Grouting and Anchoring an 1880’s Masonry Dam

26
Grouting and Anchoring an 1880’s Masonry Dam Jesse Wullenwaber, PE Project Engineer Schnabel Engineering 9/25/2015

Transcript of Grouting and Anchoring an 1880’s Masonry Dam

Page 1: Grouting and Anchoring an 1880’s Masonry Dam

Grouting and Anchoring an 1880’s Masonry Dam

Jesse Wullenwaber, PE

Project Engineer

Schnabel Engineering9/25/2015

Page 2: Grouting and Anchoring an 1880’s Masonry Dam

Presentation Overview

History

Design

Construction

Challenges and Takeaways

Page 3: Grouting and Anchoring an 1880’s Masonry Dam
Page 4: Grouting and Anchoring an 1880’s Masonry Dam
Page 5: Grouting and Anchoring an 1880’s Masonry Dam
Page 6: Grouting and Anchoring an 1880’s Masonry Dam
Page 7: Grouting and Anchoring an 1880’s Masonry Dam

Background

� Deficiencies� Spillway Capacity

� Stability

� Alternatives� Anchor

� Buttress

Page 8: Grouting and Anchoring an 1880’s Masonry Dam

Background

� Exploration� Traditional coring

� Piezometers

� Geology

Page 9: Grouting and Anchoring an 1880’s Masonry Dam

Grout rubble masonry

Dowel masonry units together

Anchor dam

Design

Stabilize for PMF Overtopping

Page 10: Grouting and Anchoring an 1880’s Masonry Dam

Design

� Pressure grout rubble fill� MMG and HMG

� Balanced / stable grouts

� Real time monitoring

� Primarily ascending stage

Page 11: Grouting and Anchoring an 1880’s Masonry Dam

Design

� Grout rubble fill

� Dowel masonry

Page 12: Grouting and Anchoring an 1880’s Masonry Dam

Design

� Grout rubble fill

� Dowel masonry

� PT anchor dam

Page 13: Grouting and Anchoring an 1880’s Masonry Dam

Parapet Dowels

Page 14: Grouting and Anchoring an 1880’s Masonry Dam

Crest Excavation

Page 15: Grouting and Anchoring an 1880’s Masonry Dam

Grouting

Page 16: Grouting and Anchoring an 1880’s Masonry Dam

Grouting Evaluation

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

UpstreamTertiary

Downstream

3.2

0.4

2.5

1.01.2

Av

era

ge

Ta

ke (

cf/f

t)Grout Take Comparison

Primary

Secondary

Page 17: Grouting and Anchoring an 1880’s Masonry Dam

Grouting Evaluation

Page 18: Grouting and Anchoring an 1880’s Masonry Dam

Masonry Dowels

Page 19: Grouting and Anchoring an 1880’s Masonry Dam

PT Anchors

Page 20: Grouting and Anchoring an 1880’s Masonry Dam

Drilling Challenges

Page 21: Grouting and Anchoring an 1880’s Masonry Dam

Drilling Challenges

Uphole Velocity

Page 22: Grouting and Anchoring an 1880’s Masonry Dam

Uphole Velocity

UHV (m/min) = 1274xFlush Rate (liters/min) Ref 1

D2 – d2 (mm)

Slip VelocityStokes law w/ drag force, stagnant fluid

νsl = ds2g(ρs-ρf) / (18µ) Ref 2

Turbulent slip velocity

Ref 2

1. Grouting Fundamentals and Current Practice, Basics of Drilling, presented by Dr. Donald

Bruce, June 2012

2. http://petrowiki.org/Cuttings_transport

Drilling Challenges

Cuttings Removal

Page 23: Grouting and Anchoring an 1880’s Masonry Dam

Drilling Challenges

Page 24: Grouting and Anchoring an 1880’s Masonry Dam

Drilling Challenges

Page 25: Grouting and Anchoring an 1880’s Masonry Dam

Drilling / Grouting Challenges

� Exploration � Coring ≠ Drilling

� Test drilling methods

� Drilling� Water Loss

� Caving

� Cutting removal

� Dam disturbance

� Grouting� MMG/HMG

� Pressure

Page 26: Grouting and Anchoring an 1880’s Masonry Dam

Thank You