HES-HKS meeting

8
HES-HKS meeting 2009/2/2 4 T.Gogami

description

HES-HKS meeting. 2009/2/24 T.Gogami. EHODO timing resolution. Run54. Run54(last week)  Run56 difference Change HV With Slewing correction Run54 164[ ps ](last week). ADC. Run56. Setup of Run56. EHODO timing resolution(Run56). With Slewing correction. 2 ch. 1ch. 3 ch. - PowerPoint PPT Presentation

Transcript of HES-HKS meeting

Page 1: HES-HKS meeting

HES-HKS meeting

2009/2/24T.Gogami

Page 2: HES-HKS meeting

EHODO timing resolution

Run54(last week)Run56 difference  Change HV

With Slewing correction  Run54164[ps](last week) ADC

Setup of Run56

Run54

Run56

Page 3: HES-HKS meeting

EHODO timing resolution(Run56)

With Slewing correction

ADC vs TOF TOF

σ=161[ps]

1ch 2ch

3ch 4ch

Page 4: HES-HKS meeting

Former EHODO timing resolution(Run65)

With Slewing correction

EHODO(used in previous experiment)

ADC vs TOF TOF

σ=171[ps]

1ch

4ch3ch

2ch

Page 5: HES-HKS meeting

Cut coercively ADC 1chThen, TOF σ=150[ps]

Cut coercively

EHODO timing resolution(Run56)

1ch

3ch 4ch

2ch

If the slewing correction could be more better, TOF sigma~=150[ps].

Page 6: HES-HKS meeting

UV curing glue

UV curing glueHas not arrived…

So I tried to bond PMT and scintillator(HTOF2Y) using the glue used Hampton group.

Mission failed ..(Exp. date 20Jan2009)

Page 7: HES-HKS meeting

summary

EHODOTiming resolution TOF sigma~=160[ps](sigma~=150[ps] )

UV curing glueIt has not arrived.I can’t work on assembling of EHODO & HTOF1Y.

To do・ EDC・ Check assembled EHODO’s PMTs・ Taking data of EHODO, WC

Page 8: HES-HKS meeting

End