Higher Education Portfolio

download Higher Education Portfolio

of 28

  • date post

    14-Mar-2016
  • Category

    Documents

  • view

    215
  • download

    1

Embed Size (px)

description

Professional work from the past 4 years

Transcript of Higher Education Portfolio

  • KEEGAN CARMICHAELHIGHER EDUCATION WORK

  • PROFESSIONAL EXPERIENCECANNON DESIGNBOSTON, MA APRIL 2011 JUNE 2012ARCHITECTURAL DESIGNERPROJECTS WORKED FROM DESIGN DEVELOPMENT THROUGH CONSTRUCTION DOCUMENTS INCLUDE: MHCP WAYPOINT CENTER IN PENETANGUISHENE, ONTARIO LANSDOWNE ATHLETIC STADIUM IN OTTAWA, ONTARIO NEW RESIDENCE, BATES COLLEGE, MAINE BENINCASA AND KOLASA HALL REDESIGN IN MIAMI, FLORIDA SOUTH SHORE HOSPITAL EXPANSION, MASSACHUSETTS

    SKILLSREVIT, AUTOCAD 2D & 3D, RHINO, SKETCHUP, 3D STUDIO MAX, ADOBE INDESIGN, PHOTOSHOP, ILLUSTRATOR, BRIDGE, ACROBAT, POWERPOINT, WORD, EXCEL

    ASSOCIATIONSBSA MEMBERNCARB IDP IN PROCESS

    EDUCATIONBOSTON ARCHITECTURAL COLLEGE

    BOSTON, MABACHELOR OF ARCHITECTURE

    2012

    ALTERNATE EDUCATIONARCOSANTI

    PHOENIX, AZPAOLO SOLERI WORK SHOP

    JULY 2009

    PUBLICATIONS / AWARDSBOSTON ARCHITECTURAL COLLEGE

    MAY 2012GREEN ARCHITECTURE DEGREE PROJECT

    STUDIO AWARDWINNER

    MAY 2012 UNDERGRADUATE THESIS

    COMMENDS

    DECEMBER 2011ADELINE GRAVES SKETCH PRIZE

    WINNER

    ARCHITECTURAL RECORDAUGUST 2010

    ANNUAL NAPKIN SKETCH COMPETITIONFIRST RUNNER UP

    BOSTON ARCHITECTURAL COLLEGEFALL 2010

    HERBERT GLASSMAN PRACTICE AWARDWINNER

    NEW HAMPSHIRE COMMUNITY TECHNICAL COLLEGE

    PORTSMOUTH, NHDRAFTING CERTIFICATE

    2006

    KALLMANN MCKINNELL AND WOOD ARCHITECTSBOSTON, MA SEPTEMBER 2007 APRIL 2011LEVEL 1 ARCHITECTDRAFTING REVIT & CAD, CONSTRUCTION ADMINISTRATION ANSWERING RFIS, COMMUNICATING WITH CONSULTANTS, REDLINES, CREATING PHYSICAL MODELS STUDY AND FINAL, RENDERINGS, GRAPHICAL COMMUNICATION AND MARKETING PRODUCTION.PROJECTS INCLUDE: UKRAINIAN CATHOLIC UNIVERSITY; NEW STRYISKY PARK CAMPUS, CHURCH, RESIDENCE AND REFECTORY GEORGETOWN UNIVERSITY LAUINGER LIBRARY MASTER PLAN UNIVERSITY OF WYOMING, COLLEGE OF BUSINESS BRANDEIS UNIVERSITY, MANDEL CENTER FOR THE HUMANITIES THE OHIO STATE UNIVERSITY,MAX FISHER COLLEGE OF BUSINESS RENOVATION CHRISTOPHER S. BOND, UNITED STATES COURTHOUSE, JEFFERSON CITY, MO

    PETERSON GRIFFIN ARCHITECTSWALTHAM, MA MARCH 2007ARCHITECTURAL INTERNRESPONSIBILITIES INCLUDE: DRAFTING, SKETCH UP MODELS, RED LINES AND FLOOR PLANS

    KEEGAN CARMICHAEL38 SAVOY STREETPORTLAND, ME 04103603 8288784KEEGANJCARMICHAELGMAIL.COM

    RESUME

  • CONTENTS

    PROFESSIONAL WORK: LANSDOWNE ATHLETIC STADIUM WHILE AT CANNON DESIGN

    GEORGETOWN UNIVERSITY LAUINGER LIBRARY WHILE AT KALLMANN MCKINNEL & WOOD

    UCU NEW STRYJSKI PARK CAMPUS WHILE AT KALLMANN MCKINNEL & WOOD

    UCU NEW STRYJSKI PARK CAMPUS RESIDENCE WHILE AT KALLMANN MCKINNEL & WOOD

    UCU NEW STRYJSKI PARK CAMPUS MULTIPURPOSE REFECTORY WHILE AT KALLMANN MCKINNEL & WOOD

    4-13

    14-17

    18-19

    20-23

    24-27

  • PROFESSIONAL WORK CANNON DESIGNLANDSDOWNE ATHLETIC STADIUM

    THE PROJECT IS LOCATED IN OTTAWA, ONTARIO ALONG THE FAMOUS RIDEAU CANAL. THE SCOPE WAS FOR A COMPLETE REVAMP OF LANDSDOWNE PARK AND THE PROJECT WILL BE THE SUMMER OF 2012.

    THE ATHLETIC FACILITY HOUSED A CFL FIELD CANADIAN FOOTBALL LEAGUE WITH AN EXISTING NORTHERN STADIUM. OTTAWA IS SCHEDULED TO HOST THE 2012 WOMENS WORLD CUP AND IN ORDER TO BETTER ACCOMMODATE THIS EVENT, A SOUTHERN STADIUM WAS DESIGNED.

    THE NEW SOUTHERN STADIUM HAS A VEIL DRAPING OVER TO REDUCE THE AMOUNT OF LIGHT PROJECTED ON THE FIELD. ONE OF THE DESIGN CONSTRAINTS OF THE NEW STADIUM WAS THAT IT COULD NOT IMPEDE THE EXISTING PEDESTRIAN PATHS ALONG THE RIDEAU CANAL. CANNON WORKED VIGOROUSLY TO DESIGN THE NEW STRUCTURE TO INCORPORATE PART OF THE CONCOURSE AND OPEN THE EXISTING CANAL PATHS TO PROMOTE MORE USER INTERACTION WHEN THERE WAS NO SCHEDULED STADIUM EVENT.

    SITE PLAN

    USERS INTERACTING WITH VEIL STRUCTURE

    FIELD SECTION OF SOUTHERN STADIUM

    RIDEA

    U CAN

    AL

    40

  • PLAN OF SOUTHERN STADIUM WITH VEIL

    AERIAL VIEW OF LANSDOWNE PARK

    41

  • PROFESSIONAL WORK CANNON DESIGNLANDSDOWNE ATHLETIC STADIUM

    THE VEIL IS SUPPORTED VERTICALLY BY STEEL COLUMNS PROJECT FROM FOUNDATION THROUGH THE CONCOURSES. THESE SUPPORTS WERE REFERRED TO AS PALMS ONCE THEY PENETRATED THROUGH THE ROOF BECAUSE THEY ABSTRACTLY LOOK LIKE HANDS HOLDING UP AN OBJECT. THE VEIL ALSO NEEDED TO BE TIED INTO THE STADIUM TO PREVENT HORIZONTAL SHIFTING FROM WIND LOADS.

    THE VEIL SPINES & INTEGRATED SHADES ARE COMPOSED OF LAMINATED WOOD WHICH GIVES MORE OF A NATURAL PRESENCE TO THE ORGANIC FORM. THE SPACING OF THE SUN SHADES ALLOW HORIZONTAL VIEWS OUT, BUT RESTRICTS THE SUMMER SUN ON THE STADIUM.

    LAMINATED WOOD VEIL SPINE DETAIL

    PLAN DETAIL OF PALM SUPPORT

    VEIL & LOWER CONCOURSE RENDERING

    42

  • PALM DETAIL THROUGH CONCRETE PALM DETAIL THROUGH ROOFING

    HORIZONTAL BRACING OF VEIL SUPPORT

    TRANSVERSE BUILDING SECTION

    MEDIA BOX

    VEIL STRUCTURE`

    UPPER CONCOURSE

    SUITE LEVEL

    MAIN CONCOURSE

    LOWER CONCOURSE

    43

  • PROFESSIONAL WORK CANNON DESIGNLANDSDOWNE ATHLETIC STADIUM

    THE STADIUM ITSELF IS COMPOSED OF CASTINPLACE CONCRETE, STANDARD CFMS STUDS, AND CORRUGATED METAL SIDING TO BREAK UP THE SHADE ON THE FACADE.

    WITH THE EXCEPTION OF THE SUITE LEVEL AND MEDIA BOX, THE CONCOURSE AND GRANDSTAND SEATING IS EXPOSED TO THE ELEMENTS. THUS THE MAJORITY OF THE BUILDING USE WILL BE DURING THE SUMMER MONTHS.

    UPPER CONCOURSE RAILING DETAIL

    MEDIA BOX/UPPER CONCOURSE DETAIL

    STEPPED PARAPET DETAIL

    44

  • AXON DETAIL OF PARAPET CORNER CONNECTIONWALL SECTION

    VIEW OF STANDS FROM MAIN CONCOURSE

    45

  • PROFESSIONAL WORK CANNON DESIGNLANDSDOWNE ATHLETIC STADIUM

    VEIL /STADIUM CONNECTION

    EXTERIOR STAIR STADIUM RENDERING

    EXTERIOR STAIR SECTION

    ON EITHER SIDE OF THE VEIL LIES THE EXTERIOR EGRESS STAIRS, OF WHICH CONTAIN MECHANICAL LOUVERS. THE MAJORITY OF THE VERTICAL CIRCULATION IS THROUGH THESE MEANS OF EGRESS, AND ELEVATORS ARE IN PLACE TO ACCOMMODATE ADA NEEDS.

    46

  • PLAN OF EXTERIOR STAIR

    NIGHT RENDERING OF SOUTH STADIUM

    47

  • PROFESSIONAL WORK KALLMANN MCKINNEL & WOODGEORGETOWN UNIVERSITY LAUINGER LIBRARY

    46

    A STUDY WAS DONE FOR GEORGETOWN UNIVERSITY IN ORDER TO UPDATE THE LAUINGER LIBRARY MASTER PLAN FOR FUTURE EXPANSION. TO KEEP UP WITH THE GROWING UNIVERSITY POPULATION THE LIBRARY NEEDED TO EVOLVE IN ORDER TO BETTER SERVE STUDENTS AND FACULTY.

    THIS STUDY WOULD EXPAND THE LIBRARY INTO THE EXISTING SOUTHERN PARKING LOT. THE FULL BUILD OUT WOULD CREATE A GRAND READING ROOM, INCREASE STUDY SPACES, FACULTY AREAS, AND CAFE EXPANSION.

    THE LIBRARY WAS THEN EXTRUDED, WHICH PROMOTED A THROUGHWAY WITH THE CAMPUS AND THE POTOMAC RIVER. SITE PLAN

    EXISTING LIBRARY CIRCULATION

    PROPOSED LIBRARY CIRCULATION

  • 47

    EXISTING LIBRARY ELEVATION

    EXISTING ENTRY LEVEL

    PROPOSED ENTRY LEVEL

    PROPOSED LIBRARY ELEVATION

  • PROFESSIONAL WORK KALLMANN MCKINNEL & WOODGEORGETOWN UNIVERSITY LAUINGER LIBRARY

    46

    PROPOSED LIBRARY BUILD OUT

    PROPOSED SOUTH ELEVATION

    EXITING SOUTH ELEVATION

  • 47

    PROPOSED READING ROOM SOUTH

    PROPOSED MAIN ENTRANCE

    PROPOSED READING ROOM EAST

  • PROFESSIONAL WORK KALLMANN MCKINNEL & WOODUCU NEW STRYJSKI PARK CAMPUS

    IN 2009 THE UKRAINIAN CATHOLIC UNIVERSITY UCU APPROACHED KMW ABOUT DESIGNING A NEW CAMPUS IN LVIV. THIS WAS A MULTI PHASE PROJECT INITIATED WITH THREE NEW BUILDINGS; A RESIDENCE, REFECTORY AND CAMPUS CHURCH. A LIBRARY AND ACADEMIC BUILDING WERE TO FOLLOW PENDING COMPLETION OF DESIGN DEVELOPMENT AND CLIENT APPROVAL.

    THE UKRAINE HAS A LARGE DEPENDENCE ON NATURAL GAS FROM RUSSIA, THE UNIVERSITY ASKED KMW TO PURSUE ALTERNATIVE ENERGY SOURCES IN AN ATTEMPT TO BECOME MORE INDEPENDENT. HYDROPOWER IS CURRENTLY THE LEADING SOURCE OF RENEWABLE ENERGY, BUT GIVEN THE LOCATION OF THE CAMPUS, SOLAR AND WIND OPTIONS WERE EXPLORED.

    INITIAL MASTER PLAN CAMPUS SKETCH

  • SITE AT CITY SCALE

    NEW CAMPUS PLAN

    PHASE 1 CAMPUS RENDERING

  • PROFESSIONAL WORK KALLMANN MCKINNEL & WOODUCU NEW STRYJSKI PARK CAMPUS RESIDENCE

    THE RESIDENCE WAS DESIGNED TO HOUSE BOTH STUDENTS AND FACULTY FOR THE EARLY STAGES OF THE NEW CAMPUS. FOR THIS REASON MULTIPLE ROOM TYPES WERE CREATED FOR FUTURE ORGANIZATION AND RENOVATIONS. FOR THIS REASON STUDENT ROOMS WERE RESTRICTED TO THE SECOND THROUGH FORTH LEVELS, AND THE FACULTY ROOMS WOULD RESIDE ON THE FIFTH FLOOR.

    A CHAPEL WAS DESIGNED ON THE FIFTH FLOOR AS IT WOULD OVERLOOK THE FUTURE CHURCH. THIS WAS AS ISSUE BECAUSE IT WOULD REQUIRE AN ASSEMBLY AREA THAT MIGHT INTERFERE WITH EGRESS, AS WELL AS REQUIRE AN ADEQUATE AMOUNT OF NATURAL LIGHT.

    LOWER LEVEL GROUND LEVEL

  • 2ND LEVEL 3RD & 4TH LEVEL 5TH LEVEL

  • PROFESSIONAL WORK KALLMANN MCKINNEL & WOODUCU NEW STRYJSKI PARK CAMPUS RESIDENCE

    RENDERING OF TWO BED SUITE

  • PROFESSIONAL WORK KALLMANN MCKINNEL & WOODUCU NEW STRYJSKI PARK CAMPUS MULTIPURPOSE REFECTORY

    THE REFECTORY BUILDING WAS MEANT TO BE THE WORKHORSE OF THE CAMPUS. IN ORDER TO ACHIEVE THIS MODULAR SEATING WAS DESIGNED FOR THE GROUND FLOOR, BECAUSE IT WAS TO BE USED FOR A CAFETERIA AS WELL AS A LECTURE HALL.

    FOOD SERVICE DELIVERY WOULD BE ACCESSED IN THE REAR OF THE BUILDING, CLASSROOMS ON THE SECOND WITH OFFICES AND ADMINISTRATIVE SPACES ON THE THIRD FLOOR. THE NEXT PHASE WOULD EVOLVE A LIBRARY AND ACADEMIC BUILDING, AT WHICH POINT THE CLASSROOMS WILL BE CONVERTED INTO OFFICES AND MEETING ROOMS.

  • PROFESSIONAL WORK KALLMANN MCKINNEL & WOODUCU NEW STRYJSKI PARK CAMPUS MULTIPURPOSE REFECTORY

    CAFETERIA VIEW OUT

    CAFETERIA VIEW IN

    IN AN EFFORT TO IMPLEMENT