 1629.45530 1601.6712 1601.67120 1601.6712 1601.67122 1574.3609 1601.67120 1574.3609 1574.36090 1574.3609 1574.36090 1574.3609 1574.36093 1527.1301 1574.36092 1501.0908 1527.13010 1501.0908 1501.09080 1501.0908 1501.09082 1475.4954 1501.09080 1475.4954 1475.49540 1475.4954 1475.49540 1475.4954 1475.49543 1431.2305 1475.49542 1406.8264 1431.23050 1406.8264 1406.82640 1406.8264 1406.82642 1382.8384 1406.82640 1382.8384 1382.83840 1382.8384 1382.83840 1382.8384 1382.83843 1341.3532 1382.83842 1318.4816 1341.35320 1318.4816 1318.48160 1318.4816 1318.48162 1296 1318.48160 1296 12960 1296 1296

0 353.588 353.5882 346.5162 353.5884 335.3383 346.51622 329.6204 335.33830 329.6204 329.62040 329.6204 329.62042 324 329.62040 324 3240 324 3240 324 3240 324 324

0 1612.3278 1612.32782 1580.0812 1612.3278

Page 196: Lembar Kerja Kelompok 5

2 1553.139 1580.08120 1553.139 1553.1390 1553.139 1553.1392 1526.6562 1553.1390 1526.6562 1526.65620 1526.6562 1526.65620 1526.6562 1526.65620 1526.6562 1526.65620 1526.6562 1526.65622 1496.1231 1526.65622 1470.6125 1496.12310 1470.6125 1470.61250 1470.6125 1470.61252 1445.5368 1470.61250 1445.5368 1445.53680 1445.5368 1445.53680 1445.5368 1445.53680 1445.5368 1445.53680 1445.5368 1445.53682 1416.6261 1445.53682 1392.471 1416.62610 1392.471 1392.4710 1392.471 1392.4712 1368.7278 1392.4710 1368.7278 1368.72780 1368.7278 1368.72780 1368.7278 1368.72780 1368.7278 1368.72780 1368.7278 1368.72782 1341.3532 1368.72782 1318.4816 1341.35320 1318.4816 1318.48160 1318.4816 1318.48162 1296 1318.48160 1296 12960 1296 12960 1296 12960 1296 1296

0 1586.0963 1586.09633 1538.5134 1586.09632 1512.2799 1538.51344 1463.4967 1512.27994 1416.2871 1463.49674 1370.6004 1416.28712 1347.2301 1370.60040 1347.2301 1347.2301

Page 197: Lembar Kerja Kelompok 5

0 1347.2301 1347.23010 1347.2301 1347.23010 1347.2301 1347.23010 1347.2301 1347.23010 1347.2301 1347.23013 1306.8132 1347.23012 1284.5305 1306.81324 1243.094 1284.53054 1202.9942 1243.0944 1164.188 1202.99422 1144.3373 1164.1880 1144.3373 1144.33730 1144.3373 1144.33730 1144.3373 1144.33730 1144.3373 1144.33730 1144.3373 1144.33730 1144.3373 1144.33733 1110.0072 1144.33732 1091.0803 1110.00724 1055.8841 1091.08034 1021.8233 1055.88414 988.8612 1021.82332 972 988.86120 972 9720 972 9720 972 9720 972 9720 972 972

0 324 324

0 324 324

0 324 324

0 324 324

0 324 324

0 324 324

Page 198: Lembar Kerja Kelompok 5

0 324 324

0 324 324

0 324 324

0 324 324

0 324 324

Page 199: Lembar Kerja Kelompok 5

Produksi Pada efisiensi Realibitas Mesin(%) % Daur Ulang Tanpa Daur Ulang

373.4229 100 0 339.8148373.4229 85 0 339.8148362.2202 100 15 330.6122356.044 95 0 324356.044 100 0 324356.044 90 15 324356.044 90 0 324356.044 100 0 324

398.7327 100 0 362.8468398.7327 85 0 362.8468386.7708 90 20 354.7998374.2943 90 20 343.3546362.2202 100 15 330.6122356.044 95 0 324356.044 100 0 324356.044 90 15 324356.044 90 0 324356.044 100 0 324

443.0146 100 0 403.1433443.0146 100 0 403.1433434.1543 100 15 396.2692426.7514 90 20 391.4756412.9853 90 20 378.8474399.6632 90 20 366.6265386.7708 90 20 354.7998374.2943 90 20 343.3546362.2202 100 15 330.6122356.044 95 0 324356.044 100 0 324356.044 90 15 324

Page 200: Lembar Kerja Kelompok 5

356.044 90 0 324356.044 100 0 324

419.1713 100 0 381.4459419.1713 85 0 381.4459406.5962 100 15 371.1158399.6632 90 20 366.6265386.7708 90 20 354.7998374.2943 90 20 343.3546362.2202 100 15 330.6122356.044 95 0 324356.044 100 0 324356.044 90 15 324356.044 90 0 324356.044 100 0 324

865.66 100 0 787.7506865.66 85 0 787.7506

839.6902 90 20 770.2803812.6034 100 15 741.6942798.7476 95 0 726.8603798.7476 100 0 726.8603798.7476 90 15 729.0474785.128 90 0 714.4665785.128 100 0 714.4665785.128 90 0 714.4665785.128 100 0 714.4665785.128 100 0 714.4665785.128 85 0 714.4665

761.5742 90 20 698.6215737.0073 100 15 672.6947724.4404 95 0 659.2408724.4404 100 0 659.2408724.4404 90 15 661.2245712.0879 90 0 648712.0879 100 0 648712.0879 90 0 648712.0879 100 0 648

388.5582 100 0 353.588388.5582 100 0 353.588380.787 90 20 349.3107

368.5036 100 15 336.3473362.2202 95 0 329.6204362.2202 95 5 329.6204

Page 201: Lembar Kerja Kelompok 5

362.2202 90 15 330.6122356.044 90 0 324356.044 100 0 324356.044 90 0 324356.044 100 0 324

376.0241 100 0 342.1819376.0241 100 0 342.1819368.5036 100 15 336.3473362.2202 95 0 329.6204362.2202 100 0 329.6204362.2202 90 15 330.6122356.044 90 0 324356.044 90 0 324356.044 100 0 324

767.3962 100 0 698.3305767.3962 100 0 698.3305752.0482 100 15 686.4232739.2249 95 0 672.6947739.2249 100 0 672.6947739.2249 90 15 672.6947739.2249 100 0 672.6947739.2249 100 0 672.6947739.2249 100 0 672.6947739.2249 100 0 672.6947724.4404 100 15 661.2245712.0879 95 0 648712.0879 100 0 648712.0879 90 15 648712.0879 100 0 648712.0879 100 0 648

468.3359 100 0 426.1857468.3359 85 0 426.1857454.2858 85 0 413.4001440.6573 85 0 400.9981427.4376 90 15 390.1386420.1492 90 20 385.4192406.596 90 20 372.9863393.48 90 20 360.9544380.787 90 20 349.3107

368.5036 100 15 336.3473362.2202 95 0 329.6204362.2202 100 0 329.6204

Page 202: Lembar Kerja Kelompok 5

362.2202 90 15 330.6122356.044 90 0 324356.044 100 0 324

394.6641 100 0 359.1443394.6641 100 0 359.1443386.7708 90 20 354.7998374.2943 90 20 343.3546362.2202 100 15 330.6122356.044 95 0 324356.044 100 0 324356.044 90 15 324356.044 90 0 324356.044 100 0 324356.044 90 0 324356.044 100 0 324

844.1397 100 0 768.1671844.1397 100 0 768.1671827.2569 85 0 752.8038802.4392 100 15 732.4169788.7567 95 0 717.7686788.7567 100 0 717.7686788.7567 90 15 719.9284775.3075 100 0 705.5298775.3075 100 0 705.5298775.3075 90 0 705.5298775.3075 100 0 705.5298775.3075 100 0 705.5298775.3075 100 0 705.5298759.8013 85 0 691.4192737.0073 100 15 672.6947724.4404 95 0 659.2408724.4404 100 0 659.2408724.4404 90 15 661.2245712.0879 100 0 648712.0879 100 0 648712.0879 90 0 648712.0879 100 0 648

767.3962 100 0 698.3305767.3962 100 0 698.3305752.0482 100 15 686.4232739.2249 95 0 672.6947739.2249 100 0 672.6947

Page 203: Lembar Kerja Kelompok 5

739.2249 90 15 672.6947739.2249 90 0 672.6947739.2249 100 0 672.6947739.2249 90 0 672.6947739.2249 100 0 672.6947739.2249 100 0 672.6947739.2249 100 0 672.6947724.4404 100 15 661.2245712.0879 95 0 648712.0879 100 0 648712.0879 90 15 648712.0879 90 0 648712.0879 100 0 648712.0879 90 0 648712.0879 100 0 648

1654.0004 100 0 1505.14041654.0004 100 0 1505.14041620.9204 100 15 1479.4761593.2819 95 0 1449.88651593.2819 100 0 1449.88651593.2819 90 15 1449.88651593.2819 90 0 1449.88651593.2819 100 0 1449.88651593.2819 100 0 1449.88651593.2819 100 0 1449.88651561.4163 100 15 1425.16431534.7923 95 0 1396.6611534.7923 100 0 1396.6611534.7923 90 15 1396.6611534.7923 90 0 1396.6611534.7923 100 0 1396.6611534.7923 100 0 1396.6611534.7923 100 0 1396.6611504.0965 100 15 1372.84631478.4499 95 0 1345.38941478.4499 100 0 1345.38941478.4499 90 15 1345.38941478.4499 90 0 1345.38941478.4499 100 0 1345.38941478.4499 100 0 1345.38941478.4499 100 0 1345.38941448.8809 100 15 1322.4491424.1758 95 0 12961424.1758 100 0 12961424.1758 90 15 12961424.1758 90 0 1296

Page 204: Lembar Kerja Kelompok 5

1424.1758 100 0 1296

5730.7815 100 0 5215.01125730.7815 100 0 5215.01125616.1659 90 20 5151.92645434.9992 100 15 4960.73155342.3263 95 0 4861.51695342.3263 100 0 4861.51695342.3263 90 15 4876.14535251.2334 90 0 4778.62245251.2334 100 0 4778.62245251.2334 90 0 4778.62245251.2334 100 0 4778.62245251.2334 100 0 4778.62245251.2334 100 0 4778.62245146.2088 90 20 4720.81654980.202 100 15 4545.6207

4895.2838 95 0 4454.70834895.2838 100 0 4454.70834895.2838 90 15 4468.11264811.8135 90 0 4378.75034811.8135 100 0 4378.75034811.8135 90 0 4378.75034811.8135 100 0 4378.75034811.8135 100 0 4378.75034811.8135 100 0 4378.75034715.5773 90 20 4325.78164563.4619 100 15 4165.2464485.6496 95 0 4081.94114485.6496 100 0 4081.94114485.6496 90 15 4094.22384409.1641 90 0 4012.33934409.1641 100 0 4012.33934409.1641 90 0 4012.33934409.1641 100 0 4012.33934409.1641 100 0 4012.33934409.1641 100 0 4012.33934320.9808 90 20 3963.80294181.5943 100 15 3816.70094110.2933 95 0 3740.36694110.2933 100 0 3740.36694110.2933 90 15 3751.62184040.2081 90 0 3676.58944040.2081 100 0 3676.58944040.2081 90 0 3676.58944040.2081 100 0 3676.58944040.2081 100 0 3676.5894

Page 205: Lembar Kerja Kelompok 5

4040.2081 100 0 3676.58943959.404 90 20 3632.1145

3831.6812 100 15 3497.32193766.3467 95 0 3427.37553766.3467 100 0 3427.37553766.3467 90 15 3437.68863702.1262 90 0 3368.93483702.1262 100 0 3368.93483702.1262 90 0 3368.93483702.1262 100 0 3368.93483702.1262 100 0 3368.93483702.1262 100 0 3368.93483628.0836 90 20 3328.18163511.0487 100 15 3204.66833451.1812 95 0 3140.57493451.1812 100 0 3140.57493451.1812 90 15 3150.0253392.3346 90 0 3087.02453392.3346 100 0 3087.02453392.3346 90 0 3087.02453392.3346 100 0 3087.02453392.3346 100 0 3087.02453392.3346 100 0 3087.02453324.4879 90 20 3049.68153217.2464 100 15 2936.50373162.3886 95 0 2877.77363162.3886 100 0 2877.77363162.3886 90 15 2886.43293108.4662 90 0 2828.70423108.4662 100 0 2828.70423108.4662 90 0 2828.70423108.4662 100 0 2828.70423108.4662 100 0 2828.70423108.4662 100 0 2828.70423046.2968 90 20 2794.4862948.0292 100 15 2690.77892897.7619 95 0 2636.96332897.7619 100 0 2636.96332897.7619 90 15 2644.8982848.3516 90 0 25922848.3516 100 0 25922848.3516 90 0 25922848.3516 100 0 2592

5730.7815 100 0 5215.01125730.7815 100 0 5215.01125616.1659 90 20 5151.9264

Page 206: Lembar Kerja Kelompok 5

5434.9992 100 15 4960.73155342.3263 95 0 4861.51695342.3263 100 0 4861.51695342.3263 90 15 4876.14535251.2334 90 0 4778.62245251.2334 100 0 4778.62245251.2334 90 0 4778.62245251.2334 100 0 4778.62245251.2334 100 0 4778.62245251.2334 100 0 4778.62245146.2088 90 20 4720.81654980.202 100 15 4545.6207

4895.2838 95 0 4454.70834895.2838 100 0 4454.70834895.2838 90 15 4468.11264811.8135 90 0 4378.75034811.8135 100 0 4378.75034811.8135 90 0 4378.75034811.8135 100 0 4378.75034811.8135 100 0 4378.75034811.8135 100 0 4378.75034715.5773 90 20 4325.78164563.4619 100 15 4165.2464485.6496 95 0 4081.94114485.6496 100 0 4081.94114485.6496 90 15 4094.22384409.1641 90 0 4012.33934409.1641 100 0 4012.33934409.1641 90 0 4012.33934409.1641 100 0 4012.33934409.1641 100 0 4012.33934409.1641 100 0 4012.33934320.9808 90 20 3963.80294181.5943 100 15 3816.70094110.2933 95 0 3740.36694110.2933 100 0 3740.36694110.2933 90 15 3751.62184040.2081 90 0 3676.58944040.2081 100 0 3676.58944040.2081 90 0 3676.58944040.2081 100 0 3676.58944040.2081 100 0 3676.58944040.2081 100 0 3676.58943959.404 90 20 3632.1145

3831.6812 100 15 3497.32193766.3467 95 0 3427.37553766.3467 100 0 3427.37553766.3467 90 15 3437.6886

Page 207: Lembar Kerja Kelompok 5

3702.1262 90 0 3368.93483702.1262 100 0 3368.93483702.1262 90 0 3368.93483702.1262 100 0 3368.93483702.1262 100 0 3368.93483702.1262 100 0 3368.93483628.0836 90 20 3328.18163511.0487 100 15 3204.66833451.1812 95 0 3140.57493451.1812 100 0 3140.57493451.1812 90 15 3150.0253392.3346 90 0 3087.02453392.3346 100 0 3087.02453392.3346 90 0 3087.02453392.3346 100 0 3087.02453392.3346 100 0 3087.02453392.3346 100 0 3087.02453324.4879 90 20 3049.68153217.2464 100 15 2936.50373162.3886 95 0 2877.77363162.3886 100 0 2877.77363162.3886 90 15 2886.43293108.4662 90 0 2828.70423108.4662 100 0 2828.70423108.4662 90 0 2828.70423108.4662 100 0 2828.70423108.4662 100 0 2828.70423108.4662 100 0 2828.70423046.2968 90 20 2794.4862948.0292 100 15 2690.77892897.7619 95 0 2636.96332897.7619 100 0 2636.96332897.7619 90 15 2644.8982848.3516 90 0 25922848.3516 100 0 25922848.3516 90 0 25922848.3516 100 0 2592

414.8941 100 0 377.5536414.8941 100 0 377.5536406.5962 100 15 371.1158399.6632 90 20 366.6265386.7708 90 20 354.7998374.2943 90 20 343.3546362.2202 100 15 330.6122356.044 95 0 324356.044 100 0 324

Page 208: Lembar Kerja Kelompok 5

356.044 90 15 324356.044 100 0 324356.044 100 0 324

1232.3012 100 0 1121.39411232.3012 85 0 1121.39411195.3322 100 15 1091.02541174.9504 95 0 1069.20491174.9504 100 0 1069.20491174.9504 90 15 1069.20491174.9504 95 0 1069.20491174.9504 100 0 1069.20491174.9504 100 0 1069.20491174.9504 85 0 1069.20491139.702 100 15 1040.2495

1120.2687 95 0 1019.44451120.2687 100 0 1019.44451120.2687 90 15 1019.44451120.2687 95 0 1019.44451120.2687 100 0 1019.44451120.2687 100 0 1019.44451120.2687 85 0 1019.44451086.6607 100 15 991.83671068.1319 95 0 9721068.1319 100 0 9721068.1319 90 15 9721068.1319 95 0 9721068.1319 100 0 972

449.976 100 0 409.4782449.976 100 0 409.4782

440.9765 90 20 404.5248426.7514 90 20 391.4756412.9853 90 20 378.8474399.6632 90 20 366.6265386.7708 90 20 354.7998374.2943 90 20 343.3546362.2202 100 15 330.6122356.044 95 0 324356.044 100 0 324356.044 90 15 324356.044 90 0 324356.044 100 0 324

1845.9899 100 0 1679.8508

Page 209: Lembar Kerja Kelompok 5

1845.9899 85 0 1679.85081790.6102 100 15 1634.35841760.0782 95 0 1601.67121760.0782 100 0 1601.67121760.0782 90 15 1606.49071730.0669 100 0 1574.36091730.0669 100 0 1574.36091730.0669 100 0 1574.36091730.0669 85 0 1574.36091678.1649 100 15 1531.72531649.5503 95 0 1501.09081649.5503 100 0 1501.09081649.5503 90 15 1505.60761621.4235 100 0 1475.49541621.4235 100 0 1475.49541621.4235 100 0 1475.49541621.4235 85 0 1475.49541572.7808 100 15 1435.53711545.9631 95 0 1406.82641545.9631 100 0 1406.82641545.9631 90 15 1411.05961519.6026 100 0 1382.83841519.6026 100 0 1382.83841519.6026 100 0 1382.83841519.6026 85 0 1382.83841474.0145 100 15 1345.38941448.8809 95 0 1318.48161448.8809 100 0 1318.48161448.8809 90 15 1322.4491424.1758 100 0 12961424.1758 100 0 1296

388.5582 100 0 353.588388.5582 100 0 353.588380.787 90 20 349.3107

368.5036 100 15 336.3473362.2202 95 0 329.6204362.2202 100 0 329.6204362.2202 90 15 330.6122356.044 90 0 324356.044 100 0 324356.044 90 0 324356.044 100 0 324

1771.7888 100 0 1612.32781771.7888 100 0 1612.3278

Page 210: Lembar Kerja Kelompok 5

1736.353 100 15 1584.83571706.7462 95 0 1553.1391706.7462 100 0 1553.1391706.7462 90 15 1557.81241677.6442 90 0 1526.65621677.6442 100 0 1526.65621677.6442 90 0 1526.65621677.6442 100 0 1526.65621677.6442 100 0 1526.65621677.6442 100 0 1526.65621644.0913 100 15 1500.6251616.0577 95 0 1470.61251616.0577 100 0 1470.61251616.0577 90 15 1475.03761588.502 90 0 1445.53681588.502 100 0 1445.53681588.502 90 0 1445.53681588.502 100 0 1445.53681588.502 100 0 1445.53681588.502 100 0 1445.53681556.732 100 15 1420.8888

1530.1879 95 0 1392.4711530.1879 100 0 1392.4711530.1879 90 15 1396.6611504.0965 90 0 1368.72781504.0965 100 0 1368.72781504.0965 90 0 1368.72781504.0965 100 0 1368.72781504.0965 100 0 1368.72781504.0965 100 0 1368.72781474.0145 100 15 1345.38941448.8809 95 0 1318.48161448.8809 100 0 1318.48161448.8809 90 15 1322.4491424.1758 90 0 12961424.1758 100 0 12961424.1758 90 0 12961424.1758 100 0 1296

1742.963 100 0 1586.09631742.963 85 0 1586.0963

1690.6741 100 15 1543.14281661.846 90 20 1524.4757

1608.2381 90 20 1475.29911556.3595 90 20 1427.70881506.1543 100 15 1374.72461480.4726 95 0 1347.2301

Page 211: Lembar Kerja Kelompok 5

1480.4726 100 0 1347.23011480.4726 90 15 1347.23011480.4726 100 0 1347.23011480.4726 100 0 1347.23011480.4726 100 0 1347.23011480.4726 85 0 1347.23011436.0585 100 15 1310.74541411.572 90 20 1294.8896

1366.0374 90 20 1253.1191321.9716 90 20 1212.69581279.3275 100 15 1167.69111257.5135 95 0 1144.33731257.5135 100 0 1144.33731257.5135 90 15 1144.33731257.5135 100 0 1144.33731257.5135 100 0 1144.33731257.5135 100 0 1144.33731257.5135 85 0 1144.33731219.7881 100 15 1113.34721198.9893 90 20 1099.87931160.3122 90 20 1064.39931122.8827 90 20 1030.06381086.6607 100 15 991.83671068.1319 95 0 9721068.1319 100 0 9721068.1319 90 15 9721068.1319 100 0 9721068.1319 100 0 972

356.044 95 5 324

356.044 95 5 324

356.044 95 5 324

356.044 95 5 324

356.044 95 5 324

356.044 95 5 324

Page 212: Lembar Kerja Kelompok 5

356.044 95 5 324

356.044 95 5 324

356.044 95 0 324

356.044 100 0 324

356.044 100 0 324

Page 213: Lembar Kerja Kelompok 5

Daur Ulang Jumlah Mesin Teoritis

0 0.020 0.03

0.9918 0.030 0.020 0.250 0.010 0.120 0.25

0 0.020 0.03

2.8384 0.022.7468 0.010.9918 0.03

0 0.030 0.250 0.010 0.10 0.33

0 0.030 0.04

1.1888 0.033.1318 0.023.0308 0.022.933 0.02

2.8384 0.012.7468 0.010.9918 0.03

0 0.030 0.080 0.01

Page 214: Lembar Kerja Kelompok 5

0 0.120 0.27

0 0.010 0.04

1.1133 0.022.933 0.04

2.8384 0.042.7468 0.010.9918 0.03

0 0.030 0.090 0.010 0.120 0.25

0 0.040 0.1

6.1622 0.012.2251 0.02

0 0.020 0.4

2.1871 0.020 0.220 0.590 0.220 0.640 0.030 0.09

5.589 0.012.0181 0.02

0 0.020 0.36

1.9837 0.020 0.20 0.540 0.20 0.58

0 0.010 0.03

2.7945 0.011.009 0.02

0 0.10 0.2

Page 215: Lembar Kerja Kelompok 5

0.9918 0.010 0.110 0.250 0.090 0.25

0 0.020 0.03

1.009 0.020 0.090 0.25

0.9918 0.040 0.010 0.010 0.23

0 0.030 0.07

2.0593 0.060 0.080 0.520 0.080 0.070 0.250 0.030 0.07

1.9837 0.050 0.080 0.50 0.070 0.070 0.24

0 0.020 0.050 0.040 0.06

1.1704 0.043.0834 0.022.9839 0.022.8876 0.022.7945 0.021.009 0.03

0 0.030 0.13

Page 216: Lembar Kerja Kelompok 5

0.9918 0.010 0.060 0.23

0 0.020 0.01

2.8384 0.022.7468 0.020.9918 0.01

0 0.010 0.260 0.040 0.090 0.230 0.020 0.26

0 0.030 0.060 0.04

2.1972 0.020 0.020 0.26

2.1598 0.030 0.030 0.290 0.030 0.250 0.020 0.050 0.04

2.0181 0.020 0.020 0.24

1.9837 0.030 0.020 0.270 0.020 0.23

0 0.030 0.04

2.0593 0.050 0.020 0.44

Page 217: Lembar Kerja Kelompok 5

0 0.030 0.050 0.030 0.050 0.520 0.030 0.04

1.9837 0.050 0.020 0.420 0.030 0.050 0.030 0.050 0.5

0 0.070 0.08

4.4384 0.030 0.110 0.110 0.060 0.090 1.120 0.070 0.08

4.2755 0.030 0.10 0.10 0.060 0.090 1.080 0.070 0.08

4.1185 0.030 0.10 0.10 0.060 0.080 1.040 0.060 0.07

3.9674 0.030 0.10 0.10 0.050 0.08

Page 218: Lembar Kerja Kelompok 5

0 1

0 0.160 0.28

41.2154 0.4214.8822 0.43

0 0.270 2.89

14.6284 0.220 0.250 3.130 0.350 3.30 0.140 0.26

37.7665 0.3913.6369 0.39

0 0.250 2.65

13.4043 0.20 0.230 2.860 0.320 3.020 0.130 0.24

34.6063 0.3512.4957 0.36

0 0.230 2.43

12.2827 0.180 0.210 2.620 0.30 2.770 0.120 0.22

31.7104 0.3311.4501 0.33

0 0.210 2.22

11.2549 0.170 0.20 2.40 0.270 2.540 0.11

Page 219: Lembar Kerja Kelompok 5

0 0.229.0569 0.310.492 0.3

0 0.190 2.04

10.3131 0.150 0.180 2.20 0.250 2.320 0.10 0.18

26.6255 0.279.614 0.28

0 0.180 1.87

9.4501 0.140 0.160 2.020 0.230 2.130 0.090 0.17

24.3975 0.258.8095 0.25

0 0.160 1.71

8.6593 0.130 0.150 1.850 0.210 1.950 0.080 0.15

22.3559 0.238.0723 0.23

0 0.150 1.57

7.9347 0.120 0.140 1.70 0.190 1.79

0 0.240 0.2

41.2154 0.14

Page 220: Lembar Kerja Kelompok 5

14.8822 0.220 0.40 3.64

14.6284 0.360 0.380 3.690 0.420 3.520 0.220 0.18

37.7665 0.1213.6369 0.21

0 0.370 3.34

13.4043 0.330 0.350 3.380 0.390 3.230 0.20 0.17

34.6063 0.1112.4957 0.19

0 0.340 3.06

12.2827 0.30 0.320 3.10 0.360 2.960 0.180 0.15

31.7104 0.111.4501 0.17

0 0.310 2.8

11.2549 0.280 0.290 2.840 0.330 2.710 0.170 0.14

29.0569 0.110.492 0.16

0 0.280 2.57

10.3131 0.25

Page 221: Lembar Kerja Kelompok 5

0 0.270 2.60 0.30 2.480 0.150 0.13

26.6255 0.099.614 0.14

0 0.260 2.35

9.4501 0.230 0.240 2.390 0.270 2.280 0.140 0.12

24.3975 0.088.8095 0.13

0 0.240 2.16

8.6593 0.210 0.220 2.190 0.250 2.090 0.130 0.11

22.3559 0.078.0723 0.12

0 0.220 1.98

7.9347 0.20 0.210 20 0.230 1.91

0 0.020 0.03

1.1133 0.022.933 0.03

2.8384 0.032.7468 0.020.9918 0.03

0 0.020 0.23

Page 222: Lembar Kerja Kelompok 5

0 0.010 0.030 0.25

0 0.050 0.1

3.2731 0.040 0.050 0.040 0.020 0.10 0.030 0.040 0.09

3.1207 0.040 0.040 0.040 0.020 0.090 0.030 0.040 0.09

2.9755 0.040 0.040 0.040 0.020 0.090 0.03

0 0.020 0.02

3.2362 0.013.1318 0.013.0308 0.012.933 0.01

2.8384 0.022.7468 0.020.9918 0.01

0 0.030 0.030 0.010 0.020 0.25

0 0.08

Page 223: Lembar Kerja Kelompok 5

0 0.034.9031 0.05

0 0.050 1.24

4.8195 0.170 0.080 1.220 0.070 0.03

4.5952 0.050 0.050 1.16

4.5168 0.150 0.080 1.140 0.070 0.02

4.3066 0.050 0.050 1.09

4.2332 0.150 0.070 1.070 0.070 0.02

4.0362 0.040 0.050 1.02

3.9674 0.140 0.070 1

0 0.020 0.01

2.7945 0.031.009 0.02

0 0.010 0.01

0.9918 0.010 0.020 0.010 0.020 0.18

0 0.040 0.03

Page 224: Lembar Kerja Kelompok 5

4.7545 0.060 0.050 0.04

4.6734 0.090 0.040 0.060 0.080 0.450 0.040 0.03

4.5019 0.060 0.050 0.04

4.4251 0.090 0.040 0.050 0.080 0.430 0.030 0.02

4.2627 0.060 0.050 0.04

4.19 0.080 0.040 0.050 0.070 0.410 0.030 0.02

4.0362 0.050 0.040 0.04

3.9674 0.080 0.030 0.050 0.070 0.39

0 0.040 0.04

4.6294 0.0712.1958 0.0811.8024 0.0811.4217 0.074.1242 0.06

0 0.06

Page 225: Lembar Kerja Kelompok 5

0 0.050 0.040 0.060 0.40 0.030 0.04

3.9322 0.0610.3591 0.0710.025 0.069.7016 0.063.5031 0.05

0 0.050 0.040 0.040 0.050 0.340 0.030 0.03

3.34 0.058.799 0.06

8.5152 0.058.2405 0.052.9755 0.04

0 0.040 0.040 0.030 0.050 0.29

0 0.01

0 0.01

0 0.01

0 0.01

0 0

0 0.01

Page 226: Lembar Kerja Kelompok 5

0 0

0 0.01

0 0.01

0 0.01

0 0.01

Page 227: Lembar Kerja Kelompok 5

ROUTING SHEET LOKO BEBAN A

No

(PE-01) Bodi Kabin Loko (Balok Kayu P = 45 mm, L = 30 mm, T = 40 mm1

O-1O-2O-3O-4O-5O-6O-7O-8O-9O-10O-11O-12O-13O-14

(PE-02) Atap Loko (Balok Kayu P = 45 mm, L = 55 mm, T = 10 mm1

O-15O-16O-17O-18O-19O-20O-21O-22O-23O-24O-25O-26

(PE-03) Cerobong (Balok Kayu P = 15 mm, L = 25 mm, T = 80 mm1

O-27O-28O-29O-30

Page 228: Lembar Kerja Kelompok 5

O-31O-32O-33O-34

(PE-04) Mesin Diesel (P = 40 mm, L = 35 mm, T = 20 mm1

O-35O-36O-37O-38O-39O-40O-41O-42O-43O-44

(PE-05) Pin Atap (Silinder Kayu D = 15 mm, T = 25 mm1

O-46O-47O-48O-49O-50O-51O-52O-53O-54O-55

(PE-06) Pin Alas (Silinder Kayu D = 15 mm, T = 25 mm1

O-56O-57O-58O-59O-60O-61O-62O-63O-64O-65

(PE-07) Dinding Samping (Balok Kayu P = 60 mm, L = 15 mm, T = 50 mm2

O-67O-68O-69O-70O-71O-72

Page 229: Lembar Kerja Kelompok 5

O-73O-74O-75O-76O-77O-78O-79O-80O-81O-82O-83O-84O-85O-86O-87O-88

(PE-08) Dinding Belakang (Balok Kayu P = 40 mm, L = 10 mm, T = 40 mm1

O-89O-90O-91O-92O-93O-94O-95O-96O-97O-98O-99

(PE-09) Pin Bumper (Silinder Kayu D = 5 mm, T = 8 mm1

O-101O-102O-103O-104O-105O-106O-107O-108O-109

(PE-10) Bumper Loko (Balok Kayu P = 50 mm, L = 8 mm, T = 25 mm1

O-110O-111O-112O-113O-114O-115

Page 230: Lembar Kerja Kelompok 5

O-116O-117O-118O-119O-120O-121

(PE-11) Chasis Loko A (Balok Kayu P = 150 mm, L = 25 mm, T = 25 mm1

O-122O-123O-124O-125O-126O-127O-128O-129O-130O-131O-132O-133O-134O-135O-136

(PE-12) Pin Chasis (Silinder Kayu D = 10 , T = 20 mm2

O-137O-138O-139O-140O-141O-142O-143O-144O-145O-146O-147O-148O-149O-150O-151O-152

(PE-13) Pin Lampu (Silinder Kayu D = 5 mm , T = 15 mm2

O-155O-156O-157O-158O-159

Page 231: Lembar Kerja Kelompok 5

O-160O-161O-162O-163O-164O-165O-166O-167O-168O-169O-170O-171O-172O-173O-174O-175O-176

(PE-14) Lampu (Silinder Kayu D = 16 , T = 10 mm2

O-177O-178O-179O-180O-181O-182O-183O-184O-185O-186O-187O-188O-189O-190O-191O-192O-193O-194O-195O-196

(PE-15) Poros Roda (Silinder Kayu D = 10 mm , T = 65 mm4

O-198O-199O-200O-201O-202O-203O-204

Page 232: Lembar Kerja Kelompok 5

O-205O-206O-207O-208O-209O-210O-211O-212O-213O-214O-215O-216O-217O-218O-219O-220O-221O-222O-223O-224O-225O-226O-227O-228O-229

(PE-16) Seal Roda (Silinder Kayu D = 20 mm , T = 10 mm8

O-230O-231O-232O-233O-234O-235O-236O-237O-238O-239O-240O-241O-242O-243O-244O-245O-246O-247O-248O-249O-250

Page 233: Lembar Kerja Kelompok 5

O-251O-252O-253O-254O-255O-256O-257O-258O-259O-260O-261O-262O-263O-264O-265O-266O-267O-268O-269O-270O-271O-272O-273O-274O-275O-276O-277O-278O-279O-280O-281O-282O-283O-284O-285O-286O-287O-288O-289O-290O-291O-292O-293O-294O-295O-296O-297O-298

Page 234: Lembar Kerja Kelompok 5

O-299O-300O-301O-302O-303O-304O-305O-306O-307O-308O-309O-310O-311O-312O-313O-314O-315O-316O-317

(PE-17) Roda (Silinder Kayu D = 35 mm , T = 10 mm8

O-318O-319O-320O-321O-322O-323O-324O-325O-326O-327O-328O-329O-330O-331O-332O-333O-334O-335O-336O-337O-338O-339O-340O-341O-342O-343O-344

Page 235: Lembar Kerja Kelompok 5

O-345O-346O-347O-348O-349O-350O-351O-352O-353O-354O-355O-356O-357O-358O-359O-360O-361O-362O-363O-364O-365O-366O-367O-368O-369O-370O-371O-372O-373O-374O-375O-376O-377O-378O-379O-380O-381O-382O-383O-384O-385O-386O-387O-388O-389O-390O-391O-392

Page 236: Lembar Kerja Kelompok 5

O-393O-394O-395O-396O-397O-398O-399O-400O-401O-402O-403O-404O-405

(PE-18) Pin Chasis Beban (Silinder Kayu D = 10 mm , T = 20 mm2

O-408O-409O-410O-411O-412O-413O-414O-415O-416O-417O-418O-419O-420O-421O-422O-423O-424O-425O-426O-427

(PE-19) Chasis Beban (Balok Kayu D = 10 mm , T = 20 mm1

O-428O-429O-430O-431O-432O-433O-434O-435O-436O-437O-438

Page 237: Lembar Kerja Kelompok 5

O-439

(PE-20) Pin Alas Beban (Silinder Kayu D = 10 mm , T = 15 mm4

O-440O-441O-442O-443O-444O-445O-446O-447O-448O-449O-450O-451O-452O-453O-454O-455O-456O-457O-458O-459O-460O-461O-462O-463O-464O-465O-466O-467O-468O-469O-470O-471

(PE-21) Alas Beban (Balok Kayu P = 190 mm , L = 55 mm, T = 10 mm1

O-472O-473O-474O-475O-476O-477O-478O-479O-480O-481O-482

Page 238: Lembar Kerja Kelompok 5

O-483O-484O-485

(PE-22) Atap Beban (Balok Kayu P = 190 mm , L = 30 mm, T = 10 mm1

O-487O-488O-489O-490O-491O-492O-493O-494O-495O-496O-497O-498O-499O-500

(PE-23) Beban Silinder (Silinder Kayu D = 40 mm , T = 15 mm2

O-501O-502O-503O-504O-505O-506O-507O-508O-509O-510O-511O-512O-513O-514O-515O-516O-517O-518O-519O-520O-521O-522

(SSA-8) Sub Sub AssemblyO-523(SSA-7) Sub Sub AssemblyO-486

(SSA-6) Sub Sub Assembly

Page 239: Lembar Kerja Kelompok 5

O-406

(SSA-5) Sub Sub AssemblyO-197

(SSA-4) Sub Sub AssemblyO-153

(SSA-3) Sub Sub AssemblyO-100

(SSA-2) Sub Sub AssemblyO-66

(SSA-1) Sub Sub AssemblyO-45

(SA-3) Sub AssemblyO-524

(SA-2) Sub AssemblyO-407

(SA-1) Sub AssemblyO-154

(A-2) AssemblyO-525

(A-1) AssemblyO-526

Page 240: Lembar Kerja Kelompok 5

ROUTING SHEET LOKO BEBAN A

Nama Operasi

(PE-01) Bodi Kabin Loko (Balok Kayu P = 45 mm, L = 30 mm, T = 40 mmpcsDiukur = p = 45 mm, l = 30 mm, t = 40 mmDipotong = p = 45 mm, l = 30 mm , t = 40 mmDiamplas HalusDibor Bagian Atas = D = 6 mmDibor Bagian Atas = D = 6 mmDibor Bagian Atas = D = 6 mmDibor Bagian Bawah = D = 5 mmDibor Bagian Bawah = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplas AkhirDicat (cat merah 100 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-02) Atap Loko (Balok Kayu P = 45 mm, L = 55 mm, T = 10 mmpcsDiukur = p = 40 mm, l = 30 mm, t = 10 mmDipotong = p = 40 mm, l = 30 mm , t = 10 mmDiamplas HalusDibor Bagian Atas = D = 5 mm, H = 25 mmDibor Bagian Atas = D = 5 mm, H = 25 mmDibor Bagian Bawah = D = 5 mm, H = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplas AkhirDicat (cat biru 100 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-03) Cerobong (Balok Kayu P = 15 mm, L = 25 mm, T = 80 mmpcsDiukur = T = 80 mmDipotong = p = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)

Page 241: Lembar Kerja Kelompok 5

DikeringkanDiamplas AkhirDicat (cat biru 100 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-04) Mesin Diesel (P = 40 mm, L = 35 mm, T = 20 mmpcsDiukur = t = 20 mmDipotong = p = 16 mmDibor Dari Pusat = D = 10 mm, H = 25 mmDibor Dari Pusat = D = 2 mm, H = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplas AkhirDicat (cat biru 100 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-05) Pin Atap (Silinder Kayu D = 15 mm, T = 25 mmpcsDiukur = T = 80 mmDipotong = p = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DiamplasDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplas AkhirDicat (pernish cat putih 80,5 ml (t = 60 cm, d = 20 cm)Dikeringkan

(PE-06) Pin Alas (Silinder Kayu D = 15 mm, T = 25 mmpcsDiukur = t = 25 mmDipotong = t = 20 mmDihaluskan PermukaannyaDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)Dihaluskan PermukaannyaDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (pernish cat putih 80,5 ml (t = 60 cm, d = 20 cm)Dikeringkan

(PE-07) Dinding Samping (Balok Kayu P = 60 mm, L = 15 mm, T = 50 mmpcsDiukur = p = 60 mm, l = 15 mm, t = 50 mmDipotong DL = 55 mm, DD = 10 mm , t = 40 mmDibor Di Titik Pusat D = 30 mm, H = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)Dikeringkan

Page 242: Lembar Kerja Kelompok 5

DiamplasDicat (cat biru 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat(cat hijau 100 ml(t = 30DikeringkanDiukur = p = 60 mm, l = 15 mm, t = 50 mmDipotong DL = 55 mm, DD = 10 mm , t = 40 mmDibor Di Titik Pusat D = 30 mm, H = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat biru 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-08) Dinding Belakang (Balok Kayu P = 40 mm, L = 10 mm, T = 40 mmpcsDiukur = D = 30 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-09) Pin Bumper (Silinder Kayu D = 5 mm, T = 8 mmpcsDiukur = D = 5 mm, t = 8 mmDipotong = t = 8 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)Dilapis pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-10) Bumper Loko (Balok Kayu P = 50 mm, L = 8 mm, T = 25 mmpcsDiukur = p = 45 mm, l = 30 mm, t = 40 mmDipotong = p = 45 mm, l = 30 mm , t = 40 mmDibor Bagian Depan = d = 3mm, h = 10 mmDibor Bagian Depan = d = 3mm, h = 10 mmDiamplas halusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)

Page 243: Lembar Kerja Kelompok 5

DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-11) Chasis Loko A (Balok Kayu P = 150 mm, L = 25 mm, T = 25 mmpcsDiukur = p = 150 mm, l = 25 mm, t = 25 mmDipotong = p = 150 mm, l = 25 mm , t = 25 mmDipotong Sisi Miring DepanDipotong Fillet BawahDihaluskan sisi Fillet BawahDibor Bagian Samping = D =5mm, H = 25 mmDibor Bagian Samping = D =5mm, H = 25 mmDibor Bagian Atas = D = 5 mm, H = 15 mmDibor Bagian Atas = D = 5 mm, H = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-12) Pin Chasis (Silinder Kayu D = 10 , T = 20 mmpcsDiukur = t = 20 mmDipotong = t =20 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)DikeringkanDiukur = t = 20 mmDipotong = t =20 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-13) Pin Lampu (Silinder Kayu D = 5 mm , T = 15 mmpcsDiukur = D = 5 mm, t = 15 mmDipotong = D = 5 mm, t = 15 mmDibuat Kemiringan Pada Bagian Atas = R = 9 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)

Page 244: Lembar Kerja Kelompok 5

DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 5 mm, t = 15 mmDipotong = D = 5 mm, t = 15 mmDibuat Kemiringan Pada Bagian Atas = R = 9 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-14) Lampu (Silinder Kayu D = 16 , T = 10 mmpcsDiukur = D = 16 mm, t = 10 mmDipotong = t = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 16 mm, t = 10 mmDipotong = t = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-15) Poros Roda (Silinder Kayu D = 10 mm , T = 65 mmpcsDiukur = D = 10 mm, t = 65 mmDipotong = t = 65 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat coklat 100 ml(t = 6 cm, d = 20 cm)

Page 245: Lembar Kerja Kelompok 5

DikeringkanDiukur = D = 10 mm, t = 65 mmDipotong = t = 65 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat coklat 100 ml(t = 6 cm, d = 20 cm)DikeringkanDiukur = D = 10 mm, t = 65 mmDipotong = t = 65 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat coklat 100 ml(t = 6 cm, d = 20 cm)DikeringkanDiukur = D = 10 mm, t = 65 mmDipotong = t = 65 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat coklat 100 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-16) Seal Roda (Silinder Kayu D = 20 mm , T = 10 mmpcsDiukur = D = 20 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 20 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)

Page 246: Lembar Kerja Kelompok 5

DikeringkanDiukur = D = 20 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 20 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 20 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 20 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 20 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mm

Page 247: Lembar Kerja Kelompok 5

Diamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 20 mm, t = 10 mmDipotong = t = 10 mmDibor Bagian Atas = D = 5 mm, H = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-17) Roda (Silinder Kayu D = 35 mm , T = 10 mmpcsDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)

Page 248: Lembar Kerja Kelompok 5

DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)Dikeringkan

Page 249: Lembar Kerja Kelompok 5

Dicat (cat biru 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 35 mm, t = 10 mmDipotong = t = 10 mmDibor = D = 5 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat biru 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-18) Pin Chasis Beban (Silinder Kayu D = 10 mm , T = 20 mmpcsDiukur = D = 10 mm, t = 20 mmDipotong = t = 20 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = D = 10 mm, t = 20 mmDipotong = t = 20 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 100 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat merah 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

(PE-19) Chasis Beban (Balok Kayu D = 10 mm , T = 20 mmpcsDiukur = p = 170 mm, l = 25 mm, t = 25 mmDipotong = p = 170 mm, l = 25 mm , t = 25 mmDiamplas HalusDibor Bagian Atas = d = 5 mm, h = 25 mmDibor Bagian Atas = d = 5 mm, h = 25 mmDibor Bagian Bawah = d = 5 mm, h = 25 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat kuning 100 ml(t = 6 cm, d = 20 cm)

Page 250: Lembar Kerja Kelompok 5

Dikeringkan

(PE-20) Pin Alas Beban (Silinder Kayu D = 10 mm , T = 15 mmpcsDiukur = t = 15 mmDipotong = p = 40 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)DikeringkanDiukur = t = 15 mmDipotong = p = 40 Diamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)DikeringkanDiukur = t = 15 mmDipotong = p = 40 Diamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)DikeringkanDiukur = t = 15 mmDipotong = p = 40 Diamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDilapis Pernish (pernish 80,5 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-21) Alas Beban (Balok Kayu P = 190 mm , L = 55 mm, T = 10 mmpcsDiukur = p = 190 mm, l = 55 mm, t = 10 mmDipotong = t = 45 mmDibor Bagian Atas = d = 8 mmDibor Bagian Atas = d = 8 mmDibor Bagian Atas = d = 8 mmDibor Bagian Atas = d = 8 mmDibor Bagian Bawah = d = 5 mm, h = 10 mmDibor Bagian Bawah = d = 5 mm, h = 10 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)Dikeringkan

Page 251: Lembar Kerja Kelompok 5

DiamplasDicat (cat kuning 100 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-22) Atap Beban (Balok Kayu P = 190 mm , L = 30 mm, T = 10 mmpcsDiukur = p = 190 mm, l = 55 mm, t = 10 mmDipotong = t = 45 mmDibor Bagian Atas = d = 5 mmDibor Bagian Atas = d = 5 mmDibor Bagian Atas = d = 5 mmDibor Bagian Atas = d = 5 mmDibor Bagian Bawah = d = 5 mm, h = 25 mmDibor Bagian Bawah = d = 5 mm, h = 25 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat kuning 100 ml(t = 6 cm, d = 20 cm)Dikeringkan

(PE-23) Beban Silinder (Silinder Kayu D = 40 mm , T = 15 mmpcsDiukur = DL = 53 mm, DD = 8 mm, t= 15 mmDipotong = DL = 53 mm, DD = 8 mm, t= 15 mmDibor Di Titik Pusat D = 81 mm, H = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)DikeringkanDiukur = DL = 53 mm, DD = 8 mm, t= 15 mmDipotong = DL = 53 mm, DD = 8 mm, t= 15 mmDibor Di Titik Pusat D = 81 mm, H = 15 mmDiamplas HalusDidempul(dempul 1 kg(t = 30 cm, d = 25 cm)DikeringkanDiamplasDicat (cat putih 80,5 ml(t = 60 cm, d = 20 cm)DikeringkanDicat (cat hijau 100 ml(t = 30 cm, d = 20 cm)Dikeringkan

Direkatkan (perekat 60 gr (t = 20 mm, d = 100 mm))

Direkatkan (male connector 1 pcs (P = 38 mm, L =11 mm, T = 6,5 mm)) (perekat 60 g(t = 20 mm,d = 100 mm

Page 252: Lembar Kerja Kelompok 5

Direkatkan (perekat 60 gr (t = 20 mm, d = 100 mm))

Direkatkan (perekat 60 gr (t = 20 mm, d = 100 mm))

Direkatkan (perekat 60 gr (t = 20 mm, d = 100 mm))

Direkatkan (perekat 60 gr (t = 20 mm, d = 100 mm))

Direkatkan (perekat 60 gr (t = 20 mm, d = 100 mm))

Direkatkan (perekat 60 gr (t = 20 mm, d = 100 mm))

Direkatkan (perekat 60 gr (t = 20 mm, d = 100 mm))

Direkatkan (perekat 60 gr (t = 20 mm, d = 100 mm))

Direkatkan (Female connector 1 pcs (P = 38 mm, L =11 mm, T = 6,5 mm)) (perekat 60 g(t = 20 mm,d = 100 mm

Direkatkan, Label Loko Beban A 1 pcs (P=100 cm, d = 5 cm)

Direkatkan Isolasi 1 pcs (P = 100 cm, d = 5 cm), Kardus 1 pcs (P = 600 mm, L =200 mm, T = 60 mm)

Page 253: Lembar Kerja Kelompok 5

ROUTING SHEET LOKO BEBAN A

KelompokKapasitas Produksi

Efisiensi Produksi:Persentase Lembur Pabrik:

Nama Mesin Waktu Baku(detik) Waktu Setup(detik)

Flexible Work Benches 0.6 36 0Circular Saw Machine 0.75 45 39600Belt & Disc Sander Machine 0.52 31.2 15840Radial Drilling Machine 0.3 18 58080Radial Drilling Machine 0.3 18 58080Radial Drilling Machine 0.3 18 58080Radial Drilling Machine 0.28 16.8 58080Radial Drilling Machine 0.28 16.8 58080Belt & Disc Sander Machine 0.63 37.8 15840Adjustable Work Benches 3 0.77 46.2 0Drying Area 2.13 127.8 0Sander Machine 1 0.25 15 0Paint Sprayer 2.6 156 18480Drying Area 7 420 0

Flexible Work Benches 0.3 18 0Band Saw Machine 0.65 39 66000Belt & Disc Sander Machine 0.48 28.8 15840Radial Drilling Machine 0.69 41.4 58080Radial Drilling Machine 0.69 41.4 58080Radial Drilling Machine 0.28 16.8 58080Belt & Disc Sander Machine 0.75 45 15840Adjustable Work Benches 3 0.65 39 0Drying Area 2.22 133.2 0Sander Machine 1 0.25 15 0Paint Sprayer 2.7 162 18480Drying Area 6.5 390 0

Flexible Work Benches 0.6 36 0Band Saw Machine 0.57 34.2 66000Belt & Disc Sander Machine 0.69 41.4 15840Adjustable Work Benches 3 0.44 26.4 0

Waktu Baku(menit)

Page 254: Lembar Kerja Kelompok 5

Drying Area 6.5 390 0Sander Machine 1 0.25 15 0Paint Sprayer 2.71 162.6 18480Drying Area 6.5 390 0

Flexible Work Benches 0.5 30 0Band Saw Machine 0.54 32.4 66000Radial Drilling Machine 0.33 19.8 58080Radial Drilling Machine 0.23 13.8 58080Belt & Disc Sander Machine 0.66 39.6 15840Adjustable Work Benches 3 0.85 51 0Drying Area 6.54 392.4 0Sander Machine 1 0.35 21 0Paint Sprayer 2.33 139.8 18480Drying Area 8.5 510 0

Flexible Work Benches 0.6 36 0Circular Saw Machine 0.84 50.4 39600Belt & Disc Sander Machine 0.42 25.2 15840Adjustable Work Benches 3 0.51 30.6 0Sander Machine 1 0.49 29.4 0Adjustable Work Benches 3 0.33 19.8 0Drying Area 3.1 186 0Sander Machine 1 0.31 18.6 0Spray Gun 1.32 79.2 48840Drying Area 4.3 258 0

Flexible Work Benches 0.42 25.2 0Circular Saw Machine 0.77 46.2 39600Belt & Disc Sander Machine 0.37 22.2 15840Adjustable Work Benches 3 0.65 39 0Belt & Disc Sander Machine 0.31 18.6 15840Adjustable Work Benches 3 0.35 21 0Drying Area 3.1 186 0Sander Machine 1 0.31 18.6 0Spray Gun 2.05 123 48840Drying Area 4.5 270 0

Flexible Work Benches 0.4 24 0Band Saw Machine 0.77 46.2 66000Radial Drilling Machine 0.12 7.2 58080Belt & Disc Sander Machine 0.25 15 15840Adjustable Work Benches 3 0.24 14.4 0Drying Area 4.6 276 0

Page 255: Lembar Kerja Kelompok 5

Sander Machine 2 0.25 15 0Paint Sprayer 2.24 134.4 18480Drying Area 7 420 0Paint Sprayer 2.25 135 18480Drying Area 7.5 450 0Flexible Work Benches 0.4 24 0Band Saw Machine 0.77 46.2 66000Radial Drilling Machine 0.12 7.2 58080Belt & Disc Sander Machine 0.25 15 15840Adjustable Work Benches 3 0.24 14.4 0Drying Area 4.6 276 0Sander Machine 2 0.25 15 0Paint Sprayer 2.24 134.4 18480Drying Area 7 420 0Paint Sprayer 2.25 135 18480Drying Area 7.5 450 0

Flexible Work Benches 0.3 18 0Circular Saw Machine 0.62 37.2 39600Radial Drilling Machine 0.18 10.8 58080Belt & Disc Sander Machine 0.43 25.8 15840Adjustable Work Benches 3 2.43 145.8 0Adjustable Work Benches 1 4.78 286.8 0Sander Machine 2 0.33 19.8 0Paint Sprayer 2.42 145.2 18480Drying Area 6.5 390 0Paint Sprayer 2.1 126 18480Drying Area 6.52 391.2 0

Flexible Work Benches 0.4 24 0Circular Saw Machine 0.63 37.8 39600Belt & Disc Sander Machine 0.58 34.8 15840Adjustable Work Benches 3 2.25 135 0Drying Area 6.5 390 0Sander Machine 2 0.84 50.4 0Adjustable Work Benches 2 0.24 14.4 0Adjustable Work Benches 2 0.24 14.4 0Drying Area 6.4 384 0

Flexible Work Benches 0.38 22.8 0Circular Saw Machine 0.15 9 39600Radial Drilling Machine 0.45 27 58080Radial Drilling Machine 0.45 27 58080Belt & Disc Sander Machine 0.32 19.2 15840Adjustable Work Benches 3 0.29 17.4 0

Page 256: Lembar Kerja Kelompok 5

Drying Area 6.75 405 0Sander Machine 1 0.83 49.8 0Paint Sprayer 2.14 128.4 18480Drying Area 6 360 0Paint Sprayer 0.42 25.2 18480Drying Area 6.75 405 0

Flexible Work Benches 0.34 20.4 0Band Saw Machine 0.77 46.2 66000Band Saw Machine 0.63 37.8 66000Band Saw Machine 0.97 58.2 66000Sander Machine 2 0.82 49.2 0Radial Drilling Machine 0.45 27 58080Radial Drilling Machine 0.45 27 58080Radial Drilling Machine 0.38 22.8 58080Radial Drilling Machine 0.38 22.8 58080Belt & Disc Sander Machine 0.66 39.6 15840Adjustable Work Benches 3 0.83 49.8 0Drying Area 3.75 225 0Sander Machine 2 0.29 17.4 0Adjustable Work Benches 2 1.45 87 0Drying Area 6 360 0

Flexible Work Benches 0.32 19.2 0Circular Saw Machine 0.77 46.2 39600Belt & Disc Sander Machine 0.67 40.2 15840Adjustable Work Benches 3 0.99 59.4 0Drying Area 6.5 390 0Sander Machine 1 0.85 51 0Adjustable Work Benches 2 0.85 51 0Drying Area 3.1 186 0Flexible Work Benches 0.32 19.2 0Circular Saw Machine 0.77 46.2 39600Belt & Disc Sander Machine 0.67 40.2 15840Adjustable Work Benches 3 0.99 59.4 0Drying Area 6.5 390 0Sander Machine 1 0.85 51 0Adjustable Work Benches 2 0.85 51 0Drying Area 3.1 186 0

Flexible Work Benches 0.28 16.8 0Circular Saw Machine 0.57 34.2 39600Band Saw Machine 0.35 21 66000Belt & Disc Sander Machine 0.22 13.2 15840Adjustable Work Benches 3 0.25 15 0

Page 257: Lembar Kerja Kelompok 5

Drying Area 3 180 0Sander Machine 2 0.29 17.4 0Paint Sprayer 0.32 19.2 18480Drying Area 3.5 210 0Paint Sprayer 0.27 16.2 18480Drying Area 3 180 0Flexible Work Benches 0.28 16.8 0Circular Saw Machine 0.57 34.2 39600Band Saw Machine 0.35 21 66000Belt & Disc Sander Machine 0.22 13.2 15840Adjustable Work Benches 3 0.25 15 0Drying Area 3 180 0Sander Machine 2 0.29 17.4 0Paint Sprayer 0.32 19.2 18480Drying Area 3.5 210 0Paint Sprayer 0.27 16.2 18480Drying Area 3 180 0

Flexible Work Benches 0.4 24 0Circular Saw Machine 0.44 26.4 39600Belt & Disc Sander Machine 0.6 36 15840Adjustable Work Benches 3 0.19 11.4 0Drying Area 5.5 330 0Sander Machine 1 0.31 18.6 0Paint Sprayer 0.53 31.8 18480Drying Area 0.42 25.2 0Paint Sprayer 0.54 32.4 18480Drying Area 6.5 390 0Flexible Work Benches 0.4 24 0Circular Saw Machine 0.44 26.4 39600Belt & Disc Sander Machine 0.6 36 15840Adjustable Work Benches 3 0.19 11.4 0Drying Area 5.5 330 0Sander Machine 1 0.31 18.6 0Paint Sprayer 0.53 31.8 18480Drying Area 0.42 25.2 0Paint Sprayer 0.54 32.4 18480Drying Area 6.5 390 0

Flexible Work Benches 0.4 24 0Circular Saw Machine 0.43 25.8 39600Belt & Disc Sander Machine 0.18 10.8 15840Adjustable Work Benches 3 0.59 35.4 0Drying Area 0.62 37.2 0Sander Machine 1 0.35 21 0Paint Sprayer 0.45 27 18480

Page 258: Lembar Kerja Kelompok 5

Drying Area 6.5 390 0Flexible Work Benches 0.4 24 0Circular Saw Machine 0.43 25.8 39600Belt & Disc Sander Machine 0.18 10.8 15840Adjustable Work Benches 3 0.59 35.4 0Drying Area 0.62 37.2 0Sander Machine 1 0.35 21 0Paint Sprayer 0.45 27 18480Drying Area 6.5 390 0Flexible Work Benches 0.4 24 0Circular Saw Machine 0.43 25.8 39600Belt & Disc Sander Machine 0.18 10.8 15840Adjustable Work Benches 3 0.59 35.4 0Drying Area 0.62 37.2 0Sander Machine 1 0.35 21 0Paint Sprayer 0.45 27 18480Drying Area 6.5 390 0Flexible Work Benches 0.4 24 0Circular Saw Machine 0.43 25.8 39600Belt & Disc Sander Machine 0.18 10.8 15840Adjustable Work Benches 3 0.59 35.4 0Drying Area 0.62 37.2 0Sander Machine 1 0.35 21 0Paint Sprayer 0.45 27 18480Drying Area 6.5 390 0

Flexible Work Benches 0.21 12.6 0Circular Saw Machine 0.35 21 39600Radial Drilling Machine 0.86 51.6 58080Belt & Disc Sander Machine 0.69 41.4 15840Adjustable Work Benches 3 0.41 24.6 0Drying Area 5 300 0Sander Machine 2 0.34 20.4 0Paint Sprayer 0.39 23.4 18480Drying Area 5.5 330 0Paint Sprayer 0.54 32.4 18480Drying Area 5.5 330 0Flexible Work Benches 0.21 12.6 0Circular Saw Machine 0.35 21 39600Radial Drilling Machine 0.86 51.6 58080Belt & Disc Sander Machine 0.69 41.4 15840Adjustable Work Benches 3 0.41 24.6 0Drying Area 5 300 0Sander Machine 2 0.34 20.4 0Paint Sprayer 0.39 23.4 18480Drying Area 5.5 330 0Paint Sprayer 0.54 32.4 18480

Page 259: Lembar Kerja Kelompok 5

Drying Area 5.5 330 0Flexible Work Benches 0.21 12.6 0Circular Saw Machine 0.35 21 39600Radial Drilling Machine 0.86 51.6 58080Belt & Disc Sander Machine 0.69 41.4 15840Adjustable Work Benches 3 0.41 24.6 0Drying Area 5 300 0Sander Machine 2 0.34 20.4 0Paint Sprayer 0.39 23.4 18480Drying Area 5.5 330 0Paint Sprayer 0.54 32.4 18480Drying Area 5.5 330 0Flexible Work Benches 0.21 12.6 0Circular Saw Machine 0.35 21 39600Radial Drilling Machine 0.86 51.6 58080Belt & Disc Sander Machine 0.69 41.4 15840Adjustable Work Benches 3 0.41 24.6 0Drying Area 5 300 0Sander Machine 2 0.34 20.4 0Paint Sprayer 0.39 23.4 18480Drying Area 5.5 330 0Paint Sprayer 0.54 32.4 18480Drying Area 5.5 330 0Flexible Work Benches 0.21 12.6 0Circular Saw Machine 0.35 21 39600Radial Drilling Machine 0.86 51.6 58080Belt & Disc Sander Machine 0.69 41.4 15840Adjustable Work Benches 3 0.41 24.6 0Drying Area 5 300 0Sander Machine 2 0.34 20.4 0Paint Sprayer 0.39 23.4 18480Drying Area 5.5 330 0Paint Sprayer 0.54 32.4 18480Drying Area 5.5 330 0Flexible Work Benches 0.21 12.6 0Circular Saw Machine 0.35 21 39600Radial Drilling Machine 0.86 51.6 58080Belt & Disc Sander Machine 0.69 41.4 15840Adjustable Work Benches 3 0.41 24.6 0Drying Area 5 300 0Sander Machine 2 0.34 20.4 0Paint Sprayer 0.39 23.4 18480Drying Area 5.5 330 0Paint Sprayer 0.54 32.4 18480Drying Area 5.5 330 0Flexible Work Benches 0.21 12.6 0Circular Saw Machine 0.35 21 39600Radial Drilling Machine 0.86 51.6 58080

Page 260: Lembar Kerja Kelompok 5

Belt & Disc Sander Machine 0.69 41.4 15840Adjustable Work Benches 3 0.41 24.6 0Drying Area 5 300 0Sander Machine 2 0.34 20.4 0Paint Sprayer 0.39 23.4 18480Drying Area 5.5 330 0Paint Sprayer 0.54 32.4 18480Drying Area 5.5 330 0Flexible Work Benches 0.21 12.6 0Circular Saw Machine 0.35 21 39600Radial Drilling Machine 0.86 51.6 58080Belt & Disc Sander Machine 0.69 41.4 15840Adjustable Work Benches 3 0.41 24.6 0Drying Area 5 300 0Sander Machine 2 0.34 20.4 0Paint Sprayer 0.39 23.4 18480Drying Area 5.5 330 0Paint Sprayer 0.54 32.4 18480Drying Area 5.5 330 0

Flexible Work Benches 0.43 25.8 0Circular Saw Machine 0.27 16.2 39600Radial Drilling Machine 0.15 9 58080Belt & Disc Sander Machine 0.37 22.2 15840Adjustable Work Benches 3 0.66 39.6 0Drying Area 6.2 372 0Sander Machine 2 0.56 33.6 0Paint Sprayer 0.58 34.8 18480Drying Area 6.5 390 0Paint Sprayer 0.65 39 18480Drying Area 6.7 402 0Flexible Work Benches 0.43 25.8 0Circular Saw Machine 0.27 16.2 39600Radial Drilling Machine 0.15 9 58080Belt & Disc Sander Machine 0.37 22.2 15840Adjustable Work Benches 3 0.66 39.6 0Drying Area 6.2 372 0Sander Machine 2 0.56 33.6 0Paint Sprayer 0.58 34.8 18480Drying Area 6.5 390 0Paint Sprayer 0.65 39 18480Drying Area 6.7 402 0Flexible Work Benches 0.43 25.8 0Circular Saw Machine 0.27 16.2 39600Radial Drilling Machine 0.15 9 58080Belt & Disc Sander Machine 0.37 22.2 15840Adjustable Work Benches 3 0.66 39.6 0

Page 261: Lembar Kerja Kelompok 5

Drying Area 6.2 372 0Sander Machine 2 0.56 33.6 0Paint Sprayer 0.58 34.8 18480Drying Area 6.5 390 0Paint Sprayer 0.65 39 18480Drying Area 6.7 402 0Flexible Work Benches 0.43 25.8 0Circular Saw Machine 0.27 16.2 39600Radial Drilling Machine 0.15 9 58080Belt & Disc Sander Machine 0.37 22.2 15840Adjustable Work Benches 3 0.66 39.6 0Drying Area 6.2 372 0Sander Machine 2 0.56 33.6 0Paint Sprayer 0.58 34.8 18480Drying Area 6.5 390 0Paint Sprayer 0.65 39 18480Drying Area 6.7 402 0Flexible Work Benches 0.43 25.8 0Circular Saw Machine 0.27 16.2 39600Radial Drilling Machine 0.15 9 58080Belt & Disc Sander Machine 0.37 22.2 15840Adjustable Work Benches 3 0.66 39.6 0Drying Area 6.2 372 0Sander Machine 2 0.56 33.6 0Paint Sprayer 0.58 34.8 18480Drying Area 6.5 390 0Paint Sprayer 0.65 39 18480Drying Area 6.7 402 0Flexible Work Benches 0.43 25.8 0Circular Saw Machine 0.27 16.2 39600Radial Drilling Machine 0.15 9 58080Belt & Disc Sander Machine 0.37 22.2 15840Adjustable Work Benches 3 0.66 39.6 0Drying Area 6.2 372 0Sander Machine 2 0.56 33.6 0Paint Sprayer 0.58 34.8 18480Drying Area 6.5 390 0Paint Sprayer 0.65 39 18480Drying Area 6.7 402 0Flexible Work Benches 0.43 25.8 0Circular Saw Machine 0.27 16.2 39600Radial Drilling Machine 0.15 9 58080Belt & Disc Sander Machine 0.37 22.2 15840Adjustable Work Benches 3 0.66 39.6 0Drying Area 6.2 372 0Sander Machine 2 0.56 33.6 0Paint Sprayer 0.58 34.8 18480Drying Area 6.5 390 0

Page 262: Lembar Kerja Kelompok 5

Paint Sprayer 0.65 39 18480Drying Area 6.7 402 0Flexible Work Benches 0.43 25.8 0Circular Saw Machine 0.27 16.2 39600Radial Drilling Machine 0.15 9 58080Belt & Disc Sander Machine 0.37 22.2 15840Adjustable Work Benches 3 0.66 39.6 0Drying Area 6.2 372 0Sander Machine 2 0.56 33.6 0Paint Sprayer 0.58 34.8 18480Drying Area 6.5 390 0Paint Sprayer 0.65 39 18480Drying Area 6.7 402 0

Flexible Work Benches 0.38 22.8 0Circular Saw Machine 0.65 39 39600Belt & Disc Sander Machine 0.62 37.2 15840Adjustable Work Benches 3 0.45 27 0Drying Area 5.2 312 0Sander Machine 1 0.52 31.2 0Paint Sprayer 0.63 37.8 18480Drying Area 6.1 366 0Paint Sprayer 0.78 46.8 18480Drying Area 6.43 385.8 0Flexible Work Benches 0.38 22.8 0Circular Saw Machine 0.65 39 39600Belt & Disc Sander Machine 0.62 37.2 15840Adjustable Work Benches 3 0.45 27 0Drying Area 5.2 312 0Sander Machine 1 0.52 31.2 0Paint Sprayer 0.63 37.8 18480Drying Area 6.1 366 0Paint Sprayer 0.78 46.8 18480Drying Area 6.43 385.8 0

Flexible Work Benches 0.4 24 0Circular Saw Machine 0.73 43.8 39600Belt & Disc Sander Machine 0.45 27 15840Radial Drilling Machine 0.45 27 58080Radial Drilling Machine 0.45 27 58080Radial Drilling Machine 0.32 19.2 58080Belt & Disc Sander Machine 0.62 37.2 15840Adjustable Work Benches 3 0.65 39 0Drying Area 6 360 0Sander Machine 1 0.38 22.8 0Paint Sprayer 0.45 27 18480

Page 263: Lembar Kerja Kelompok 5

Drying Area 6.5 390 0

Flexible Work Benches 0.33 19.8 0Band Saw Machine 0.05 3 66000Belt & Disc Sander Machine 0.13 7.8 15840Adjustable Work Benches 3 0.273 16.38 0Drying Area 6.5 390 0Sander Machine 2 0.65 39 0Adjustable Work Benches 2 0.43 25.8 0Drying Area 3.5 210 0Flexible Work Benches 0.33 19.8 0Band Saw Machine 0.05 3 66000Belt & Disc Sander Machine 0.13 7.8 15840Adjustable Work Benches 3 0.273 16.38 0Drying Area 6.5 390 0Sander Machine 2 0.65 39 0Adjustable Work Benches 2 0.43 25.8 0Drying Area 3.5 210 0Flexible Work Benches 0.33 19.8 0Band Saw Machine 0.05 3 66000Belt & Disc Sander Machine 0.13 7.8 15840Adjustable Work Benches 3 0.273 16.38 0Drying Area 6.5 390 0Sander Machine 2 0.65 39 0Adjustable Work Benches 2 0.43 25.8 0Drying Area 3.5 210 0Flexible Work Benches 0.33 19.8 0Band Saw Machine 0.05 3 66000Belt & Disc Sander Machine 0.13 7.8 15840Adjustable Work Benches 3 0.273 16.38 0Drying Area 6.5 390 0Sander Machine 2 0.65 39 0Adjustable Work Benches 2 0.43 25.8 0Drying Area 3.5 210 0

Flexible Work Benches 0.42 25.2 0Circular Saw Machine 0.25 15 39600Radial Drilling Machine 0.22 13.2 58080Radial Drilling Machine 0.22 13.2 58080Radial Drilling Machine 0.22 13.2 58080Radial Drilling Machine 0.22 13.2 58080Radial Drilling Machine 0.38 22.8 58080Radial Drilling Machine 0.38 22.8 58080Belt & Disc Sander Machine 0.35 21 15840Adjustable Work Benches 1 0.55 33 0Drying Area 0.65 39 0

Page 264: Lembar Kerja Kelompok 5

Sander Machine 1 0.31 18.6 0Paint Sprayer 0.65 39 18480Drying Area 6.32 379.2 0

Flexible Work Benches 0.4 24 0Circular Saw Machine 0.37 22.2 39600Radial Drilling Machine 0.24 14.4 58080Radial Drilling Machine 0.24 14.4 58080Radial Drilling Machine 0.24 14.4 58080Radial Drilling Machine 0.24 14.4 58080Radial Drilling Machine 0.32 19.2 58080Radial Drilling Machine 0.32 19.2 58080Belt & Disc Sander Machine 0.34 20.4 15840Adjustable Work Benches 3 0.88 52.8 0Drying Area 4.5 270 0Sander Machine 1 0.41 24.6 0Paint Sprayer 0.25 15 18480Drying Area 4.5 270 0

Flexible Work Benches 0.29 17.4 0Band Saw Machine 0.74 44.4 66000Radial Drilling Machine 0.22 13.2 58080Belt & Disc Sander Machine 0.18 10.8 15840Adjustable Work Benches 3 0.36 21.6 0Drying Area 4 240 0Sander Machine 2 0.25 15 0Paint Sprayer 0.24 14.4 18480Drying Area 4.2 252 0Paint Sprayer 0.45 27 18480Drying Area 5.1 306 0Flexible Work Benches 0.29 17.4 0Band Saw Machine 0.74 44.4 66000Radial Drilling Machine 0.22 13.2 58080Belt & Disc Sander Machine 0.18 10.8 15840Adjustable Work Benches 3 0.36 21.6 0Drying Area 4 240 0Sander Machine 2 0.25 15 0Paint Sprayer 0.24 14.4 18480Drying Area 4.2 252 0Paint Sprayer 0.45 27 18480Drying Area 5.1 306 0

Adjustable Work Benches 1 0.13 7.8 0

Adjustable Work Benches 1 0.16 9.6 0

Page 265: Lembar Kerja Kelompok 5

Adjustable Work Benches 1 0.18 10.8 0

Adjustable Work Benches 1 0.15 9 0

Adjustable Work Benches 1 0.15 9 0

Adjustable Work Benches 1 0.14 8.4 0

Adjustable Work Benches 1 0.15 9 0

Adjustable Work Benches 1 0.12 7.2 0

Adjustable Work Benches 1 0.17 10.2 0

Adjustable Work Benches 1 0.19 11.4 0

Adjustable Work Benches 1 0.11 6.6 0

Steel Work Benches A 0.11 6.6 0

Basic Packing A 0.3 18 0

Page 266: Lembar Kerja Kelompok 5

ROUTING SHEET LOKO BEBAN A

5327 Unit Truk Kontainer A334 Unit Loko Beban A332 Unit Truk Kontainer B324 Unit Loko Beban B

91 %15 %

Kapasitas mesin teoris/bulan %Skrap

15400 0 415.585911440 2 407.2742

17261.54 2 400.329727573.33 4 387.415927573.33 4 374.918627573.33 4 362.824429542.86 4 351.120429542.86 4 339.793914247.62 2 334

12000 0 3344338.03 0 334

36960 0 3343435.38 0 334

1320 0 334

30800 0 393.218912523.08 3 381.4223

18700 2 374.918611988.41 4 362.824411988.41 4 351.120429542.86 4 339.7939

11968 2 33414215.38 0 3344162.16 0 334

36960 0 3343308.15 0 3341421.54 0 334

15400 0 350.30314280.7 3 339.793913008.7 2 334

21000 0 334

Jumlah Diharapkan per bulan

Page 267: Lembar Kerja Kelompok 5

1421.54 0 33436960 0 334

3295.94 0 3341421.54 0 334

18480 0 374.045815074.07 3 362.824425066.67 4 351.120435965.22 4 339.7939

13600 2 33410870.59 0 3341412.84 0 334

26400 0 3343833.48 0 3341087.06 0 334

15400 0 346.728510214.29 2 339.793921371.43 2 33418117.65 0 33418857.14 0 334

28000 0 3342980.65 0 334

29806.45 0 3346383.33 0 3342148.84 0 334

22000 0 352.743211142.86 2 345.688324259.46 2 339.793914215.38 0 339.793928954.84 2 334

26400 0 3342980.65 0 334

29806.45 0 3344110.24 0 3342053.33 0 334

23100 0 812.063910571.43 3 787.70268933.33 4 762.2922

35904 2 749.294338500 0 749.2943

2008.7 0 749.2943

Page 268: Lembar Kerja Kelompok 5

36960 2 736.51793987.5 0 736.5179

1320 0 736.51793969.78 0 736.5179

1232 0 736.517923100 0 736.5179

10571.43 3 714.422468933.33 4 691.3765

35904 2 679.587838500 0 679.5878

2008.7 0 679.587836960 2 668

3987.5 0 6681320 0 668

3969.78 0 6681232 0 668

30800 0 364.501313838.71 2 357.211345955.56 4 345.688320874.42 2 339.79393802.47 0 339.79391933.05 0 339.7939

28000 2 3343690.91 0 3341421.54 0 3344253.33 0 3341417.18 0 334

23100 0 352.743213619.05 2 345.688315475.86 2 339.79394106.67 0 339.79391421.54 0 339.7939

11000 2 33438500 0 33438500 0 334

1443.75 0 334

24315.79 0 370.22957200 2 362.8244

18382.22 4 351.120418382.22 4 339.7939

28050 2 33431862.07 0 334

Page 269: Lembar Kerja Kelompok 5

1368.89 0 33411132.53 0 3344173.83 0 334

1540 0 33421266.67 0 3341368.89 0 334

27176.47 0 439.339610571.43 3 426.159412920.63 3 413.37468391.75 3 400.9734

11268.29 2 394.136318382.22 4 381.422218382.22 4 369.118321768.42 4 357.211321768.42 4 345.6883

13600 2 339.793911132.53 0 339.7939

2464 0 339.793931862.07 2 3346372.41 0 334

1540 0 334

28875 0 719.88411142.86 2 705.486313397.01 2 693.45699333.33 0 693.45691421.54 0 693.4569

10870.59 0 693.456910870.59 0 693.45692980.65 0 693.4569

28875 0 693.456911142.86 2 679.587813397.01 2 6689333.33 0 6681421.54 0 668

10870.59 0 66810870.59 0 6682980.65 0 668

33000 0 791.875915052.63 2 776.038423257.14 3 752.7572

40800 2 739.921936960 0 739.9219

Page 270: Lembar Kerja Kelompok 5

3080 0 739.921931862.07 2 727.305427912.5 0 727.3054

2640 0 727.305433081.48 0 727.3054

3080 0 727.305433000 0 727.3054

15052.63 2 712.759323257.14 3 691.3765

40800 2 679.587836960 0 679.58783080 0 679.5878

31862.07 2 66827912.5 0 668

2640 0 66833081.48 0 668

3080 0 668

23100 0 719.88419500 2 705.486314960 2 693.4569

48631.58 0 693.45691680 0 693.4569

29806.45 0 693.456916852.83 0 693.4569

22000 0 693.456916540.74 0 693.45691421.54 0 693.4569

23100 0 693.456919500 2 679.587814960 2 668

48631.58 0 6681680 0 668

29806.45 0 66816852.83 0 668

22000 0 66816540.74 0 6681421.54 0 668

23100 0 1551.595419953.49 2 1520.563549866.67 2 1494.636115661.02 0 1494.636114903.23 0 1494.6361

26400 0 1494.636119848.89 0 1494.6361

Page 271: Lembar Kerja Kelompok 5

1421.54 0 1494.636123100 0 1494.6361

19953.49 2 1464.743449866.67 2 1439.767915661.02 0 1439.767914903.23 0 1439.7679

26400 0 1439.767919848.89 0 1439.76791421.54 0 1439.7679

23100 0 1439.767919953.49 2 1410.972549866.67 2 1386.913815661.02 0 1386.913814903.23 0 1386.9138

26400 0 1386.913819848.89 0 1386.91381421.54 0 1386.9138

23100 0 1386.913819953.49 2 1359.175549866.67 2 133615661.02 0 133614903.23 0 1336

26400 0 133619848.89 0 13361421.54 0 1336

44000 0 5375.968424514.29 2 5268.449

9618.6 4 5098.49913008.7 2 5011.5637

22536.59 0 5011.56371848 0 5011.5637

27176.47 2 4926.110722902.56 0 4926.1107

1680 0 4926.110716540.74 0 4926.1107

1680 0 4926.110744000 0 4926.1107

24514.29 2 4827.58859618.6 4 4671.8599

13008.7 2 4592.199322536.59 0 4592.1993

1848 0 4592.199327176.47 2 4513.89722902.56 0 4513.897

1680 0 4513.89716540.74 0 4513.897

Page 272: Lembar Kerja Kelompok 5

1680 0 4513.89744000 0 4513.897

24514.29 2 4423.61919618.6 4 4280.9217

13008.7 2 4207.92722536.59 0 4207.927

1848 0 4207.92727176.47 2 4136.17722902.56 0 4136.177

1680 0 4136.17716540.74 0 4136.177

1680 0 4136.17744000 0 4136.177

24514.29 2 4053.45359618.6 4 3922.6969

13008.7 2 3855.810422536.59 0 3855.8104

1848 0 3855.810427176.47 2 3790.064322902.56 0 3790.0643

1680 0 3790.064316540.74 0 3790.0643

1680 0 3790.064344000 0 3790.0643

24514.29 2 3714.2639618.6 4 3594.448

13008.7 2 3533.158522536.59 0 3533.1585

1848 0 3533.158527176.47 2 3472.914122902.56 0 3472.9141

1680 0 3472.914116540.74 0 3472.9141

1680 0 3472.914144000 0 3472.9141

24514.29 2 3403.45589618.6 4 3293.6669

13008.7 2 3237.50622536.59 0 3237.506

1848 0 3237.50627176.47 2 3182.302822902.56 0 3182.3028

1680 0 3182.302816540.74 0 3182.3028

1680 0 3182.302844000 0 3182.3028

24514.29 2 3118.65679618.6 4 3018.0549

Page 273: Lembar Kerja Kelompok 5

13008.7 2 2966.593622536.59 0 2966.5936

1848 0 2966.593627176.47 2 2916.009822902.56 0 2916.0098

1680 0 2916.009816540.74 0 2916.0098

1680 0 2916.009844000 0 2916.0098

24514.29 2 2857.68969618.6 4 2765.5061

13008.7 2 2718.35122536.59 0 2718.351

1848 0 2718.35127176.47 2 267222902.56 0 2672

1680 0 267216540.74 0 2672

1680 0 2672

21488.37 0 5375.968431777.78 2 5268.44955146.67 4 5098.49924259.46 2 5011.5637

14000 0 5011.56371490.32 0 5011.5637

16500 2 4926.110715400 0 4926.1107

1421.54 0 4926.110713741.54 0 4926.1107

1379.1 0 4926.110721488.37 0 4926.110731777.78 2 4827.588555146.67 4 4671.859924259.46 2 4592.1993

14000 0 4592.19931490.32 0 4592.1993

16500 2 4513.89715400 0 4513.897

1421.54 0 4513.89713741.54 0 4513.897

1379.1 0 4513.89721488.37 0 4513.89731777.78 2 4423.619155146.67 4 4280.921724259.46 2 4207.927

14000 0 4207.927

Page 274: Lembar Kerja Kelompok 5

1490.32 0 4207.92716500 2 4136.17715400 0 4136.177

1421.54 0 4136.17713741.54 0 4136.177

1379.1 0 4136.17721488.37 0 4136.17731777.78 2 4053.453555146.67 4 3922.696924259.46 2 3855.8104

14000 0 3855.81041490.32 0 3855.8104

16500 2 3790.064315400 0 3790.0643

1421.54 0 3790.064313741.54 0 3790.0643

1379.1 0 3790.064321488.37 0 3790.064331777.78 2 3714.26355146.67 4 3594.44824259.46 2 3533.1585

14000 0 3533.15851490.32 0 3533.1585

16500 2 3472.914115400 0 3472.9141

1421.54 0 3472.914113741.54 0 3472.9141

1379.1 0 3472.914121488.37 0 3472.914131777.78 2 3403.455855146.67 4 3293.666924259.46 2 3237.506

14000 0 3237.5061490.32 0 3237.506

16500 2 3182.302815400 0 3182.3028

1421.54 0 3182.302813741.54 0 3182.3028

1379.1 0 3182.302821488.37 0 3182.302831777.78 2 3118.656755146.67 4 3018.054924259.46 2 2966.5936

14000 0 2966.59361490.32 0 2966.5936

16500 2 2916.009815400 0 2916.0098

1421.54 0 2916.0098

Page 275: Lembar Kerja Kelompok 5

13741.54 0 2916.00981379.1 0 2916.0098

21488.37 0 2916.009831777.78 2 2857.689655146.67 4 2765.506124259.46 2 2718.351

14000 0 2718.3511490.32 0 2718.351

16500 2 267215400 0 2672

1421.54 0 267213741.54 0 2672

1379.1 0 2672

24315.79 0 719.88413200 2 705.4863

14477.42 2 693.456920533.33 0 693.45691776.92 0 693.4569

17769.23 0 693.456914177.78 0 693.45691514.75 0 693.4569

11451.28 0 693.45691437.01 0 693.4569

24315.79 0 693.456913200 2 679.5878

14477.42 2 66820533.33 0 6681776.92 0 668

17769.23 0 66814177.78 0 6681514.75 0 668

11451.28 0 6681437.01 0 668

23100 0 389.206411753.42 2 381.422319946.67 2 374.918618382.22 4 362.824418382.22 4 351.1204

25850 4 339.793914477.42 2 33414215.38 0 334

1540 0 33424315.79 0 33419848.89 0 334

Page 276: Lembar Kerja Kelompok 5

1421.54 0 334

28000 0 1731.6984162800 3 1679.7474

69046.15 2 1651.105833846.15 0 1651.10581421.54 0 1651.1058

14215.38 2 1622.952521488.37 0 1622.9525

2640 0 1622.952528000 0 1622.9525

162800 3 1574.263969046.15 2 1547.420933846.15 0 1547.42091421.54 0 1547.4209

14215.38 2 1521.035621488.37 0 1521.0356

2640 0 1521.035628000 0 1521.0356

162800 3 1475.404569046.15 2 1450.247133846.15 0 1450.24711421.54 0 1450.2471

14215.38 2 1425.518721488.37 0 1425.5187

2640 0 1425.518728000 0 1425.5187

162800 3 1382.753169046.15 2 1359.175533846.15 0 1359.17551421.54 0 1359.1755

14215.38 2 133621488.37 0 1336

2640 0 1336

22000 0 422.116334320 2 413.67437600 4 400.329737600 4 387.415937600 4 374.918637600 4 362.8244

21768.42 4 351.120421768.42 4 339.793925645.71 2 334

16800 0 33414215.38 0 334

Page 277: Lembar Kerja Kelompok 5

29806.45 0 33413741.54 0 3341462.03 0 334

23100 0 422.116323189.19 2 413.67434466.67 4 400.329734466.67 4 387.415934466.67 4 374.918634466.67 4 362.8244

25850 4 351.120425850 4 339.793926400 2 33410500 0 334

2053.33 0 33422536.59 0 334

35728 0 3342053.33 0 334

31862.07 0 812.063911000 3 787.70237600 4 762.2922

49866.67 2 749.294325666.67 0 749.2943

2310 0 749.294336960 2 736.5179

37216.67 0 736.51792200 0 736.5179

19848.89 0 736.51791811.76 0 736.5179

31862.07 0 736.517911000 3 714.422437600 4 691.3765

49866.67 2 679.587825666.67 0 679.5878

2310 0 679.587836960 2 668

37216.67 0 6682200 0 668

19848.89 0 6681811.76 0 668

71076.92 0 334

57750 0 334

Page 278: Lembar Kerja Kelompok 5

51333.33 0 334

61600 0 334

61600 0 334

66000 0 334

61600 0 334

77000 0 334

54352.94 0 334

48631.58 0 334

84000 0 334

84000 0 334

30800 0 334

Page 279: Lembar Kerja Kelompok 5

ROUTING SHEET LOKO BEBAN A

Jumlah Disiapkan per bulan Produksi Pada efisiensi Realibitas Mesin(%)

415.5859 456.6878 100415.5859 456.6878 100407.2742 447.5541 100400.3297 439.9227 90387.4159 425.7318 90374.9186 411.9985 90362.8244 398.7081 90351.1204 385.8466 90339.7939 373.3999 100

334 367.033 95334 367.033 100334 367.033 90334 367.033 90334 367.033 100

393.2189 432.1087 100393.2189 432.1087 85381.4223 419.1454 100374.9186 411.9985 90362.8244 398.7081 90351.1204 385.8466 90339.7939 373.3999 100

334 367.033 95334 367.033 100334 367.033 90334 367.033 90334 367.033 100

350.303 384.9484 100350.303 384.9484 85

339.7939 373.3999 100334 367.033 95

Page 280: Lembar Kerja Kelompok 5

334 367.033 100334 367.033 90334 367.033 90334 367.033 100

374.0458 411.0393 100374.0458 411.0393 85362.8244 398.7081 90351.1204 385.8466 90339.7939 373.3999 100

334 367.033 95334 367.033 100334 367.033 90334 367.033 90334 367.033 100

346.7285 381.0203 100346.7285 381.0203 100339.7939 373.3999 100

334 367.033 95334 367.033 90334 367.033 95334 367.033 100334 367.033 90334 367.033 90334 367.033 100

352.7432 387.6299 100352.7432 387.6299 100345.6883 379.8773 100339.7939 373.3999 95339.7939 373.3999 100

334 367.033 95334 367.033 100334 367.033 90334 367.033 90334 367.033 100

812.0639 892.3779 100812.0639 892.3779 85

787.702 865.6066 90762.2922 837.6837 100749.2943 823.4003 95749.2943 823.4003 100

Page 281: Lembar Kerja Kelompok 5

749.2943 823.4003 90736.5179 809.3603 90736.5179 809.3603 100736.5179 809.3603 90736.5179 809.3603 100736.5179 809.3603 100736.5179 809.3603 85714.4224 785.0796 90691.3765 759.7544 100679.5878 746.7998 95679.5878 746.7998 100679.5878 746.7998 90

668 734.0659 90668 734.0659 100668 734.0659 90668 734.0659 100

364.5013 400.5509 100364.5013 400.5509 100357.2113 392.5399 90345.6883 379.8773 100339.7939 373.3999 95339.7939 373.3999 95339.7939 373.3999 90

334 367.033 90334 367.033 100334 367.033 90334 367.033 100

352.7432 387.6299 100352.7432 387.6299 100345.6883 379.8773 100339.7939 373.3999 95339.7939 373.3999 100339.7939 373.3999 90

334 367.033 100334 367.033 100334 367.033 100

370.229 406.8451 100370.229 406.8451 100

362.8244 398.7081 90351.1204 385.8466 90339.7939 373.3999 100

334 367.033 95

Page 282: Lembar Kerja Kelompok 5

334 367.033 100334 367.033 90334 367.033 90334 367.033 100334 367.033 90334 367.033 100

439.3396 482.7908 100439.3396 482.7908 85426.1594 468.307 85413.3746 454.2578 85400.9734 440.6301 90394.1363 433.1168 90381.4222 419.1453 90369.1183 405.6245 90357.2113 392.5399 90345.6883 379.8773 100339.7939 373.3999 95339.7939 373.3999 100339.7939 373.3999 90

334 367.033 100334 367.033 100

719.884 791.0813 100719.884 791.0813 100

705.4863 775.2597 100693.4569 762.0405 95693.4569 762.0405 100693.4569 762.0405 90693.4569 762.0405 100693.4569 762.0405 100693.4569 762.0405 100693.4569 762.0405 100679.5878 746.7998 100

668 734.0659 95668 734.0659 100668 734.0659 90668 734.0659 100668 734.0659 100

791.8759 870.1933 100791.8759 870.1933 100776.0384 852.7895 85752.7572 827.2057 100739.9219 813.101 95

Page 283: Lembar Kerja Kelompok 5

739.9219 813.101 100739.9219 813.101 90727.3054 799.2367 90727.3054 799.2367 100727.3054 799.2367 90727.3054 799.2367 100727.3054 799.2367 100727.3054 799.2367 100712.7593 783.252 85691.3765 759.7544 100679.5878 746.7998 95679.5878 746.7998 100679.5878 746.7998 90

668 734.0659 90668 734.0659 100668 734.0659 90668 734.0659 100

719.884 791.0813 100719.884 791.0813 100

705.4863 775.2597 100693.4569 762.0405 95693.4569 762.0405 100693.4569 762.0405 90693.4569 762.0405 90693.4569 762.0405 100693.4569 762.0405 90693.4569 762.0405 100693.4569 762.0405 100693.4569 762.0405 100679.5878 746.7998 100

668 734.0659 95668 734.0659 100668 734.0659 90668 734.0659 90668 734.0659 100668 734.0659 90668 734.0659 100

1551.5954 1705.0499 1001551.5954 1705.0499 1001520.5635 1670.9489 1001494.6361 1642.4573 951494.6361 1642.4573 1001494.6361 1642.4573 901494.6361 1642.4573 90

Page 284: Lembar Kerja Kelompok 5

1494.6361 1642.4573 1001494.6361 1642.4573 1001494.6361 1642.4573 1001464.7434 1609.6081 1001439.7679 1582.1625 951439.7679 1582.1625 1001439.7679 1582.1625 901439.7679 1582.1625 901439.7679 1582.1625 1001439.7679 1582.1625 1001439.7679 1582.1625 1001410.9725 1550.5192 1001386.9138 1524.0811 951386.9138 1524.0811 1001386.9138 1524.0811 901386.9138 1524.0811 901386.9138 1524.0811 1001386.9138 1524.0811 1001386.9138 1524.0811 1001359.1755 1493.5995 100

1336 1468.1319 951336 1468.1319 1001336 1468.1319 901336 1468.1319 901336 1468.1319 100

5375.9684 5907.6576 1005375.9684 5907.6576 1005268.449 5789.5044 905098.499 5602.7462 100

5011.5637 5507.2129 955011.5637 5507.2129 1005011.5637 5507.2129 904926.1107 5413.3085 904926.1107 5413.3085 1004926.1107 5413.3085 904926.1107 5413.3085 1004926.1107 5413.3085 1004926.1107 5413.3085 1004827.5885 5305.0423 904671.8599 5133.912 1004592.1993 5046.3729 954592.1993 5046.3729 1004592.1993 5046.3729 904513.897 4960.3264 904513.897 4960.3264 1004513.897 4960.3264 90

Page 285: Lembar Kerja Kelompok 5

4513.897 4960.3264 1004513.897 4960.3264 1004513.897 4960.3264 100

4423.6191 4861.1199 904280.9217 4704.3096 1004207.927 4624.0956 954207.927 4624.0956 1004207.927 4624.0956 904136.177 4545.2495 904136.177 4545.2495 1004136.177 4545.2495 904136.177 4545.2495 1004136.177 4545.2495 1004136.177 4545.2495 100

4053.4535 4454.3445 903922.6969 4310.6559 1003855.8104 4237.1543 953855.8104 4237.1543 1003855.8104 4237.1543 903790.0643 4164.9058 903790.0643 4164.9058 1003790.0643 4164.9058 903790.0643 4164.9058 1003790.0643 4164.9058 1003790.0643 4164.9058 1003714.263 4081.6077 903594.448 3949.9429 100

3533.1585 3882.5918 953533.1585 3882.5918 1003533.1585 3882.5918 903472.9141 3816.3891 903472.9141 3816.3891 1003472.9141 3816.3891 903472.9141 3816.3891 1003472.9141 3816.3891 1003472.9141 3816.3891 1003403.4558 3740.0613 903293.6669 3619.4142 1003237.506 3557.6989 953237.506 3557.6989 1003237.506 3557.6989 90

3182.3028 3497.036 903182.3028 3497.036 1003182.3028 3497.036 903182.3028 3497.036 1003182.3028 3497.036 1003182.3028 3497.036 1003118.6567 3427.0953 90

Page 286: Lembar Kerja Kelompok 5

3018.0549 3316.5438 1002966.5936 3259.993 952966.5936 3259.993 1002966.5936 3259.993 902916.0098 3204.4064 902916.0098 3204.4064 1002916.0098 3204.4064 902916.0098 3204.4064 1002916.0098 3204.4064 1002916.0098 3204.4064 1002857.6896 3140.3182 902765.5061 3039.0177 1002718.351 2987.1989 952718.351 2987.1989 1002718.351 2987.1989 90

2672 2936.2637 902672 2936.2637 1002672 2936.2637 902672 2936.2637 100

5375.9684 5907.6576 1005375.9684 5907.6576 1005268.449 5789.5044 905098.499 5602.7462 100

5011.5637 5507.2129 955011.5637 5507.2129 1005011.5637 5507.2129 904926.1107 5413.3085 904926.1107 5413.3085 1004926.1107 5413.3085 904926.1107 5413.3085 1004926.1107 5413.3085 1004926.1107 5413.3085 1004827.5885 5305.0423 904671.8599 5133.912 1004592.1993 5046.3729 954592.1993 5046.3729 1004592.1993 5046.3729 904513.897 4960.3264 904513.897 4960.3264 1004513.897 4960.3264 904513.897 4960.3264 1004513.897 4960.3264 1004513.897 4960.3264 100

4423.6191 4861.1199 904280.9217 4704.3096 1004207.927 4624.0956 95

Page 287: Lembar Kerja Kelompok 5

4207.927 4624.0956 1004207.927 4624.0956 904136.177 4545.2495 904136.177 4545.2495 1004136.177 4545.2495 904136.177 4545.2495 1004136.177 4545.2495 1004136.177 4545.2495 100

4053.4535 4454.3445 903922.6969 4310.6559 1003855.8104 4237.1543 953855.8104 4237.1543 1003855.8104 4237.1543 903790.0643 4164.9058 903790.0643 4164.9058 1003790.0643 4164.9058 903790.0643 4164.9058 1003790.0643 4164.9058 1003790.0643 4164.9058 1003714.263 4081.6077 903594.448 3949.9429 100

3533.1585 3882.5918 953533.1585 3882.5918 1003533.1585 3882.5918 903472.9141 3816.3891 903472.9141 3816.3891 1003472.9141 3816.3891 903472.9141 3816.3891 1003472.9141 3816.3891 1003472.9141 3816.3891 1003403.4558 3740.0613 903293.6669 3619.4142 1003237.506 3557.6989 953237.506 3557.6989 1003237.506 3557.6989 90

3182.3028 3497.036 903182.3028 3497.036 1003182.3028 3497.036 903182.3028 3497.036 1003182.3028 3497.036 1003182.3028 3497.036 1003118.6567 3427.0953 903018.0549 3316.5438 1002966.5936 3259.993 952966.5936 3259.993 1002966.5936 3259.993 902916.0098 3204.4064 902916.0098 3204.4064 100

Page 288: Lembar Kerja Kelompok 5

2916.0098 3204.4064 902916.0098 3204.4064 1002916.0098 3204.4064 1002916.0098 3204.4064 1002857.6896 3140.3182 902765.5061 3039.0177 1002718.351 2987.1989 952718.351 2987.1989 1002718.351 2987.1989 90

2672 2936.2637 902672 2936.2637 1002672 2936.2637 902672 2936.2637 100

719.884 791.0813 100719.884 791.0813 100

705.4863 775.2597 100693.4569 762.0405 95693.4569 762.0405 100693.4569 762.0405 90693.4569 762.0405 90693.4569 762.0405 100693.4569 762.0405 90693.4569 762.0405 100693.4569 762.0405 100693.4569 762.0405 100679.5878 746.7998 100

668 734.0659 95668 734.0659 100668 734.0659 90668 734.0659 90668 734.0659 100668 734.0659 90668 734.0659 100

389.2064 427.6993 100389.2064 427.6993 100381.4223 419.1454 100374.9186 411.9985 90362.8244 398.7081 90351.1204 385.8466 90339.7939 373.3999 100

334 367.033 95334 367.033 100334 367.033 90334 367.033 90

Page 289: Lembar Kerja Kelompok 5

334 367.033 100

1731.6984 1902.9653 1001731.6984 1902.9653 851679.7474 1845.8763 1001651.1058 1814.402 951651.1058 1814.402 1001651.1058 1814.402 901622.9525 1783.4643 1001622.9525 1783.4643 1001622.9525 1783.4643 1001622.9525 1783.4643 851574.2639 1729.9603 1001547.4209 1700.4625 951547.4209 1700.4625 1001547.4209 1700.4625 901521.0356 1671.4677 1001521.0356 1671.4677 1001521.0356 1671.4677 1001521.0356 1671.4677 851475.4045 1621.3236 1001450.2471 1593.6781 951450.2471 1593.6781 1001450.2471 1593.6781 901425.5187 1566.5041 1001425.5187 1566.5041 1001425.5187 1566.5041 1001425.5187 1566.5041 851382.7531 1519.5089 1001359.1755 1493.5995 951359.1755 1493.5995 1001359.1755 1493.5995 90

1336 1468.1319 1001336 1468.1319 100

422.1163 463.8641 100422.1163 463.8641 100

413.674 454.5868 90400.3297 439.9227 90387.4159 425.7318 90374.9186 411.9985 90362.8244 398.7081 90351.1204 385.8466 90339.7939 373.3999 100

334 367.033 95334 367.033 100

Page 290: Lembar Kerja Kelompok 5

334 367.033 90334 367.033 90334 367.033 100

422.1163 463.8641 100422.1163 463.8641 100

413.674 454.5868 90400.3297 439.9227 90387.4159 425.7318 90374.9186 411.9985 90362.8244 398.7081 90351.1204 385.8466 90339.7939 373.3999 100

334 367.033 95334 367.033 100334 367.033 90334 367.033 90334 367.033 100

812.0639 892.3779 100812.0639 892.3779 85

787.702 865.6066 90762.2922 837.6837 100749.2943 823.4003 95749.2943 823.4003 100749.2943 823.4003 90736.5179 809.3603 90736.5179 809.3603 100736.5179 809.3603 90736.5179 809.3603 100736.5179 809.3603 100736.5179 809.3603 85714.4224 785.0796 90691.3765 759.7544 100679.5878 746.7998 95679.5878 746.7998 100679.5878 746.7998 90

668 734.0659 90668 734.0659 100668 734.0659 90668 734.0659 100

334 367.033 95

334 367.033 95

Page 291: Lembar Kerja Kelompok 5

334 367.033 95

334 367.033 95

334 367.033 95

334 367.033 95

334 367.033 95

334 367.033 95

334 367.033 95

334 367.033 95

334 367.033 95

334 367.033 100

334 367.033 100

Page 292: Lembar Kerja Kelompok 5

ROUTING SHEET LOKO BEBAN A

%Daur Ulang Tanpa Daur Ulang Daur Ulang

0 415.5859 00 415.5859 0

15 408.4997 1.225520 403.5582 3.228520 390.5402 3.124320 377.9421 3.023520 365.7504 2.92620 353.952 2.831615 340.8163 1.02240 334 00 334 0

15 334 00 334 00 334 0

0 393.2189 00 393.2189 0

15 382.57 1.147720 377.9421 3.023520 365.7504 2.92620 353.952 2.831615 340.8163 1.02240 334 00 334 0

15 334 00 334 00 334 0

0 350.303 00 350.303 0

15 340.8163 1.02240 334 0

Page 293: Lembar Kerja Kelompok 5

0 334 015 334 00 334 00 334 0

0 374.0458 00 374.0458 0

20 365.7504 2.92620 353.952 2.831615 340.8163 1.02240 334 00 334 0

15 334 00 334 00 334 0

0 346.7285 00 346.7285 0

15 340.8163 1.02240 334 0

15 334 00 334 00 334 0

15 334 00 334 00 334 0

0 352.7432 00 352.7432 0

15 346.7285 1.04020 339.7939 0

15 340.8163 1.02240 334 00 334 0

15 334 00 334 00 334 0

0 812.0639 00 812.0639 0

20 794.0544 6.352415 764.586 2.29380 749.2943 00 749.2943 0

Page 294: Lembar Kerja Kelompok 5

15 751.5489 2.25460 736.5179 00 736.5179 00 736.5179 00 736.5179 00 736.5179 00 736.5179 0

20 720.1839 5.761515 693.4569 2.08040 679.5878 00 679.5878 0

15 681.6327 2.04490 668 00 668 00 668 00 668 0

0 364.5013 00 364.5013 0

20 360.092 2.880715 346.7285 1.04020 339.7939 05 339.7939 0

15 340.8163 1.02240 334 00 334 00 334 00 334 0

0 352.7432 00 352.7432 0

15 346.7285 1.04020 339.7939 00 339.7939 0

15 340.8163 1.02240 334 00 334 00 334 0

0 370.229 00 370.229 0

20 365.7504 2.92620 353.952 2.831615 340.8163 1.02240 334 0

Page 295: Lembar Kerja Kelompok 5

0 334 015 334 00 334 00 334 00 334 00 334 0

0 439.3396 00 439.3396 00 426.1594 00 413.3746 0

15 402.1799 1.206520 397.3148 3.178520 384.4982 3.07620 372.0951 2.976820 360.092 2.880715 346.7285 1.04020 339.7939 00 339.7939 0

15 340.8163 1.02240 334 00 334 0

0 719.884 00 719.884 0

15 707.6091 2.12280 693.4569 00 693.4569 0

15 693.4569 00 693.4569 00 693.4569 00 693.4569 00 693.4569 0

15 681.6327 2.04490 668 00 668 0

15 668 00 668 00 668 0

0 791.8759 00 791.8759 00 776.0384 0

15 755.0223 2.26510 739.9219 0

Page 296: Lembar Kerja Kelompok 5

0 739.9219 015 742.1484 2.22650 727.3054 00 727.3054 00 727.3054 00 727.3054 00 727.3054 00 727.3054 00 712.7593 0

15 693.4569 2.08040 679.5878 00 679.5878 0

15 681.6327 2.04490 668 00 668 00 668 00 668 0

0 719.884 00 719.884 0

15 707.6091 2.12280 693.4569 00 693.4569 0

15 693.4569 00 693.4569 00 693.4569 00 693.4569 00 693.4569 00 693.4569 00 693.4569 0

15 681.6327 2.04490 668 00 668 0

15 668 00 668 00 668 00 668 00 668 0

0 1551.5954 00 1551.5954 0

15 1525.1389 4.57540 1494.6361 00 1494.6361 0

15 1494.6361 00 1494.6361 0

Page 297: Lembar Kerja Kelompok 5

0 1494.6361 00 1494.6361 00 1494.6361 0

15 1469.1509 4.40750 1439.7679 00 1439.7679 0

15 1439.7679 00 1439.7679 00 1439.7679 00 1439.7679 00 1439.7679 0

15 1415.2182 4.24570 1386.9138 00 1386.9138 0

15 1386.9138 00 1386.9138 00 1386.9138 00 1386.9138 00 1386.9138 0

15 1363.2653 4.08980 1336 00 1336 0

15 1336 00 1336 00 1336 0

0 5375.9684 00 5375.9684 0

20 5310.9365 42.487515 5113.8405 15.34150 5011.5637 00 5011.5637 0

15 5026.6436 15.07990 4926.1107 00 4926.1107 00 4926.1107 00 4926.1107 00 4926.1107 00 4926.1107 0

20 4866.5207 38.932215 4685.9177 14.05780 4592.1993 00 4592.1993 0

15 4606.0173 13.8180 4513.897 00 4513.897 00 4513.897 0

Page 298: Lembar Kerja Kelompok 5

0 4513.897 00 4513.897 00 4513.897 0

20 4459.2934 35.674315 4293.8031 12.88140 4207.927 00 4207.927 0

15 4220.5888 12.66180 4136.177 00 4136.177 00 4136.177 00 4136.177 00 4136.177 00 4136.177 0

20 4086.1426 32.689115 3934.5004 11.80350 3855.8104 00 3855.8104 0

15 3867.4126 11.60220 3790.0643 00 3790.0643 00 3790.0643 00 3790.0643 00 3790.0643 00 3790.0643 0

20 3744.2167 29.953715 3605.2638 10.81580 3533.1585 00 3533.1585 0

15 3543.7899 10.63140 3472.9141 00 3472.9141 00 3472.9141 00 3472.9141 00 3472.9141 00 3472.9141 0

20 3430.903 27.447215 3303.5776 9.91070 3237.506 00 3237.506 0

15 3247.2478 9.74180 3182.3028 00 3182.3028 00 3182.3028 00 3182.3028 00 3182.3028 00 3182.3028 0

20 3143.8072 25.1505

Page 299: Lembar Kerja Kelompok 5

15 3027.1363 9.08140 2966.5936 00 2966.5936 0

15 2975.5202 8.92660 2916.0098 00 2916.0098 00 2916.0098 00 2916.0098 00 2916.0098 00 2916.0098 0

20 2880.7355 23.045915 2773.8276 8.32150 2718.351 00 2718.351 0

15 2726.5306 8.17960 2672 00 2672 00 2672 00 2672 0

0 5375.9684 00 5375.9684 0

20 5310.9365 42.487515 5113.8405 15.34150 5011.5637 00 5011.5637 0

15 5026.6436 15.07990 4926.1107 00 4926.1107 00 4926.1107 00 4926.1107 00 4926.1107 00 4926.1107 0

20 4866.5207 38.932215 4685.9177 14.05780 4592.1993 00 4592.1993 0

15 4606.0173 13.8180 4513.897 00 4513.897 00 4513.897 00 4513.897 00 4513.897 00 4513.897 0

20 4459.2934 35.674315 4293.8031 12.88140 4207.927 0

Page 300: Lembar Kerja Kelompok 5

0 4207.927 015 4220.5888 12.66180 4136.177 00 4136.177 00 4136.177 00 4136.177 00 4136.177 00 4136.177 0

20 4086.1426 32.689115 3934.5004 11.80350 3855.8104 00 3855.8104 0

15 3867.4126 11.60220 3790.0643 00 3790.0643 00 3790.0643 00 3790.0643 00 3790.0643 00 3790.0643 0

20 3744.2167 29.953715 3605.2638 10.81580 3533.1585 00 3533.1585 0

15 3543.7899 10.63140 3472.9141 00 3472.9141 00 3472.9141 00 3472.9141 00 3472.9141 00 3472.9141 0

20 3430.903 27.447215 3303.5776 9.91070 3237.506 00 3237.506 0

15 3247.2478 9.74180 3182.3028 00 3182.3028 00 3182.3028 00 3182.3028 00 3182.3028 00 3182.3028 0

20 3143.8072 25.150515 3027.1363 9.08140 2966.5936 00 2966.5936 0

15 2975.5202 8.92660 2916.0098 00 2916.0098 0

Page 301: Lembar Kerja Kelompok 5

0 2916.0098 00 2916.0098 00 2916.0098 00 2916.0098 0

20 2880.7355 23.045915 2773.8276 8.32150 2718.351 00 2718.351 0

15 2726.5306 8.17960 2672 00 2672 00 2672 00 2672 0

0 719.884 00 719.884 0

15 707.6091 2.12280 693.4569 00 693.4569 0

15 693.4569 00 693.4569 00 693.4569 00 693.4569 00 693.4569 00 693.4569 00 693.4569 0

15 681.6327 2.04490 668 00 668 0

15 668 00 668 00 668 00 668 00 668 0

0 389.2064 00 389.2064 0

15 382.57 1.147720 377.9421 3.023520 365.7504 2.92620 353.952 2.831615 340.8163 1.02240 334 00 334 0

15 334 00 334 0

Page 302: Lembar Kerja Kelompok 5

0 334 0

0 1731.6984 00 1731.6984 0

15 1684.8018 5.05440 1651.1058 00 1651.1058 0

15 1656.074 4.96820 1622.9525 00 1622.9525 00 1622.9525 00 1622.9525 0

15 1579.0009 4.7370 1547.4209 00 1547.4209 0

15 1552.0771 4.65620 1521.0356 00 1521.0356 00 1521.0356 00 1521.0356 0

15 1479.844 4.43950 1450.2471 00 1450.2471 0

15 1454.6109 4.36380 1425.5187 00 1425.5187 00 1425.5187 00 1425.5187 0

15 1386.9138 4.16070 1359.1755 00 1359.1755 0

15 1363.2653 4.08980 1336 00 1336 0

0 422.1163 00 422.1163 0

20 417.0101 3.336120 403.5582 3.228520 390.5402 3.124320 377.9421 3.023520 365.7504 2.92620 353.952 2.831615 340.8163 1.02245 334 00 334 0

Page 303: Lembar Kerja Kelompok 5

15 334 00 334 00 334 0

0 422.1163 00 422.1163 0

20 417.0101 3.336120 403.5582 3.228520 390.5402 3.124320 377.9421 3.023520 365.7504 2.92620 353.952 2.831615 340.8163 1.02240 334 00 334 0

15 334 00 334 00 334 0

0 812.0639 00 812.0639 0

20 794.0544 6.352415 764.586 2.29380 749.2943 00 749.2943 0

15 751.5489 2.25460 736.5179 00 736.5179 00 736.5179 00 736.5179 00 736.5179 00 736.5179 0

20 720.1839 5.761515 693.4569 2.08040 679.5878 00 679.5878 0

15 681.6327 2.04490 668 00 668 00 668 00 668 0

5 334 0

5 334 0

Page 304: Lembar Kerja Kelompok 5

5 334 0

5 334 0

5 334 0

5 334 0

5 334 0

5 334 0

5 334 0

5 334 0

5 334 0

0 334 0

0 334 0

Page 305: Lembar Kerja Kelompok 5

ROUTING SHEET LOKO BEBAN A

Jumlah Mesin Teoritis

0.030.040.030.020.020.020.010.010.030.030.080.010.120.28

0.010.040.020.040.040.010.030.030.090.010.120.26

0.020.030.030.02

Page 306: Lembar Kerja Kelompok 5

0.260.010.120.26

0.020.030.020.010.030.040.260.020.110.34

0.020.040.020.020.020.010.120.010.060.17

0.020.030.020.030.010.010.120.010.1

0.18

0.040.1

0.010.020.020.41

Page 307: Lembar Kerja Kelompok 5

0.020.230.610.230.660.040.090.010.020.020.370.020.2

0.560.210.6

0.010.030.010.020.10.2

0.010.110.260.1

0.26

0.020.030.020.1

0.260.040.010.010.25

0.020.010.020.020.010.01

Page 308: Lembar Kerja Kelompok 5

0.270.040.1

0.240.020.27

0.020.050.040.060.040.030.030.020.020.030.040.150.010.060.24

0.030.070.060.090.540.080.070.260.030.070.060.080.520.080.070.25

0.030.060.040.020.02

Page 309: Lembar Kerja Kelompok 5

0.260.030.030.3

0.030.260.020.050.040.020.020.240.030.030.280.020.24

0.030.040.050.020.450.030.050.030.050.540.030.040.050.020.440.030.050.030.050.52

0.070.090.030.110.110.070.09

Page 310: Lembar Kerja Kelompok 5

1.160.070.080.030.110.110.070.091.110.070.080.030.10.1

0.060.091.070.070.080.030.10.1

0.060.081.03

0.130.240.670.430.262.980.230.263.220.363.220.120.220.610.390.242.730.210.242.950.33

Page 311: Lembar Kerja Kelompok 5

2.950.110.2

0.560.360.222.5

0.190.222.710.312.710.1

0.190.510.330.2

2.290.170.2

2.480.282.480.090.170.470.3

0.182.1

0.160.192.270.262.270.090.160.430.280.171.930.150.172.080.232.080.080.140.4

Page 312: Lembar Kerja Kelompok 5

0.250.151.760.130.161.910.221.910.070.130.360.230.141.620.120.141.750.2

1.75

0.270.190.120.230.413.7

0.370.393.810.443.930.250.170.110.210.383.390.340.363.490.43.6

0.230.160.1

0.190.35

Page 313: Lembar Kerja Kelompok 5

3.10.310.333.2

0.373.3

0.210.140.090.180.322.840.290.3

2.930.343.020.190.130.080.160.292.610.260.282.680.312.770.180.120.080.150.272.390.240.252.460.282.540.160.110.070.140.252.190.220.232.25

Page 314: Lembar Kerja Kelompok 5

0.262.320.150.1

0.060.130.22

20.2

0.212.070.242.13

0.030.060.050.040.430.050.060.5

0.070.530.030.060.050.040.410.050.060.480.070.51

#DIV/0!#DIV/0!

0.020.040.020.020.020.020.030.030.240.020.02

Page 315: Lembar Kerja Kelompok 5

0.26

0.070.010.030.061.280.140.080.680.060.010.030.051.2

0.130.080.630.060.010.020.051.120.120.070.590.060.010.020.051.050.120.070.56

0.020.010.010.010.010.010.020.020.010.020.03

Page 316: Lembar Kerja Kelompok 5

0.010.030.25

0.020.020.010.010.010.010.020.020.010.040.180.020.010.18

0.030.1

0.030.020.030.360.020.020.370.050.450.030.090.020.020.030.320.020.020.330.040.41

0.01

0.01

Page 317: Lembar Kerja Kelompok 5

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0

0

0.01

Page 318: Lembar Kerja Kelompok 5

L1.2 JUMLAH MESIN SEBENARNYA

PERHITUNGAN JUMLAH MESINPT. TAZOV

Kelompok

No. Praktikan:

Kapasitas Produksi:

Efisiensi Produksi:Persentase Lembur Pabrik:

No. Mesin Nama MesinJumlah Mesin/Stasiun

Loko AProcess Layout

1 Flexible Work Benches 3.582 Band Saw Machine 0.753 Circular Saw Machine 3.64 Radial Drilling Machine 5.365 Belt & Disc Sander Machine 4.996 Spray Gun 0.167 Paint Sprayer 11.548 Sander Machine 1 0.769 Sander Machine 2 4.3410 Adjustable Work Benches 1 0.3211 Adjustable Work Benches 2 0.5212 Adjustable Work Benches 3 5.62

Product Layout Loko A1 Steel Work Benches A 02 Basic Packing A 0.01

Product Layout Truk A1 Steel Work Benches C2 Basic Packing C

Product Layout Loko B1 Steel Work Benches B

Page 319: Lembar Kerja Kelompok 5

2 Basic Packing BProduct Layout Truk B

1 Steel Work Benches D2 Basic Packing D

Page 320: Lembar Kerja Kelompok 5

PERHITUNGAN JUMLAH MESINPT. TAZOV

5

433415407449

9115

Jumlah Mesin/Stasiun Jumlah Mesin/Stasiun Jumlah Mesin/StasiunTruk A Loko B Truk B

3.4 3.74 2.770.24 1.01 0.212.8 3.81 2.59

2.83 4.47 1.442.78 5.52 3.160.03 0.15 0.017.53 11.11 7.170.18 0.71 0.033.37 4.63 3.30.09 0.26 0.054.97 0.89 0.69

0 6.11 2.3

0.010.01

0.01

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Page 321: Lembar Kerja Kelompok 5

0.01

00.01

Page 322: Lembar Kerja Kelompok 5

PERHITUNGAN JUMLAH MESINPT. TAZOV

Unit Loko A/BulanUnit Truk A/BulanUnit Loko B/BulanUnit Truk B/Bulan

%%

Jumlah Mesin/Stasiun Teoritis Jumlah Mesin Sebenarnya

13.49 13 0.0376922.21 2 0.10512.8 12 0.06666714.1 14 0.007143

16.45 16 0.0281250.35 1 #DIV/0!

37.35 37 0.0094591.68 2 0.68

15.64 15 0.0426670.72 1 #DIV/0!7.07 7 0.01

14.03 14 0.002143

0 10.01 1

0.01 10.01 1

0.01 1

Page 323: Lembar Kerja Kelompok 5

0.01 1

0 10.01 1

Page 324: Lembar Kerja Kelompok 5

0.037692

0.15 13.49 130.15 2.21 20.15 12.8 120.15 14.1 140.15 16.45 160.15 0.35 10.15 37.35 370.15 1.68 20.15 15.64 150.15 0.72 10.15 7.07 70.15 14.03 14

Page 325: Lembar Kerja Kelompok 5

L1.3 JUMLAH SUPERVISOR

TABEL PERHITUNGAN JUMLAH SUPERVISORPT. TAZOV

Kelompok 5

No. Praktikan:

Kapasitas Produksi: 327 Unit Loko A/Bulan334 Unit Truk A/Bulan332 Unit Loko B/Bulan324 Unit Truk B/Bulan

Efisiensi Produksi: 91 %Persentase Lembur Pabrik: 15 %

No. Nama Mesin/Meja Kerja Jumlah Mesin/Stasiun Operator/Mesin1 Flexible Work Benches 13 12 Band Saw Machine 2 13 Circular Saw Machine 12 14 Radial Drilling Machine 14 15 Belt & Disc Sander Machine 16 16 Spray Gun 1 17 Paint Sprayer 37 18 Sander Machine 1 2 19 Sander Machine 2 15 110 Adjustable Work Benches 1 1 111 Adjustable Work Benches 2 7 112 Adjustable Work Benches 3 14 113 Steel Work Benches A 1 114 Steel Work Benches B 1 115 Steel Work Benches C 1 116 Steel Work Benches D 1 117 Basic Packing A 1 118 Basic Packing B 1 119 Basic Packing C 1 120 Basic Packing D 1 1

Total Jumlah Operator Jumlah Supervisor ProduksiJumlah Supervisor Gudang

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Page 326: Lembar Kerja Kelompok 5

Total Jumlah Supervisor

Page 327: Lembar Kerja Kelompok 5

TABEL PERHITUNGAN JUMLAH SUPERVISORPT. TAZOV

Jumlah Operator132

1214161

372

1517

1411111111

142123

Page 328: Lembar Kerja Kelompok 5

15

Page 329: Lembar Kerja Kelompok 5

L1.5 PROCESS LAYOUT

PERHITUNGAN LUAS LANTAI MESIN TEORITIS (PROCESS LAYOUT)PT. TAZOV

Kelompok

Nama Praktikan:

Kapasitas Produksi:

Efisiensi Produksi:Persentase Lembur Pabrik:

No Nama Mesin/PeralatanUkuran Mesin

P (m) L (m)

1

Flexible Work Benches

1 13

1.7 0.75

2.8

Operator 1 1Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

2

Band Saw Machine

1 2

1.5 0.65

2.8

Operator 1 1Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

3

Circular Saw Machine

1 12

1.37 0.75

2.8

Operator 1 1Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

4

Radial Driling Machine

1 14

1.65 0.55

2.8

Jumlah Alat/Sub

Jumlah Total

Panjang Sub Kelompok Mesin

Page 330: Lembar Kerja Kelompok 5

4

Operator

1 14

1 1

2.8Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

5

Belt & Disc Sander Machine

1 16

1.05 0.65

2.8

Operator 1 1Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

6

Spray Gun

1 1

1.35 0.8

2.8

Operator 1 1Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

7

Paint Sprayer 1

1 19

1.6 0.65

2.8

Operator 1 1Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

8

Paint Sprayer 2

1 18

1.6 0.65

2.8

Operator 1 1Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

9

Sander Machine 1

1 2

1.5 1

3

Operator 1 1Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

10

Sander Machine 2

1 15

1.4 0.8

2.8

Operator 1 1

Page 331: Lembar Kerja Kelompok 5

10Tempat Sampah

1 150.35 0.3

2.8Input 0.5 0.4Output 0.5 0.4

Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

11

Adjustable Work Benches 1

1 1

1.25 0.75

2.8

Operator 1 1Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

12

Adjustable Work Benches 2

1 7

1.4 0.65

2.8

Operator 1 1Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

13

Adjustable Work Benches 3

1 14

1.5 0.65

2.8

Operator 1 1Tempat Sampah 0.35 0.3Input 0.5 0.4Output 0.5 0.4Tempat Bahan Baku Utama 3.2 1Tempat Barang Jadi Utama 3.2 1

14 Lemari Aksesoris 1 2 5.5 0.5 5.5

Page 332: Lembar Kerja Kelompok 5

PERHITUNGAN LUAS LANTAI MESIN TEORITIS (PROCESS LAYOUT)PT. TAZOV

Kelompok 5

Nama Praktikan:

Kapasitas Produksi: 327 Unit Loko A/Bulan334 Unit Loko B/Bulan332 Unit Truk A/Bulan324 Unit Truk B/Bulan

Efisiensi Produksi: 91 %Persentase Lembur Pabrik: 15 %

Total Lebar Kelompok Mesin

2.8 2.75 100.1 39.4 7.75

2.8 2.65 14.84 8.6 7.65

2.8 2.75 92.4 36.6 7.75

2.8 2.55 99.96 42.2 7.55

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Panjang Sub Kelompok Mesin

Lebar Sub Kelompok Mesin

Total Luas Kelompok Mesin Tanpa Gang

Total Panjang Kelompok Mesin + Gang

Page 333: Lembar Kerja Kelompok 5

2.82.8 2.55 99.96 42.2 7.55

2.8 2.65 118.72 47.8 7.65

2.8 2.8 7.84 5.8 7.8

2.8 2.65 140.98 56.2 7.65

2.8 2.65 133.56 53.4 7.65

3 2.8 16.8 9 7.8

2.8 2.8 117.6 45 7.8

Page 334: Lembar Kerja Kelompok 5

2.82.8 2.8 117.6 45 7.8

2.8 2.75 7.7 5.8 7.75

2.8 2.65 51.94 22.6 7.65

2.8 2.65 103.88 42.2 7.65

5.5 1.5 11 11 1.5Total

Page 335: Lembar Kerja Kelompok 5

PERHITUNGAN LUAS LANTAI MESIN TEORITIS (PROCESS LAYOUT)PT. TAZOV

Total Lebar Kelompok Mesin Luas Kelompok Mesin (m2)

7.75 305.35

7.65 65.79

7.75 283.65

7.55 318.61

Page 336: Lembar Kerja Kelompok 5

7.557.55 318.61

7.65 365.67

7.8 45.24

7.65 429.93

7.65 408.51

7.8 70.2

7.8 351

Page 337: Lembar Kerja Kelompok 5

7.87.8 351

7.75 44.95

7.65 172.89

7.65 322.83

1.5 16.5Total 3201.12

Page 338: Lembar Kerja Kelompok 5

L1.4 PRODUCT LAYOUT

Product LayoutPT. TAZOV

No Nama Mesin / PeralatanJumlah Kebutuhan Mesin / PeralatanJumlah Alat/Sub Jumlah Total

1Steel Work Benches A 1

1Operator 1

2Steel Work Benches B 1

1Operator 1

3Steel Work Benches C 1

1Operator 1

4Steel Work Benches D 1

1Operator 1

5Basic Packing A 1

1Operator 1

6Basic Packing B 1

1Operator 1

7Basic Packing C 1

1Operator 1

8Basic Packing D 1

1Operator 1

9 Conveyor 1 1Total

Page 339: Lembar Kerja Kelompok 5

L1.4 PRODUCT LAYOUT

Product LayoutPT. TAZOV

Kelompok 5

No. Praktikan:

Kapasitas Produksi: 327334332324

Efisiensi Produksi: 91Persentase Lembur Pabrik: 15

Ukuran MesinPanjang Sub Kelompok Mesin

Panjang (m) Lebar (m)1.45 0.85

1.851 1

1.45 0.81.8

1 11.45 0.75

1.751 1

1.45 0.61.6

1 11.5 0.65

1.651 1

1.2 0.451.45

1 11.35 0.6

1.61 1

1.35 0.51.5

1 115 1 13.2

Total

WED / 1A ⑫WED / 1A ⑫WED / 1A ⑫

Page 340: Lembar Kerja Kelompok 5

L1.4 PRODUCT LAYOUT

Product LayoutPT. TAZOV

Unit Loko A/BulanUnit Loko B/BulanUnit Truk A/BulanUnit Truk B/Bulan

%%

Lebar Sub Kelompok Mesin Luas Kelompok Mesin

1.45 5.37

1.45 5.22

1.45 5.08

1.45 4.64

1.5 4.95

1.2 3.48

1.35 4.32

1.35 4.05

1 13.2Total 50.31

Panjang Lini Assembly 19.2Lebar Lini Assembly 8Luas Lini Assembly 153.6Luas Lantai 3354.72

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Page 341: Lembar Kerja Kelompok 5

L1.5 Drying Area

Perhitungan Drying AreaPT.TAZOV

Kelompok 5

No. Praktikan:

Kapasitas Produksi: 327334332324

Efisiensi Produksi: 91Persentase Lembur 15

No RuanganUkuran Kelonggaran Penggunaan

P (m²) 250-300%1 Drying Area 7 2.25 1 15.75 266

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Jumlah personel

Luas (m²)L (m²)

Page 342: Lembar Kerja Kelompok 5

L1.5 Drying Area

Perhitungan Drying AreaPT.TAZOV

Unit Loko A/BulanUnit Loko B/BulanUnit Truk A/BulanUnit Truk B/Bulan

%%

Kelonggaran Penggunaan Kelonggaran Lalu Lintas250-300%

41.9 57.65 52 29.98 87.63

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Luas Area Penggunaan (m²)

Luas (m²)m² m²

Page 343: Lembar Kerja Kelompok 5

L1.6 Penentuan Lokasi Pabrik

Penentuan Lokasi PabrikPT. PASTI BISA PIM 3

Kelompok 5

No. Praktikan:

Kapasitas Produksi : 327334332324

Efesiensi Produksi : 91Presentase Lembur Pabrik : 15

No Faktor Bobot1 Pengadaan bahan baku 12%2 Lokasi Pemasaran Produk 9%3 Sarana Transportasi 10%4 Tenaga Kerja 10%5 Iklim 8%6 Biaya 11%7 Sikap masyarakat setempat 9%8 Utilitas 10%9 Lahan 11%10 Kebijaksanaan Pemerintah 10%

\

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Page 344: Lembar Kerja Kelompok 5

Penentuan Lokasi PabrikPT. PASTI BISA PIM 3

Unit Loko A / BulanUnit Truk A / BulanUnit Loko B / BulanUnit Truk B / Bulan

%%

Kondisi Yang DiinginkanDekat dengan penyediaan bahan bakuStategis dan mudah dijangkauBanyak kendaraan menuju lokasiBanyak dan Pekerja KerasCurah Hujan RendahTejangkauRamah dan KondusifDekat dengan penyediaan bahan bakuSuburTidak Menggangu

No Kriteria

Page 345: Lembar Kerja Kelompok 5

No Kriteria

1 Pengadaan bahan baku

2 Lokasi Pemasaran Produk

3 Sarana Transportasi

4 Tenaga Kerja

5 Iklim

6 Biaya

7 Sikap masyarakat setempat

8 Utilitas

9 Lahan

10 Kebijaksanaan Pemerintah

Page 346: Lembar Kerja Kelompok 5

Cikarang

Page 347: Lembar Kerja Kelompok 5

Kondisi Nilai Bobot x Nilai

Bahan Baku mudah didapatkan 4 0.48

Strategis dan mudah dijangkau 4 0.36

3 0.3

Sedikit dan sulit bersosialisasi 2 0.2

Curah Hujan Rendah 4 0.32

Terjangkau 4 0.44

Sulit Bersosialisasi 2 0.18

4 0.4

Tandus 2 0.22

Tidak Mengganggu 3 0.3

TOTAL 3.2

Mudah dicapai dan cukup banyak kendaraan yang melintas

Dekat dengan penyediaan bahan baku

Page 348: Lembar Kerja Kelompok 5

Cibinong

Page 349: Lembar Kerja Kelompok 5

Kondisi Nilai Bobot x Nilai

Bahan Baku sulit didapatkan 2 0.24

Strategis dan mudah dijangkau 4 0.36

4 0.4

Banyak dan mudah bersosialisasi 3 0.3

Curah Hujan Tinggi 2 0.16

Terjangkau 4 0.44

Ramah 4 0.36

2 0.2

Subur 4 0.44

Tidak Mengganggu 3 0.3

TOTAL 3.2

Mudah dicapai dan cukup banyak kendaraan yang melintas

Rada Jauh dengan penyediaan bahan baku

Page 350: Lembar Kerja Kelompok 5

Tangerang

Page 351: Lembar Kerja Kelompok 5

Kondisi Nilai Bobot x Nilai

Bahan Baku mudah didapatkan 4 0.48

Strategis dan mudah dijangkau 5 0.45

Banyak Kendaraan yang melintas 4 0.4

Banyak dan mudah bersosialisasi 4 0.4

Curah Hujan Rendah 4 0.32

Sedikit Lebih Mahal 3 0.33

Ramah 4 0.36

Dekat dengan penyediaan bahan baku 4 0.4

Sedikit Subur 3 0.33

Tidak Mengganggu 3 0.3

TOTAL 3.77

Page 352: Lembar Kerja Kelompok 5

L.2.1 Visi Organisasi

No PERTANYAAN1 Apa mimpi ambisius organisasi?2 Apa pandangan tentang masa depan organisasi?3 Kemana akan pergi dari tempat saat ini berada?4 Apa ambisi jangka panjang organisasi?5 Perubahan - perubahan apa yang dihadapi dalam dunia usaha?

6

7 Hal-hal apa yang menentukan keberhasilan?8 Faktor-faktor apa yang membuat menjadi unik?

Citra bersama apa yang ingin diciptakan berkaitan dengan kondisi ke depan yang ingin dicapai dan jalur perubahan apa yang diperlukan

untuk mencapainya?

Page 353: Lembar Kerja Kelompok 5

L.2.1 Visi Organisasi

JAWABANMenjadi perusahaan mainan kayu yang terkenal sehingga menjadi pilihan utama para konsumen

Menjadi perusahaan mainan kayu yang berkompetenMenjadi perusahaan mainan kayu yang berkompeten di seluruh Pulau Jawa

Menjadi salah satu perusahaan mainan kayu terkemuka di IndonesiaPerubahan harga bahan baku dan biaya sumber daya manusia

Ketekunan, kegigihan & fleksibilitas dalam bekerjaMengadakan olahraga pagi setiap 2 minggu sekali guna meningkatkan kinerja karyawan

Zero waste, dengan mengoptimalkan pemakaian bahan baku dan menggunakan kembali bahan baku yang tersisa

Page 354: Lembar Kerja Kelompok 5

L.2.2 Misi Organisasi

No PERTANYAAN1 Siapakah konsumen dari organisasi?2 Apa produk utama dari organisasi?3 Secara geografi, dimana perusahaan organisasi bersaing?

4 Apa teknologi terbaru yang digunakan organisasi ?

5

6 Apa nilai kepercayaan, aspirasi dan etika dari organisasi?7 Apa keunggulan kompetitif utama dari organisasi8 Apa tanggung jawab organisasi terhadap komunitas sosial dan lingkungan?9 Apakah karyawan merupakan aset penting bagi organisasi?

Apakah organisasi memiliki komitmen untuk tumbuh, berkembang, dan menguntungkan?

Page 355: Lembar Kerja Kelompok 5

L.2.2 Misi Organisasi

JAWABANAnak-anak dan kolektor

Mainan kayuPulau Jawa

Menciptakan lapangan pekerjaanOptimal produktivitasnya

Zero Waste dan menciptakan lapangan pekerjaanYa, karyawan merupakan aset penting bagi organisasi

Menggunakan lini perakitan yang otomatis dan dilengkapi dengan buku panduan yang dicetak menggunakan 3D Printer

Ya, organisasi memiliki komitmen untuk tumbuh, berkmbang dan mengntungkan

Page 356: Lembar Kerja Kelompok 5

L.2.3 TUJUAN ORGANISASI

No PERTANYAAN

1

2

3

4

5

Karyawan. Tujuan apa yang ingin organisasi capai dalam rangka memperbaiki kualitas pekerjaan?

Pelanggan. Tujuan apa yang perlu organisasi capai demi memenuhi kepuasan pelanggan ? Temukan kebutuhan pelanggan

Pemegang Saham. Apa yang diharapkan pemegang saham terhadap organisasi? Tujuan apa yang perlu organisasi capai untuk mempertahankan kepuasan pemegang saham terhadap organisasi?

Pemasok. Tujuan apa yang perlu organisasi capai dalam rangka meningkatkan nilai tambah bahan baku?

Masyarakat. Tujuan apa yang perlu organisasi capai dalam rangka melayani masyarakat secara efektif dan menjadi warga negara yang baik?

Page 357: Lembar Kerja Kelompok 5

JAWABAN

Peningkatan penjualan

Memberikan pelatihan dan evaluasi guna meningkatkan kinerja karyawan

Meningkatkan kualitas mainan sesuai feedback konsumen

Mengolah bahan baku menjadi sesuatu yang unik sehingga diminati oleh

banyak orang

Zero Waste dan menciptakan lapangan pekerjaan bagi warga sekitar pabrik

Page 358: Lembar Kerja Kelompok 5

L.2.4 STRATEGI

No PERTANYAAN YA TIDAK1 Pemasaran produk dispesialisasikan pada satu segmen √

2 √

3 Mampu mengembangkan produk secara cepat √

4 √

5 √

6 √

7 √

8 Pemasaran produk pada banyak segmen √

Memiliki keterampilan fungsional yang dapat menghasilkan produk yang unik

Memproduksi barang dengan biaya rendah untuk semua pelanggan

Memfokuskan seluruh sumber daya organisasi pada satu segmen

Menggunakan keterampilan untuk menciptakan produk dengan biaya rendah

Menggunakan keterampilan untuk menciptakan produk yang berbeda dengan harga premium

Page 359: Lembar Kerja Kelompok 5

L.2.5 Visi, Misi, Tujuan dan Strategi PT Pasti Bisa PIM 3

PT TAZOV

VISI

MISI

Zero Waste dan menciptakan lapangan pekerjaanMengoptimalkan produktivitas

Menarik perhatian target konsumen

TUJUAN

Memberikan pelatihan dan evaluasi guna meningkatkan kinerja karyawanMeningkatkan kualitas mainan sesuai feedback konsumenPenjualan tidak menurun, diusahakan konstan/meningkat

Mengolah bahan baku menjadi sesuatu yang unik sehingga diminati oleh banyak orang

STRATEGI

Pemasaran produk pada banyak segmenMenggunakan keterampilan untuk menciptakan produk dengan biaya rendah

Memfokuskan seluruh sumber daya organisasi pada satu segmenMemproduksi barang dengan biaya rendah untuk semua pelanggan

Menjadi perusahaan mainan kayu terkemuka di seluruh Indonesia yang berkompeten dan memiliki teknologi yang ramah lingkungan

Page 360: Lembar Kerja Kelompok 5

L.2.5 Visi, Misi, Tujuan dan Strategi PT Pasti Bisa PIM 3

Zero Waste dan menciptakan lapangan pekerjaanMengoptimalkan produktivitas

Menarik perhatian target konsumen

Memberikan pelatihan dan evaluasi guna meningkatkan kinerja karyawanMeningkatkan kualitas mainan sesuai feedback konsumenPenjualan tidak menurun, diusahakan konstan/meningkat

Mengolah bahan baku menjadi sesuatu yang unik sehingga diminati oleh banyak orangPemasaran produk pada banyak segmen

Menggunakan keterampilan untuk menciptakan produk dengan biaya rendahMemfokuskan seluruh sumber daya organisasi pada satu segmen

Memproduksi barang dengan biaya rendah untuk semua pelanggan

Menjadi perusahaan mainan kayu terkemuka di seluruh Indonesia yang berkompeten dan memiliki teknologi

Page 361: Lembar Kerja Kelompok 5

L.2.6 DIMENSI KONTEKSTUAL - UKURAN ORGANISASI

Jumlah Karyawan OrangUkuran Organisasi

√ sedang

o kecil(Beri tanda ü pada pilihan yang sesuai)

o besar

Page 362: Lembar Kerja Kelompok 5

L.2.6 DIMENSI KONTEKSTUAL - UKURAN ORGANISASI

Page 363: Lembar Kerja Kelompok 5

L.2.7 DIMENSI KONTEKSTUAL - TEKNOLOGI (WOODWARD)

No Teknologi1 Aliran produksi kontinu2 Memproduksi unit yang sederhana berdasarkan pesanan3 Mass produksi4 Memproduksi batch besar, dengan tipe lini perakitan5 Memproduksi unit yang kompleks secara teknis6 Proses produksi kimia dalam batch7 Dalam setiap fabrikasi menggunakan peralatan besar8 Memproduksi batch kecil9 Memproduksi komponen-komponen dalam batch kemudian dirakit secara berbeda10 Kompleksitas Teknologi

Page 364: Lembar Kerja Kelompok 5

L.2.7 DIMENSI KONTEKSTUAL - TEKNOLOGI (WOODWARD)

YA TIDAK√

√√

√√

√√

√√

Page 365: Lembar Kerja Kelompok 5

L.2.9 DIMENSI KONTEKSTUAL - LINGKUNGAN

Lingkungan SpesifikKompleksitas Lingkungan Dinamika

Pelanggan Sederhana Kompleks Stabil Dinamis Sedikit BanyakDistributor √ √ √Pemasok √ √ √Pesaing √ √ √Pemerintah √ √ √Serikat Kerja √ √ √

Ketidakpastian Lingkungan√ Rendah

Jumlah Sumber Daya Tersedia

o Tinggi

Page 366: Lembar Kerja Kelompok 5

L.2.9 DIMENSI KONTEKSTUAL - LINGKUNGAN

Page 367: Lembar Kerja Kelompok 5

L.2.10 HUBUNGAN DIMENSI KONTEKSTUAL - DIMENSI STRUKTURAL

Dimensi KontekstualDimensi Struktural

Kompleksitas Formalisasi Pengambilan KeputusanRendah Tinggi Rendah Tinggi Sentralisasi

Ukuran Organisasi √ √ √Teknologi (Woodward) √ √ √

Lingkungan √ √ √Tipe Struktur √ Sederhana

o Birokrasi Mesin/Mekanistiko Birokrasi Profesionalo Adhokrasi/Organik/Matrikso Divisionalo Jaringano Virtualo ………

Page 368: Lembar Kerja Kelompok 5

L.2.10 HUBUNGAN DIMENSI KONTEKSTUAL - DIMENSI STRUKTURAL

Dimensi StrukturalPengambilan Keputusan

Desentralisasi

√ Sederhana

Page 369: Lembar Kerja Kelompok 5

L.2.11 PROSES BISNIS/MANAJEMEN

No Proses Bisnis Departemen

1 Pemasaran Produk Purchasing & Marketing

2 Produksi Mainan Kayu PPIC

3 Pengembangan Produk Mainan Kayu PPIC

4 Penjualan Mainan Kayu Purchasing & Marketing

5 Kontrol Produk Mainan Kayu QC

6

7

8

9

10

11

12

13

Page 370: Lembar Kerja Kelompok 5

L.2.11 PROSES BISNIS/MANAJEMEN

Proses Manajemen Departemen

Logistic ke distributor/penjual Warehousing & Transportation

HRD HRD

Warehousing Warehousing & Transportation

Finance Keuangan

Page 371: Lembar Kerja Kelompok 5

L.2.11 PROSES BISNIS/MANAJEMEN

Page 372: Lembar Kerja Kelompok 5

L.2.12 PROSES BISNIS/MANAJEMEN

Karakteristik Struktural Teknologi Beri √ small-batch □mass production □continous process

Beri tanda V pada kondisi yang sesuaiTipe Struktur Organictingkat Hirarki 3Rentang Kendali dari CEO (jumlah) 4Rentang Kendali dari kepala seksi 23Rasio dari manajer terhadap non manajer 1 to 23

Pendekatan bentuk organisasi

Page 373: Lembar Kerja Kelompok 5

L.2.12 PROSES BISNIS/MANAJEMEN

√ small-batch □mass production □continous process

Organic3423

1 to 23

Page 374: Lembar Kerja Kelompok 5

L.2.13 BAGAN STRUKTUR ORGANISASI

Direktur

General Manager

Sekretaris

Departemen PPIC

Manager Warehousing & Transportation

Manager HRDManager Finance

& AccountingManager Purchasing

& MarketingManager

MaintenanceManager QCStaff Warehousing &

TransportationStaff HRD

Staff Finance & Accounting

Staff Purchasing & Marketing

Staff Maintenance

Staff QCManager PPIC Staff PPIC

Departemen Warehousing & Transportation

Departemen HRD

Departemen Finance & Accounting

Departemen Purchasing & Marketing

Departemen Maintenance Departemen QC

Page 375: Lembar Kerja Kelompok 5

L.2.13 BAGAN STRUKTUR ORGANISASI

Direktur

General Manager

Sekretaris

Departemen PPIC

Manager Warehousing & Transportation

Manager HRDManager Finance

& AccountingManager Purchasing

& MarketingManager

MaintenanceManager QCStaff Warehousing &

TransportationStaff HRD

Staff Finance & Accounting

Staff Purchasing & Marketing

Staff Maintenance

Staff QCManager PPIC Staff PPIC

Departemen Warehousing & Transportation

Departemen HRD

Departemen Finance & Accounting

Departemen Purchasing & Marketing

Departemen Maintenance Departemen QC

Page 376: Lembar Kerja Kelompok 5

Direktur

General Manager

Sekretaris

Departemen PPIC

Manager Warehousing & Transportation

Manager HRDManager Finance

& AccountingManager Purchasing

& MarketingManager

MaintenanceManager QCStaff Warehousing &

TransportationStaff HRD

Staff Finance & Accounting

Staff Purchasing & Marketing

Staff Maintenance

Staff QCManager PPIC Staff PPIC

Departemen Warehousing & Transportation

Departemen HRD

Departemen Finance & Accounting

Departemen Purchasing & Marketing

Departemen Maintenance Departemen QC

Page 377: Lembar Kerja Kelompok 5

Direktur

General Manager

Sekretaris

Departemen PPIC

Manager Warehousing & Transportation

Manager HRDManager Finance

& AccountingManager Purchasing

& MarketingManager

MaintenanceManager QCStaff Warehousing &

TransportationStaff HRD

Staff Finance & Accounting

Staff Purchasing & Marketing

Staff Maintenance

Staff QCManager PPIC Staff PPIC

Departemen Warehousing & Transportation

Departemen HRD

Departemen Finance & Accounting

Departemen Purchasing & Marketing

Departemen Maintenance Departemen QC

Page 378: Lembar Kerja Kelompok 5

L.2.14 ANALISA JABATAN (JOB ANALYSIS)

1 Nama jabatan Manager QC

2 Ringkasan jabatan / tujuan Menganalisa kegagalan produksi, mendiskusikannya dengan bagian-bagian terkait serta mencari sebab-sebab dan jalan keluarnya.

3 Departemen / bagian Quality Control4 Nama jabatan atasan langsung General Manager

5

Posisi Bawahan Tanggung Jawab

Staff. Quality ControlMembuat laporan berkala dan laporan-laporan lain yang diminta oleh atasan.Mengawasi dan menjaga kualitas barang yang akan di produksi.Mengevaluasi dan menetapkan stabilitas produk/bahan dan menetapkan standar sesuai dengan data-data yang ada.

6

Apa yang dilakukan pemegang jabatan secara reguler atau teraturTugas

Bertanggung jawab atas keputusan meluluskan atau menolak bahan awal

7

Apakah pemegang jabatan melakukan tugas-tugas lain secara periodik?Pada waktu tertentu? Jika seperti itu, uraikan dan sebutkan frekuensinya

8Kewenangan apa yang dimiliki oleh pemegang jabatan dalam beberapa permasalahan seperti pelatihan atau memberikan petunjuk kepada orang lain?

Menegur staff bawahannya apabila melakukan kesalahan dalam bekerja dan terus memberikan evaluasi sekaligus motivasi agar meningkatkan semangat kerja staffnya.

9Apa pendidikan, pengalaman dan kemampuan yang dibutuhkan untuk kepuasan penampilan jabatan

Pendidikan Minimal Strata-1 Memiliki Jiwa Kepemimpinan Memiliki pengalaman bekerja selama 1 tahun

10Pada tahap manakah pekerjaan dari pemegang jabatan ditinjau atasan?Pada saat memberikan laporan yang dibuat setiap bulannya.

11Mesin atau peralatan apakah yang menjadi tanggung jawab pemegang jabatan untuk dioperasikan?

Komputer Fax Telepon Printer

12

√□Pelatihan√□ Penilaian kerja√□ pengawasan kerja□ pembuatan anggaran□ pendamping atau konsultasi□ lainya

13Deskripsikan jenis dan supervisi yang diterima oleh pemegang jabatanMelakukan pengawasan terhadap barang yang akan di produksi sehingga kualitas dari barang tersebut terjaga

14

Deskripsikan apa yang dilakukan untuk pemegang jabatan, klasifikasi jabatan di dalam kategori di bawah ini :

Bertanggung jawab atas perencanaan dan pelaksanaan seluruh aktifitas Bagian Pengawasan Mutu mencakup pelaksanaan tugas di laboratorium fisika kimia, mikrobiologi, pelaksanaan pengawasan selama proses produksi.

Mengawasi pelaksanaan semua POB apakah telah dijalankan dengan benar sesuai dengan ketentuan yang dibuat.

Bertanggung jawab atas keputusan meluluskan, menolak, atau memproses ulang produk yang diproduksi maupun menghentikan proses produksi bila diperlukan

Menganalisa kegagalan produksi, mendiskusikannya dengan bagian-bagian terkait serta mencari sebab-sebab dan jalan keluarnya.

Bertanggung jawab untuk pengembangan dan pelatihan karyawan bawahannya, menjaga disiplin, memelihara, memotivasi kerja dan melakukan evaluasi terhadap karyawan bawahannya

Cek aktivitas berikut, apakah bagian daripada tanggung jawab atasan langsung

Page 379: Lembar Kerja Kelompok 5

14a. tugas harian : menganalisa apakah terjadi kegagalan dalam produksi atau tidakb. tugas periodik : membuat laporan untuk merekap apa yang terjadi pada saat produksic. tugas yang dilakukan pada interval yang tidak regular : memberikan evaluasi dan pelatihan khusus agar kualitas dalam bekerja terus meningkat

Page 380: Lembar Kerja Kelompok 5

L.2.14 ANALISA JABATAN (JOB ANALYSIS)

Manager QC

Menganalisa kegagalan produksi, mendiskusikannya dengan bagian-bagian terkait serta mencari sebab-sebab dan jalan keluarnya.

Quality ControlGeneral ManagerTanggung JawabMembuat laporan berkala dan laporan-laporan lain yang diminta oleh atasan.Mengawasi dan menjaga kualitas barang yang akan di produksi.Mengevaluasi dan menetapkan stabilitas produk/bahan dan menetapkan standar sesuai dengan data-data yang ada.

Apa yang dilakukan pemegang jabatan secara reguler atau teraturPersentasi waktu yang dimanfaatkan

20%

20%

20%

20%

20%

Apakah pemegang jabatan melakukan tugas-tugas lain secara periodik?Pada waktu tertentu? Jika seperti itu, uraikan dan sebutkan frekuensinya

Kewenangan apa yang dimiliki oleh pemegang jabatan dalam beberapa permasalahan seperti pelatihan atau memberikan petunjuk kepada orang lain?

Menegur staff bawahannya apabila melakukan kesalahan dalam bekerja dan terus memberikan evaluasi sekaligus motivasi agar meningkatkan semangat kerja staffnya.

Apa pendidikan, pengalaman dan kemampuan yang dibutuhkan untuk kepuasan penampilan jabatanMemiliki pengalaman bekerja selama 1 tahun Memiliki sikap dan sifat yang jujur dan bertanggung jawab

Pada tahap manakah pekerjaan dari pemegang jabatan ditinjau atasan?Pada saat memberikan laporan yang dibuat setiap bulannya.Mesin atau peralatan apakah yang menjadi tanggung jawab pemegang jabatan untuk dioperasikan?

√□Pelatihan√□ Penilaian kerja√□ pengawasan kerja□ pembuatan anggaran□ pendamping atau konsultasi□ lainya

Deskripsikan jenis dan supervisi yang diterima oleh pemegang jabatanMelakukan pengawasan terhadap barang yang akan di produksi sehingga kualitas dari barang tersebut terjagaDeskripsikan apa yang dilakukan untuk pemegang jabatan, klasifikasi jabatan di dalam kategori di bawah ini :

Bertanggung jawab untuk pengembangan dan pelatihan karyawan bawahannya, menjaga disiplin, memelihara, memotivasi kerja dan melakukan evaluasi terhadap karyawan

Page 381: Lembar Kerja Kelompok 5

a. tugas harian : menganalisa apakah terjadi kegagalan dalam produksi atau tidakb. tugas periodik : membuat laporan untuk merekap apa yang terjadi pada saat produksic. tugas yang dilakukan pada interval yang tidak regular : memberikan evaluasi dan pelatihan khusus agar kualitas dalam bekerja terus meningkat

Page 382: Lembar Kerja Kelompok 5

Memiliki sikap dan sifat yang jujur dan bertanggung jawab

Page 383: Lembar Kerja Kelompok 5

L.2.14 ANALISA JABATAN (JOB ANALYSIS)

1 Nama jabatan Manager Finance & Accounting

2 Ringkasan jabatan / tujuan

3 Departemen / bagian Finance & Accounting4 Nama jabatan atasan langsung General Manager

5

Posisi Bawahan Tanggung Jawab

Staff. Finance & AccountingMembuat laporan-laporan manajemen dari bagiannya secara periodik.Menjaga stabilitas pengeluaran dan pemasukan.

6

Apa yang dilakukan pemegang jabatan secara reguler atau teraturTugas

7

Apakah pemegang jabatan melakukan tugas-tugas lain secara periodik?Pada waktu tertentu? Jika seperti itu, uraikan dan sebutkan frekuensinya

8Kewenangan apa yang dimiliki oleh pemegang jabatan dalam beberapa permasalahan seperti pelatihan atau memberikan petunjuk kepada orang lain?

Menegur staff bawahannya apabila melakukan kesalahan dalam bekerja dan terus memberikan evaluasi sekaligus motivasi agar meningkatkan semangat kerja staffnya.

9Apa pendidikan, pengalaman dan kemampuan yang dibutuhkan untuk kepuasan penampilan jabatan

Pendidikan Minimal Strata-1 Memiliki Jiwa Kepemimpinan Memiliki pengalaman bekerja selama 1 tahun

10Pada tahap manakah pekerjaan dari pemegang jabatan ditinjau atasan?Pada saat memberikan laporan keuangan yang dibuat setiap bulannya.

11Mesin atau peralatan apakah yang menjadi tanggung jawab pemegang jabatan untuk dioperasikan?

Komputer

12

√□Pelatihan√□ Penilaian kerja√□ pengawasan kerja√□ pembuatan anggaran□ pendamping atau konsultasi□ lainya

13Deskripsikan jenis dan supervisi yang diterima oleh pemegang jabatanMelakukan pengawasan terhadap biaya pengeluaran dan pemasukan agar tetap stabil

14

Deskripsikan apa yang dilakukan untuk pemegang jabatan, klasifikasi jabatan di dalam kategori di bawah ini :

Memimpin penyusunan laporan keuangan (Laporan Posisi Keuangan, Laporan Laba-Rugi, Laporan Arus Kas, Catatan atas Laporan Keuangan) dan mengkonsolidasikan semua laporan keuangan tersebut utnuk pihak manajemen serta laporan keuangan untuk pihak luar agar laporan tersebut benar, teliti, dan tepat waktu.

Mengatur dan mengawasi pelaksanaan tugas yang dibebankan kepada bawahannya menurut sistem dan prosedur yang ditentukan

Memeriksa dan menandatangani Laporan Mutasi Piutang dan Laporan Mutasi Hutang sebelum disampaikan kepada Direktur Keuangan dan Akutansi

Melakukan pemeriksaan bukti-bukti akutansi, pencatatannya, pengelompokan sampai dengan penyusunan laporan keuangan.

Memimpin penyusunan laporan keuangan (Laporan Posisi Keuangan, Laporan Laba-Rugi, Laporan Arus Kas, Catatan atas Laporan Keuangan) dan mengkonsolidasikan semua laporan keuangan tersebut utnuk pihak manajemen serta laporan keuangan untuk pihak luar agar laporan tersebut benar, teliti, dan tepat waktu.

Bertanggung jawab untuk pengembangan dan pelatihan karyawan bawahannya, menjaga disiplin, memelihara, memotivasi kerja dan melakukan evaluasi terhadap karyawan bawahannya

Cek aktivitas berikut, apakah bagian daripada tanggung jawab atasan langsung

Page 384: Lembar Kerja Kelompok 5

14a. tugas harian : menganalisa apakah terjadi kegagalan dalam produksi atau tidakb. tugas periodik : membuat laporan keuangan untuk merekap biaya-biaya yang dikeluarkanc. tugas yang dilakukan pada interval yang tidak regular : memberikan evaluasi dan pelatihan khusus agar kualitas dalam bekerja terus meningkat

Page 385: Lembar Kerja Kelompok 5

L.2.14 ANALISA JABATAN (JOB ANALYSIS)

Manager Finance & Accounting

Finance & AccountingGeneral ManagerTanggung JawabMembuat laporan-laporan manajemen dari bagiannya secara periodik.Menjaga stabilitas pengeluaran dan pemasukan.

Apa yang dilakukan pemegang jabatan secara reguler atau teraturPersentasi waktu yang dimanfaatkan

20%

20%

30%

30%

Apakah pemegang jabatan melakukan tugas-tugas lain secara periodik?Pada waktu tertentu? Jika seperti itu, uraikan dan sebutkan frekuensinya

Kewenangan apa yang dimiliki oleh pemegang jabatan dalam beberapa permasalahan seperti pelatihan atau memberikan petunjuk kepada orang lain?

Menegur staff bawahannya apabila melakukan kesalahan dalam bekerja dan terus memberikan evaluasi sekaligus motivasi agar meningkatkan semangat kerja staffnya.

Apa pendidikan, pengalaman dan kemampuan yang dibutuhkan untuk kepuasan penampilan jabatanMemiliki pengalaman bekerja selama 1 tahun Memiliki sikap dan sifat yang jujur dan bertanggung jawab

Pada tahap manakah pekerjaan dari pemegang jabatan ditinjau atasan?Pada saat memberikan laporan keuangan yang dibuat setiap bulannya.Mesin atau peralatan apakah yang menjadi tanggung jawab pemegang jabatan untuk dioperasikan?

√□Pelatihan√□ Penilaian kerja√□ pengawasan kerja√□ pembuatan anggaran□ pendamping atau konsultasi□ lainya

Deskripsikan jenis dan supervisi yang diterima oleh pemegang jabatanMelakukan pengawasan terhadap biaya pengeluaran dan pemasukan agar tetap stabilDeskripsikan apa yang dilakukan untuk pemegang jabatan, klasifikasi jabatan di dalam kategori di bawah ini :

Memimpin penyusunan laporan keuangan (Laporan Posisi Keuangan, Laporan Laba-Rugi, Laporan Arus Kas, Catatan atas Laporan Keuangan) dan mengkonsolidasikan semua laporan keuangan tersebut utnuk pihak manajemen serta laporan keuangan untuk pihak luar agar laporan

Bertanggung jawab untuk pengembangan dan pelatihan karyawan bawahannya, menjaga disiplin, memelihara, memotivasi kerja dan melakukan evaluasi terhadap karyawan

Page 386: Lembar Kerja Kelompok 5

a. tugas harian : menganalisa apakah terjadi kegagalan dalam produksi atau tidakb. tugas periodik : membuat laporan keuangan untuk merekap biaya-biaya yang dikeluarkanc. tugas yang dilakukan pada interval yang tidak regular : memberikan evaluasi dan pelatihan khusus agar kualitas dalam bekerja terus meningkat

Page 387: Lembar Kerja Kelompok 5

Memiliki sikap dan sifat yang jujur dan bertanggung jawab

Page 388: Lembar Kerja Kelompok 5

L.2.14 ANALISA JABATAN (JOB ANALYSIS)

1 Nama jabatan Manager Purchasing & Marketing

2 Ringkasan jabatan / tujuan Memastikan kesediaan barang dan melakukan perencanaan strategi pemasaran dengan memperhatikan trend pasar dan sumber daya perusahaan.

3 Departemen / bagian Purchasing & Marketing 4 Nama jabatan atasan langsung General Manager

5

Posisi Bawahan Tanggung Jawab

Staff. Purchasing & MarketingMembuat laporan berkala dan laporan-laporan lain yang diminta oleh atasan.Memastikan kesediaan barang/material melalui mekanisme auditMelakukan pemilihian / seleksi rekanan pengadaan sesuai kriteria perusahaan

6

Apa yang dilakukan pemegang jabatan secara reguler atau teraturTugas

Melakukan perencanaan tindakan antisipatif dalam menghadapi penurunan order.

7

Apakah pemegang jabatan melakukan tugas-tugas lain secara periodik?Pada waktu tertentu? Jika seperti itu, uraikan dan sebutkan frekuensinya

8Kewenangan apa yang dimiliki oleh pemegang jabatan dalam beberapa permasalahan seperti pelatihan atau memberikan petunjuk kepada orang lain?

Memantau potensi bawahan untuk dilakukan pembinaan sehingga menjadi lebih baik.

9Apa pendidikan, pengalaman dan kemampuan yang dibutuhkan untuk kepuasan penampilan jabatan

Pendidikan Minimal Strata-1 Memiliki Jiwa Kepemimpinan Memiliki pengalaman bekerja selama 1 tahun

10Pada tahap manakah pekerjaan dari pemegang jabatan ditinjau atasan?Pada saat memberikan laporan yang dibuat setiap bulannya.

11Mesin atau peralatan apakah yang menjadi tanggung jawab pemegang jabatan untuk dioperasikan?

Komputer

12

√□Pelatihan√□ Penilaian kerja√□ pengawasan kerja□ pembuatan anggaran□ pendamping atau konsultasi□ lainya

13Deskripsikan jenis dan supervisi yang diterima oleh pemegang jabatanMelakukan pengawasan terhadap barang yang akan di pasarkan sehingga dapat memenuhi permintaan konsumen

14

Deskripsikan apa yang dilakukan untuk pemegang jabatan, klasifikasi jabatan di dalam kategori di bawah ini :a. tugas harian : memastikan ketersediaan barang yang akan di pasarkan.b. tugas periodik : membuat laporan untuk merekap apa yang terjadi pada saat produksic. tugas yang dilakukan pada interval yang tidak regular : memberikan evaluasi dan pelatihan khusus agar kualitas dalam bekerja terus meningkat

Merencanakan marketing research yaitu dengan mengikuti pasar, terutama terhadap produk sejenis dari perusahaan pesaing.

Melakukan pengelolaan pengadaan barang melalui perencanaan secara sistematis dan terkontrol.

Memimpin seluruh jajaran departemen purchasing & marketing sehingga tercipta tingkat efisiensi, efektivitas dan produktivitas setinggi mungkin.

Bertanggung jawab untuk pengembangan dan pelatihan karyawan bawahannya, menjaga disiplin, memelihara, memotivasi kerja dan melakukan evaluasi terhadap karyawan bawahannya

Cek aktivitas berikut, apakah bagian daripada tanggung jawab atasan langsung

Page 389: Lembar Kerja Kelompok 5

L.2.14 ANALISA JABATAN (JOB ANALYSIS)

Manager Purchasing & Marketing

Memastikan kesediaan barang dan melakukan perencanaan strategi pemasaran dengan memperhatikan trend pasar dan sumber daya perusahaan.

Purchasing & Marketing General ManagerTanggung JawabMembuat laporan berkala dan laporan-laporan lain yang diminta oleh atasan.Memastikan kesediaan barang/material melalui mekanisme auditMelakukan pemilihian / seleksi rekanan pengadaan sesuai kriteria perusahaan

Apa yang dilakukan pemegang jabatan secara reguler atau teraturPersentasi waktu yang dimanfaatkan

20%

20%

30%

30%

Apakah pemegang jabatan melakukan tugas-tugas lain secara periodik?Pada waktu tertentu? Jika seperti itu, uraikan dan sebutkan frekuensinya

Kewenangan apa yang dimiliki oleh pemegang jabatan dalam beberapa permasalahan seperti pelatihan atau memberikan petunjuk kepada orang lain?

Memantau potensi bawahan untuk dilakukan pembinaan sehingga menjadi lebih baik.

Apa pendidikan, pengalaman dan kemampuan yang dibutuhkan untuk kepuasan penampilan jabatanMemiliki pengalaman bekerja selama 1 tahun Memiliki sikap dan sifat yang jujur dan bertanggung jawab

Pada tahap manakah pekerjaan dari pemegang jabatan ditinjau atasan?Pada saat memberikan laporan yang dibuat setiap bulannya.Mesin atau peralatan apakah yang menjadi tanggung jawab pemegang jabatan untuk dioperasikan?

√□Pelatihan√□ Penilaian kerja√□ pengawasan kerja□ pembuatan anggaran□ pendamping atau konsultasi□ lainya

Deskripsikan jenis dan supervisi yang diterima oleh pemegang jabatanMelakukan pengawasan terhadap barang yang akan di pasarkan sehingga dapat memenuhi permintaan konsumenDeskripsikan apa yang dilakukan untuk pemegang jabatan, klasifikasi jabatan di dalam kategori di bawah ini :a. tugas harian : memastikan ketersediaan barang yang akan di pasarkan.b. tugas periodik : membuat laporan untuk merekap apa yang terjadi pada saat produksic. tugas yang dilakukan pada interval yang tidak regular : memberikan evaluasi dan pelatihan khusus agar kualitas dalam bekerja terus meningkat

Bertanggung jawab untuk pengembangan dan pelatihan karyawan bawahannya, menjaga disiplin, memelihara, memotivasi kerja dan melakukan evaluasi terhadap karyawan

Page 390: Lembar Kerja Kelompok 5

Memiliki sikap dan sifat yang jujur dan bertanggung jawab

Page 391: Lembar Kerja Kelompok 5

L.2.17 FASILITAS PENUJANG PERSONEL

ASUMSI FASILITAS PERSONELPT.TAZOV

No Praktikan :

Kapasitas Produksi :

Efisiensi Produksi :Persentase Lembur Pabrik :

No Fasilitas Tersedia

1 Pusat Kesehatan Karyawan √

2 Kantin √

3 Parkir Mobil √

4 Parkir Motor √

5 Parkir Mobil Box √

6 Toilet Pria √

7 Toilet Wanita √

8 Musholla √

9 Ruang Locker √

10 Ruang Olahraga √

Page 392: Lembar Kerja Kelompok 5

10 Ruang Olahraga √

Page 393: Lembar Kerja Kelompok 5

L.2.17 FASILITAS PENUJANG PERSONEL

ASUMSI FASILITAS PERSONELPT.TAZOV

Tidak Tersedia

Page 394: Lembar Kerja Kelompok 5
Page 395: Lembar Kerja Kelompok 5

L.2.17 FASILITAS PENUJANG PERSONEL

ASUMSI FASILITAS PERSONELPT.TAZOV

Unit Loko A/BulanUnit Truk A/BulanUnit Loko B/BulanUnit Truk B /Bulan

%%

AlasanMemberikan pelayanan kesehatan/medis kepada setiap karyawan nya.

Memberikan pertolongan pertama untuk karyawan apabila mengalami kecelakaan kerjaMemberikan jaminan kesehatan untuk setiap karyawan nya

Untuk menjual makanan dan minuman bagi karyawanMenghemat waktu karena berada disekitar lokasi pabrikSebagai tempat untuk menghilangkan rasa lelah sejenak

Untuk memarkir mobil atasan/karyawan/tamu di lokasi pabrikUntuk mengatur letak mobil agar lebih teratur di lokasi pabrik

Agar lokasi pabrik tertata dengan rapi tidak ada kendaraan yang parkir sembaranganUntuk memarkir motor atasan/karyawan/tamu di lokasi pabrikUntuk mengatur letak motor agar lebih teratur di lokasi pabrik

Agar lokasi pabrik tertata dengan rapi tidak ada kendaraan yang berseliweranSupaya tidak mengganggu ketika menurunkan barang di lokasi pabrik

Untuk mengatur letak mobil box agar lebih teratur di lokasi pabrikUntuk mengatur letak motor agar lebih teratur di lokasi pabrik

Sebagai tempat untuk buang air untuk karyawan priaSebagai tempat untuk berbenah diri bagi karyawan priaSebagai tempat untuk berganti pakaian karyawan pria

Sebagai tempat untuk buang air untuk karyawan wanitaSebagai tempat untuk berbenah diri bagi karyawan wanitaSebagai tempat untuk berganti pakaian karyawan wanita

Sebagai tempat beribadah shalat bagi karyawan yang beragama IslamSebagai tempat untuk mengaji bagi karyawan

Sebagai tempat untuk meningkatkan silaturahmi antar karyawanSebagai tempat untuk menyimpan segala keperluan karyawan

Untuk menghindari terjadinya barang yang tertukar antar karyawanAgar barang - barang karyawan tersimpan dengan aman dan teratur

Sebagai tempat untuk menjaga kebugaran karyawanSebagai tempat untuk menghilangkan stress yang terjadi pada karyawan

Page 396: Lembar Kerja Kelompok 5

Sebagai tempat untuk meningkatkan skills olahraga karyawan

Page 397: Lembar Kerja Kelompok 5

L.2.17 FASILITAS PENUJANG PERSONEL

Page 398: Lembar Kerja Kelompok 5

L.2.18 FASILITAS PENUNJANG FISIK PABRIK

ASUMSI FASILITAS PABRIKPT.TAZOV

No Praktikan :

Kapasitas Produksi :

Efisiensi Produksi :Persentase Lembur Pabrik :

No Fasilitas Tersedia

1 Area Bahan Bakar & Pelumas √

2 Area Pemadam Kebakaran √

3 Cleaning Service Produksi √

4 Gardu Listrik √

5 Genset √

6 Koperasi √

7 Kotak Pos √

8 Maintenance Shop & Tools √

9 Menara Air √

10 Panel Listrik √

Page 399: Lembar Kerja Kelompok 5

10 Panel Listrik √

11 Plang Perusaahan √

12 Pos Keamanan A √

13 Pos Keamanan B √

14 Pos Keamanan C √

15 Scrap Area √

16 Telfon Umum √

17 Tempat Pembuangan Sampah √

18 Evacuation Site √

Page 400: Lembar Kerja Kelompok 5

L.2.18 FASILITAS PENUNJANG FISIK PABRIK

ASUMSI FASILITAS PABRIKPT.TAZOV

Tidak Tersedia

Page 401: Lembar Kerja Kelompok 5
Page 402: Lembar Kerja Kelompok 5

L.2.18 FASILITAS PENUNJANG FISIK PABRIK

ASUMSI FASILITAS PABRIKPT.TAZOV

Unit Loko A/BulanUnit Truk A/BulanUnit Loko B/BulanUnit Truk B /Bulan

%%

AlasanSebagai tempat untuk mengisi bahan bakar

Untuk mempermudah saat mengisi bahan bakarUntuk menyimpan bahan

Berisi property yang digunakan sebagai alat untuk memadamkan api ketika terjadi kebakaran

Untuk memadamkan api apabila terjadi kebakaranSebagai tanda peringatan apabila terjadi kebakaran

Membersihkan area di sekitar lokasi pabrikAgar lokasi pabrik terlihat bersih dan nyaman

Menyimpan property/alat yang kaitannya dengan kebersihanSebagai alat untuk membangkitkan tenaga listrik

Untuk menstranformasikan daya listrikUntuk mengawasi proses operasi dan pengamanan sistem tenaga listrik

Menghasilkan daya listrik di sekitar lokasi pabrikPengganti listrik apabila terjadi mati listrikMemberikan supply daya listrik alternatif

Untuk menabung/menyimpan uang Menjual barang dengan harga yang lebih murah

Membeli barang dengan cara kreditUntuk mengirim surat

Untuk menyimpan suratUntuk menampung kritik dan saran

Sebagai tempat untuk merawat kebutuhan mesinSebagai tempat untuk menyimpan alat perawatan mesinUntuk meminimasi biaya pembelian alat-alat perawatan

Untuk menampung persediaan air dalam kapasitas yang besarDapat memasok air ketika listrik padam

Mengurangi ketergantungam pada air tanahMengalirkan energi listrik

Page 403: Lembar Kerja Kelompok 5

Sebagai tempat untuk membagi dan memutus aliran listrikMeminimasi daya listrik yang digunakan

Sebagai penanda suatu keberadaan perusaahanSebagai daya tarik untuk masyarakat

Sebagai jaminan terhadap produk yang dihasilkanUntuk mengenali dan memeriksa tamu yang datang

Untuk memeriksa barang tamu yang masuk atau keluarUntuk memeriksa kendaraan tamu yang datang/keluar

Untuk mengawasi dan melindungi lokasi pabrikUntuk menjaga agar lokasi pabrik tetap aman dan kondusif

Untuk menunjukan lokasi apabila terdapat tamu yang bertanyaUntuk memerika tamu yang datang

Untuk melindungi di sekitar lokasi pabrikUntuk menjaga agar lokasi pabrik tertib, aman dan nyaman

Sebagai tempat menyimpan komponen yang rusakSebagai tempat untuk mengecek apakah komponen masih bisa digunakan/tidak

Sebagai tempat untuk memperbaiki komponen yang masih dapat digunakanDigunakan untuk berkomunikasi

Biaya lebih murahTidak semua karyawan memiliki handphoneUntuk menampung dan menyimpan sampah

Agar lokasi pabrik terlihat bersih dan nyamanMenghindari sumber penyakit

Menjaga keselamatan saat keadaan daruratUntuk meyelamatkan diri ketika terjadi keadaan bahaya

Untuk memudahkan karyawan menghindar saat terjadi keadaan bahaya

Page 404: Lembar Kerja Kelompok 5

L.2.18 FASILITAS PENUNJANG FISIK PABRIK

Page 405: Lembar Kerja Kelompok 5

L.2.19 FASILITAS PENUNJANG PRODUKSI

ASUMSI FASILITAS PENUNJANG PRODUKSIPT.PASTI BISA PIM 3

No Praktikan :

Kapasitas Produksi :

Efisiensi Produksi :Persentase Lembur Pabrik :

No Fasilitas Tersedia Tidak Tersedia

1 Receiving √

2 Shipping √

3 Gudang Bahan Baku √

4 Gudang Bahan Pembantu √

5 Gudang Barang Jadi √

6 Supervisor Room √

7 Ruang Material Handling √

8 Area Scrap √

9 Quality Control √

10 Compressor Room √

Page 406: Lembar Kerja Kelompok 5

10 Compressor Room √

Page 407: Lembar Kerja Kelompok 5

L.2.19 FASILITAS PENUNJANG PRODUKSI

ASUMSI FASILITAS PENUNJANG PRODUKSIPT.PASTI BISA PIM 3

Unit Loko A/BulanUnit Truk A/BulanUnit Loko B/BulanUnit Truk B /Bulan

%%

Jumlah Alasan

1Tempat untuk penerimaan barang

Tempat untuk memeriksa barang yang datangTempat untuk membongkar barang dari kontainer

1Tempat untuk mengemas barang jadi

Tempat untuk mengurus dokumen - dokumen pengiriman barangTempat untuk memasukkan barang ke kendraan pengangkut

1

Tempat untuk menyimpan bahan baku atau bahan mentahTempat menyimpan stock untuk kebutuhan tertentu

1Tempat untuk menyimpan bahan pembantu

Tempat untuk menyimpan barang yang sudah tidak terpakaiTempat untuk memisahkan bahan pembantu dengan bahan lainnya

1Tempat untuk menyimpan barang jadi atau produk akhir

Tempat dilakukan pengemasan produkTempat untuk melaksanakan kegiatan administrasi pergudangan

1Tempat untuk mengawasi dan melakukan instruksi kerja terhadap karyawan

Tempat untuk mengontrol dan memberikan evaluasi terhadap bawahanTempat untuk mengatur kelompok kerja bawahan nya

1Tempat untuk menyimpan material handling apabila tidak digunakanTempat untuk mengamankan material handling agar tidak cepat rusak

Tempat untuk memindahkan barang

1Tempat untuk menyimpan komponen yang rusak

Tempat untuk menampung scrapTempat untuk mengelola scrap

1Tempat untuk meningkatkan kualitas barang

Tempat untuk menjamin kualitas barang yang masukTempat untuk memastikan apakah produk memenuhi standar

1

Tempat untuk menyimpan compressor

Tempat untuk mengamankan bahan baku yang dibutuhkan pada proses berikutnya

Page 408: Lembar Kerja Kelompok 5

1 Tempat untuk mengamankan compressor

Tempat untuk menghindari kebisingan yang disebabkan dari compressor yang dinyalakan

Page 409: Lembar Kerja Kelompok 5

L.2.19 FASILITAS PENUNJANG PRODUKSI

Page 410: Lembar Kerja Kelompok 5

L.2.20 FASILITAS PENUNJANG ADMINISTRASI

ASUMSI FASILITAS PENUNJANG ADMINISTRASIPT.TAZOV

No Praktikan :

Kapasitas Produksi :

Efisiensi Produksi :Persentase Lembur Pabrik :

No Fasilitas Tersedia

1 Direktur √

2 General Manager √

3 Sekretaris √

4 Manager PPIC √

5 Staff PPIC √

6 Manager Warehousing & Transportation √

7 Staff Warehousing & Transportation √

8 Manager HRD √

9 Staff HRD √

10 Manager Finance & Accounting √

Page 411: Lembar Kerja Kelompok 5

11 Staff Finance & Accounting √

12 Manager Purchasing & Marketing √

13 Staff Promosi √

14 Manager Reaserch & Development √

15 Staff Reaserch & Development √

16 Manager QC √

17 Staff QC √

18 Musholla √

19 Pantry √

20 Ruang Rapat √

21 Ruang Fotocopy √

22 Ruang Receptionist √

23 Toilet Receptionist Pria √

24 Toilet Receptionist Wanita √

25 Toilet Pria √

26 Toilet Wanita √

Page 412: Lembar Kerja Kelompok 5

27 Ruang Cleaning Service √

28 Ruang Perpustakaan √

Page 413: Lembar Kerja Kelompok 5

L.2.20 FASILITAS PENUNJANG ADMINISTRASI

ASUMSI FASILITAS PENUNJANG ADMINISTRASIPT.TAZOV

Unit Loko A/BulanUnit Truk A/BulanUnit Loko B/BulanUnit Truk B /Bulan

%%

Tidak Tersedia Jumlah

1

1

1

1

1

1

1

1

1

1

Page 414: Lembar Kerja Kelompok 5

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Page 415: Lembar Kerja Kelompok 5

1

1

Page 416: Lembar Kerja Kelompok 5

L.2.20 FASILITAS PENUNJANG ADMINISTRASI

ASUMSI FASILITAS PENUNJANG ADMINISTRASIPT.TAZOV

AlasanTempat khusus dimana direktur bekerja

Tempat untuk menerima tamu yang datang menghadap direkturTempat untuk menandatangani surat - surat keluar dan laporan perusaahaan

Tempat khusus dimana GM bekerjaTempat untuk mengawasi seluruh kegiatan departemen yang ada

Tempat untuk membuat rancangan perusaahanTempat untuk menyusun kegiatan jadwal rapat direktur

Tempat untuk menyelenggarakan pengaturan penerimaan tamuTempat untuk melaksanakan kegiatan adminstrasi umum perusaahan dan surat menyurat

Tempat untuk membuat rencana produksi atau forecastTempat untuk berdiskusi antara manager PPIC dengan staff PPIC

Tempat untuk menyimpan segalan dokumen yang berkaitan dengan PPICTempat untuk membuat rencana kegiatan tahunan

Tempat untuk membuat laporan kegiatanTempat untuk melakukan perbaikan - perbaikan terhadap departemen PPIC

Tempat untuk membahas kegiatan operasional gudangTempat khusus dimana Manager warehousing & transportation bekerja

Tempat untuk menyimpan segalan dokumen yang berkaitan dengan WarehousingTempat untuk membuat laporan kegiatan & pertanggungjawaban

Tempat untuk mengecek barang apa saja yang masih ada atau telah habisTempat untuk mengawasi keberadaan dan kondisi bahan - bahan di gudang

Tempat untuk mengatur dan menghitung jumlah tenaga kerja yang dibutuhkanTempat untuk mengatur penempatan tenaga kerja masing- masing bagian

Tempat untuk mengatur dan memberikan gaji kepada karyawanTempat untuk menginput data - data karyawan

Tempat untuk melakukan penilaian kinerja karyawanTempat untuk menyelenggarakan rekruitmen karyawan baru

Tempat untuk membuat laporan keuangan perusaahanTempat untuk mengatur keuangan perusaahan serta mengawasi pemasukan dan pengeluaran

Tempat untuk mengatur pembayaran pajak

Page 417: Lembar Kerja Kelompok 5

Tempat untuk membuat rincian perhitungan kebutuhan akan produk yang ditawarkanTempat untuk menyimpan data - data yang berhubungan dengan keuangan perusaahan/pabrik

Tempat untuk membuat pertanggungjawaban terhadap manager finance & accounting managerTempat untuk menandatangani Purchasing Order(PO)

Tempat untuk berdiskusi dengan staff PurchasingTempat untuk mengkoordinir fungsi penjualan

Tempat untuk menangani promosi produk perusaahanTempat untuk menyiapkan bahan promosi suatu produk secara menyeluruh

Tempat untuk membantu manager promosi dalam menyusun laporan pemasaranTempat yang digunakan untuk membuat anggaran pengembangan di suatu perusaahan

Tempat yang bertanggung jawab terhadap sejumlah dana tertentu yang telah dianggarkanTempat yang digunakan apabila ada pihak luar/tamu yang ingin melakukan kerjasama

Untuk mempertanggungjawabkan segala aktivitas riset dan pengembanganUntuk bertanggung jawab dalam memastikan kualitas performansi dalam perusaahan

Bertanggung jawab dalam mengelola dana tertentuTempat yang digunakan untuk menganalisa kegagalan produksi

Bertanggung jawab atas keputusan meluluskan/menolak bahan awalBertanggung Jawab dalam membuat laporan berkala suatu perusaahan

Tempat untuk memastikan kualitas barang yang dibeliTempat untuk merekomendasikan ulang produk - produk berkualitas rendah

Tempat khusus staff QC dalam menyimpan laporan beserta dokumen penting lainnyaTempat karyawan melakukan ibadah shalat bagi karyawan beragama islam

Tempat untuk menjalin silaturahmi antar sesama karyawanTempat untuk melakukan pengajian rutin bagi karyawan

Tempat yang digunakan untuk menyimpan atau menyediakan alat memasakTempat yang digunakan untuk memenuhi kebutuhan personal seberti membuat teh dan sebagainya

Tempat yang digunakan sebagai area menyediakan makanan dan minumanTempat berkumpul yang digunakan untuk memecahkan masalah

Tempat yang digunakan untuk berdiskusi antara atasan dan bawahanTempat para atasan mengambil keputusan

Tempat yang digunakan untuk mengcopy data - data yang diperlukanTempat untuk meminimasi waktu memperbanyak data

Tempat yang digunakan untuk meminimasi biaya keluarTempat yang digunakan sebagai pusat informasi oleh para tamu yang datang

Tempat yang digunakan para tamu untuk menunggu orang yang ditujuTempat yang digunakan untuk melakukan pendaftaran bagi tamu yang berkunjung

Toilet khusus receptionist priaTempat untuk berbenah diri bagi receptionist priaTempat untuk receptionist pria berganti pakaian

Toilet khusus receptionist wanitaTempat untuk berbenah diri bagi receptionist wanitaTempat untuk receptionist wanita berganti pakaian

Sebagai tempat untuk buang air untuk karyawan priaSebagai tempat untuk berbenah diri bagi karyawan priaSebagai tempat untuk berganti pakaian karyawan pria

Sebagai tempat untuk buang air untuk karyawan wanitaSebagai tempat untuk berbenah diri bagi karyawan wanitaSebagai tempat untuk berganti pakaian karyawan wanita

Page 418: Lembar Kerja Kelompok 5

Tempat untuk menyimpan alat - alat kebersihanTempat untuk mengontrol alat - alat kebersihan masih layak digunakan/tidak

Tempat untuk perawatan alat - alat kebersihanTempat karyawan mencari buku panduan untuk menemukan informasi penting yang dibutuhkan

Tempat membaca bagi para karyawanTempat menyimpan arsip perusaahan

Page 419: Lembar Kerja Kelompok 5

L.2.20 FASILITAS PENUNJANG ADMINISTRASI

Page 420: Lembar Kerja Kelompok 5

ARC Fasilitas Penunjang Personel

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

1 Pusat Kesehatan Karyawan

O

2 Kantin

4,9,10

U

3 Parkir Mobil

11,12,13,15

E

4 Parkir Motor

1,2,3,4

E

5 Parkir Mobil Box

1,2,3,4

U

Page 421: Lembar Kerja Kelompok 5

6 Toilet Pria

11,13,14

A

7 Toilet Wanita

1,2,3,6,7

A

8 Musholla

3,4,6,7,9

I

9 Ruang Loker

3,4,5,9

I

10 Ruang Olahraga

2,4,5

No. Alasan1 Memiliki kegunaan yang sama2 Melaksanakan kegiatan yang sama3 Waktu lebih efektif4 Digunakan oleh pegawai pria dan wanita5 Memudahkan untuk menyimpan barang6 Memudahkan untuk mandi/berganti pakaian7 Jarak yang ditempuh tidak bisa jauh8 Memudahkan untuk beristirahat9 Area harus selalu bersih10 Area tidak boleh berbau11 Area dapat menjadi kotor12 Kemungkinan adanya bau13 Polusi udara yang membuat tidak nyaman14 Area menimbulkan kebisingan15 Kegunaannya tidak memiliki keterkaitan

Page 422: Lembar Kerja Kelompok 5

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

No. Praktikan:

Kapasitas Produksi: 327 Unit Loko A/Bulan334 Unit Truk A/Bulan332 Unit Loko B/Bulan324 Unit Truk B/Bulan

Efisiensi Produksi: 91 %Persentase Lembur Pabrik: 15 %

A = Mutlak didekatkanE = Sangat Penting Didekatkan

I = Penting DekatO = Biasa - Biasa Saja

U = Tidak Penting Dekat

U11,13,15

U11,13,15

O U11,12,13 11,13,15

O I11,12,13 3,4,9

A I I1,2,3,4 3,4,9 3,4,9

O I11,13,14 3,4,9

U O O11,13 11,13,14 11,12

U U

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Page 423: Lembar Kerja Kelompok 5

11,13 11,12,13,14U U O

11,13,14 11,13 11,12,13,14U U

11,12,13,15 12,13A U U

3,4,6,7,9 11,13,14 11,13I U

3,4 11,12I I

4,6 4,6I

3,4,6U15

Page 424: Lembar Kerja Kelompok 5

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

I3,4,9

U15

O O11,12 4,5

O U

Page 425: Lembar Kerja Kelompok 5

11,12 11,12,15O U

11,12,13,14 11,12,15U

13,14,15U

11,13

Page 426: Lembar Kerja Kelompok 5

ARC Fasilitas Penujang Produksi

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

No. Praktikan:

Kapasitas Produksi:

Efisiensi Produksi:Persentase Lembur Pabrik:

1 Receiving

O

2 Shipping

2,12,13E

5,6,8,9,10U

3 GBB

12,13U

12,15I

4 GBP

1,4,6O4

I

5 GBJ

1,4,6O

12,15E

Page 427: Lembar Kerja Kelompok 5

6 Supervisor Room

3,8,9I

6,7,8O

7 Ruang MH

12,14O

11,12O

8 Area Scrap & Waste

5,12U

11,14,15U

9 QC

11,12,15U15

U

10 Compressor Room

15

No. Alasan1 Menggunakan tenaga kerja yang sama2 Urutan aliran kerja3 Kontak personel sering terjadi4 Area berdekatan5 Menggunakan peralatan yang sama6 Memudahkan dalam pencatatan barang7 Penggunaan alat sering terjadi8 Tingkat urgensi kontak tinggi9 Menggunakan laporan yang sama

10 Adanya hubungan antar fasilitas11 Menimbulkan area yang berdebu12 Kontak personal jarang terjadi13 Penggunaan alat jarang terjadi14 Area bising15 Tidak ada hubungan antar fasilitas

Page 428: Lembar Kerja Kelompok 5

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

No. Praktikan:

Kapasitas Produksi: 327 Unit Loko A/Bulan334 Unit Truk A/Bulan332 Unit Loko B/Bulan324 Unit Truk B/Bulan

Efisiensi Produksi: 91 %Persentase Lembur Pabrik: 15 %

A = Mutlak didekatkanE = Sangat Penting Didekatkan

I = Penting DekatO = Biasa - Biasa Saja

U = Tidak Penting Dekat

I6,9

U12,15

E O2,3,6,9,10 6

O I12,11,14 5,6

I I U3,8,9,10 4,5,6 11,15

I U5,6,7 11

I O I

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Page 429: Lembar Kerja Kelompok 5

6,7,8 12 3,10U O

11,14,15 12O O U

11,12,13 12 12,13,15E U

3,6,8,9 15I E

3,6,8,9 4,9,10O

12,13U

11,15

Page 430: Lembar Kerja Kelompok 5

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

U11,15

U12,13,14

I U

Page 431: Lembar Kerja Kelompok 5

3,10 15I

1,10U

12,13,15

Page 432: Lembar Kerja Kelompok 5

ARC Fasilitas Penujang Fisik Pabrik

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

1 Area Bahan Bakar & Pelumas

A

2 Area Pemadam Kebakaran

2,3

U

3 Cleaning Service Produksi

13,14

U

4 Gardu Listrik

13,14

A

5 Genset

1,3,5,8

U

6 Koperasi

13,15

Page 433: Lembar Kerja Kelompok 5

6 Koperasi

O

7 Kotak Pos

14

U

8 Maintenance Shop & Tools

12,13,14

I

9 Menara Air

4,8

U

10 Panel Listrik

11,12,13

O

11 Plang Perusahaan

13,15

U

12 Pos Keamanaan A

13,14,15

I

13 Pos Keamanaan B

1,3,5,7,8

I

14 Pos Keamanaan C

1,3,5,7,8

U

15 Scrap Area

14,15

U

16 Telepon Umum

14,15

I

17 Tempat Pembuangan Sampah

6,8

Page 434: Lembar Kerja Kelompok 5

17 Tempat Pembuangan Sampah

O

18 Evacuation Area

6

No. Alasan1 Alat yang digunakan serupa2 Dapat mengatasi kebakaran3 Memiliki keterkaitan antar area4 Pemindahan material lebih mudah5 Memiliki operator yang sama6 Agar area tetap bersih dan terawat7 Memberi ruang untuk pekerja 8 Lebih mudah dijangkau9 Terdapat keterkaitan antar fasilitas

10 Memudahkan mobilisasi pekerja11 Dapat menyebabkan kebakaran12 Area tidak boleh berdekatan13 Mobilisasi sulit dilakukan14 Membuat area berantakan15 Tidak terdapat keterkaitan antar fasilitas

Page 435: Lembar Kerja Kelompok 5

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

No. Praktikan:

Kapasitas Produksi: 327 Unit Loko A/Bulan334 Unit Truk A/Bulan332 Unit Loko B/Bulan324 Unit Truk B/Bulan

Efisiensi Produksi: 91 %Persentase Lembur Pabrik: 15 %

A = Mutlak didekatkanE = Sangat Penting Didekatkan

I = Penting DekatO = Biasa - Biasa Saja

U = Tidak Penting Dekat

I6,8

U11,12,13,15

A U2,3 11,12,13,15

A U2,3 11,15

U O U13,14 13,15 11,15

I O5,6,8 13,15

O I O9 5,6,8 13,15

O I9 1,3,4,8

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Page 436: Lembar Kerja Kelompok 5

U O O15 9 15

O U8,9 11,12,13

O U I8 11,12 1,3,9

U I15 1,3,5,8,9,10

U O O15 13 13

U U15 15

O U O8 15 7,8,10

O O8 8,10

U O O13,15 8 8,10

U O15 8

O U O8,9 15 8

O U8,9 15

U O U13,14,15 8,9 14,15

U O13,14,15 8,9

I U O1,3,5,7,8 13,14,15 8,9

U U14,15 13,14,15

U O U14,15 7,8 13,14,15

O I8 6,8

O O I7,8 6,8 8

I O6,8 8

E O1,3,4,6,8 8

U15

O8

Page 437: Lembar Kerja Kelompok 5
Page 438: Lembar Kerja Kelompok 5

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

U11,15

U11,15

O I13,15 2,8

I U2,3,8 11,12,14

Page 439: Lembar Kerja Kelompok 5

O A U15 2,3 11,15

U O15 8

I U I1,3,9 15 2,8

I O1,3,9 6

O I O13 3,8,9,10 6

O I8,9 3,8,9,10

O O I7,8,10 8,9 3,8,9,10

O O7,8,10 8,9

O O U8,10 7,8,10 14,15

O U8,10 13,14

O U O8 13,14,15 8

O O8 8

U O O14,15 8 6

U I15 6,7,8

O U U8,9 15 15

O I8,9 6

U U13,14,15 13,14

U13,14,15

I8

Page 440: Lembar Kerja Kelompok 5

U11,13,14,15

U11,13,14,15

I U2,8 11,13,14,15

I O2,8 14

O I U6 2,8 15

I O1,4,6 8

U U I14 15 2,8

U I15 1,4,6

U U U15 11,12 15

U U11,14,15 15

I U5,8,10 15

U15

U15

Page 441: Lembar Kerja Kelompok 5

U15

U11,15

I U2,8 15

O13

U15

Page 442: Lembar Kerja Kelompok 5

ARC Fasilitas Penujang Administrasi

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

No. Praktikan:

Kapasitas Produksi:

Efisiensi Produksi:Persentase Lembur Pabrik:

Direktur

A

General Manager

1A3

I O

Sekretaris

3 2I1

O O

Manager PPIC

12 12O12

E O

Staff PPIC

1 12O12

U U

Manager Warehousing

12 12U12

E U

Staff Warehousing

1 12O12

U U

Page 443: Lembar Kerja Kelompok 5

Manager HRD

12 12U12

E U

Staff HRD

1 12O12

U U

Manager Accounting

12 12U12

E U

Staff Accounting

9 12O12

U U12 12

U12

E U1 12

O12

U U

Manager R & D

12 12U12

E U

Staff R & D

1 12O12

U U

Manager QC

12 12U12

E O

Staff QC

1 4O4

O O

Musholla

4 13O13

O O

Pantry

15 8O

Manager Purchasing & Marketing

Staff Purchasing & Marketing

Page 444: Lembar Kerja Kelompok 5

Pantry4

O O

Ruang Rapat

15 12O12

O O

Ruang Fotocopy

2 12O12

O U

Ruang Receiptionist

12 5O12

I U

Toilet Receiptionist Pria

5 12I5

A O5 11

U11

U U

Toilet Pria

11 11U11

A I

Toilet Wanita

5 12I6

I O

Ruang Cleaning Service

6 2O12

O

Ruang Perpustakaan

12

Toilet Receiptionist Wanita

Page 445: Lembar Kerja Kelompok 5

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

327 Unit Loko A/Bulan334 Unit Truk A/Bulan332 Unit Loko B/Bulan324 Unit Truk B/Bulan

91 %Persentase Lembur Pabrik: 15 %

O2

U12

O O12 2

I U1 12

O O O12 12 2

O I12 1

U O O12 12 12

O O12 12

U U O12 12 12

U O12 12

U U U

WED / 1A ⑫ F 072�WED / 1A ⑫ F 100�WED / 1A ⑫ F 102�

Page 446: Lembar Kerja Kelompok 5

12 12 12O U12 12

U U U12 12 12

U O12 12

U U U12 12 12

O U12 12

U U U12 12 12

U O12 12

U U U12 12 12

O U12 12

U U U12 12 12

U O12 12

U U U12 12 12

O U12 12

U U O12 12 4

U O12 4

U U O12 4 13

O U4 13

O 13 O4 8

O I13 8

O O O13 8 3

I O8 3

O O U8 3 12

O U

Page 447: Lembar Kerja Kelompok 5

3 12O O U12 12 15

O U12 15

O U U12 15 15

U U12 15

U U I5 12 5

U O5 5

U O O12 5 5

O O5 5

O O U11 5 15

O U11 15

U U O11 15 2

I O15 2

I O12 2

O2

O2

Page 448: Lembar Kerja Kelompok 5

ACTIVITY RELATIONSHIP CHARTPT. TAZOV

A = Mutlak didekatkanE = Sangat Penting Didekatkan

I = Penting DekatO = Biasa - Biasa Saja

U = Tidak Penting Dekat

U12

O2

I U1 12

O O12 2

O I U12 1 12

O O

Page 449: Lembar Kerja Kelompok 5

12 12O O I12 12 1

U O12 12

U O O12 12 12

U U12 12

O U O12 12 12

U U12 12

U O U12 12 12

U U12 12

O U O12 12 4

U O12 12

U O U12 4 4

O U4 13

O O I4 13 8

O O13 8

U I O13 8 3

O O8 3

I O O8 3 12

O O3 12

O O U3 12 15

U U12 15

U U U12 15 15

U U15 15

U U O

Page 450: Lembar Kerja Kelompok 5

15 15 5U O15 5

U O O15 5 5

O O5 5

O O U5 5 15

O U5 15

I U O5 15 2

U O15 2

U O15 2

O2

O2

Page 451: Lembar Kerja Kelompok 5

U12

O

Page 452: Lembar Kerja Kelompok 5

2I U1 12

O O12 2

O I U12 1 12

O O12 12

O O O12 12 4

U O12 4

U O O12 4 13

U O4 13

O U I4 13 8

U O13 8

U O O4 8 3

O O13 3

I O U8 8 12

O U3 3

O U U3 12 12

U U12 15

O U U12 15 15

U U15 15

U U O15 15 5

U O15 5

U O O15 5 5

O O5 5

O O U

Page 453: Lembar Kerja Kelompok 5

5 5 15O U5 15

O U O5 15 2

U O15 2

U O15 2

O2

O2

Page 454: Lembar Kerja Kelompok 5

U4

U13

U A13 8

A O8 12

I O U8 12 12

O O3 12

O O O3 12 15

U O12 15

U U O12 15 15

U U15 15

U U O15 15 5

U O15 5

U O O15 5 5

O O5 5

O O U5 5 15

O U5 15

O U O5 15 2

U O15 2

U O15 2

O

Page 455: Lembar Kerja Kelompok 5

2O2

Page 456: Lembar Kerja Kelompok 5

U12

U14

O U15 14

O O15 14

O I O15 5 14

O I5 5

O O U5 5 15

O U5 15

O O O5 15 2

U O15 2

U O15 2

O2

O2

Page 457: Lembar Kerja Kelompok 5

No1234567891011121314

Page 458: Lembar Kerja Kelompok 5

15

U15

O2

O2

Page 459: Lembar Kerja Kelompok 5

Alasan Mempermudah atasan untuk mengontrol pekerjaan staffnyaMempermudah proses pengecekan laporan produksiMempermudah atasan untuk mendapatkan data produksiMempermudah karyawan untuk beribadahMempermudah karyawan untuk mengambil wudhu / buang airMemudahkan OB / OG untuk membersihkan area toiletMemudahkan atasan untuk mengontrol proses produksiMemudahkan divisi-divisi yang ada untuk mengadakan rapat atau evaluasiMemudahkan atasan untuk mengontrol pemasukan dan pengeluaran perusahaanMemudahkan atasan untuk mengontrol stock barangTidak diperlukan karena sudah tersedia toilet resepsionisTidak ada hubungan yang kuat antar departemen / jabatanRuangan mudah berbau dan berasapTidak diperlukan karena sudah tersedia toilet didalam ruangan direktur

Page 460: Lembar Kerja Kelompok 5

Tidak disarankan karena ruangan kotor dan kurang kondusif